EP0452537A1 - Fertigteile und Verfahren für die Ausführung von kreisförmigen Behältern - Google Patents
Fertigteile und Verfahren für die Ausführung von kreisförmigen Behältern Download PDFInfo
- Publication number
- EP0452537A1 EP0452537A1 EP90114841A EP90114841A EP0452537A1 EP 0452537 A1 EP0452537 A1 EP 0452537A1 EP 90114841 A EP90114841 A EP 90114841A EP 90114841 A EP90114841 A EP 90114841A EP 0452537 A1 EP0452537 A1 EP 0452537A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- cables
- manufactured parts
- ribbing
- tanks
- blocks
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000000034 method Methods 0.000 title claims description 4
- 238000010276 construction Methods 0.000 claims abstract description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 230000002706 hydrostatic effect Effects 0.000 claims description 2
- 239000003566 sealing material Substances 0.000 claims 1
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 230000006835 compression Effects 0.000 abstract 1
- 238000007906 compression Methods 0.000 abstract 1
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- 239000004570 mortar (masonry) Substances 0.000 description 3
- 229910052742 iron Inorganic materials 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- FAPWRFPIFSIZLT-UHFFFAOYSA-M Sodium chloride Chemical compound [Na+].[Cl-] FAPWRFPIFSIZLT-UHFFFAOYSA-M 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 229920001084 poly(chloroprene) Polymers 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000011780 sodium chloride Substances 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 238000009827 uniform distribution Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H7/00—Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
- E04H7/02—Containers for fluids or gases; Supports therefor
- E04H7/18—Containers for fluids or gases; Supports therefor mainly of concrete, e.g. reinforced concrete, or other stone-like material
- E04H7/20—Prestressed constructions
Definitions
- This invention relates to prefabricated articles in reinforced concrete for making circular tanks set in or out of the ground.
- the method is concerned with blocks with arc cross-sections and lateral self-centring joints.
- the blocks are laid side by side to form the vertical circular wall of the tank and are held together by tension cables placed around the outside of the walls of the tank.
- the blocks have ribbing shaped for the seatings of the tension cables.
- the cables are thus positioned exactly during assembly and afterwards remain hidden from view.
- tanks there are numerous sectors which may require tanks to be constructed, especially of the above-ground type which can be produced with prefabricated parts and are thus cheaper, easier and quicker to construct.
- Tanks of this kind are often used in agriculture for water or detritus storage, or in industry for filters or similar such purposes.
- these tanks are circular in shape because it is this form which ensures a more uniform distribution of internal forces and pressure, takes up the least surface area in relation to capacity, and is easier rig up and construct.
- an iron beam is first set up or a mounting with means of attaching the tension cables, fixed to appropriate previously-prepared foundations.
- the various panels are then positioned side by side, held in place by bracing elements.
- the tension cables are wound around the tank with their ends anchored to the iron beam for tightening to be carried out.
- the invention in question proposes manufactured articles and a related construction method for making circular tanks both out of and in the ground.
- Each of these arc cross-section manufactured parts has a self-centring joint externally and ribbed channelling for the tension cable seatings which are thus automatically positioned and hidden from view.
- This seating can then be filled with mortar or any other suitable material to protect the cables from external agents.
- a tank out of the ground is created by the combination of a number of blocks and panels (1), joined and fixed at their extremities to a head element (2) which is mounted on a foundation plinth (3).
- Each of these blocks has an arc cross-section (Fig. 7) viewed from above and has the sides 4 and 5 shaped respectively male and female for a self-centring joint with the adjoining panels.
- each of these blocks has a series of essentially horizontal ribbing, illustrated in detail in Figure 9.
- the ribbing (6) creates a raised border or parapet (7) on the external part of the block thus forming a seating between the wall of the panel and this border for the tension cables (8).
- the upper wall (9) of each rib is not flat but is raised in the centre so that the bottom of ribbing slopes from the centre outwards.
- the ribbing (6) is slightly shorter than the panel itself so as to leave a small space between adjacent ribbing when construction is complete, as shown in Fig. 8.
- the distance between the ribbing is not constant. Lower down on the panel the ribs are closer together, where the hydrostatic pressure exerted on the walls is greater and where the cables around the panels must thus be closer together.
- the head element (2) (Figs. 10,11 and 12) also has an arc plan cross-section. but without ribbing. It is thicker than the other blocks, essentially equal to the thickness of the panels (1) plus that of the ribbing, with the central part enlarged to contain the ends of the cables (8) to be tightened, giving a firm anchorage.
- the head element (2) is mounted on a plinth (10) with a seating (11) shaped to allow (1) the insertion and fastening of the element (2).
- a foundation kerb and plate are set out, on which the various blocks are placed.
- the plinth is then put in position and the head element assembled, fixing it temporarily with two wedges or similar objects.
- the various blocks are then put in place side by side bringing the lateral walls together and fixing them, again temporarily, with a gusset plate, a clamp or similar system, with the first and the last block fixed to the head (2).
- a sealing gasket (10) (Fig. 8) is placed between adjacent blocks, made of Neoprene or similar material.
- tension cables can be put in place. They are simply inserted in the ribbed seatings (6) with the respective borders (7) and anchored at their ends to the head element (2).
- the gusset plates which held the blocks together can be removed and finishing operations carried out - e.g. applying a layer of sealing glue (11) along the internal edges of the blocks (Fig. 8), filling the seatings with mortar or similar material thus protecting the cables from possible damage and from atmospheric weathering.
- Water drainage is improved in the cable seating area, which can also be protected with a filling of mortar or other suitable material.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Blow-Moulding Or Thermoforming Of Plastics Or The Like (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| IT4480990 | 1990-04-18 | ||
| IT04480990A IT1247587B (it) | 1990-04-18 | 1990-04-18 | Manufatti e metodo per la realizzazione di vasche circolari. |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP0452537A1 true EP0452537A1 (de) | 1991-10-23 |
Family
ID=11256439
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP90114841A Withdrawn EP0452537A1 (de) | 1990-04-18 | 1990-08-02 | Fertigteile und Verfahren für die Ausführung von kreisförmigen Behältern |
Country Status (2)
| Country | Link |
|---|---|
| EP (1) | EP0452537A1 (de) |
| IT (1) | IT1247587B (de) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| ES2084554A2 (es) * | 1993-10-26 | 1996-05-01 | Prefabricats M Planas S A | Estructura hueca formada por paneles prefabricados de hormigon y procedimiento para la fabricacion de dicha estrctura. |
| WO2001051740A1 (en) * | 2000-01-10 | 2001-07-19 | Abetong Teknik Ab | Casting of tank |
| ES2212887A1 (es) * | 2002-05-17 | 2004-08-01 | Francisco J. Segovia Espiau | Procedimiento de obtencion de depositos de gran capacidad y producto obtenido. |
| JP2012233354A (ja) * | 2011-05-02 | 2012-11-29 | Ihi Corp | 低温タンク |
| WO2022226573A1 (en) * | 2021-04-28 | 2022-11-03 | Concept Environmental Services Pty Ltd | Brine processing system |
| US11885224B2 (en) * | 2008-01-28 | 2024-01-30 | Darin R. Kruse | Apparatus and methods for underground structures and construction thereof |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113734640A (zh) * | 2021-09-06 | 2021-12-03 | 华电重工股份有限公司 | 钢板仓 |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB1103455A (en) * | 1965-06-08 | 1968-02-14 | Preload International Inc | Prestressed steel tank structure |
| AT302921B (de) * | 1970-10-12 | 1972-11-10 | Friedrich Oestreicher Ing | Behälter, Schacht od.dgl., insbesondere für Abwasseranlagen und Vorrichtung zur Herstellung von Platten für einen solchen Behälter |
| GB1306448A (en) * | 1969-08-05 | 1973-02-14 | Leon Ballot Sa Des Entreprises | Reservoirs |
| DE3004473A1 (de) * | 1979-02-10 | 1980-08-21 | Betonson B V | Verfahren zur herstellung einer zylindrischen betonwand |
| DE8608882U1 (de) * | 1986-04-03 | 1986-05-15 | Dyckerhoff & Widmann AG, 81902 München | Bauelementensatz zum Herstellen der Wandung eines stehenden Behälters, insbesondere eines Güllebehälters |
-
1990
- 1990-04-18 IT IT04480990A patent/IT1247587B/it active IP Right Grant
- 1990-08-02 EP EP90114841A patent/EP0452537A1/de not_active Withdrawn
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB1103455A (en) * | 1965-06-08 | 1968-02-14 | Preload International Inc | Prestressed steel tank structure |
| GB1306448A (en) * | 1969-08-05 | 1973-02-14 | Leon Ballot Sa Des Entreprises | Reservoirs |
| AT302921B (de) * | 1970-10-12 | 1972-11-10 | Friedrich Oestreicher Ing | Behälter, Schacht od.dgl., insbesondere für Abwasseranlagen und Vorrichtung zur Herstellung von Platten für einen solchen Behälter |
| DE3004473A1 (de) * | 1979-02-10 | 1980-08-21 | Betonson B V | Verfahren zur herstellung einer zylindrischen betonwand |
| DE8608882U1 (de) * | 1986-04-03 | 1986-05-15 | Dyckerhoff & Widmann AG, 81902 München | Bauelementensatz zum Herstellen der Wandung eines stehenden Behälters, insbesondere eines Güllebehälters |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| ES2084554A2 (es) * | 1993-10-26 | 1996-05-01 | Prefabricats M Planas S A | Estructura hueca formada por paneles prefabricados de hormigon y procedimiento para la fabricacion de dicha estrctura. |
| WO2001051740A1 (en) * | 2000-01-10 | 2001-07-19 | Abetong Teknik Ab | Casting of tank |
| AU778554B2 (en) * | 2000-01-10 | 2004-12-09 | Abetong Teknik Ab | Casting of tank |
| ES2212887A1 (es) * | 2002-05-17 | 2004-08-01 | Francisco J. Segovia Espiau | Procedimiento de obtencion de depositos de gran capacidad y producto obtenido. |
| ES2212887B1 (es) * | 2002-05-17 | 2005-10-16 | Francisco J. Segovia Espiau | Procedimiento de obtencion de depositos de gran capacidad y producto obtenido. |
| US11885224B2 (en) * | 2008-01-28 | 2024-01-30 | Darin R. Kruse | Apparatus and methods for underground structures and construction thereof |
| JP2012233354A (ja) * | 2011-05-02 | 2012-11-29 | Ihi Corp | 低温タンク |
| WO2022226573A1 (en) * | 2021-04-28 | 2022-11-03 | Concept Environmental Services Pty Ltd | Brine processing system |
Also Published As
| Publication number | Publication date |
|---|---|
| IT9044809A0 (it) | 1990-04-18 |
| IT1247587B (it) | 1994-12-28 |
| IT9044809A1 (it) | 1991-10-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA2601457C (en) | Concrete panel construction system | |
| US3316721A (en) | Tensioned retaining wall for embankment | |
| US4090266A (en) | Swimming pool construction | |
| US5066165A (en) | Modular and componential trench drain system | |
| US6568141B2 (en) | Concrete footing and wall system | |
| EP0803618A2 (de) | Modulares Element zur Unterstützung und Lüftung von Decken | |
| EP0185065B1 (de) | Verfahren zur herstellung einer eine konstruktion tragenden, starren platte | |
| WO2002018712A1 (en) | Integrated footings | |
| US5067289A (en) | Foundation system for manufactured housing | |
| US4697398A (en) | Multistoried aseismic building made of modular panels | |
| CA1145584A (en) | Concrete form system | |
| EP0452537A1 (de) | Fertigteile und Verfahren für die Ausführung von kreisförmigen Behältern | |
| US6192639B1 (en) | Structural system for erecting buildings, particularly single-family dwellings | |
| EP0107749A1 (de) | Erdbebensichere Gebäudestruktur | |
| AU707066B2 (en) | Fluid circulation pipe | |
| US20050183363A1 (en) | Prefabricated tower foundation comprising equipment shelters and a method for its deployment on site | |
| US6477722B2 (en) | Overflow system with a spillway rim, particularly for a prefabricated swimming pool to be sunk into the ground, and a method and apparatus for its construction | |
| CN108677998A (zh) | 一种转角型加筋土挡墙结构及制作方法 | |
| WO1997043499A1 (en) | Interlocking building block | |
| EP1208270B1 (de) | Fundament und herstellungsverfahren desselben | |
| US3834094A (en) | Track system wall assembly for houses or the like | |
| US4597230A (en) | Log construction device | |
| GB2268525A (en) | Water-tight building structures | |
| JPH0730755Y2 (ja) | 擁壁ブロック | |
| AU723188B2 (en) | Interlocking building block |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH DE ES FR GB GR LI LU NL |
|
| 17P | Request for examination filed |
Effective date: 19920326 |
|
| 17Q | First examination report despatched |
Effective date: 19930609 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
| 18D | Application deemed to be withdrawn |
Effective date: 19931020 |