EP0972894A1 - Gerüstgeländer und seine Befestigungsvorrichtung - Google Patents
Gerüstgeländer und seine Befestigungsvorrichtung Download PDFInfo
- Publication number
- EP0972894A1 EP0972894A1 EP99420161A EP99420161A EP0972894A1 EP 0972894 A1 EP0972894 A1 EP 0972894A1 EP 99420161 A EP99420161 A EP 99420161A EP 99420161 A EP99420161 A EP 99420161A EP 0972894 A1 EP0972894 A1 EP 0972894A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- stud
- pawl
- railing
- slot
- spring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 241001125879 Gobio Species 0.000 abstract 3
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 description 6
- 229910052725 zinc Inorganic materials 0.000 description 6
- 239000011701 zinc Substances 0.000 description 6
- 208000031968 Cadaver Diseases 0.000 description 3
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 3
- 230000004075 alteration Effects 0.000 description 2
- 238000002788 crimping Methods 0.000 description 2
- 238000000605 extraction Methods 0.000 description 2
- 238000005246 galvanizing Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- BASFCYQUMIYNBI-UHFFFAOYSA-N platinum Chemical compound [Pt] BASFCYQUMIYNBI-UHFFFAOYSA-N 0.000 description 2
- 240000008042 Zea mays Species 0.000 description 1
- 210000003323 beak Anatomy 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000007747 plating Methods 0.000 description 1
- 229910052697 platinum Inorganic materials 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 239000011241 protective layer Substances 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/30—Scaffolding bars or members with non-detachably fixed coupling elements
- E04G7/302—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members
- E04G7/306—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are fixed at several bars or members to connect
- E04G7/307—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are fixed at several bars or members to connect with tying means for connecting the bars or members
Definitions
- the present invention relates generally to scaffolding, and it relates more particularly to a railing scaffolding as well as the device for fixing this railing to the remaining from the scaffolding structure.
- Scaffolding is usually made up of a metal structure and floors, attached to this structure to different levels.
- the operators who work on the floors are protected from a fall to the outside by railings, which are in the form of bars arranged horizontally at approximately 1 meter and 0.5 meter in height, above the edge of the floor, and connected to the scaffolding structure.
- the tubular posts 1 of the frames 2, forming the structure of the scaffolding, carry cylindrical tubular elements 3 of axis vertical, called “sockets", welded longitudinally on each post 1, in being distributed at regular intervals along this post 1.
- the sockets 3 are usually welded in diametrically positions opposite, with respect to post 1, unless they are grouped by four and arranged, in this case, at regular angular intervals of 90 ° all around the posts 1.
- Guardrails 4 to be fixed above each floor scaffolding 5, each have a horizontal tube 6, at the ends opposite which are arranged respectively two tubular studs 7, welded perpendicular to the longitudinal direction of the tube 6, and located in the same plane.
- the frames 2, whose posts 1 carry the sockets 3, are generally arranged at a distance corresponding to the length of a railing 4, so that the railing 4 can, thanks to the studs 7 provided at its ends, come and engage in sockets 3 correspondents belonging to two consecutive 2 frames, and located at same height on one side (especially the outer side) of the scaffolding.
- the installation of a railing 4 is achieved by simultaneously engaging its two studs 7, directed towards the bottom, in the corresponding sockets 3, this by a vertical movement oriented from top to bottom (see arrow F).
- the diameter outside of the studs 7 must here be less than the inside diameter of the sockets 3, and to ensure a good connection, the studs 7 must have a length greater than that of the sockets 3.
- the studs 7 are usually fitted with safety catches called positive action, i.e. it is necessary to activate voluntarily each pawl, to release it from its safety position normally occupied, and then be able to freely remove the railing 4.
- the pawl consists of a "rocker" 8, articulated around a transverse axis 9 in the part lower of the stud 7, the rocker 8 being partially housed inside of said stud 7, from which it exits through the open lower end 10 and also by a side slit 11, opening at the lower edge of the stud 7.
- the articulation axis 9 is eccentric relative to the center of gravity G of the rocker 8, so that at rest, the rocker 8 occupies the stable position shown in Figure 2.
- the rocker 8 then comes to contact of the lower edge of the stud 7, at a point A, and the weight P of the rocker 8 exerts, with respect to axis 9, a torque which maintains the rocker 8 in this position.
- the stable position considered of the rocker 8 is an inclined position, in which a portion of said rocker 8 laterally protrudes from the stud 7, through the slot 11 of the stud 7, forming a beak (see Figure 2).
- rocker 8 It remains possible, thanks to a manual action exerted on the lower part of rocker 8 (see figure 3), to rotate this rocker according to arrow F1 to put it in an upright position, in the axis of stud 7, so that rocker 8 no longer projects laterally through the slot 11. It then becomes possible to release the stud 7 of the socket 3, by a vertical sliding movement, oriented from bottom to top (arrow F2).
- Such a device requires simultaneous intervention two people, to remove the railing 4.
- a first operator must be placed at one end of the railing 4, to rotate the rocker 8 and disengage the stud 7 from the bush 3, at this end, while a second operator performs the same manipulations to the other end of the railing 4. From the point of view of productivity, this operation is very penalizing, because it requires two operators to clear each railing, while it is a component relatively light, weighing less than 5 Kg.
- the components of scaffolding are generally hot dip galvanized, i.e. these parts are immersed in a zinc bath heated to around 500 ° C, to ensure good rust protection.
- this galvanizing operation is carried out prior to mounting the rocker.
- the galvanizing operation is rarely carried out in the manufacture of scaffolding, and many manipulations are necessary to bring the railings back to the factory and fix the rockers.
- the hinge pin 9 of each rocker 8 is constituted in practice by a rivet, the crimping of which on the stud 7 is made by riveting machines which sometimes break the protective layer of zinc, under the action of their punches. The local absence of zinc, which results, creates on the studs 7 areas susceptible to rust.
- US Patent No. 5,400,870 discloses a system which has a partial analogy with that of the invention, but which does not apply to the fixing of scaffolding railings on posts of a structure scaffolding.
- This document only concerns a system for vertical scaffolding frames, and more particularly a system for connecting the tubular uprights of such frames between them.
- the device of the aforementioned US patent has a lock or ratchet in the shape of a "U", with two branches of length uneven, the smallest branch forming a ramp and the largest branch with a catch notch and also used to manual operation.
- This connection device also requires three openings, i.e.
- the present invention aims to remedy the drawbacks previously exposed, providing a scaffolding railing provided with a fixing device which allows the guardrail to be removed by a single operator, while ensuring the required security, and which removes the zinc alterations on the studs and the risk of rust resulting therefrom, by a solution leading to a particular structure and / or use simple.
- the invention relates to a railing scaffolding and its fixing device, the railing comprising a horizontal tube at opposite ends of which are arranged two tubular studs, perpendicular to the longitudinal direction of the tube, each stud being provided without being vertically engaged in a corresponding socket, carried by a post of the structure the scaffolding, and ratchet-like means being provided for lock each stud on the corresponding socket, when the railing is put in place, said means being constituted, for each tubular stud, by a ratchet partially housed inside the stud but not mechanically linked to the stud, and mounted sliding in a non-opening side slot in the stud, the ratchet having the shape of a trapezoidal plate, the large base of which is facing the railing tube, the height of the pawl being slightly less than the length of the lateral slot of the stud, and this pawl being subjected to the action of a spring housed inside the stud and urging it ratchet in the direction of its
- a first stable position said locking, in which the pawl appears laterally projecting on the stud through the slot, the vertical sliding of the stud engaged in a socket being prevented in this position, and a second stable position known as unlocking, in which the pawl is partially pressed inside the stud, against the action of the spring, and comes into contact with the lower part of the stud slot, this position allowing the vertical movement of the stud release relative to the corresponding socket.
- the spring which requests the pawl is made in the form of a leaf spring folded in "U” and housed inside the tubular stud, a branch of the leaf spring in "U” carrying the pawl, and the other branch of this leaf spring being pressed against the inner wall of the stud, opposite the slot, without mechanical connection with said stud.
- the railing object of the invention can not only be put in place, but also removed by a single operator, the operation of dismantling the railing being carried out first placing the pawls in the stable unlocking position, both ends of the railing, then lifting the railing to release the two studs of the corresponding sockets. As for the position of locking, this provides the required safety against lifting untimely.
- each pawl and by the associated spring in particular shaped as a U-shaped leaf spring, is not mechanically linked to the stud but simply introduced by the end open bottom of the stud, so that the pawl is lodged "naturally" in the slot of the stud, while the spring ensures the retaining the ratchet while allowing limited movement, as well in radial direction than in axial direction (with reference to the stud tubular).
- the assembly is particularly simple, and does not require no mechanical assembly that could cause local alterations zinc plating of the stud.
- the railing 4 object of the invention shown partially in Figures 4 to 7, includes as already described a tube horizontal 6, at the two ends of which studs 7 are welded, perpendicular to the longitudinal direction of the tube 6.
- Each stud 7 has the shape of a sleeve, the outside diameter of which is less than inside diameter of a socket 3 into which it must be introduced (the socket 3 being here shown alone, without indication of the post which door).
- Stud 7 has a slot in its lower part lateral 12 not emerging at its lower edge, formed in a generator.
- a pawl 13 shaped of trapezoidal platinum, the large base of which faces upwards, i.e. towards the tube 6, the height of the pawl 13 being slightly less than the length of the slot 12.
- the pawl 13 is fixed, for example by welding or by crimping, on one of the branches 14a of a leaf spring 14 folded not "U", and housed inside the stud 7, the curved part 14b of the leaf spring 14 being turned upwards.
- the assembly formed by the pawl 13 and by the leaf spring 14 is not mechanically linked to stud 7. This assembly is simply initially introduced by the open lower end 10 of the stud 7, and it is held in place by engaging the pawl 13 in the slot 12, as well as by the elastic pressure and the friction of the second branch 14c of the leaf spring 14 against the inner wall of the stud 7, opposite of the slot 12.
- the pawl 13, thus formed and mounted, has two positions stable, namely a locking position and a unlocking, shown respectively in FIGS. 5 and 6.
- the unlocking position (figure 6) is obtained from the previous locking position, exerting manually on the pawl 13 a pushing action along arrow F3, tending to push in the pawl 13 through the slot 12, against the action of the leaf spring 14.
- the pawl 13 is then housed inside the stud 13, in a stable position where this pawl 13 is in contact, by its edge oblique, with the lower part of the slot 12 at point E.
- the pawl 13 protrudes still outside of stud 7, but it no longer prevents sliding vertical of the stud 7 relative to the sleeve 3.
- the contact of the pawl 13, at C, with the lower edge of the sleeve 3 no longer constitutes a blocking point, because the pawl 13, no longer in abutment (at point D), can still slide deeper inside the stud 7, until completely erase, further compressing the leaf spring 14. The vertical movement of release of the stud 7 is thus authorized.
- FIG. 7 illustrates this movement of disengaging the stud 7, during which the pawl 12, pushed back inside the stud 7, slides the along the inner wall of the sleeve 3, during the vertical movement of the stud 7 according to arrow F4.
- the leaf spring 14 which has been previously strongly compressed brings the pawl 13 back into position fully extended, and thus the pawl 13 is positioned again automatically in stable locking position.
- the disassembly of a railing 4 can therefore be performed by a single operator, by following these steps:
- the two pawls 13, located respectively at the two ends of the railing 4 and being in locking position, are put in the stable unlocking position.
- the operation is carried out successively, at one end of the railing 4 then at the other end, by the same operator.
- this operator proceeds to lifting the guardrail 4, grabbing it in the middle region of the tube 6, the overall vertical movement of the railing 4, directed from below at the top, accompanied by the release of the two studs 7 opposite the corresponding 3 sockets.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| FR9809178A FR2781242B1 (fr) | 1998-07-15 | 1998-07-15 | Garde-corps d'echafaudage et son dispositif de fixation |
| FR9809178 | 1998-07-15 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP0972894A1 true EP0972894A1 (de) | 2000-01-19 |
Family
ID=9528742
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP99420161A Withdrawn EP0972894A1 (de) | 1998-07-15 | 1999-07-12 | Gerüstgeländer und seine Befestigungsvorrichtung |
Country Status (2)
| Country | Link |
|---|---|
| EP (1) | EP0972894A1 (de) |
| FR (1) | FR2781242B1 (de) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2008015410A1 (en) * | 2006-07-31 | 2008-02-07 | Safestand Limited | Stabiliser for builders' trestles |
| CN106592946A (zh) * | 2016-12-23 | 2017-04-26 | 苏州飞华铝制工业有限公司 | 大型建筑用组合式模块化脚手架 |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2473388A (en) * | 1945-03-08 | 1949-06-14 | Safway Steel Products Inc | Tubing coupler |
| US2847259A (en) * | 1956-03-29 | 1958-08-12 | David E Beatty | Scaffold brace fastening means |
| BE777175A (fr) * | 1971-12-22 | 1972-04-17 | Travaux Hydrauliques Et Entrep | Cadre d'etanconnement. |
| FR2347508A1 (fr) * | 1976-04-06 | 1977-11-04 | Entrepose | Procede pour assurer la securite des operations de montage et de demontage de l'ossature d'un echafaudage. dispositif pour le mettre en oeuvre |
| US4188143A (en) * | 1978-04-05 | 1980-02-12 | Matsura Norio | Device for retaining scaffold member |
| FR2504215A1 (fr) * | 1981-04-21 | 1982-10-22 | Duarib Sa | Dispositif de verrouillage d'un element tubulaire sur lequel est emmanche un autre element tubulaire |
| DE9411951U1 (de) * | 1994-07-22 | 1994-09-22 | G.F Merker-Rivela, 42697 Solingen | Steckverbindung |
| US5400870A (en) * | 1991-06-24 | 1995-03-28 | Alinco, Inc. | Scaffolding frame system |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2562127A1 (fr) | 1984-03-30 | 1985-10-04 | Comabi Sa | Procede d'assemblage d'elements d'echafaudage |
-
1998
- 1998-07-15 FR FR9809178A patent/FR2781242B1/fr not_active Expired - Lifetime
-
1999
- 1999-07-12 EP EP99420161A patent/EP0972894A1/de not_active Withdrawn
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US2473388A (en) * | 1945-03-08 | 1949-06-14 | Safway Steel Products Inc | Tubing coupler |
| US2847259A (en) * | 1956-03-29 | 1958-08-12 | David E Beatty | Scaffold brace fastening means |
| BE777175A (fr) * | 1971-12-22 | 1972-04-17 | Travaux Hydrauliques Et Entrep | Cadre d'etanconnement. |
| FR2347508A1 (fr) * | 1976-04-06 | 1977-11-04 | Entrepose | Procede pour assurer la securite des operations de montage et de demontage de l'ossature d'un echafaudage. dispositif pour le mettre en oeuvre |
| US4188143A (en) * | 1978-04-05 | 1980-02-12 | Matsura Norio | Device for retaining scaffold member |
| FR2504215A1 (fr) * | 1981-04-21 | 1982-10-22 | Duarib Sa | Dispositif de verrouillage d'un element tubulaire sur lequel est emmanche un autre element tubulaire |
| US5400870A (en) * | 1991-06-24 | 1995-03-28 | Alinco, Inc. | Scaffolding frame system |
| DE9411951U1 (de) * | 1994-07-22 | 1994-09-22 | G.F Merker-Rivela, 42697 Solingen | Steckverbindung |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2008015410A1 (en) * | 2006-07-31 | 2008-02-07 | Safestand Limited | Stabiliser for builders' trestles |
| CN106592946A (zh) * | 2016-12-23 | 2017-04-26 | 苏州飞华铝制工业有限公司 | 大型建筑用组合式模块化脚手架 |
Also Published As
| Publication number | Publication date |
|---|---|
| FR2781242B1 (fr) | 2001-01-12 |
| FR2781242A1 (fr) | 2000-01-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0925996B1 (de) | Fahrzeugsitzeinheit mit auf Gleitschienen montiertem, abnehmbarem Sitz | |
| EP0678310A1 (de) | Abstürzsicherungsvorrichtung die selbsttätig auf einer Sicherheitslinie klemmbarer ist | |
| FR2720985A1 (fr) | Système de verrouillage d'un élément mobile d'un siège de véhicule automobile. | |
| CH624728A5 (de) | ||
| FR2524408A1 (fr) | Assemblages de balais d'essuie-glace | |
| FR2513290A1 (fr) | Echafaudages de type tubulaire, procede de montage et traverses horizontales de ces echafaudages | |
| FR2732706A1 (fr) | Garde-corps d'echafaudage | |
| FR2527711A1 (fr) | Noeud d'assemblage pour structures diverses, telles que des echafaudages | |
| EP0972894A1 (de) | Gerüstgeländer und seine Befestigungsvorrichtung | |
| FR2718510A1 (fr) | Procédé et dispositif d'assemblage de profilés, et structure démontable en faisant application. | |
| EP0058810B1 (de) | Aufklappbarer Seilrollenträger | |
| EP0908375A1 (de) | Vorrichtung zur Befestigung einer Vorderfront an einem Vorderbau eines Kraftfahrzeuges | |
| FR2788804A1 (fr) | Poteau de garde-corps | |
| WO2000077324A1 (fr) | Dispositif de protection contre les chutes | |
| FR2597920A1 (fr) | Dispositif permettant d'accrocher et de deplacer une echelle sur un toit, et echelle munie de ses elements | |
| EP0533556A1 (de) | Verschlusseinrichtung für eine umwendbare Tür, und Schrank mit solcher Einrichtung, für ein Elektrisches Gerät | |
| EP0385870A1 (de) | Verbindungsvorrichtung zum Einhalten des Winkels zwischen zwei Elementen, die durch ein Gelenk miteinander verbunden sind | |
| EP1073814B1 (de) | Schutzgeländer | |
| FR2655393A1 (fr) | Dispositif d'assemblage d'equerre entre des elements tubulaires. | |
| FR2555235A1 (fr) | Dispositif de blocage d'un organe, en particulier le volet ou la ridelle d'un vehicule a plate-forme | |
| FR2642577A1 (fr) | Support d'intervention sur armement de ligne electrique aerienne | |
| FR2496741A3 (fr) | Echafaudage tubulaire et ses moyens d'assemblage | |
| FR2562126A1 (fr) | Dispositif pour l'accrochage d'une console d'echafaudage a un element de charpente | |
| FR3079863A1 (fr) | Garde-corps d'echafaudage montable a partir d'un niveau inferieur a l'aide d'une perche | |
| EP0217779A2 (de) | Verbindungsteile für Gerüste |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): BE DE ES LU NL |
|
| AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
| 17P | Request for examination filed |
Effective date: 20000626 |
|
| AKX | Designation fees paid |
Free format text: BE DE ES LU NL |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
| 18D | Application deemed to be withdrawn |
Effective date: 20040116 |