EP0724683A1 - Integrationsbau von dampfkessel und dampfturbine und methode zur speisewasservorwärmung für die dampfturbine - Google Patents

Integrationsbau von dampfkessel und dampfturbine und methode zur speisewasservorwärmung für die dampfturbine

Info

Publication number
EP0724683A1
EP0724683A1 EP94928907A EP94928907A EP0724683A1 EP 0724683 A1 EP0724683 A1 EP 0724683A1 EP 94928907 A EP94928907 A EP 94928907A EP 94928907 A EP94928907 A EP 94928907A EP 0724683 A1 EP0724683 A1 EP 0724683A1
Authority
EP
European Patent Office
Prior art keywords
supply water
steam
bled
economizer
die
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP94928907A
Other languages
English (en)
French (fr)
Other versions
EP0724683B1 (de
Inventor
Ilmari MÄKILÄ
Markku Raiko
Sasu Valkamo
Jarmo Tuominen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fortum Power and Heat Oy
Original Assignee
Imatran Voima Oy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Imatran Voima Oy filed Critical Imatran Voima Oy
Publication of EP0724683A1 publication Critical patent/EP0724683A1/de
Application granted granted Critical
Publication of EP0724683B1 publication Critical patent/EP0724683B1/de
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22DPREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
    • F22D1/00Feed-water heaters, i.e. economisers or like preheaters
    • F22D1/40Combinations of exhaust-steam and smoke-gas preheaters
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F22STEAM GENERATION
    • F22DPREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
    • F22D1/00Feed-water heaters, i.e. economisers or like preheaters
    • F22D1/36Water and air preheating systems

Definitions

  • the invention concerns an integration construction between a steam boiler and a steam turbine and a method in preheating of the supply water for a steam turbine.
  • a flue-gas/air heat exchanger is understood as a heat exchanger between flue gas and combustion air, in which the heat is transferred from flue gas to combustion air to preheat the combustion air.
  • an economizer is understood as a heat exchanger in which thermal energy is transferred from the flue gases to the supply water.
  • the supply water for the boiler can be preheated by means of bled steam from the steam turbine, whereby the efficiency of the steam turbine process is improved.
  • a flue-gas/air heat exchanger i.e. a heat exchanger in which thermal energy is transferred from the flue gases directly into the combustion air, is usually not used in small steam power plants because of its high cost.
  • the flue gases of the steam boiler are cooled, before they are passed into the smokestack, by means of an economizer.
  • the supply water cannot be preheated by means of bled steam from the steam turbine, because the preheating would raise the ultimate temperature of the flue gases and would thereby lower the efficiency of the boiler.
  • the idea of the present invention is to divide the economizer of the steam boiler of a steam power plant into two or more parts, the supply water being preheated in the preheaters of the high-pressure side fitted between said economizer parts by means of bled steam from the steam turbine.
  • the invention is advantageous especially when the combustion air of the steam boiler is heated in one or several steam/air heat exchangers that are connected in series and that utilize bled steam.
  • the integration construction in accordance with the invention between a steam boiler and a steam turbine is mainly characterized in that the economizer consists of at least two parts, comprising at least one first economizer part and at least one second economizer part, whose supply water is hotter, and that the supply water is passed from the first economizer part to a supply-water preheater, which consists of a heat exchanger in which thermal energy is transferred from bled steams of the steam turbine, either directly or through a medium, preferably water, into the supply water, after which the supply water, which had been thus preheated by means of bled steams from the steam turbine, is passed in the steam boiler into the second economizer part and further through the vaporizer into the superheater and through the superheater into the steam turbine.
  • a supply-water preheater which consists of a heat exchanger in which thermal energy is transferred from bled steams of the steam turbine, either directly or through a medium, preferably water, into the
  • the method in accordance with the invention in steam turbine operation is mainly characterized in that, in the method, the supply water is, before the vaporizer, preheated in at least three steps, the preheating involving at least two economizer parts and the first preheating of the supply water taking place by means of thermal energy taken out of the flue gases in the first economizer part, and that there is at least one second preheating stage between the economizer parts, in which stage the preheating of the supply water is carried out by means of bled steams or by means of thermal energy taken out of said steams, the supply water that has been preheated in the method by means of bled steam being thereupon passed into the second economizer part, in which the supply water is hotter, and further into the vaporizer and into the superheater and further, in the form of steam, into the steam turbine so as to rotate an electric generator and to generate electricity.
  • FIG. 1 shows a first preferred embodiment of the integration construction in accordance with the invention, in which the boiler construction comprises an economizer for preheating the supply water by means of thermal energy taken out of the flue gases, which economizer is divided into two parts, the supply water duct between said economizer parts being provided with a supply-water preheater, which consists of a heat exchanger in which heat is transferred from bled steams to preheating of the supply water.
  • a supply-water preheater which consists of a heat exchanger in which heat is transferred from bled steams to preheating of the supply water.
  • FIG. 2 shows an embodiment of the invention in which the economizer is divided into two parts, between which there are two preheaters of supply water, which consist of heat exchangers in which the supply water is preheated in two steps by means of bled steams from the steam turbine.
  • Figure 3 is a temperamre/thermal-capacity graph of an economizer operation as per the embodiment of Fig. 1.
  • Figure 4 is a temperature/thermal-capacity graph of the economizer of a steam boiler as per Fig. 2.
  • Figure 5 is a temperature/thermal-capacity graph of an economizer operation in which the economizer consists of three parts and in which preheating of the supply water is carried out between die parts of the economizer by means of bled steams.
  • Fig. 1 shows a first preferred embodiment of the invention.
  • the steam boiler is denoted with the reference numeral 10, the steam turbine with the reference numeral 11, and the electric generator that is rotated by the turbine and that generates electricity with the reference numeral 12.
  • the combustion air is introduced (arrow I ⁇ ) by means of the fresh- air blower 14 of the boiler 10 along the duct 13 into the furnace M of the boiler 10.
  • the fuel is introduced along the duct 15 as is indicated by the arrow 1 ⁇ .
  • the frame constructions of the boiler 10 are denoted with the reference R.
  • the flue gases are passed from the boiler 10 into the smokestack 16.
  • the condenser is denoted with the reference numeral 17 and the supply water tank with the reference numeral 18. From the condenser 17, which is a heat exchanger, there is, for example, a district heating duct 17a for utilization of the condensing heat.
  • the condensate pump is denoted with the refer ⁇ ence numeral 19.
  • the steam duct 21a from the steam turbine 11 communicates with the inlet side of the condenser 17, and the condensate- water duct 21b communicates with the outlet side of the condenser 17, while the condensate- water pump 19 circulates the conden ⁇ sate water into the supply water tank 18.
  • a supply water duct 22a to the economizer 23', i.e. to the heat exchanger, which is placed inside the frame construction R of the boiler 10 as one heat face in connection with the flue gas duct D.
  • heat is transferred from the flue gas S before the smokestack 16, by means of the heat exchanger 23, to the supply water.
  • the heated supply water is made to flow by means of the pump 190 along the duct 22b to the supply- water preheater, i.e. the heat exchanger 26, to which a bled-steam duct 27a passes and from which heat exchanger 26 there is a duct 27b for condensate water to the supply water tank 18.
  • preheating of the supply water that flows in the duct 22b is carried out by means of the thermal energy obtained from bled steams.
  • the supply water is passed further along the duct 22b, after it has been brought to a higher temperature, into the second part 23" of the economizer 23, i.e. of the flue-gas/supply- water heat exchanger, and further from the economizer 23" through the vaporizer 240 to the superheater 24 and, in the form of steam, along the duct 24a, to the steam turbine 11.
  • Fig. 2 shows an embodiment of me invention which is in the other respects similar to that shown in Fig. 1, except that combustion-air preheaters 25a, 25b, i.e. steam/air heat exchangers, are placed in the duct 13. They are heat exchangers in which bled- steam heat is transferred to the combustion air. It is a further difference in compari ⁇ son with the embodiment shown in Fig. 1 that, between the first part 23' and the second part 23" of d e economizer of the boiler, the supply water is heated in two stages by means of thermal energy recovered from bled steams.
  • combustion-air preheaters 25a, 25b i.e. steam/air heat exchangers
  • the steam boiler is denoted with the reference numeral 10, the steam turbine with the reference numeral 11, and me electric generator that generates electricity and that is rotated by the turbine with the reference numeral 12.
  • the combustion air is introduced (arrow L j ) by means of the fresh-air blower 14 of the boiler 10 along the duct 13 into the furnace M of the boiler 10.
  • the fuel is supplied along die duct 15 in d e way indicated by the arrow I ⁇ .
  • the frame constructions of the boiler 10 are denoted with me letter R.
  • the flue gases are passed from me boiler 10 into the smokestack 16.
  • the condenser is denoted with the reference numeral 17, and me supply water tank with the reference numeral 18.
  • the condenser 17 is a heat exchanger. It comprises a cooling- water duct 17a for removal of the condensate heat. Thus, condensate heat is transferred from the exhaust steam of the turbine to the cooling water.
  • the condensate pump is denoted with the reference numeral 19.
  • me supply water is made to flow by means of the pump 190 along the supply- water duct 22a to the economizer 23', i.e. to the flue- gas/supply-water heat exchanger, in which thermal energy of the flue gas is trans ⁇ ferred into die supply water through tubular heat faces of equivalent placed in me heat exchanger 23' in the flue-gas duct D.
  • die supply water which has been preheated in accordance widi the invention is passed further into a first heat exchanger 26a, to which there is a bled-steam duct 27a from the steam turbine 11 and from which mere is an outlet duct 27b for condensate/steam into the supply water tank 18.
  • the supply water tiiat was preheated in two stages by means of bled steams is transferred into die second part 23" of the two-part economizer of the boiler 10, from which part 23" the supply water is passed further into the vaporizer 240 placed next to die furnace of the boiler and into die superheater, and drrough its heat exchanger constructions along the duct 24a, in die form of steam into the steam turbine 11.
  • die bled-steam duct 27 includes a branch point C 2 for passing a bled-steam duct 29a to die heat exchanger 25a for preheating of the combustion air
  • mat die bled-steam duct 28a includes a branch point C 3 for passing a bled-steam duct 30a to me heat exchanger 25b.
  • ducts 29b,30b to d e branch point C 4 for passing the condensate to d e duct 27b and further into the supply water tank 18.
  • bled steam of the same pressure level is passed into one or several supply-water pre ⁇ heaters and/or into one or several combustion-air preheaters.
  • die preheating of the supply water is carried out by means of bled steams from the steam turbine between the two parts of the two-part economizer. Further, in the construction, by means of the thermal energy recovered from the bled steams, combustion air is also heated, which is passed along die duct 13 into the furnace M of the boiler 10.
  • Fig. 2 illustrates a preferred mode of carrying out the invention.
  • the supply water is passed into die first economizer package 23' of the steam boiler at a temperature of about 100°C from the supply water tank.
  • the supply water is heated in the first economizer package to about 150°C.
  • the supply water is passed to the high-pressure side bled-steam preheater, i.e. to the heat exchanger 26a, in which the supply water is preheated by means of bled steam to about 175°C.
  • d e supply water is passed to the second preheater, to die heat exchanger 26b, where the supply water is heated to about 200°C, and further into the second economizer package 23", where the supply water is heated by further 50...100°C.
  • the combustion air is preheated, likewise by means of bled steam, in one or several steps, preferably to a temperature of about 200°C.
  • Fig. 3 shows a temperature/thermal-capacity graph of an economizer which corre ⁇ sponds to die embodiment of Fig. 1.
  • the temperature is indicated in d e vertical system of coordinates, and the thermal capacity in the horizontal system of coordinates.
  • the temperature increase line 1-2 illustrates a conventional prior-art solution, in which the supply water is heated from the state 1 to the state 2 and die flue gases are cooled from the state 3 to die state 4. Further, in the figure, the solution of Fig.
  • Fig. 4 is a temperature/thermal-capacity graph of an economizer corresponding to the embodiment of Fig. 2.
  • the embodiment of the figure is in the other respects similar to the illustration in Fig. 2 except that from the stams point 5 to the stams point 6 the preheating of the supply water is carried out in two steps, first from the point 5 to the point 5a and from the point 5a to the point 6. From the point 5 to the point 5a, the preheating of the supply water is carried out by means of bled steams at a lower pressure of steam, and from the stams point 5a to the stams point 6 the preheating of the supply water is carried out by means of bled steams at a higher pressure of steam.
  • the preheating of the supply water is carried out by means of bled steams at a higher pressure of steam.
  • the preheating of the supply water takes place in four steps: from the stams point 1 to the stams point 5 by means of the first part 23' of the economizer; from the stams point 5 to the stams point 5a and from me stams point 5a to the stams point 6 by means of bled steams by means of the heat exchangers 26a, 26b, and from the stams point 6 to the stams point 7 by means of the second part 23" of the economizer.
  • the economizer comprises more than two parts, between which parts preheating of the supply water is carried out separately by means of bled steams.
  • An operation of an economizer in three parts is illustrated by d e temperamre/thermal-capacity graph of an economizer in Fig. 5.
  • Preheating of the supply water by means of bled steams takes place between the economizer parts 23 ',23" from the status point 5 to the stams point 5a, and between me economizer parts 23" and 23"' from the stams point 5b to the stams point 6.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)
  • Air Supply (AREA)
  • Transformer Cooling (AREA)
  • Vehicle Body Suspensions (AREA)
EP94928907A 1993-10-19 1994-10-11 Integrationsbau von dampfkessel und dampfturbine und methode zur speisewasservorwärmung für die dampfturbine Expired - Lifetime EP0724683B1 (de)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
FI934603A FI101163B (fi) 1993-10-19 1993-10-19 Höyrykattilan ja höyryturbiinin välinen kytkentärakenne ja menetelmä h öyryturbiinin syöttöveden esilämmityksessä
FI934603 1993-10-19
PCT/FI1994/000455 WO1995011370A1 (en) 1993-10-19 1994-10-11 Integration construction between a steam boiler and a steam turbine and method in preheating of the supply water for a steam turbine

Publications (2)

Publication Number Publication Date
EP0724683A1 true EP0724683A1 (de) 1996-08-07
EP0724683B1 EP0724683B1 (de) 2000-06-28

Family

ID=8538797

Family Applications (1)

Application Number Title Priority Date Filing Date
EP94928907A Expired - Lifetime EP0724683B1 (de) 1993-10-19 1994-10-11 Integrationsbau von dampfkessel und dampfturbine und methode zur speisewasservorwärmung für die dampfturbine

Country Status (11)

Country Link
EP (1) EP0724683B1 (de)
AT (1) ATE194208T1 (de)
AU (1) AU7814694A (de)
DE (1) DE69425064T2 (de)
DK (1) DK0724683T3 (de)
EE (1) EE03219B1 (de)
ES (1) ES2148346T3 (de)
FI (1) FI101163B (de)
GR (1) GR3034073T3 (de)
PT (1) PT724683E (de)
WO (1) WO1995011370A1 (de)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6813888B2 (en) 2000-12-29 2004-11-09 Fortum Oyj Integration construction between a boiler and a steam turbine and method in preheating of the supply water for a steam turbine and in its control
US6951106B2 (en) 2000-12-29 2005-10-04 Fortum Oyj Integration construction between a boiler and a steam turbine and method in preheating of the supply water for a steam turbine and in its control

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI20106010A7 (fi) * 2010-09-30 2012-03-31 Aaf Consult Oy Menetelmä lämmön talteenottamiseksi savukaasusta ja höyryvoimalaitos
AU2017425082B2 (en) 2017-07-27 2021-06-03 Sumitomo SHI FW Energia Oy A fluidized bed boiler plant and a method of preheating combustion gas in a fluidized bed boiler plant

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3913330A (en) * 1974-06-17 1975-10-21 Combustion Eng Vapor generator heat recovery system
AT377578B (de) * 1980-03-21 1985-04-10 Siemens Ag Oesterreich Dampfkraftanlage mit dampfturbine
CH645433A5 (de) * 1980-04-11 1984-09-28 Sulzer Ag Kombinierte gasturbinen-dampfkraftanlage.
FR2547863B1 (fr) * 1983-06-27 1987-09-18 Stein Industrie Procede de production d'energie repondant a des pointes de consommation, et dispositif de mise en oeuvre de ce procede

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO9511370A1 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6813888B2 (en) 2000-12-29 2004-11-09 Fortum Oyj Integration construction between a boiler and a steam turbine and method in preheating of the supply water for a steam turbine and in its control
US6951106B2 (en) 2000-12-29 2005-10-04 Fortum Oyj Integration construction between a boiler and a steam turbine and method in preheating of the supply water for a steam turbine and in its control

Also Published As

Publication number Publication date
DE69425064D1 (de) 2000-08-03
DE69425064T2 (de) 2001-03-08
WO1995011370A1 (en) 1995-04-27
PT724683E (pt) 2000-12-29
ES2148346T3 (es) 2000-10-16
FI934603A0 (fi) 1993-10-19
ATE194208T1 (de) 2000-07-15
FI101163B (fi) 1998-04-30
DK0724683T3 (da) 2000-10-02
GR3034073T3 (en) 2000-11-30
AU7814694A (en) 1995-05-08
FI934603A7 (fi) 1995-04-20
EP0724683B1 (de) 2000-06-28
EE03219B1 (et) 1999-08-16

Similar Documents

Publication Publication Date Title
US5293841A (en) Arrangement for utilizing the heat contained in the exhaust gas of a coal-fired boiler
KR100385372B1 (ko) 가스및증기터빈플랜트의운전방법및이에따라동작하는플랜트
JP3783195B2 (ja) ガスタービン及び蒸気タービンを有する複合発電所における電流発生
US5560209A (en) Arrangement for improving efficiency of a power plant
JPH0388902A (ja) 石炭ガス化設備を持ったガス・蒸気タービン複合設備
US5269130A (en) Method for operating a gas and steam turbine plant and gas and steam turbine plant operated according to the method
JPH0481693B2 (de)
JPH08502345A (ja) 電気的なエネルギを生ぜしめるための蒸気動力装置
US4637212A (en) Combined hot air turbine and steam power plant
US5396865A (en) Startup system for power plants
AU674751B2 (en) Steam turbine
JP3905967B2 (ja) 発電・給湯システム
CN116447572B (zh) 基于熔盐储热的燃煤锅炉启动装置及方法
RU2079672C1 (ru) Способ регенерации теплоты пара в парогазовых циклах
EP0724683B1 (de) Integrationsbau von dampfkessel und dampfturbine und methode zur speisewasservorwärmung für die dampfturbine
EP0639254B1 (de) Methode anwendbar bei kleinen kraftanlagen
US3913330A (en) Vapor generator heat recovery system
EP4286770A1 (de) Produzieren von wärme in kohlenstoffarmen energiesystemen
JP3023922B2 (ja) パワーステーション設備
CN119509189B (zh) 一种基于低压加热器的余热发电系统及控制方法
SU1733841A1 (ru) Котельна установка
SU1193362A1 (ru) Котельная установка
CN119321558A (zh) 一种燃煤锅炉排烟余热回收利用系统及工作方法
RU2069291C1 (ru) Способ регулирования температуры перегретого пара энергетического котла и котельная установка для его осуществления
RU1824510C (ru) Энергоблок теплоэлектростанций

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19960517

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LI LU MC NL PT SE

17Q First examination report despatched

Effective date: 19970818

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: FORTUM POWER AND HEAT OY

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE DK ES FR GB GR IE IT LI LU MC NL PT SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20000628

Ref country code: CH

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20000628

Ref country code: BE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20000628

REF Corresponds to:

Ref document number: 194208

Country of ref document: AT

Date of ref document: 20000715

Kind code of ref document: T

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REF Corresponds to:

Ref document number: 69425064

Country of ref document: DE

Date of ref document: 20000803

ET Fr: translation filed
ITF It: translation for a ep patent filed
REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20001011

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2148346

Country of ref document: ES

Kind code of ref document: T3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20001114

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 20000918

Ref country code: CH

Ref legal event code: PL

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DK

Payment date: 20131021

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20131022

Year of fee payment: 20

Ref country code: IE

Payment date: 20131029

Year of fee payment: 20

Ref country code: DE

Payment date: 20131021

Year of fee payment: 20

Ref country code: GB

Payment date: 20131021

Year of fee payment: 20

Ref country code: SE

Payment date: 20131022

Year of fee payment: 20

Ref country code: AT

Payment date: 20131011

Year of fee payment: 20

Ref country code: PT

Payment date: 20130412

Year of fee payment: 20

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IT

Payment date: 20131028

Year of fee payment: 20

Ref country code: NL

Payment date: 20131022

Year of fee payment: 20

Ref country code: GR

Payment date: 20131021

Year of fee payment: 20

Ref country code: ES

Payment date: 20131029

Year of fee payment: 20

REG Reference to a national code

Ref country code: DE

Ref legal event code: R071

Ref document number: 69425064

Country of ref document: DE

REG Reference to a national code

Ref country code: DK

Ref legal event code: EUP

Effective date: 20141011

REG Reference to a national code

Ref country code: DE

Ref legal event code: R071

Ref document number: 69425064

Country of ref document: DE

REG Reference to a national code

Ref country code: PT

Ref legal event code: MM4A

Free format text: MAXIMUM VALIDITY LIMIT REACHED

Effective date: 20141011

REG Reference to a national code

Ref country code: NL

Ref legal event code: V4

Effective date: 20141011

REG Reference to a national code

Ref country code: GB

Ref legal event code: PE20

Expiry date: 20141010

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK07

Ref document number: 194208

Country of ref document: AT

Kind code of ref document: T

Effective date: 20141011

REG Reference to a national code

Ref country code: SE

Ref legal event code: EUG

REG Reference to a national code

Ref country code: IE

Ref legal event code: MK9A

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20150107

REG Reference to a national code

Ref country code: GR

Ref legal event code: MA

Ref document number: 20000401765

Country of ref document: GR

Effective date: 20141012

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20141011

Ref country code: ES

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20141012

Ref country code: GB

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20141010

Ref country code: PT

Free format text: LAPSE BECAUSE OF EXPIRATION OF PROTECTION

Effective date: 20141021