EP1559841A2 - Regard de collecte d'eaux usées - Google Patents

Regard de collecte d'eaux usées Download PDF

Info

Publication number
EP1559841A2
EP1559841A2 EP04028908A EP04028908A EP1559841A2 EP 1559841 A2 EP1559841 A2 EP 1559841A2 EP 04028908 A EP04028908 A EP 04028908A EP 04028908 A EP04028908 A EP 04028908A EP 1559841 A2 EP1559841 A2 EP 1559841A2
Authority
EP
European Patent Office
Prior art keywords
time
time duration
measurement
wastewater
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP04028908A
Other languages
German (de)
English (en)
Other versions
EP1559841A3 (fr
EP1559841B1 (fr
Inventor
Holge Wiese
Bernd Schneider
Jens Oppitz
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jung Pumpen GmbH
Original Assignee
Jung Pumpen GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jung Pumpen GmbH filed Critical Jung Pumpen GmbH
Priority to PL04028908T priority Critical patent/PL1559841T3/pl
Publication of EP1559841A2 publication Critical patent/EP1559841A2/fr
Publication of EP1559841A3 publication Critical patent/EP1559841A3/fr
Application granted granted Critical
Publication of EP1559841B1 publication Critical patent/EP1559841B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/22Adaptations of pumping plants for lifting sewage

Definitions

  • the invention relates to a sewer manhole with explosion hazard or non-explosive atmosphere above the sewage level, being in the sewage at least a sewage pump is immersed, wherein the Sewer pump depending on an upper level of the sewage level and after a delivery time can be switched off again.
  • Such a sewer manhole is from the state of Technique known.
  • sewage collection shafts or their Operation must follow guidelines, according to which It should be avoided that mechanically moving parts with the air-gas mixture of a potentially explosive atmosphere come in contact. So it must be in the removal of sewage be avoided that moving parts of the sewage pump due to excessive sinking of the wastewater level with come into contact with the potentially explosive atmosphere. This means that the sewage pump is not too late may be turned off.
  • the optimal delivery time is et al depending on the back pressure against which the sewage pump removes the wastewater. Is a low back pressure on, the delivery time is shorter, at higher back pressures increases the funding period. Also an inflow of Waste water when the pump is activated influences the optimal delivery time.
  • the procedure described is disadvantageous for several reasons.
  • the present invention has the object underlying, a sewer manhole as known presupposed way of creating with the reliable and optimal delivery time can be determined with little effort is.
  • a Pump control a timing device and a pressure sensing device is provided, wherein with the timing device a period of time between the detection of two corresponding to different heights of the wastewater level, predetermined pressure values can be measured, depending on the duration of the measured time of the Pump control can be specified.
  • the wastewater collection shaft according to the invention allows the determination an optimal conveying time without manual intervention.
  • the amount of time that is necessary to lower the sewage level by a certain amount determined and on the basis of this period determines the funding period.
  • the beginning and the end of the mentioned period correspond to the acquisition of predetermined pressure values, the different heights of the sewage level correspond.
  • the delivery time may be during installation and / or maintenance be predeterminable of the sewage collection shaft.
  • This funding period can for the further operation of the sewage collection shaft to be maintained without changes.
  • the funding period correspond to a multiple of the measured time duration.
  • the delivery time in dependence changeable from a respective last measured time duration is. This allows it without manual intervention the funding period corresponding to a changing, at the Sewage pump adjoining applied back pressure. In this case, successive measurements can also each be considered proportionally.
  • the pressure sensing device may include a ram bell and / or have a back pressure hose. This has the Advantage that no electrical components with the explosion hazard Atmosphere come into contact.
  • the pressure sensing device may include a dynamic pressure sensor, a differential pressure sensor and / or a pressure switch, esp. Have a pressure switch with hysteresis.
  • These sensors or switches can the Stauffyglokke and / or downstream of the dynamic pressure hose, wherein the switches or sensors in a non-hazardous Environment should be arranged.
  • the pressure sensing device or the switches or sensors can be electrical or via radio with the pump control communicate.
  • the use of a radio link has the advantage that the pump control on one further distant location of the sewer manhole is.
  • the invention further relates to a method for operating a Wastewater collection tray.
  • a wastewater collecting shaft 2 is provided, which is arranged below a cover 2a. Within the sewage collection shaft 2 wastewater 4 can be collected which forms a sewage level 6. The room 8 above the sewage level 6 is at risk of explosion.
  • the waste water 4 is the sewage collection shaft 2 by a Supply line 10 supplied.
  • a sewage pump 12 a In the collected wastewater 4 dives at least partially a sewage pump 12 a. These has a volute 14, which always in the waste water. 4 should be immersed.
  • the pump 12 is over a Flange 16 in an anchoring area 18 in the ground 20th attached.
  • the pump 12 is followed by a drain line 22, wherein vary the voltage applied in the drain line back pressure can.
  • a dynamic pressure bell 24 is arranged, the via a dynamic pressure hose 26 with a switching / sensor device 28 communicates.
  • the device 28 communicates with a pump control 30.
  • one of the units 28 according to FIG. 1 is corresponding Unit 28a with a hysteresis pressure switch shown.
  • the unit 28a has a housing 28b having an interior 28c, in which two mutually adjacent, gas-tight diaphragm 28d and 28e are provided.
  • the membranes 28d and 28e define a membrane space 28f. Through the membrane 28e is a downstream switch 28g operable, the 28h from the housing of a adjacent pump control 30a is isolated.
  • the interior 28c of the unit 28a is above a housing neck 28i with the illustrated back pressure hose 26a in communication with the lower end the ram bell 24a is connected.
  • the via the back pressure hose 26 a the interior 28c is supplied by a laterally arranged Channel 28j are derived.
  • FIG. 2 Only indicated in FIG. 2 is a second unit 28k, which corresponds in structure to the unit 28a. With such a second unit may have another, not shown back pressure bell of the sewage 6th be detected. Such a second device 28k may be off Be provided for security reasons, a redundant arrangement to accomplish.
  • the unit 28 according to FIG Differential pressure sensor 281 formed.
  • This has a housing 28m, filled with a potting compound 28n is.
  • the housing 28m has a first housing socket 28o on, via a back pressure hose 26b with a back pressure bell 24b communicates.
  • the housing 28m has a second housing port 28p, at the simple ambient pressure is applied.
  • a differential pressure sensor element 28q is provided which is suitable is, a differential pressure between the at the housing neck 28p and the housing stub 28o applied pressure to capture.
  • the differential pressure sensor element 28q is above a downstream board 28r and electrical lines 28s with a pump control 30b in conjunction.
  • the entire funding period will be determined.
  • the pump 12 be turned off when reaching a water level "III” should, the measured time duration with a factor Multiplied by "2". Should be a "IV" designated Sewer 6 should be achieved, the measured Time multiplied by a multiplier of "3" become.
  • the switching on of the pump 12 also upon reaching the height "I" of the sewage level 6 initiated become.
  • the highest level, from the sewage pump 12 is turned on, the highest height of the heights, the given pressure values correspond.
  • the sewage collection shaft 2 can be put into operation without a manual Intervention by an installer is required. Especially however, it is advantageous if the delivery time can be changed is. This will be explained below by way of example be explained.
  • the measured time for example 5 sec.
  • This measured time can be increased by one predetermined multiplier, for example multiplied by "3" 15 seconds in total receive.
  • the pump is 12th switched off. If the sewage level 6 then again rises to the height "I", the pump 12 is turned on and the time to reach the height "II” can again be measured. Should the duration of this second Measurement equal to the time duration of the first measurement is no change in the funding period required.
  • this second measurement of delivery time can directly be based on. For example, at the second Measure the duration 4 sec., So that at a multiplier of "3" a funding period of 12 seconds determined can be. This ensures that the Back pressure bell 24 completely exposed from wastewater 4 can be.
  • the measured time duration of the second measurement is longer than the first measurement, so the Duration of the second measurement not readily the delivery time be used without the risk of that is pumped off too long, resulting in an exposure of the Spiral housing 14 of the sewage pump 12 could lead.
  • the second, longer Time period initially considered only proportionately.
  • a measured first time of 5 seconds and a measured second period of 10 sec. would be a new one Initially only a period of 7.5 sec become. These 7.5 seconds will be used to determine the Funding time with the o.g. Multiplier multiplied.

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Control Of Positive-Displacement Pumps (AREA)
  • Centrifugal Separators (AREA)
  • Sewage (AREA)
  • Control Of Non-Positive-Displacement Pumps (AREA)
  • Structures Of Non-Positive Displacement Pumps (AREA)
  • Pretreatment Of Seeds And Plants (AREA)
EP04028908A 2004-01-29 2004-12-07 Procédé d'installation et/ou de fonctionnement d'un bac de collecte d'eaux usées Expired - Lifetime EP1559841B1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL04028908T PL1559841T3 (pl) 2004-01-29 2004-12-07 Sposób instalacji i/lub eksploatacji szybu zbiorczej studzienki ściekowej

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102004004401A DE102004004401B8 (de) 2004-01-29 2004-01-29 Verfahren zur Installation und/oder zum Betrieb eines Abwassersammelschachts
DE102004004401 2004-01-29

Publications (3)

Publication Number Publication Date
EP1559841A2 true EP1559841A2 (fr) 2005-08-03
EP1559841A3 EP1559841A3 (fr) 2007-01-24
EP1559841B1 EP1559841B1 (fr) 2008-01-23

Family

ID=34638795

Family Applications (1)

Application Number Title Priority Date Filing Date
EP04028908A Expired - Lifetime EP1559841B1 (fr) 2004-01-29 2004-12-07 Procédé d'installation et/ou de fonctionnement d'un bac de collecte d'eaux usées

Country Status (4)

Country Link
EP (1) EP1559841B1 (fr)
AT (1) ATE384834T1 (fr)
DE (2) DE102004004401B8 (fr)
PL (1) PL1559841T3 (fr)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007008692A1 (de) 2007-02-20 2008-08-21 Ksb Aktiengesellschaft Niveauabhängige Steuerung von Pumpen
CN102220783A (zh) * 2011-04-14 2011-10-19 中国市政工程中南设计研究总院 城市合流污水溢流和雨水径流污染控制的装置、方法和用途
EP2489798A1 (fr) * 2011-02-16 2012-08-22 Grundfos Management a/s Installation de relèvement d'eaux usées
EP2746477A1 (fr) * 2012-12-20 2014-06-25 Grundfos Holding A/S Procédé pour faire fonctionner une station de pompage des eaux usées

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2913970A1 (de) * 1979-04-04 1980-10-23 Hubert Combe Steuerung fuer eine abwasser- und faekalienhebeanlage
DE3110735C2 (de) * 1981-03-16 1984-03-22 Hubert 1000 Berlin Combé Trockenlaufschutzvorrichtung für eine Abwasserpumpe
DE3311980A1 (de) * 1983-03-30 1984-10-04 Hubert 1000 Berlin Combé Abwasserhebeanlage
FI80933C (fi) * 1988-06-08 1990-08-10 Sarlin Ab Oy E Oevervakningsfoerfarande foer avlopps- pumpstation samt oevervakningsanordning foer foerverkligande av foerfarandet.
EP0511383B1 (fr) * 1990-01-16 1997-03-19 Kabushiki Kaisha Komatsu Seisakusho Procede et appareil de generation automatique de vibrations pour excavateur hydraulique
ES2087701T3 (es) * 1992-07-21 1996-07-16 Carlo Lencioni Dispositivo para controlar bombas elevadoras de una instalacion de desague o similar.
FR2696424B1 (fr) * 1992-10-05 1994-12-23 Europ Laitiere Dispositif d'emballage notamment pour produit alimentaire.
DE19609427C2 (de) * 1996-03-11 1999-04-01 Hermann Schmelzer Kanalüberlaufsicherung für Schachtbauwerke

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007008692A1 (de) 2007-02-20 2008-08-21 Ksb Aktiengesellschaft Niveauabhängige Steuerung von Pumpen
EP1961963A2 (fr) 2007-02-20 2008-08-27 KSB Aktiengesellschaft Commande de pompes en fonction du niveau
EP1961963A3 (fr) * 2007-02-20 2010-07-14 KSB Aktiengesellschaft Commande de pompes en fonction du niveau
EP2489798A1 (fr) * 2011-02-16 2012-08-22 Grundfos Management a/s Installation de relèvement d'eaux usées
CN102644319A (zh) * 2011-02-16 2012-08-22 格伦德福斯管理联合股份公司 废水提升装置
CN102220783A (zh) * 2011-04-14 2011-10-19 中国市政工程中南设计研究总院 城市合流污水溢流和雨水径流污染控制的装置、方法和用途
EP2746477A1 (fr) * 2012-12-20 2014-06-25 Grundfos Holding A/S Procédé pour faire fonctionner une station de pompage des eaux usées
CN103882938A (zh) * 2012-12-20 2014-06-25 格兰富控股联合股份公司 用于操作污水泵站的方法
US9719241B2 (en) 2012-12-20 2017-08-01 Grundfos Holding A/S Method for operating a wastewater pumping station

Also Published As

Publication number Publication date
EP1559841A3 (fr) 2007-01-24
DE102004004401B8 (de) 2008-11-06
ATE384834T1 (de) 2008-02-15
EP1559841B1 (fr) 2008-01-23
PL1559841T3 (pl) 2008-06-30
DE102004004401A1 (de) 2005-08-25
DE102004004401B4 (de) 2006-02-02
DE502004006037D1 (de) 2008-03-13

Similar Documents

Publication Publication Date Title
EP2258949B1 (fr) Procédé de détermination de valeurs caractéristiques, notamment de valeurs, notamment de paramètres, d'un agrégat de pompe centrifuge entraîné par moteur électrique intégré dans une installation
DE2616097B2 (de) Verfahren und vorrichtung zur messung der querschnittsungleichmaessigkeit von garnen, vorgarnen und baendern
DE102010062622A1 (de) Verfahren zur Selbstüberwachung einer keramischen Druckmesszelle eines kapazitiven Drucksensors und eine Auswerteschaltung zur Durchführung des Verfahrens
DE102011053407A1 (de) Füllstandsüberwachung
DE102007008692A1 (de) Niveauabhängige Steuerung von Pumpen
EP0890088A1 (fr) Dispositif et procede pour detecter des fuites
DE3124875A1 (de) "messsonde"
EP2595522B1 (fr) Procédé et dispositif de commande de performance d'un moteur de soufflerie pour un aspirateur
EP1559841A2 (fr) Regard de collecte d'eaux usées
DE202008008971U1 (de) Siphon
DE102011083133B4 (de) Verfahren zur Selbstüberwachung einer keramischen Druckmesszelle eines kapazitiven Drucksensors und eine Auswerteschaltung zur Durchführung des Verfahrens
EP2076635B1 (fr) Procédé et dispositif pour détecter l'utilisation d'urinoirs et déclencher un rinçage automatique
DE19931227C2 (de) Verfahren und Vorrichtung zur Prüfung und/oder Kalibrierung eines Differenzdruckmeßsystems
DE19963837A1 (de) Entlüftungsanlage und Verfahren zum Einstellen und Betreiben der Entlüftungsanlage
DE3228061A1 (de) Vorrichtung zum betaetigen der spuelung einer wc-anlage
DE102006024717B4 (de) Verfahren zum Betrieb eines Drucklufthebersystems für eine Kleinkläranlage und Drucklufthebersystem
DE102015119498A1 (de) Vorrichtung und Verfahren zum Entfeuchten von porösen Baustoffschichten
DE102022121362A1 (de) Rückspülfilter mit Differenzdruckmessung
DE19537149A1 (de) Verfahren und Meßgerät zum Messen des hydrostatischen Drucks, insbesondere des Grundwassers
DE3443130A1 (de) Einrichtung zur ueberwachung des wasserstandes im kanalisationssystem eines gebaeudes
EP2081019B1 (fr) Capteur de gaz et procédé de détection de petites pièces de NOx dans un flux de gaz
DE102006041482B3 (de) Verfahren zum Spülen einer Druckrohrleitung und Abwasserfördervorrichtung
DE3444363A1 (de) Vorrichtung zur probenentnahme von fluessigkeiten
DE4410231C2 (de) Abschalteinrichtung in einem Gasmeßsystem bei erhöhtem Wassergehalt
EP1370857B1 (fr) Procede de fonctionnement d'un circuit d'evaluation pour une cellule electrochimique

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR LV MK YU

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA HR LV MK YU

17P Request for examination filed

Effective date: 20070110

17Q First examination report despatched

Effective date: 20070220

17Q First examination report despatched

Effective date: 20070220

RTI1 Title (correction)

Free format text: METHOD OF INSTALLATION AND/OR WORKING OF A SEWAGE COLLECTION WELL

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REF Corresponds to:

Ref document number: 502004006037

Country of ref document: DE

Date of ref document: 20080313

Kind code of ref document: P

REG Reference to a national code

Ref country code: PL

Ref legal event code: T3

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080523

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080504

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080123

GBV Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed]
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080423

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080623

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080123

REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080423

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080123

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080123

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080123

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080123

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080123

EN Fr: translation not filed
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080123

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20081024

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080123

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080123

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20081114

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080123

BERE Be: lapsed

Owner name: JUNG PUMPEN G.M.B.H.

Effective date: 20081231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081231

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080123

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080123

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081231

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20081207

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080724

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080123

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20080424

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20181219

Year of fee payment: 15

Ref country code: PL

Payment date: 20181206

Year of fee payment: 15

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 384834

Country of ref document: AT

Kind code of ref document: T

Effective date: 20191207

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191207

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191207

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20221221

Year of fee payment: 19

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 502004006037

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20240702

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20240702