EP0447438A1 - Elektrisch beheizter wärmespeicherkessel. - Google Patents
Elektrisch beheizter wärmespeicherkessel.Info
- Publication number
- EP0447438A1 EP0447438A1 EP90900240A EP90900240A EP0447438A1 EP 0447438 A1 EP0447438 A1 EP 0447438A1 EP 90900240 A EP90900240 A EP 90900240A EP 90900240 A EP90900240 A EP 90900240A EP 0447438 A1 EP0447438 A1 EP 0447438A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- bricks
- boiler
- tube
- header tank
- boiling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005338 heat storage Methods 0.000 title description 2
- 239000011449 brick Substances 0.000 claims abstract description 113
- 238000010438 heat treatment Methods 0.000 claims abstract description 69
- 238000009835 boiling Methods 0.000 claims description 65
- 238000009413 insulation Methods 0.000 claims description 43
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 34
- 239000012530 fluid Substances 0.000 claims description 12
- 239000007788 liquid Substances 0.000 claims description 12
- 239000000203 mixture Substances 0.000 claims description 11
- 239000000463 material Substances 0.000 claims description 9
- SZVJSHCCFOBDDC-UHFFFAOYSA-N iron(II,III) oxide Inorganic materials O=[Fe]O[Fe]O[Fe]=O SZVJSHCCFOBDDC-UHFFFAOYSA-N 0.000 claims description 8
- 239000001095 magnesium carbonate Substances 0.000 claims description 8
- ZLNQQNXFFQJAID-UHFFFAOYSA-L magnesium carbonate Chemical compound [Mg+2].[O-]C([O-])=O ZLNQQNXFFQJAID-UHFFFAOYSA-L 0.000 claims description 8
- 229910000021 magnesium carbonate Inorganic materials 0.000 claims description 8
- 235000014380 magnesium carbonate Nutrition 0.000 claims description 8
- 238000009833 condensation Methods 0.000 claims description 5
- 230000005494 condensation Effects 0.000 claims description 5
- 238000009434 installation Methods 0.000 claims description 5
- 229910052751 metal Inorganic materials 0.000 claims description 5
- 239000002184 metal Substances 0.000 claims description 5
- 238000013022 venting Methods 0.000 claims description 5
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims description 3
- 229910052802 copper Inorganic materials 0.000 claims description 3
- 239000010949 copper Substances 0.000 claims description 3
- 239000004033 plastic Substances 0.000 claims description 3
- 229920003023 plastic Polymers 0.000 claims description 3
- 238000001704 evaporation Methods 0.000 description 5
- 230000008020 evaporation Effects 0.000 description 5
- 229910001220 stainless steel Inorganic materials 0.000 description 4
- 239000010935 stainless steel Substances 0.000 description 4
- 230000000630 rising effect Effects 0.000 description 3
- 238000012546 transfer Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000013011 mating Effects 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 239000004449 solid propellant Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005299 abrasion Methods 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 239000000378 calcium silicate Substances 0.000 description 1
- 229910052918 calcium silicate Inorganic materials 0.000 description 1
- OYACROKNLOSFPA-UHFFFAOYSA-N calcium;dioxido(oxo)silane Chemical compound [Ca+2].[O-][Si]([O-])=O OYACROKNLOSFPA-UHFFFAOYSA-N 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000011010 flushing procedure Methods 0.000 description 1
- 239000008236 heating water Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000009428 plumbing Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000001960 triggered effect Effects 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
- F24H7/00—Storage heaters, i.e. heaters in which the energy is stored as heat in masses for subsequent release
- F24H7/02—Storage heaters, i.e. heaters in which the energy is stored as heat in masses for subsequent release the released heat being conveyed to a transfer fluid
- F24H7/04—Storage heaters, i.e. heaters in which the energy is stored as heat in masses for subsequent release the released heat being conveyed to a transfer fluid with forced circulation of the transfer fluid
- F24H7/0408—Storage heaters, i.e. heaters in which the energy is stored as heat in masses for subsequent release the released heat being conveyed to a transfer fluid with forced circulation of the transfer fluid using electrical energy supply
- F24H7/0433—Storage heaters, i.e. heaters in which the energy is stored as heat in masses for subsequent release the released heat being conveyed to a transfer fluid with forced circulation of the transfer fluid using electrical energy supply the transfer medium being water
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B1/00—Methods of steam generation characterised by form of heating method
- F22B1/02—Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers
- F22B1/028—Steam generation using heat accumulators
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B1/00—Methods of steam generation characterised by form of heating method
- F22B1/28—Methods of steam generation characterised by form of heating method in boilers heated electrically
- F22B1/282—Methods of steam generation characterised by form of heating method in boilers heated electrically with water or steam circulating in tubes or ducts
Definitions
- the invention relates to boilers in which water is heated by electricity, through the medium of a core of material capable of storing heat, the core being heated by electrically powered heating elements and heat from the core being transferred to a secondary circuit in which a fluid, commonly water, is circulated, as in the case of a domestic central heating or hot water system. It is envisaged that such electrically heated boilers be used in place of gas, oil or solid fuel boilers which also heat fluid secondary circuit in a way which is familiar.
- Electric boilers which include a core and elements as referred to above, and in which transfer of heat from the core to the secondary circuit is achieved using air as the heat transfer medium. Thus air is heated by the core and the heated air passes over a heat exchanger through which water in the secondary circuit passes.
- a more recent approach to an electric storage boiler is to utilise steam as the medium for transferring heat from the store to the secondary circuit.
- the general arrangement which has been proposed has a core of material capable of storing heat, electrically heated element means in the core, a primary heating circuit, in which water is supplied to the base of boiling tubes which pass steam upwards through the core to a heat exchanger, from which condensed water is returned to the base of the boiling tubes, losses being made up from a header tank or similar arrangement, and a secondary heating circuit portion which passes through the heat exchanger and which is connected, in use, to a secondary heating circuit in a conventional way, the secondary heating circuit including radiators and/or a coil for heating water in a domestic hot water cylinder.
- an electric boiler will be referred to hereinafter as "an electric boiler of the kind described", and is envisaged as a substitute for a gas, oil or solid fuel boiler.
- a practical problem with electric boilers of the kind described is arranging for manageable installation and servicing, for example replacement of heating elements which may fail from time to time.
- a substantial weight of heat storing bricks is necessary and it is desirable to be able to install and service the boiler from a single direction, preferably from the front so that the boiler can be placed, if desired, under a working surface.
- an electric boiler of the kind described comprising a plurality of' boiling tubes extending substantially vertically, the core consisting of a multiplicity of heat storing bricks, and an insulated casing surrounding the core, the casing having an openable front face to allow installation of the core and access thereto, bricks which lie, in use, against the boiling tubes having side face profiles formed to provide channels for accepting part of a boiling tubes whereby a combination of such bricks surrounds a length of boiling tubes, the width of said bricks being such that, when the boiling tubes are surrounded by a course of said bricks lying adjacent the boiling tubes, space when viewed from the front is provided between the bricks and the casing, and between the bricks surrounding adjacent boiling tubes whereby that space can be filled by sliding further bricks in a front to back direction with respect to the boiler.
- the bricks in an assembled core preferably define channels extending from front to rear of the boiler, the heating elements being elongate and located in the core by sliding into the channels from the front of the core.
- Each element is preferably U-shaped.
- the cross- sectional profile of the element channels and the cross- section of the heating elements are preferably such that contact is achieved between a portion of the external surface of each element and the adjacent bricks.
- the bricks which lie against the boiling tubes may be of a different profile from the further bricks.
- the further bricks preferably have planar faces, and each brick which lies against the boiling tubes preferably includes not only the boiling tube portion accepting channel but groove means extending, in use, in a direction from front to back of the core, which groove means defining with a planar face of a further brick at least one channel for accepting an element.
- Each groove means preferably has two parallel grooves such that each pair of bricks which includes a further brick defines two element channels.
- the core preferably comprises a plurality of brick and boiling tube units, each unit comprising a length of boiling tube, a pair of bricks lying against and surrounding, between them, the length of boiling tube, and a pair of further bricks, each lying outside and against a respective one of the boiling tube contacting bricks to define at least one element channel on each side of the boiling tube.
- a preferred embodiment envisages a boiler tube to be three brick courses high, and with four boiling tubes, a total of forty-eight bricks. With such a height, a boiler with two boiling tubes would have twenty-four bricks, and a boiler with six boiling tubes would have seventy-two bricks.
- the insulated casing preferably has a front insulation layer including slots through which the elements pase whereby contacts for connecting each element to an electrical supply lie on the side of the insulation remote from the core, in use.
- Metal sheets for example of stainless steel, may be placed within and to cover the inner surfaces of the insulation on the side walls, base and top of the casing.
- a further metal sheet again of stainless steel for example, may be placed in a vertical plane adjacent walls of the further bricks.
- composition of the bricks lying between elements may be magnetite and the composition of bricks between an element and a boiling tube may be a mixture of magnetiteand magnesite.
- the proportion of magnetite to magnesite may be varied from boiler to boiler to achieve particular storage and heat release characteristics.
- an electric boiler of the kind described comprising a capillary tube connection between the heat exchanger and the header tank in the primary heating circuit, which capillary tube connection includes a non-return valve such that fluid, for example air or steam, can pass from the heat exchanger to the header tank, but not in the reverse direction.
- an electric boiler of the kind described comprising a return pipe connected to the primary heating circuit and extending above the water level in the header tank, means for closing the pipe supplying fluid from the header tank and means for preventing release of pressure from the heat exchanger, wherein the condensing fluid in the primary heating circuit may be driven out of the return pipe and into the header tank when the secondary heating system is turned off.
- the header tank is preferably made of a plastics material to allow a degree of distortion in the walls of the tank.
- the heat exchanger is manufactured from copper and is angled slightly to improve drainage therefrom down the drain pipe. This arrangement improves the efficiency of removal of the condensed water from the primary circuit into the header tank when the secondary circuit is turned off, and also the efficiency of the primary heating circuit when heating the secondary circuit.
- a header tank for an electric boiler of the kind described which header tank is a closed vessel including vent means for venting the vessel to atmosphere, the vent means comprising a tube extending from the vessel and into a fluid condensing and retaining container, the arrangement being such that as liquid is drawn, in use, from the header tank into the primary heating circuit, condensate from the condensing and retaining container is drawn into the header tank via said tube.
- the bore of thetube is preferably in the range 1mm to 5mm, and is preferably of 3mm.
- the condensing and retaining container is preferably a tube of larger bore than the tube extending from the header tank.
- the bore of the larger tube may be in the range 5mm to 10mm, preferably 8mm.
- the smaller bore tube preferably has a length toward its end away from the header tank extending substantially vertically within a section of the larger bore tube.
- Both free ends of the larger tube preferably lie above the opening of the smaller bore tube within the larger bore tube.
- the smaller bore tube preferably opens within the larger bore tube at or adjacent the lowest point of the larger bore tube.
- the larger bore tube preferably includes at least one section having bends therein to add length to the condensation path for vapour from the larger bore tube.
- the larger bore tube preferably lies in one plane, the plane thereof preferably lying parallel to the back of the boiler, in use.
- the invention further provides an electric boiler of the kind described comprising a header tank according to the invention.
- an electric boiler according to the invention will now be described with reference to the accompanying drawings, in whic :-
- Figure 1 is a schematic illustration of the pipework layout of a boiler
- Figure 2 is a plan view of a course of core bricks in the boiler of Figure 1 having four boiling tubes;
- Figure 3 is a sectional view along the lines X-X in Figure 2, and showing one element in position for the sake of example;
- Figure 4 is an exploded view of the course of bricks of Figures 2 and 3;
- Figure 5 is a side view of a heating element
- Figure 6 is a plan view of the heating element of Figure 5;
- Figure 7 is a plan view of side, front and rear insulation of the casing
- Figure 8 is a front view of insulation of the casing, but without base and front insulation
- Figure 9 is a side view of top, front and rear insulation
- Figure 10 is a plan view of base insulation
- Figure 11 is an end view of the base insulation of Figure 10 ;
- Figure 12 is a view of a header tank and condensing vent as Incorporated in another boiler according to the invention ;
- Figure 13 is a schematic illustration of an alternative pipework layout for a boiler according to the invention.
- FIG 1 shows a schematic layout of pipework " in an electric boiler 10 according to the invention.
- a primary heating circuit has four boiling tubes 11 surrounded in an assembled boiler by a core of heat storing bricks (not shown in Figure 1).
- Vaporizable liquid preferably demineralised water
- Water in the boiling tubes is turned to steam by heat in the core, the steam rising from the boiling tubes to a heat exchanger 13 through which liquid in a secondary heating circuit 14 flows.
- Steam from the boiling tubes condenses in the heat exchanger 13 while giving up its heat to the secondary circuit 14, condensed steam returning via pipe 15 and motorised valve 16 to the pipes 12.
- the motorised valve 16 is opened to allow the primary heating circuit to operate if there is a demand for heat from the secondary heating circuit 1 .
- the motorised valve 16 can be controlled, for example, by a room thermostat or other suitable means to indicate a need for heat.
- a header tank 17 having a capacity approximately twice that of the primary heating circuit is able to feed liquid via the motorised valve ' 16 to the pipes 12.
- Non-return valve 18 is provided to allow water to return to the header tank 17 when heat is not required from the boiler and the motorised valve 16 is therefore closed.
- a drain cock 20 is provided to allow the header tank 17 to be drained.
- a flow heater 23 is provided in the secondary heating circuit to provide direct heating in the secondary heating circuit if necessary.
- a control system provides apportionment of heat supplied to the secondary heating circuit from the flow heater 23 or the heat exchanger 13. The presence of the flow heater 23 and the control system therefore is the subject of a co-pending Patent application of today's date.
- Figure12 shows the header tank 17 in isolation.
- Venting takes place via a tube coupling130 to which is connected a small bore tube131.
- a preferred bore for the tube131 is 3mm but it will be appreciatedthat other small bore tubes may be used, typically in the range 1mm to 5mm although other bores may be appropriate in certain circumstances.
- the tube 131 runs horizontally in an upper portion and bends downwards at point 132. In an assembled boiler, the tube 131 would exit from the boiler casing on the header tank side of the bend132. From the bend132, the tube 131 extends downwards and into a larger bore tube133, in this embodiment of 8mm bore.
- the larger bore tube could be of a different bore from 8mm, for example within the range 5mm to 10mm although other bores could be used.
- the tube 131 extends to the lowest point of the larger bore tube133, the larger bore tube133 then rising in a S configuration to an outlet134. In this way, there is a long condensation path for vapour trying to leave the tube 133, condensed vapour forming a liquid pool rising from the lowest point of the tube133.
- the advantage of this embodiment of a header tank according to the invention is that evaporation losses from the header tank are minimised, thereby reducing the frequency at which the header tank must be refilled.
- Figure 2 shows a plan view of a core of bricks surrounding the four boiling tubes 11.
- Figure 2 shows one course of heat storing bricks and, in the embodiment shown, there are sixteen bricks in each course, there being three courses of bricks in all making forty-eight bricks in the entire core.
- Figure 3 being a section along the lines X-X in Figure 2 and Figure 4 being an exploded view of the bricks, two different shapes of brick are used.
- the boiling tubes are arranged bricks 30 of a first shape having semi-circular section, vertical channels 31 formed therein such that two bricks 30 are able to surround a single boiling tube 11. Additionally, the shaped bricks 30 includes horizontal channels 31 which define with plain, cuboidal bricks 35 heating element channels 36. Into which elongate sheathed heating elements 40 can be slid. One such element 40 is shown in a channel 36 in Figure 3.
- a heating element 40 is shown in more detail in Figures 5 and 6, the element 40 being of the sheathed type and being of elongate ⁇ -shape. As can be seen in Figure 3, the dimensions of the element channel 36 are such that the sheath of the element makes physical contact with curves of the channel 36 to provide enhanced heat transfer from the element to adjacent bricks. Legs of the U-shape element 40 are held together remote from the base of the U-shape by a mounting plate 41. In assembling a boiler 10, each heating element 40 is slid into a respective heating element channel 36 in the core, having first passed through a front, slotted insulation slab against which the mounting plate 41 lies adjacent in its final position.
- This arrangement has the advantage that electrical connections 42 through which power is supplied to each heating element 40 are insulated from the main heat of the core.
- the front insulation slab of the boiler 10 includes a number of elongate slots for engagement by the heating elements 40 corresponding to the number of heating elements 40 in the boiler 10 and at positions corresponding to the heating element channels 36 in the core. Wiring connections to the heating elements 40 are arranged conventionally and will therefore not be described in detail.
- the material of the heat storing bricks 30 and 35 may be the same, for example magnetite or magnesite or a mixture of the two, magnesite having a higher thermal conductivity than magnetite which can be advantageous in transferring heat stored in the core more rapidly to the boiling tubes 11. It is also possible and can be advantageous for particular boiler demands to form the shaped bricks 30 of a material having higher thermal conductivity than the plain bricks 35. In the configuration described, it is the shaped bricks 30 which lie against the boiling tubes and an increase in thermal conductivity of the shaped bricks 30 results in easier passage of heat to the boiling tubes 11. Where the bricks are made of a mixture of magnetite and magnesite, an increase in thermal conductivity can be achieved by increasing the proportion of magnesite in the bricks.
- Forming the two sorts of bricks of different compositions is economically sensible since magnesite is significantly more expensive than magnetite, the materials having similar heat storing capacities but different thermal conductivities.
- a further advantage of having the shaped bricks 30 with a higher thermal conductivity is that it provides a better direct conduction path from the elements 40 to the boiling tubes 11 should it be necessary to boost the core temperature while heat is actually being drawn from the core in order to provide steam for the heat exchanger 13 to heat the secondary circuit 14. Efficiency of such an operation is thus increased.
- the number and type of bricks 30 and 35 employed allows filling of a boiler casing to be achieved from the front of the casing.
- the core is assembled by first placing the shaped bricks 30 of a particular course around the boiling tubes 11, thereby leaving a space the width of two plain bricks 35 between the shaped bricks and a space the width of one plain brick 35 between respective shaped bricks 30 and the casing side walls. This means that the respective course of bricks can be completed simply by sliding in plain bricks 35 from the front.
- the front insulation slab is placed in front of the core and the elements 40 are simply slid through the front insulation slab and between the bricks in respective element channels 36.
- assembly is achieved entirely from the front and servicing of elements, should there be a failure, is likewise achieved through the front of the casing. This enables the boiler to be fitted under a work surface and yet be serviceable.
- Equipment above the core such as the header tank, heat exchanger and flow heater are also arranged to be accessible from the front.
- These protective sheets have an additional advantage that, at high temperatures the sheets tend to bow and thus force inwardly the bricks of the core with which they are in contact. This has an effect of improving physical contact between the shaped bricks and the boiling tubes and also the bricks surrounding the heating elements 40.
- An additional possibility is to provide a thin sheet of metal, for example stainless steel, extending vertically from front to rear of the core. This sheet acts initially as a shim and also bows at high temperatures to enhance the effect described above with the protective side sheets. While heat losses directly through the wall insulation can be minimised, a consistent problem arises where slabs of insulation meet at a right angled corner.
- the insulation slabs have been designed as shown in Figures 7, 8, 9 and 10 to provide at every corner at least one step contact so that there is no direct heat leakage path from the core to outside the insulation. This is achieved by stepping the insulation slabs at their periphery, the slabs being formed either in one piece with a step or in two pieces, one piece being of smaller dimensions than the other.
- rear insulation 50 has stepped side edge profiles 51 which mate with stepped side edge profiles 52 of side insulation panel 53, 54.
- Front insulation slab 55 has plain edges and locates in a recess formed by steps 56 in the side insulation slabs 53 and 54.
- Figure 8 shows the stepped profiles 56 of the side insulation slabs 53 and 54 and that the stepped arrangement continues to the top of the side insulation slabs 53, 54 to mate with stepped profile in top insulation 57.
- Figure 9 shows stepped mating of top and rear insulations 57 and 50 respectively and the mating of front insulation 55 with the top insulation 57.
- Figures 10 and 11 show the base insulation slab 60 having a peripherally stepped profile shown in Figure 11.
- Four holes 61 are provided for allowing the base insulation slab 60 to slide over the boiling tubes 11 during assembly.
- An advantage of this embodiment of the invention is that installation and maintenance of the boiler can be achieved from the front of the boiler.
- Installation can be effected by plumbing in the boiler to the secondary circuit, which may be in existence already or may be a new system, before the core is built in the casing and then building the core around the boiling tubes and in the remainder of the casing space from the front of the casing.
- the elements are then inserted from the front, after the front insulation is in place, and the casing is then closed for the front cover. Should an element need to be replaced, the front cover is removed, the non-functioning element disconnected and slid out and a replacement element slid in and connected.
- the flow heater is arranged so that its element can be replaced from the front also.
- the insulation profiles minimise heat losses at corners.
- the capillary bleed from the heat exchanger to the header tank allows convenient flushing of air when use of the boiler is started in a simple fashion and with negligible subsequent steam loss.
- Providing the header tank with a capacity substantially larger than the capacity of the primary heating circuit means that topping up of the header tank can be infrequent, it being desirable to provide for topping up during an annual maintenance inspection of the boiler.
- the pipework includes boiling tubes (64), a heat exchanger (66) and an auxiliary flow heater (68).
- a return pipe (70) extends from the primary heating circuit to the header tank (72) • The top of the return pipe is above the water level in the header tank at all times so that water cannot pass from the header tank down the return pipe (70) .
- the motor valve (74) is closed to prevent water entering the primary heating circuit from the header tank ( 72) and the solenoid valve (76) between the heat exchanger and the header tank (72) is also closed. Pressure within the primary heating circuit then forces the water/steam in the primary circuit up the return pipe (70) and into the header tank (72) . No water from the header tank can pass down the return pipe (70) since the upper end of the pipe is above the water level in the header tank (72) .
- the header tank (72) includes a sensor (78) to determine the water level in the tank (72) and hence when additional water should be added via the inlet (80) .
- the sensor (78) is triggered and a light illuminates on the control panel of the boiler appliance.
- the header tank is made of plastics material which enables it to withstand changes in internal pressure and temperature by virtue of its suitable properties. Further, the heat exchanger is more efficient if it is made from copper rather than steel, and water can be drained from the heat exchanger more easily if the exchanger is angled slightly with the drain pipe (82) extending from its lower end.
Landscapes
- Engineering & Computer Science (AREA)
- Thermal Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Sustainable Energy (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Heat-Pump Type And Storage Water Heaters (AREA)
- Control Of Steam Boilers And Waste-Gas Boilers (AREA)
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
- Central Heating Systems (AREA)
Applications Claiming Priority (9)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| GB888828421A GB8828421D0 (en) | 1988-12-06 | 1988-12-06 | Electric boiler |
| GB888828422A GB8828422D0 (en) | 1988-12-06 | 1988-12-06 | Improvements in boilers |
| GB8828422 | 1988-12-06 | ||
| GB8828421 | 1988-12-06 | ||
| GB8901281 | 1989-01-20 | ||
| GB898901281A GB8901281D0 (en) | 1989-01-20 | 1989-01-20 | Improvements in or relating to boilers |
| GB8922306 | 1989-10-04 | ||
| GB898922306A GB8922306D0 (en) | 1989-10-04 | 1989-10-04 | Improvements in or relating to boilers and controls therefor |
| PCT/GB1989/001459 WO1990006473A2 (en) | 1988-12-06 | 1989-12-06 | Electrical heat storage boiler |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP0447438A1 true EP0447438A1 (de) | 1991-09-25 |
| EP0447438B1 EP0447438B1 (de) | 1995-03-29 |
Family
ID=27450225
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP19900900241 Withdrawn EP0533658A1 (de) | 1988-12-06 | 1989-12-06 | Elektrische wasserheizvorrichtung und steuerungen dafür |
| EP90900240A Expired - Lifetime EP0447438B1 (de) | 1988-12-06 | 1989-12-06 | Elektrisch beheizter wärmespeicherkessel |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP19900900241 Withdrawn EP0533658A1 (de) | 1988-12-06 | 1989-12-06 | Elektrische wasserheizvorrichtung und steuerungen dafür |
Country Status (4)
| Country | Link |
|---|---|
| EP (2) | EP0533658A1 (de) |
| DE (1) | DE68921988T2 (de) |
| ES (1) | ES2070310T3 (de) |
| WO (2) | WO1990006473A2 (de) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| SE509732C2 (sv) * | 1996-06-18 | 1999-03-01 | Tsp Medical Ab | Ånggenerator med reglerad till- och bortförsel av vatten |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AT234236B (de) * | 1962-12-27 | 1964-06-25 | Veitscher Magnesitwerke Ag | Aus einem Dreiphasennetz zu speisender elektrischer Speicherofen mit mehreren Widerstandsheizkörpern |
| BE657497A (fr) * | 1964-12-23 | 1965-06-23 | Acec | Dispositif de commande de la résistance chauffante d'un poêle à accumulation |
| FR1434485A (fr) * | 1965-03-24 | 1966-04-08 | Witte Haustechnik Gmbh | Générateur de vapeur d'eau à fonctionnement périodique, chauffé électriquementet pourvu d'un accumulateur de chaleur |
| DE1579864A1 (de) * | 1965-09-02 | 1970-08-27 | Elektrowaerme Inst Essen E V | Elektrische Speicherheizung |
| DE1812340A1 (de) * | 1968-12-03 | 1970-06-25 | Zenkner Dr Ing Kurt | Nachtstromwaermspeicherofen |
| GB1296992A (de) * | 1969-03-20 | 1972-11-22 | ||
| GB1261649A (en) * | 1969-06-10 | 1972-01-26 | Potterton Internat Ltd | Control means for electrical storage heaters |
| GB1394745A (en) * | 1972-06-13 | 1975-05-21 | Potterton Int Ltd | Storage heaters |
| CH635187A5 (fr) * | 1980-04-15 | 1983-03-15 | Battelle Memorial Institute | Appareil de chauffage. |
-
1989
- 1989-12-06 WO PCT/GB1989/001459 patent/WO1990006473A2/en not_active Ceased
- 1989-12-06 WO PCT/GB1989/001458 patent/WO1990006477A2/en not_active Ceased
- 1989-12-06 DE DE68921988T patent/DE68921988T2/de not_active Expired - Fee Related
- 1989-12-06 EP EP19900900241 patent/EP0533658A1/de not_active Withdrawn
- 1989-12-06 ES ES90900240T patent/ES2070310T3/es not_active Expired - Lifetime
- 1989-12-06 EP EP90900240A patent/EP0447438B1/de not_active Expired - Lifetime
Non-Patent Citations (1)
| Title |
|---|
| See references of WO9006473A3 * |
Also Published As
| Publication number | Publication date |
|---|---|
| WO1990006473A3 (en) | 1990-08-23 |
| ES2070310T3 (es) | 1995-06-01 |
| EP0533658A1 (de) | 1993-03-31 |
| DE68921988T2 (de) | 1995-08-03 |
| EP0447438B1 (de) | 1995-03-29 |
| WO1990006477A3 (en) | 1990-08-23 |
| WO1990006477A2 (en) | 1990-06-14 |
| DE68921988D1 (de) | 1995-05-04 |
| WO1990006473A2 (en) | 1990-06-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6577817B2 (en) | Water heater | |
| IL212041A (en) | Solar heating system for hot water with self-suction with overheating protection | |
| FI76205C (fi) | System omfattande en vaermeackumulator och en vaermevaexlare. | |
| KR102751199B1 (ko) | 내부 가열식 상 변화 물질을 갖는 열 배터리 | |
| KR100751485B1 (ko) | 전기보일러 | |
| NO172311B (no) | Varmtvannsbereder | |
| CA2001505C (en) | Pipe apparatus in heat accumulator | |
| CA2702463A1 (en) | Heat driven self-circulating fluid heating and storage tank and system | |
| US20050025471A1 (en) | Liquid heater | |
| EP0447438B1 (de) | Elektrisch beheizter wärmespeicherkessel | |
| KR20020040230A (ko) | 심야전기를 이용한 온수기의 열교환기 | |
| KR200269038Y1 (ko) | 열매체유를 이용한 전기 보일러 | |
| KR200238364Y1 (ko) | 난방라인에서 온수사용이 가능한 축열식 보일러의 배관구조 | |
| JPS5950903B2 (ja) | 熱交換器 | |
| AU2009201129A1 (en) | Liquid Heater | |
| US4655042A (en) | Method and apparatus for improving the operation of a hot water heater | |
| GB2241569A (en) | Boilers | |
| RU2006781C1 (ru) | Устройство для нагрева воды | |
| GB2241568A (en) | Boilers | |
| GB2082757A (en) | Integral Storage Collector Solar Heating System | |
| KR200220770Y1 (ko) | 심야전기를 이용한 온수기의 열교환기 | |
| FI83135B (fi) | Foerfarande foer att ladda och urladda vaerme-energi fraon ackumuleranden vattenvaermaren. | |
| RU2045699C1 (ru) | Автономная котельная установка парового отопления | |
| KR20060087019A (ko) | 난방시스템을 이용한 용수예열장치 | |
| KR20010025466A (ko) | 열매체유를 이용한 심야전기 보일러 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 19910606 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): BE DE ES FR GB NL |
|
| 17Q | First examination report despatched |
Effective date: 19931006 |
|
| RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: DIMPLEX (UK) LIMITED |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): BE DE ES FR GB NL |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19950329 Ref country code: FR Effective date: 19950329 |
|
| REF | Corresponds to: |
Ref document number: 68921988 Country of ref document: DE Date of ref document: 19950504 |
|
| REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2070310 Country of ref document: ES Kind code of ref document: T3 |
|
| EN | Fr: translation not filed | ||
| NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 19951127 Year of fee payment: 7 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 19951214 Year of fee payment: 7 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 19951219 Year of fee payment: 7 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 19960109 Year of fee payment: 7 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| 26N | No opposition filed | ||
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Effective date: 19961206 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Effective date: 19961231 |
|
| BERE | Be: lapsed |
Owner name: DIMPLEX (UK) LTD Effective date: 19961231 |
|
| GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 19961206 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Effective date: 19970902 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19971207 |
|
| REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 19980113 |