EP1065332A1 - Escaliers hélicoidaux à quart-ou demi-tour - Google Patents

Escaliers hélicoidaux à quart-ou demi-tour Download PDF

Info

Publication number
EP1065332A1
EP1065332A1 EP00105774A EP00105774A EP1065332A1 EP 1065332 A1 EP1065332 A1 EP 1065332A1 EP 00105774 A EP00105774 A EP 00105774A EP 00105774 A EP00105774 A EP 00105774A EP 1065332 A1 EP1065332 A1 EP 1065332A1
Authority
EP
European Patent Office
Prior art keywords
reinforced concrete
side walls
stairs
quarter
turn
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP00105774A
Other languages
German (de)
English (en)
Inventor
Herbert Theves
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP1065332A1 publication Critical patent/EP1065332A1/fr
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof

Definitions

  • the invention relates to quarter-turn or half-turn stairs made of reinforced concrete connected to side walls or supports are, which preferably consist of reinforced concrete.
  • Quarter-turn or half-turn staircases made of reinforced concrete are usually poured into in-situ concrete or prefabricated as prefabricated concrete parts by manufacturing companies and assembled on site at the construction site.
  • the production of the spiral stairs made of reinforced concrete on site requires formwork including the attachment of connecting reinforcement and support lugs.
  • the preparation of the stairs from reinforced concrete on site has the considerable disadvantage that extensive preparatory measures are necessary on the construction site and this results in a high expenditure of time.
  • the prefabricated stairs have to be installed in a time-consuming manner, whereby assembly locks are required. These measures each require a high level of skill during installation, since aligning the stairs, this is particularly true for spiral stairs, places high demands on those who work on the building site. Assembly errors are not uncommon. Due to the complicated installation, the assembly takes a lot of time.
  • the invention has as its object the assembly effort to a minimum by assembling the coiled Reinforced concrete stairs quickly without aligning the spiral staircase takes place in the traditional sense and at the same time avoid assembly errors.
  • the side walls (2) or optional supports (3) are used preferably made of reinforced concrete.
  • the spiral connection of reinforced concrete stairs (1) with the reinforced concrete walls (2) or supports (3) can be carried out in a technological production stage as part of the prefabrication of the reinforced concrete stairs.
  • the construction of the construction according to the invention from a spiral staircase made of reinforced concrete (1) and reinforced concrete walls (2) or supports (3) is carried out in one Casting "carried out, the connection of the parts in a conventional manner, for example by means of concrete reinforcement, which causes a sufficiently firm connection of the parts to one another.
  • the stairs are optionally made Provide reinforced concrete (1) with one, two or three side walls (2).
  • the side walls (2) or supports (3) are preferably formed at floor level. Instead of the side walls (2) there is also the option of connecting the spiral staircase made of reinforced concrete (1) with supports (3) made of reinforced concrete, the connection also being made in a single manufacturing document when using reinforced concrete.
  • the prefabricated spiral stairs made of reinforced concrete offer due to their already fixed in the manufacturing process Formation on the floor-high side walls the possibility Stairs both individually on the floor or on false ceilings to be able to set up.
  • the correct installation dimension and the angle of attack of the stairs are fully fixed by the side walls, so that their alignment is reduced to a minimum during installation.
  • the stairs made of reinforced concrete with side walls prevent assembly errors since the alignment only has to be carried out by means of a vertical and horizontal part of the reinforced concrete walls.
  • Stairwells composed in a manner that consists in the fact that because of the smaller contact areas between the Conventionally connected stairs made of reinforced concrete with side walls and the surrounding walls and Ceiling is connected to a low sound transmission and so that an improvement in sound insulation is made possible. As a rule, it can even be assumed that during assembly there are no points of contact with walls.
  • the side walls can already be in the Prefabrication or on site with a sound absorbing Provide layer of conventional suitable materials become.
  • FIG. 1 shows how a quarter-turn staircase made of reinforced concrete (1) with two precast concrete side files (2) is provided. It becomes clear how on simple way of assembling the prefabricated coiled Reinforced concrete stairs (1) with side walls (2) can take place in part A, for example on the base is set up, while Part B on the floor above stands on the ceiling. Because of the straight Areas of the reinforced concrete side walls (2) is between part A and Part B allows easy alignment during assembly.
  • Figure 2 shows the spiral staircase in plan view Reinforced concrete (1) with two reinforced concrete side walls (2), wherein from the figure Figure 3 (side view above), Figure 4 (Side view center) and Figure 5 (side view bottom) clearly it becomes apparent how a close and stable connection between the concrete side walls (2) and the spiral staircase made of reinforced concrete (1) can be reached.
  • Fig. 4 (middle side view) it can be seen that in use of two reinforced concrete side walls (2), the spiral Reinforced concrete stairs (1) are self-supporting on one side. In an example, there is a span of about 2 m bridged.
  • FIG shown that depending on the chosen application, the on the planning side or on the construction site, supports (3) Reinforced concrete or steel are used.
  • the Connection of the spiral staircase made of reinforced concrete (1) with the supports (3) made of reinforced concrete is sufficiently strong and ensures the same advantages of the invention Solution as achieved with the reinforced concrete side walls (2) becomes.
  • the use of supports (3) advantageously allows realize other applications.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)
EP00105774A 1999-07-01 2000-03-18 Escaliers hélicoidaux à quart-ou demi-tour Withdrawn EP1065332A1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE29911369U DE29911369U1 (de) 1999-07-01 1999-07-01 Viertel- und halbgewendelte Treppen
DE29911369U 1999-07-01

Publications (1)

Publication Number Publication Date
EP1065332A1 true EP1065332A1 (fr) 2001-01-03

Family

ID=8075479

Family Applications (1)

Application Number Title Priority Date Filing Date
EP00105774A Withdrawn EP1065332A1 (fr) 1999-07-01 2000-03-18 Escaliers hélicoidaux à quart-ou demi-tour

Country Status (2)

Country Link
EP (1) EP1065332A1 (fr)
DE (1) DE29911369U1 (fr)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2710724A1 (de) * 1977-03-11 1978-09-14 Byelvelt Rudi Van Schraubenfoermige fluchtwegstruktur in modulfertigbauweise fuer mehrgeschossige gebaeude
DE3341057A1 (de) * 1983-11-12 1985-05-23 Benno 8400 Regensburg Domesle Verfahren zur herstellung einer gebaeudetreppe oder eines treppenhauselementes, schalung zur durchfuehrung des verfahrens und nach dem verfahren erhaltenes treppenhauselement
EP0337392A2 (fr) * 1988-04-11 1989-10-18 Heinrich Schaper Hoch-, Beton- Und Stahlbetonbau Gmbh Elément d'escalier en béton à section en U ayant la hauteur d'un étage
DE29721616U1 (de) * 1997-12-06 1999-04-08 Ammann oHG, 86830 Schwabmünchen Freitragende Treppe

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2710724A1 (de) * 1977-03-11 1978-09-14 Byelvelt Rudi Van Schraubenfoermige fluchtwegstruktur in modulfertigbauweise fuer mehrgeschossige gebaeude
DE3341057A1 (de) * 1983-11-12 1985-05-23 Benno 8400 Regensburg Domesle Verfahren zur herstellung einer gebaeudetreppe oder eines treppenhauselementes, schalung zur durchfuehrung des verfahrens und nach dem verfahren erhaltenes treppenhauselement
EP0337392A2 (fr) * 1988-04-11 1989-10-18 Heinrich Schaper Hoch-, Beton- Und Stahlbetonbau Gmbh Elément d'escalier en béton à section en U ayant la hauteur d'un étage
DE29721616U1 (de) * 1997-12-06 1999-04-08 Ammann oHG, 86830 Schwabmünchen Freitragende Treppe

Also Published As

Publication number Publication date
DE29911369U1 (de) 1999-09-16

Similar Documents

Publication Publication Date Title
DE69302390T2 (de) Rahmen für ein gebäude
DE69317274T2 (de) Bauteilsatz zur Verwendung beim Bauen und Verwendungsverfahren
DE19920032A1 (de) Herstellungs- und Montagesystem für Fertigteile von Gebäuden
EP1065332A1 (fr) Escaliers hélicoidaux à quart-ou demi-tour
DE102019107578A1 (de) Holz-/Beton-Verbundbauteil
DE2363501A1 (de) Schalenwandelement insbesondere aus schalenwandmontagesteinen
DE202004006629U1 (de) Bodenplatte mit Kellerwand
DE2705231A1 (de) Montagetreppe
DE3835790C1 (fr)
AT335686B (de) Zellenbauweise aus fertigteilen
DE29821180U1 (de) Schalungssystem für Gebäude
DE3925591A1 (de) Bausatz fuer die erstellung eines balkons
DE102019107579A1 (de) Holz-/Beton-Verbundbauteil
DE2511219A1 (de) Stahlbetonraumzelle und aus mehreren stahlbetonraumzellen bestehendes gebaeude, insbesondere tiefgarage
DE2342046A1 (de) Mehrgeschossiges fertiggebaeude
EP3502374B1 (fr) Procédé de construction d'une cage d'escalier pourvu d'une cage d'ascenseur intégrée sur ou dans un bâtiment existant
DE20301303U1 (de) Gebäudefertigteil
DE10121864B4 (de) Drempelwandvorrichtung
DD296528A5 (de) Gebaeude
DE3426898A1 (de) Verfahren zum bauen eines mehrgeschossigen gebaeudes sowie teilsaeule zur durchfuehrung des verfahrens
DE2121503A1 (de) Umschlossene Gebäudeeinheit
DE3151332A1 (de) Geschossdecke
DE4118511C2 (de) Verfahren und Bausatz zur Erzeugung einer Fertigbetontreppe
DE7828455U1 (de) Veraenderbares dachgeschoss
DE2123166A1 (de) Wohngebäude

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE FR NL

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

17P Request for examination filed

Effective date: 20010628

AKX Designation fees paid

Free format text: AT BE CH CY LI

RBV Designated contracting states (corrected)

Designated state(s): AT BE FR NL

REG Reference to a national code

Ref country code: DE

Ref legal event code: 8566

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20031001