EP1502993A2 - Machine pour échanger une voie ferrée - Google Patents

Machine pour échanger une voie ferrée Download PDF

Info

Publication number
EP1502993A2
EP1502993A2 EP04017355A EP04017355A EP1502993A2 EP 1502993 A2 EP1502993 A2 EP 1502993A2 EP 04017355 A EP04017355 A EP 04017355A EP 04017355 A EP04017355 A EP 04017355A EP 1502993 A2 EP1502993 A2 EP 1502993A2
Authority
EP
European Patent Office
Prior art keywords
rail
car
carriage
rails
train
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP04017355A
Other languages
German (de)
English (en)
Other versions
EP1502993B1 (fr
EP1502993A3 (fr
Inventor
Olaf Unbehaun
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of EP1502993A2 publication Critical patent/EP1502993A2/fr
Publication of EP1502993A3 publication Critical patent/EP1502993A3/fr
Application granted granted Critical
Publication of EP1502993B1 publication Critical patent/EP1502993B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/16—Transporting, laying, removing, or replacing rails; Moving rails placed on sleepers in the track

Definitions

  • the present invention relates to a rail change train for Remove old rails installed on sleepers and replace them New rails.
  • Rail tracks must be at intervals of several years, i. e. the worn old rails must be replaced with new bars. In the older state of the art this was done regularly in such a way that initially a trolley loaded with new rails, For example, a so-called long rail unit, the rail route drove along, and the Neuschienen loaded next to the next used old rails were unloaded. In a later operation then the rail change was essentially done by hand Transfer blocks or two-way dredgers performed. The removed old rails were in a further operation, for example by means of a crane on a especially for this provided old rail dolly loaded and transported away, if necessary after crushing on the construction site. Finally, in in a further step, all necessary welding, i. the Connection of newly laid on the sleepers new rails with each other and with the remaining track to be used and therefore left behind, carried out.
  • This generic rail change train thus allows the Summary of several separate in the older art Operations to a single joint step, namely the Transporting and unloading the new rails in the track, removing the to be replaced old rails and the discontinuation of the new rails on the this expansion freed rail support on the thresholds.
  • this object is achieved in a generic Rail change train solved in that he behind in operating direction the transfer car and before the Ausbauffenn the rail car arranged disassembly unit for dismantling old rail fasteners having.
  • This disassembly unit according to the invention allows namely, the Old rail fasteners only immediately before actual removal the old rails with the help of the expansion means of the rail car to disassemble.
  • the inventive Disassembly unit more or less immediately before the expansion means of the Rail car is arranged.
  • the inventively provided Arrangement of the dismantling unit behind the transfer car thus allows it in contrast to the rail change train known from the prior art, especially the particularly heavy vehicles of the overall system over to drive fixed old rails, namely the locomotive and the heavy loaded Neuschienen-Dolly.
  • the Dismantling a directly above the threshold working platform includes. On it can be the workers dismantling the fasteners stop, or sit on it and reach down to the thresholds.
  • the disassembly unit on the rail supports the thresholds includes lowerable disassembly devices.
  • These are in particular known screwing machines, for example also multi-spindle screwdrivers, as explained in the above-mentioned DB textbook and allow the simultaneous unscrewing of several sleeper screws.
  • a disassembly device by means of a kind Rail guide provided in the longitudinal direction movable in the disassembly unit be so that the rail change train also during the dismantling of Old rail fasteners continue its slow continuous ride can.
  • the disassembly unit basically be arranged on the rail car itself, in particular immediately before the expansion means for removing the old rails (here and in the Throughout the description, the terms "before” and “behind” are basically related to understand the operating direction of the train). Then that is also possible front bogie of the rail car still on fixed old rails drive. However, this bogie is usually not so heavily loaded, that it could not drive over unpaved rails. In addition, the Space between the bogies of the rail car for the actual rail change, so the removal of the old rails and the Placing the new rails on the rail supports needed, so that a additional disassembly unit in this position could interfere.
  • This Dismounting car can then be specially designed for optimal operation of the Disassembly devices are designed, and the place under the Rail car is completely for the actual Rail replacement available.
  • demountable one between its bogies raised frame and possibly attached to the frame work cabin includes. Under the raised frame creates a working space for the Dismantling equipment operating personnel. The work cabin can be transported serve these personnel or to accommodate disassembly unit accessories.
  • the new rails are by the Forward movement of the train automatically deducted from the Neuschienen-Dolly, as soon as the foremost newcomer ends in the so-called “threading phase” has been connected to the end of the remaining old rail track.
  • the withdrawn Neuschiene by various Guide means, in particular on rail car, but also on Disassembly car according to the invention, guided in such a way that they have a relatively "gentle” bending line to excessive Avoid material stress.
  • the rail change train especially for replacing long rails with a Length of, for example, from 120 m to be used, can be achieved an optimum bending line of the deducted from the Neuschienen-Dolly Neuschienen be provided that the rail change train also a arranged between the transfer car and the dismantling truck front distance car with guide means for lowering the from Transfer vehicles supplied Neuschienen includes.
  • This distance car serves So essentially, an extra distance between the front Transfer car and the rear dismantling car to create, and the of the Transfer vehicles supplied Neuschienen by suitable guidance means of gently lower the far end of the distance car to its rear end. It It should be mentioned at this point in general that as a guide in particular horizontally and vertically mounted rollers are used.
  • Rail shuttle provided that the takeover means of the Transfer car and the guide means of the front distance car, the Disassembly carriage and the rail car are aligned, that the new rails when driving the rail shuttle on the transfer car spread apart laterally, further spread on the front distance car and lowered under his rear bogie and around the dismantling truck be led around.
  • the dismantling truck extra space for disassembly work available, which is e.g. then from great advantage can be if with some disassembly difficulties is calculated, so that about the expected times for solving the Old rail mounting screws are larger than usual.
  • One such distance car with a narrow in the direction of travel frame facilitates the first-mentioned embodiment, the spreading and simultaneous lowering of the Neuschienen at the edges of the front distance car, and at the same time this front spacer car in a rail shuttle according to the second embodiment are used, in which case the new rails by the openings in the ground are threaded through.
  • the front one Distance wagons - as its name implies - essentially intended a certain distance between the transfer car and the Dismantling to create, so Neuschienen on a larger horizontal distance can be lowered and thus the optimal Can go through the bend line.
  • no special burden arises rest the front distance car.
  • the distance wagon it is therefore always possible, but not absolutely necessary to use the distance wagon as a separate wagon to provide a dedicated only to him front and rear bogie.
  • the rear bogie of the front spacer car as a front Be designed bogie dismantling the car. In this case, that is almost the case rear end of the front distance car via a hinge connection on the front bogie of the dismantling truck. If necessary, can also on front end of the distance car in place of a standard bogie one Single axle be provided, as there are no particularly large loads rest on the distance car.
  • this embodiment will be used when the Coupling device a welding system, preferably Abbrennstumpfsch try plant includes. This allows it, namely on the transfer car the end a currently withdrawn Neuschiene with the beginning of one next To be welded new rail to be welded, especially in the rail usual flash butt welding technique.
  • a welding system preferably Abbrennstumpfsch try plant includes. This allows it, namely on the transfer car the end a currently withdrawn Neuschiene with the beginning of one next To be welded new rail to be welded, especially in the rail usual flash butt welding technique.
  • This special Resistance pressure welding process and corresponding, usually stationary Welding systems used are known in the art and also in the described above DB textbook.
  • the disassembly unit is provided with in it Tool to, old rail fasteners and other small parts too dismantle, which are made in particular of metal.
  • a magnetic iron collecting device be provided in the operating direction behind the Disassembly.
  • this is an electromagnetic drum, the attracts metal objects in its lower area and in its upper area fall onto a conveyor belt, from where the metal objects then into a Be promoted container.
  • Such systems are well known and will not to be continued here.
  • the expansion means a threshold holding device, in particular one between the Old rails caterpillar track or a runner, over the Threshold surfaces is pulled to depress the thresholds be provided. This avoids that by the expansion means removed old rails, which lifted off the rail supports or the Side, due to adhesive forces take the thresholds or move.
  • rails need to be open for the endlessly welded track a certain target temperature can be brought, which is at about 21 to 23 ° C.
  • these are the rails, usually at night, with so-called heat pipes subjected to a temperature elongation.
  • This step usually at finished laying on the thresholds, but not yet fortified or again dissolved new cheeks, can now elegantly into the described method are integrated when the rail car with Heat pipes for temperature elongation of the new rails is provided.
  • the rail change train also has an operating direction of travel arranged behind the guide means of the rail car Assembly unit for mounting the new rails on the thresholds comprises.
  • Assembly unit is basically the dismantling unit already described above similarly, i. In turn, it can be located immediately above the thresholds Work platform should include, and in particular on the rail supports of Swell include lowerable mounting devices.
  • the mounting unit can basically be at the rear end of the Rail car be mounted, such as in the form of a work platform with attached lowerable mounting devices.
  • the assembly unit on a in operating direction behind the Rail car exchangers arranged assembly cars be provided.
  • This Mounting carriage corresponds in terms of its construction substantially the above described dismantling car. So again it can be provided that the assembly carriage a raised between its bogies frame and a work cage attached to the frame.
  • the rail shuttle according to the invention described so far thus expediently comprises a at its front end Transfer car, which directly to a drawn by a locomotive Neuschienen transport unit is coupled, behind a front Distance car, a dismantling car, the rail car, as well as in conclusion, i. in the direction of travel at the rear, the described assembly carriage.
  • Rail change train unloaded the new rails, in optimal bending line through Guided guide led to rail car and there directly to the Rail supports of the sleepers are discontinued, with the rails already through a welding system on the transfer car to a more or less "endless" tape were welded and when passing through the Heat pipes on rail car of a required temperature elongation were subjected.
  • the Final assembly of newly installed new rails on the sleepers In the final assembly cart then the Final assembly of newly installed new rails on the sleepers.
  • Rail change train can be achieved in that it further one arranged between the assembly carriage and the transfer car rear distance carriage with guide means for lifting the over guide means includes old rails supplied by the rail change carriage.
  • the function and The construction of this rear distance car corresponds to that of the above explained front distance car.
  • Rail replacement with regard to the new rails so are also in the rear Range with regard to the old rails turn different Management options can be realized: For example, it can be provided that the guide means of the rail car, the assembly truck and the rear distance car and the transfer means of the transfer car in such a way are aligned that the old rails when driving the rail shuttle on Rail car side spread apart to the mounting car guided around and on the rear distance car over his rear bogie be raised. This in turn offers the advantage that no old rails through Run through the assembly car, so that the staff working there undisturbed important assembly of new rails can make.
  • a continuous slow ride of the To allow rail change train according to the invention and to avoid that to separate the old ribbon into individual sections of the entire train can stop can be similar to that provided in the front train area
  • Coupling device for coupling the new rails also provided here be that the separator on a longitudinal direction of the transfer car slidable carriage is arranged. For example, one on one Saw arranged first in the front area of the transfer car be arranged, and the old track belt passes through the saw. As soon as the maximum loading length on the old rail transport vehicle is reached, ie about a length of about 120 m, the saw is turned on and then sawn through the old track band, which takes a few seconds.
  • mechanical scrapers can be, for example, metal ribs or webs act, which are mounted in front of a roller pair forming a guide means and over which the dismantled old rail slides, in which case one at the bottom the old rail-sticking object "gets stuck" and is thus removed.
  • the invention avoids Rail change train the problem occurring in the prior art that heavy Vehicles, in particular the locomotive and the fully laden Neuschienen-Dolly, have to drive over unpaved tracks.
  • rail exchange trailer attached old rail transport trolley which can achieve the same total weight drives at proposed system over fixed rails, namely in the area of Mounting car fastened new rails.
  • they are also so far Some bogies inevitably discussed unsecured rails to lead, namely the rear bogie of the dismantling car, the Bogies of the rail car and the front bogie of the Montagewagen, according to all bogies between the Disassembly area and the mounting area.
  • This emergency rerouting device can in particular be telescopic extendable and / or pivotable supports, preferably are mechanically and / or hydraulically actuated.
  • Fig. 1 shows a highly simplified schematic view of Rail change train 10 according to the invention, wherein Fig. 1a is a side view and Fig. 1b is a plan view.
  • the structure of this rail change train 10 is in Following in Fig. 1 from right to left opposite to the arrow P indicated operating direction explained. This operating direction from the left to the right applies to all other side views and plan views.
  • the rail change train 10 is characterized by a in the Figures drawn locomotive not shown, for example, in Figs. 1a and 1b would each be coupled to the right end of the illustrated carriage sequence.
  • the first carriage shown on the right in FIGS. 1a and 1b is a common one Long rail unit, which is used here as Neuschienen-Dolly 12.
  • Neuschienen-transport vehicle 12 On this Neuschienen-transport vehicle 12 are, as in particular in the Rear view of FIG. 3 is shown to be laid Neuschienen 14 stored, possibly in several layers one above the other.
  • a front spacer car 20 Behind the transfer car 16 follows as the next part of Rail exchange 10 of the invention a front spacer car 20.
  • the rear end of the front spacer car 20 however, is rotatably mounted on a front bogie 24 of a subsequent disassembly carriage 26 according to the invention.
  • FIG. 1 b As can be seen in the plan view of FIG. 1 b well, has the front spacer cars 20 via a so-called "narrow frame" 20a, i. its frame has between its front single axis 22 and the rear Bogie 24 a smaller width transverse to the operating direction of travel (arrow P) as at his ends up.
  • the Frame 20a of the front spacer car 20 according to the invention at least in its middle area is narrower than any other vehicle frame. It was However, at this point it should be noted that other cars, in particular following in the operating direction of the dismantling 26 cars Rail car 28, a narrow frame may have.
  • FIGs. 1 a and 1b the on the Rail car 28 following rear part of the invention Rail shuttle 10 substantially symmetrical to its front part is designed. So follows on the rail car 28 initially a Assembly cart 30 for mounting the installed new rails 14 and a rear Distance car 32, the front end turn on the rear bogie 24 of the assembly carriage 30 rests, which thus virtually a common bogie 24 forms for these two vehicles, which is in the operating direction rear end of the rear spacer car 32 in turn by means of a single axis 22 supported on the rails. It is understood, however, that the rear Distance cars 32 as well as the front distance car 20 as a completely independent car with two own bogies 24 or single axles can be trained. Likewise, one of the two distance cars 20, 32 as stand-alone car with two bogies 24 be designed, each other cars then in the manner shown here in Fig. 1 with a Single axis 22.
  • a separating device 40 is schematically indicated, which in particular is a saw or a cutting torch or else a combination of these devices can act, and which serves as the Endless belt removed old rails 36 back into individual rail pieces according to the usable loading length of the old rail transport carriage 38 separate.
  • Rail change train 10 After this purely constructive explanation of the structure of Rail change train 10 according to the invention will be described below with reference to FIG. 2 an example of Neuschienen- and old rail guide when rail changes with Help the rail change train 10 of the invention will be explained. Out For reasons of clarity of drawing, some vehicle superstructures in FIG. 2b has been omitted.
  • Fig. 2 shows an example of the Neuschienen- and the old rail course during the continuous operation of the invention Rail shuttle 10, i. after the conclusion of the first to be explained Einfädelphase.
  • This threading is done as follows: First decided from which track position the old rails 36 removed and through New rails 14 are to be replaced, which is essentially due to the wear of the Old rails 36 depends. At this position, the thresholds 42 severed mounted old rails.
  • the rail change train according to the invention then goes so far into the construction site that the rail car 28 on This separation between the end of the lying and the beginning of the to be built old rails 36 is.
  • both the locomotive and the heavily loaded Neuschienen-transport vehicle 12 still drive on paved old rails 36.
  • the Rail support on the thresholds 42 have been exposed over several meters, the first new rails 14 are threaded. It will be in the further Description assumed that these are long rails 14 with a length of 120 m and more, on the Neuschienen-dolly 12 are charged, as shown in Fig. 3.
  • the plan view of Fig. 2b now also the advantage of the proposed for the front transfer car 20 narrow frame 20a, namely, which allows the new rails 14 in Lowering the area of the front distance car 20:
  • the new rails 14 are at the front end of the front Distance car 20 still above the normal frame level of all vehicles, i.e.
  • the guide means 44 In the area of the rail car 28, the guide means 44 in turn arranged so that the new rails 14 just before the rear Bogie 24 of the rail car 28 the rail support on the Reach thresholds 42 and can be discontinued there.
  • Fig. 2b can be seen further to the Neuschienen-course largely symmetrical old rail course:
  • the developed old rails 36 are in the Area of the front bogie 24 of the rail car 28 from the Rail supports lifted by the guide means 44 to the Assembly cart 30 guided around and finally in the area of the rear Distance car 32 and the transfer car 34 so far merged again that they pushed onto the final old rail trolley 38 can be.
  • the shown old rails course offers the Advantage that the staff working in the assembly vehicle 30 is fully on the assembly the newly laid new rails 14, i.
  • Neuschienen 14 means Screws and clamps on the sleepers 42, can concentrate, and that Risk of injury from passing old rails 36 is excluded. It is again emphasized that the old rails 36 and also the new rails 14 only in the reference frame of the railcar 10 itself almost horizontal pass by, in the earth-fixed reference system, however, perform the rails exclusively an up and down movement, and the train moves in the figures of from left to right.
  • Fig. 3 shows a greatly simplified rear view, i. a View from the front end of the transfer trolley 16 in the direction of travel to front, on the Neuschienen-Dolly 12, the front of the invention Train 10 is coupled.
  • the Neuschienen-Dolly 12 includes in Essentially a horizontal frame 12a, which has one at its bottom mounted suspension device with a bogie 24 or - as in Fig. 3 from For reasons of simplicity - a simple axis 22 in the usual way connected is.
  • the wheels 46 run on still laid and fastened old rails 36, which are fastened in the region of the rail supports on the sleepers 42.
  • Neuschienen 14 are charged to the frame 12a, in the example of FIG. 3 in two Layers on top of each other.
  • Vehicle boundary profile F drawn i. the area around the track around, no part of a passing train in transport position may protrude.
  • the meaning of this vehicle boundary profile F will continue below in connection with the possible use of a narrow frame be explained for the rail car 28.
  • the new rails 14 Between the front single axle 22 and the rear bogie 24 of the front spacer car 20, the new rails 14 through the normal Lowered frame level, which is facilitated by the fact that the Frame 20a is designed as a narrow frame. Thus, the new rails run 14 under a work booth 48 mounted on the bogie 24, that the front spacer car 20 and the dismantling 26 share.
  • Fig. 6 shows a partially sectioned rear view of the disassembly carriage 26 according to the invention, wherein the section approximately in the rear Area of the front bogie 24 is made (section along the line VI-VI in Fig. 5a).
  • the frame 26a of the dismantling carriage 26 which has a Trunnion 52 is supported on the front bogie 24.
  • the frame 26a is in this range at the level of the normal frame level, i. for example, in approximately the same height as the frame 16 a of Transfer carriage 16, the frame 12a of the new rail transport vehicle 12th etc. (see Fig. 1a).
  • a work booth 48 arranged for the staff working in the dismantling 26. It can be seen in Fig. 6 in the middle of a leading into the work cabin door 48 and side windows. It can also be seen in Fig. 6 left and right outside of the frame 26a suspended guide means holders 45, in their lower in Fig. 6 Each area a roller 44 as a guide means for the pair of new rails hold.
  • Fig. 6 is a view in the direction of travel of Rail change train 10.
  • the in Fig. 6 left and right on the respective Rolls 44 current Neuschienen 14 thus run in the reference system of the train 10 the viewer and are hereby lowered continuously, then behind the viewer, namely in the area of the rail car 28, again spread apart on the rail supports to be discontinued.
  • Fig. 7 shows a highly simplified schematic cross-sectional view similar to Fig. 6, but with the cut through the dismantling something is further back, so here by the raised area of the Frame 26 a has been cut, namely along the section line VII-VII in Fig. 5a.
  • Fig. 7 two in the longitudinal direction of the dismantling carriage 26th extending and fastened at the bottom of its raised frame 26 a Longitudinal member 54.
  • a roller holder 56 shown with a spring suspension 58, on whose lower end of an electric screwdriver 60 is suspended in the in Fig. 7 just shown by a worker 62 to unscrew a Threshold screw is used.
  • the roller holder 56 allows the Displacement of the electric screwdriver 60 along the longitudinal member 54 in The longitudinal direction of the dismantling carriage 26.
  • the further course of Neuschienen 14 towards Schienenetzlager is now shown in Figs. 8a and 8b.
  • a Iron collecting device 64 which is a substantially
  • the iron collecting container 66 comprises, in the small iron, e.g. dismantled Threshold screws and tension clamps conveyed via a conveyor belt 68 on which these pieces of hardware from a just above the thresholds 42 driving magnetic drum 70 are thrown.
  • Fig. 8 In Fig. 8 is shown centrally the rail car 28 with a elevated frame 28a, in the middle of two working seats 72 are suspended. Of the The purpose of these working seats 72 is described below in particular with reference to Top view in Fig. 8b are explained:
  • Fig. 8 Neuschienen- and Altschienen.00
  • the in Fig. 2 corresponds explained variant, is approximately the middle of the rail car 28 the area at which a seated on a seat 72 worker 62 on undisturbed on the sleepers 42 down, an old liner lose weight and put on a new liner.
  • Fig. 8b Immediately sees, is at any other longitudinal position of the rail car 28 either from the front coming pair of Neuschienen 14 or after behind withdrawn pair of removed old rails 36 closer to the track axis located in Fig. 8b in the middle of the rail car 28 by a dash-dotted line is indicated.
  • a pair of heat pipes 74 which by means of a holder on Rail car frame 28a are suspended.
  • In these heat pipes 74 is the prescribed temperature elongation of the Neuschienen to be laid 14, by you bring them to a well-defined target temperature.
  • the heat pipes - as the name implies - are used as heating elements. Basically but it is also conceivable to replace the heat pipes with cooling elements, then For example, in the summer during the day defined target temperatures of the new rails 14 to reach.
  • Fig. 8a In the side view of Fig. 8a can be seen on the Rail car 28 a roof 28b.
  • Gas cylinders in particular propane cylinders 76 for supplying energy to the Heat pipes 74 are stored safely.
  • Fig. 8a it can be seen in Fig. 8a in the area the working seats 72 container 78, in particular for collected old Liners and new liners to be laid, as well as for iron and steel Bracing elements.
  • FIG. 9 shows a sectional view of the rail vehicle 280 opposite to the direction of travel of the train, the section along the in Fig. 8b dash-dotted line IX-IX was performed.
  • This view So corresponds to a view from the front of the rail car 28 to the rear, in other words, the one shown in Fig. 9 moves Rail car 28 when driving the rail shuttle 10 on the Viewer too.
  • Fig. 9 left schematically indicated a Guide means holder 45 with a guide roller 44, which is strictly speaking not in the sectional plane shown in Fig. 9, but in the direction of travel of the train 10 behind it (approximately in the area of the rear bogie 24 of Rail car 28).
  • the drawn, running on the roll 44 Rail is thus the already discussed old rail 36, in this further back plane on the one hand lifted up and on the other was spread away to the left, as in the two views of FIG. 8 clearly illustrated and symbolized in Fig. 9 by the arrow AS.
  • FIG. 9 right schematically indicated another guide means holder 45 with a guide roller 44.
  • the arrangement is not in the sectional plane according to FIG. 9, but in the direction of travel of the train 10 in front, i. closer to the viewer of FIG. 9 (substantially in the area of the front bogie 24 of the Rail car 28).
  • the rail running on this roller 44 is a new rail 14 brought up from the front draw area, between this further forward plane and the actually shown in Fig. 9 Cutting plane is lowered and further inward, as is also the case clearly shows from the two views of FIG. 8 and in Fig. 9 by the arrow NS is symbolized.
  • Fig. 10a shows first a variant in which the pair of new rails 14 as in the previously discussed embodiment to the dismantling 26th spread around to provide maximum space there, where the Neuschienen 14 then in the area of the rail car 28 inside be led to finally in front of the rear bogie 24 of the Rail car 28 in the track axis on the rail supports to be discontinued.
  • the Neuschienen Entry corresponds to the date discussed course.
  • the old rails 36 are in this embodiment of FIG. 10a not spread outwards around the assembly carriage 30, but run there in the area of the track center. That in the assembly car 30, the otherwise in construction corresponds to the dismantling 26, active personnel must therefore on pay attention to passing through the assembly carriage 30 old rails 36.
  • the old rails 36 are then immediately behind the front bogie 24 of the rail car 28 separated, for example sawn through, as well as that of the front Switzerland Jardin Arriving Neuschienenclam seperated at a suitable place and attracts re-start the rail shuttle 10 automatically to the last remaining meters of rail supports on sleepers 42.
  • this is missing now for the last few meters of the old rails 36 to be removed necessary back pressure, which they during continuous operation on the Old rail trolley 38 pushes, since the old rails 36 yes, as just explained, were already severed in the track.
  • are on the Transfer car 34 usually provided transfer means designed to are to use the old rails 36 removed and on the old rail transport vehicle 38 to push. These may be, in particular, crane arms or gantry cranes, as generally known in the art Area of collecting old rails known and in Fig. 1 as an arm on the Separator 40 are indicated schematically.
  • the rail change train according to the invention was in the figures on the basis of his preferred, but by no means restrictive Embodiment, explained in the behind the rail car 28 more cars for mounting the freshly laid Neuschienen 14 and the removed old rails 36 are coupled. It is, however, again to Remember that the rail change train 10 according to the invention in principle also without these components, as mounting in the area of Rail car 28 laid new rails 14 in principle also by a work troop running behind the train 10 can take place. Likewise the collection of the old rails 36 also by conventional rail loading units, about the "design Robel" done.
  • Essential to the invention is namely, starting from the generic rail change train only the use of the described Dismantling unit, approximately in the form of detailed demounting carriage 26, behind the takeover wagon 16 and before the expansion of the Railcar 28 is arranged and thus the number of bogies 24, which have to drive over unpaved rails, considerably reduced.
  • the rail car 28 When an embodiment of the rail car 28 is used, the is provided with heat pipes 74, so should the front hydraulic device in Operating direction in front of the heat pipes 74 and the rear hydraulic device behind the heat pipes 74 are each attached to the frame 28a such that they by controlled extension of pistons on the passing Neuschienen 14th can press.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Adhesives Or Adhesive Processes (AREA)
  • Transition And Organic Metals Composition Catalysts For Addition Polymerization (AREA)
EP04017355A 2003-07-30 2004-07-22 Machine pour échanger une voie ferrée Expired - Lifetime EP1502993B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE10334846A DE10334846A1 (de) 2003-07-30 2003-07-30 Schienenwechselzug
DE10334846 2003-07-30

Publications (3)

Publication Number Publication Date
EP1502993A2 true EP1502993A2 (fr) 2005-02-02
EP1502993A3 EP1502993A3 (fr) 2006-04-26
EP1502993B1 EP1502993B1 (fr) 2008-03-12

Family

ID=33521487

Family Applications (1)

Application Number Title Priority Date Filing Date
EP04017355A Expired - Lifetime EP1502993B1 (fr) 2003-07-30 2004-07-22 Machine pour échanger une voie ferrée

Country Status (3)

Country Link
EP (1) EP1502993B1 (fr)
AT (1) ATE389064T1 (fr)
DE (2) DE10334846A1 (fr)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008154986A1 (fr) * 2007-06-19 2008-12-24 Franz Plasser Bahnbaumaschinen-Industriegesellschaft Mbh Machine de réception et de logement de petit matériel d'une voie et procédé associé
CN105155370A (zh) * 2015-09-30 2015-12-16 株洲时代电子技术有限公司 一种连续换轨作业列车及其作业方法
CN105369700A (zh) * 2015-12-08 2016-03-02 广州铁路(集团)公司广州工务大修段 无缝线路一体化换轨方法
WO2017129214A1 (fr) * 2016-01-27 2017-08-03 Robel Bahnbaumaschinen Gmbh Véhicule de maintenance
WO2018050917A1 (fr) * 2016-09-19 2018-03-22 Schwihag Ag Mécanisme de préhension pour machine d'agrafage par vis et broche
CN112744238A (zh) * 2019-10-31 2021-05-04 中车沈阳机车车辆有限公司 自动间隔装置、运轨车及长钢轨运输车组
CN114622450A (zh) * 2022-02-11 2022-06-14 中国铁路广州局集团有限公司 高速铁路一体化换轨列车编排结构以及换轨方法
CN115418897A (zh) * 2022-09-21 2022-12-02 成都瑞威交通科技有限公司 一种高铁既有线路钢轨换铺施工方法
WO2023241089A1 (fr) * 2022-06-16 2023-12-21 中铁上海工程局集团(苏州)轨道交通科技研究院有限公司 Dispositif de levage synchrone et de déplacement transversal pour remplacement de rail long en acier

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102009033516A1 (de) * 2009-07-15 2011-04-14 Db Gleisbau Gmbh Fahrzeug zur Durchführung von Baumaßnahmen im Gleisbereich des Eisenbahnverkehrs
DE202022002760U1 (de) 2022-05-18 2023-08-21 Martin Buck Vorrichtung zur Fixierung von Laufschienen eines Hochregallagergestells
DE102022112480A1 (de) 2022-05-18 2023-11-23 Martin Buck Vorrichtung und Verfahren zur Fixierung von Laufschienen eines Hochregallagergestells

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT366435B (de) * 1978-12-12 1982-04-13 Plasser Bahnbaumasch Franz Einrichtung zum auswechseln bzw. erneuern der schienen eines verlegten gleises
GB8413659D0 (en) * 1984-05-29 1984-07-04 Northern Eng Ind Rail handling train
ES2110306T3 (es) * 1995-03-24 1998-02-01 Scheuchzer Sa Procedimiento para el atornillado y desatornillado de los tirafondos de una via ferrea y maquina para la realizacion del procedimiento.

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
5. AUFL.: "Arbeitsvefahren für die Insandhaltung des Oberbaus", 2000, EISENBAHN-FACHVERLAG, HEIDELBERG/MAINZ, ISBN: 39801093-7-2

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008154986A1 (fr) * 2007-06-19 2008-12-24 Franz Plasser Bahnbaumaschinen-Industriegesellschaft Mbh Machine de réception et de logement de petit matériel d'une voie et procédé associé
AT505403B1 (de) * 2007-06-19 2009-01-15 Plasser Bahnbaumasch Franz Maschine zur aufnahme und lagerung von kleineisen eines gleises sowie verfahren
EA015062B1 (ru) * 2007-06-19 2011-04-29 Франц Плассер Банбаумашинен-Индустригезельшафт Мбх Машина для приема и хранения скреплений рельсового пути, а также метод
US7966938B2 (en) 2007-06-19 2011-06-28 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Machine for picking up and storing rail fastenings of a track, and a method
CN105155370A (zh) * 2015-09-30 2015-12-16 株洲时代电子技术有限公司 一种连续换轨作业列车及其作业方法
CN105369700A (zh) * 2015-12-08 2016-03-02 广州铁路(集团)公司广州工务大修段 无缝线路一体化换轨方法
WO2017129214A1 (fr) * 2016-01-27 2017-08-03 Robel Bahnbaumaschinen Gmbh Véhicule de maintenance
US10808363B2 (en) 2016-01-27 2020-10-20 Robel Bahnbaumaschinen Gmbh Maintenance vehicle
WO2018050917A1 (fr) * 2016-09-19 2018-03-22 Schwihag Ag Mécanisme de préhension pour machine d'agrafage par vis et broche
US11293145B2 (en) 2016-09-19 2022-04-05 Schwihag Ag Gripping mechanism for spindle-screw clipping machine
CN112744238A (zh) * 2019-10-31 2021-05-04 中车沈阳机车车辆有限公司 自动间隔装置、运轨车及长钢轨运输车组
CN112744238B (zh) * 2019-10-31 2023-06-13 中车沈阳机车车辆有限公司 自动间隔装置、运轨车及长钢轨运输车组
CN114622450A (zh) * 2022-02-11 2022-06-14 中国铁路广州局集团有限公司 高速铁路一体化换轨列车编排结构以及换轨方法
WO2023241089A1 (fr) * 2022-06-16 2023-12-21 中铁上海工程局集团(苏州)轨道交通科技研究院有限公司 Dispositif de levage synchrone et de déplacement transversal pour remplacement de rail long en acier
CN115418897A (zh) * 2022-09-21 2022-12-02 成都瑞威交通科技有限公司 一种高铁既有线路钢轨换铺施工方法

Also Published As

Publication number Publication date
DE10334846A1 (de) 2005-02-24
ATE389064T1 (de) 2008-03-15
EP1502993B1 (fr) 2008-03-12
EP1502993A3 (fr) 2006-04-26
DE502004006462D1 (de) 2008-04-24

Similar Documents

Publication Publication Date Title
DE2840917C2 (fr)
EP0682148B1 (fr) Appareillage pour le transport des tronçons assemblés de la voie
CH639717A5 (de) Einrichtung zum kontinuierlichen abbauen oder auswechseln der schienen und schwellen eines gleises.
EP2576908A1 (fr) Combinaison de véhicules pour le transport de rails
CH688615A5 (de) Maschine zur Vorbereitung von Schweissarbeiten.
DE4421662A1 (de) Arbeitszug zum Austauschen alter Schwellen eines Gleises gegen neue Schwellen
DD284068A5 (de) Gleisumbauzug
EP1502993B1 (fr) Machine pour échanger une voie ferrée
DE3706563C2 (de) Fahrbare Anlage zum Aufnehmen oder Verlegen sowie Transportieren von Gleisjochen
DE2529135A1 (de) Verfahren zur vollstaendigen erneuerung einer eisenbahnschienenstrecke und bauzug zur durchfuehrung dieses verfahrens
DE3430002C2 (fr)
EP0486456B1 (fr) Wagon pour le transport d'aiguillage ferroviaire
DD278368A5 (de) Gleisverfahrbare maschinen-anordnung zum ein- oder ausziehen der querschwellen
DE2542778B1 (de) Verfahren zum mechanisierten einbringen von streckenausbau und einrichtung zur durchfuehrung des verfahrens
EP2374683A2 (fr) Véhicule destiné à l'exécution de travaux sur des voies ferrées
DE2928355C2 (fr)
DE3511520A1 (de) Schienenwagen zum auswechseln oder verlegen bzw. abbauen, sowie zum transportieren von gleisjochen
DE3017655C2 (de) Einrichtung zur kontinuierlichen Abförderung des mittels einer Vortriebsmaschine geschrämten Materials in Strecken oder Tunnels
DE2228196A1 (de) Verfahren und anordnung zur erneuerung von eisenbahnschienenabschnitten
WO2006117066A1 (fr) Procede et dispositif d'echange d'essieu de roues dans des vehicules ferroviaires, au moyen d'un mecanisme mobile
DE3343618C2 (de) Gleisbaumaschine zum Ausräumen und Planieren des Schotters
DE3420829A1 (de) System zum auswechseln von walzgeruesten eines formstahl-walzwerks, als walzgeruesttraeger dienender mehrfachfunktions-laufwagen fuer das aufstellen an den walzplaetzen und den transport zu den vormontagestellen
DE19610440A1 (de) Vorrichtung zum Zusammenbau und zum Verlegen von Spurträger- und Vorbauträgerabschnitten zu einem Brückentragwerk
DE957449C (de) Dreiachsiges Kraftfahrzeug zur Befoerderung von Eisenbahnwagen auf gewoehnlichen Strassen
DE3528152A1 (de) Umbauwagen fuer gleisanlagen

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL HR LT LV MK

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL HR LT LV MK

AKX Designation fees paid
17P Request for examination filed

Effective date: 20061026

RBV Designated contracting states (corrected)

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REF Corresponds to:

Ref document number: 502004006462

Country of ref document: DE

Date of ref document: 20080424

Kind code of ref document: P

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080312

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: SCHMAUDER & PARTNER AG PATENTANWALTSBUERO

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080312

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080312

REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080623

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080312

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080818

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080312

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080612

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080312

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080312

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20080624

Year of fee payment: 5

EN Fr: translation not filed
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080312

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080312

26N No opposition filed

Effective date: 20081215

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080312

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090102

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080612

REG Reference to a national code

Ref country code: CH

Ref legal event code: PCAR

Free format text: SCHMAUDER & PARTNER AG PATENT- UND MARKENANWAELTE VSP;ZWAENGIWEG 7;8038 ZUERICH (CH)

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080312

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080312

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20090723

Year of fee payment: 6

Ref country code: CH

Payment date: 20090727

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20090929

Year of fee payment: 6

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20090722

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090722

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080731

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080722

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080913

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080312

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080613

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100731

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20110201

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100731

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 502004006462

Country of ref document: DE

Effective date: 20110201

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20100722