EP2090703A2 - Dormant pour la réception d'un recouvrement - Google Patents

Dormant pour la réception d'un recouvrement Download PDF

Info

Publication number
EP2090703A2
EP2090703A2 EP09001133A EP09001133A EP2090703A2 EP 2090703 A2 EP2090703 A2 EP 2090703A2 EP 09001133 A EP09001133 A EP 09001133A EP 09001133 A EP09001133 A EP 09001133A EP 2090703 A2 EP2090703 A2 EP 2090703A2
Authority
EP
European Patent Office
Prior art keywords
frame
shaped
anchor
shaped element
gutter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP09001133A
Other languages
German (de)
English (en)
Other versions
EP2090703A3 (fr
EP2090703B1 (fr
Inventor
Jörg Blecher
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Prevent Twb & Co KG GmbH
Original Assignee
Prevent Twb & Co KG GmbH
Twb Presswerk & Co KG GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Prevent Twb & Co KG GmbH, Twb Presswerk & Co KG GmbH filed Critical Prevent Twb & Co KG GmbH
Priority to SI200930034T priority Critical patent/SI2090703T1/sl
Priority to PL09001133T priority patent/PL2090703T3/pl
Publication of EP2090703A2 publication Critical patent/EP2090703A2/fr
Publication of EP2090703A3 publication Critical patent/EP2090703A3/fr
Application granted granted Critical
Publication of EP2090703B1 publication Critical patent/EP2090703B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/04Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
    • E03F5/06Gully gratings

Definitions

  • the invention relates to a frame for receiving a cover, in particular a grate of a gutter, with at least one anchor-shaped element, through which the frame in a binder, in particular concrete, is anchored, wherein the at least one anchor-shaped element is releasably secured to the frame.
  • Frames are known mainly from the door and window construction. However, they are also used in gutters, in light or manhole shafts, which are covered on the top, namely by means of suitable covers, eg rusting. To attach these covers to the gutters or shafts serve frames.
  • the shafts and gutters are usually made of concrete or other comparable binder or by means of this individual shaft elements are founded in the soil.
  • the frames usually have an angle profile and a plurality of anchor-shaped elements in the form of tie rods, via which the frames are anchored in the not yet set binder.
  • a generic frame with tie rods is made EP 0 908 567 B1 known, this frame has long been in use and has proven itself in practice.
  • the tie rods of the known frame are relatively expensive to produce molded parts, in particular of galvanized sheet metal, which must be used in correspondingly shaped openings of the frame.
  • This known frame already offers the advantage that a transport of frame and tie rods in unassembled state is possible, whereby the space requirement and thus the transport costs are lower than in frames to which the tie rods are permanently mounted, for example by welding.
  • Such a frame is made, for example DE 20 2005 006 275 U1 known.
  • the object of the invention is therefore to improve a generic frame so that the production is further simplified.
  • the at least one anchor-shaped element is rod-shaped.
  • the frame according to the invention thus has no tie rods made of elaborate moldings more, but there are simple rod-shaped elements are provided, which are formed for example of conventional rods of structural steel. These rod-shaped elements do not serve as tie rods and thus as a support of the frame on the mold part to be joined to the frame, in particular concrete part, but they fulfill the function of a reinforcing element for the side walls of the concrete part of the gutter or the shaft. It has been found that tie rods are not required for fastening the frame, for anchoring the frame on the concrete part the already provided in the frame punched out Betonpitchen sufficient. Due to the omission of the tie rods, the frame manufacturing technology obviously is much easier, without the benefits of the EP 0 908 567 B1 known frame with respect to the simple transport or the like.
  • the at least one anchor-shaped element of a Round rod is formed.
  • This round rod is preferably made of steel, for example a standard structural steel, which is used for reinforced concrete reinforcements.
  • a holding element inserted into a recess of the frame is provided, which is preferably designed so that it is clipped into a recess of the frame.
  • the retaining element is then preferably clipped into the frame before being transported, while the anchor-shaped elements are fastened to the retaining elements only before the connection of the frame to the binder.
  • the respective holding element preferably has an insertion opening for inserting the armature-shaped element.
  • the frame has an H-shaped or L-shaped cross section, as seen in the installation position, at least one tongue-shaped spring tab for lateral locking of the cover is provided on the frame, which is partially triggered from the frame.
  • tongue-shaped spring tab in a frame is basically from EP 0 908 568 B1
  • the tongue-shaped spring tab it is not essential that the tongue-shaped spring tab is triggered from the vertical web seen in the installation position of the frame.
  • the spring tab can, at least in some areas, also be triggered from the horizontal web of the frame.
  • a gutter 1 made of concrete or a suitable other material which has two side webs 2, 3. On the top side, a frame 4 is fastened on each side web 2, 3. These two thus arranged in parallel frames 4 serve to receive a cover, not shown, for the gutter 1.
  • This cover can be formed, for example in the form of a grate.
  • the structure of the frame 4 is best from the Fig. 2 and 3 out.
  • the frame 4 consists in the embodiment of a cross-sectionally h-shaped sheet metal profile with a vertical outer web 5, a vertical inner web 6, a horizontal web 7 and another vertical web 8.
  • a vertical outer web 5 a vertical inner web 6
  • a horizontal web 7 a horizontal web 7
  • another vertical web 8 a vertical Web
  • the frame 4 To anchor the frame 4 on the gutter 1, which takes place as long as the binder of the gutter 1, eg concrete, screed, mortar or the like., Not yet cured is, the frame 4, a plurality of issued from the horizontal web 7 downward fastening hooks 9.
  • the armature-shaped elements 10 are releasably secured to the frame 4.
  • a downwardly directed recess 11 is provided with a recess 12 for a generally designated 13 holding element for the respective armature-shaped element 10 on the frame 4 in the horizontal web 7 for the respective armature-shaped element 10.
  • the holding element 13 is preferably designed so that it can be clipped into the respective recess 12 of the frame 4.
  • a main body 14 it has at least two lateral latching webs 15, 16 and two upper-side latching lugs 17, 18.
  • the holding member 13 can thus easily from the top in the sense of Fig. 2 and 3 be inserted through the respective recess 12 of the frame 4 until the locking lugs 17, 18 rest on the upper edge of the recess 12.
  • the respective holding element 13 For receiving or releasably securing the respective armature-shaped element 10, the respective holding element 13 has an insertion opening 19 accessible from its underside for the end of the armature-shaped element 10.
  • the insertion opening 19 may be slightly inclined relative to the vertical.
  • the holding elements 13 are clipped into the respective recesses 12 of the frame 4.
  • the armature-shaped elements 10, however, are preferably only then inserted into the holding elements 13, when the connection of the frame 4 takes place with the gutter 1.
  • the armature-shaped elements 10 have no function of a tie rod, but serve as reinforcement or reinforcement of the side webs 2, 3 of the gutter 1.
  • the frame 4 itself is held on the gutter 1 by suitable surface design and the fastening hooks 9 on the gutter 1, which proved to be sufficient in practical experiments.
  • the frame 4 may have over its length one or more tongue-shaped spring tabs 20, which serve for lateral locking of the cover, not shown, on the frame 4.
  • the respective spring tab 20 resiliently engages in a corresponding groove or recess on the side edge of the cover.
  • the more precise operation of such a spring tab 20 is exemplified in EP 0 908 568 B1 described.
  • the spring tab 20 is slightly angled relative to the vertical and triggered along cutting lines 21, 22 from the vertical inner web 6 of the frame 4.

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Insulation, Fastening Of Motor, Generator Windings (AREA)
  • Cable Accessories (AREA)
  • Sewage (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)
EP09001133A 2008-02-14 2009-01-28 Dormant pour la réception d'un recouvrement Active EP2090703B1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
SI200930034T SI2090703T1 (sl) 2008-02-14 2009-01-28 Okvir za sprejemanje pokrova
PL09001133T PL2090703T3 (pl) 2008-02-14 2009-01-28 Obramienie do mocowania pokrywy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102008009101A DE102008009101A1 (de) 2008-02-14 2008-02-14 Zarge für die Aufnahme eine Abdeckung

Publications (3)

Publication Number Publication Date
EP2090703A2 true EP2090703A2 (fr) 2009-08-19
EP2090703A3 EP2090703A3 (fr) 2010-05-12
EP2090703B1 EP2090703B1 (fr) 2011-05-11

Family

ID=40671071

Family Applications (1)

Application Number Title Priority Date Filing Date
EP09001133A Active EP2090703B1 (fr) 2008-02-14 2009-01-28 Dormant pour la réception d'un recouvrement

Country Status (8)

Country Link
EP (1) EP2090703B1 (fr)
AT (1) ATE509164T1 (fr)
DE (1) DE102008009101A1 (fr)
ES (1) ES2364001T3 (fr)
HR (1) HRP20110463T1 (fr)
PL (1) PL2090703T3 (fr)
PT (1) PT2090703E (fr)
SI (1) SI2090703T1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3266937B1 (fr) * 2016-07-08 2021-12-15 Hauraton GmbH & Co. KG Chassis

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0908568B1 (fr) 1997-10-08 2002-07-24 TWB-Presswerk GmbH & Co. KG Dispositif de verrouillage pour des grilles dans des cadres
EP0908567B1 (fr) 1997-10-08 2002-07-24 TWB-Presswerk GmbH & Co. KG Tirant d'ancrage pour cadre
DE202005006275U1 (de) 2005-04-20 2005-06-23 Franz Brinkmann Gmbh Abwasserinnenzarge

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1038921A (en) * 1964-09-16 1966-08-10 Edward Charles Hallock Gratings
US6220784B1 (en) * 1998-02-18 2001-04-24 Albert W. Bricker Method and apparatus for forming a trench

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0908568B1 (fr) 1997-10-08 2002-07-24 TWB-Presswerk GmbH & Co. KG Dispositif de verrouillage pour des grilles dans des cadres
EP0908567B1 (fr) 1997-10-08 2002-07-24 TWB-Presswerk GmbH & Co. KG Tirant d'ancrage pour cadre
DE202005006275U1 (de) 2005-04-20 2005-06-23 Franz Brinkmann Gmbh Abwasserinnenzarge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3266937B1 (fr) * 2016-07-08 2021-12-15 Hauraton GmbH & Co. KG Chassis

Also Published As

Publication number Publication date
EP2090703A3 (fr) 2010-05-12
HRP20110463T1 (hr) 2011-07-31
ATE509164T1 (de) 2011-05-15
PT2090703E (pt) 2011-07-06
PL2090703T3 (pl) 2011-09-30
ES2364001T3 (es) 2011-08-22
SI2090703T1 (sl) 2011-08-31
DE102008009101A1 (de) 2009-08-20
EP2090703B1 (fr) 2011-05-11

Similar Documents

Publication Publication Date Title
EP2851477B1 (fr) Caniveau d'écoulement des eaux
EP2963205B1 (fr) Dispositif de coffrage
EP2987595B1 (fr) Agencement destiné à la fabrication de préfabriqués en béton doté d'au moins un rail d'ancrage intégré dans le préfabriqué en béton et procédé de fabrication de tels préfabriqués en béton
DE29808197U1 (de) Entwässerungsrinne
DE102011088456A1 (de) Positionierungselement und Anordnung zum Positionieren zumindest eines stabförmigen Bewehrungselementes
WO2004081313A1 (fr) Elements d'armature et pieces en beton arme ou precontraint produites avec ces elements d'armature
DE102014106068B4 (de) Vorrichtung zur Verbindung zweier einander gegenüberliegender plattenförmiger Schalungselemente
EP2090703B1 (fr) Dormant pour la réception d'un recouvrement
EP2716839A1 (fr) Elément de coffrage
EP2385189B1 (fr) Elément de coffrage
DE102017206316B3 (de) Schalungselement
DE60116241T2 (de) Rolladenkasten
DE202020100059U1 (de) Schalungselement
DE102016204383A1 (de) Schalungselement
DE102016103981B4 (de) Schalungselement
DE102016103982B4 (de) Schalungselement
DE19522280A1 (de) Einrichtung zur Festlegung von Bewehrungen
DE10229734B4 (de) Zaun-, Tor-, Sichtschutzelement od.dgl.
DE1229270B (de) Stahlbetonrippendecke
EP1503022B1 (fr) Ensemble de pièces pour la finition d'un joint entre deux parties de bâtiment
EP3144443B1 (fr) Dispositif de fixation de tuiles de toit presentant une feuillure sur des voliges
DE7829299U1 (de) Heimtier-kaefig
DE102015119950A1 (de) Befestigungsvorrichtung für einen Tür- oder Fensterrahmen
DE202017102195U1 (de) Schalungselement
DE102017206317A1 (de) Schalungselement

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA RS

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA RS

17P Request for examination filed

Effective date: 20101104

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RIC1 Information provided on ipc code assigned before grant

Ipc: E03F 5/06 20060101AFI20101129BHEP

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: PREVENT TWB GMBH & CO. KG

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

AXX Extension fees paid

Extension state: AL

Payment date: 20101104

Extension state: RS

Payment date: 20101104

Extension state: BA

Payment date: 20101104

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA RS

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: HR

Ref legal event code: TUEP

Ref document number: P20110463

Country of ref document: HR

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502009000638

Country of ref document: DE

Effective date: 20110622

REG Reference to a national code

Ref country code: NL

Ref legal event code: T3

Ref country code: PT

Ref legal event code: SC4A

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 20110627

REG Reference to a national code

Ref country code: HR

Ref legal event code: T1PR

Ref document number: P20110463

Country of ref document: HR

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2364001

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20110822

REG Reference to a national code

Ref country code: SK

Ref legal event code: T3

Ref document number: E 9564

Country of ref document: SK

REG Reference to a national code

Ref country code: PL

Ref legal event code: T3

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110811

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110511

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110511

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110511

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110511

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110812

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110911

REG Reference to a national code

Ref country code: IE

Ref legal event code: FD4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110511

Ref country code: IE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110511

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110511

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110511

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20120214

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: TR

Payment date: 20120126

Year of fee payment: 4

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502009000638

Country of ref document: DE

Effective date: 20120214

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: HR

Payment date: 20120116

Year of fee payment: 4

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120131

REG Reference to a national code

Ref country code: PT

Ref legal event code: MM4A

Free format text: LAPSE DUE TO NON-PAYMENT OF FEES

Effective date: 20121031

REG Reference to a national code

Ref country code: HR

Ref legal event code: ODRP

Ref document number: P20110463

Country of ref document: HR

Payment date: 20130118

Year of fee payment: 5

REG Reference to a national code

Ref country code: PT

Ref legal event code: NF4A

Free format text: RESTITUTIO IN INTEGRUM

Effective date: 20130122

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20121031

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CZ

Payment date: 20130117

Year of fee payment: 5

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SK

Payment date: 20130117

Year of fee payment: 5

Ref country code: LV

Payment date: 20130123

Year of fee payment: 5

Ref country code: PL

Payment date: 20130123

Year of fee payment: 5

Ref country code: SI

Payment date: 20130116

Year of fee payment: 5

PGRI Patent reinstated in contracting state [announced from national office to epo]

Ref country code: PT

Effective date: 20130122

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110811

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20110511

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20130128

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130128

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20120128

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20090128

REG Reference to a national code

Ref country code: HR

Ref legal event code: PBON

Ref document number: P20110463

Country of ref document: HR

Effective date: 20140128

REG Reference to a national code

Ref country code: SK

Ref legal event code: MM4A

Ref document number: E 9564

Country of ref document: SK

Effective date: 20140128

REG Reference to a national code

Ref country code: SI

Ref legal event code: KO00

Effective date: 20140909

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140128

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140128

Ref country code: SI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140129

Ref country code: HR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140128

Ref country code: SK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140128

REG Reference to a national code

Ref country code: PL

Ref legal event code: LAPE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140128

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: MK

Payment date: 20130128

Year of fee payment: 5

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 8

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 9

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140128

REG Reference to a national code

Ref country code: FR

Ref legal event code: PLFP

Year of fee payment: 10

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140129

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20190215

Year of fee payment: 11

Ref country code: IT

Payment date: 20190121

Year of fee payment: 11

Ref country code: NL

Payment date: 20190122

Year of fee payment: 11

Ref country code: FR

Payment date: 20190122

Year of fee payment: 11

Ref country code: CH

Payment date: 20190124

Year of fee payment: 11

Ref country code: DE

Payment date: 20181016

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20190118

Year of fee payment: 11

Ref country code: BE

Payment date: 20190122

Year of fee payment: 11

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: PT

Payment date: 20190121

Year of fee payment: 11

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 502009000638

Country of ref document: DE

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20200201

REG Reference to a national code

Ref country code: AT

Ref legal event code: MM01

Ref document number: 509164

Country of ref document: AT

Kind code of ref document: T

Effective date: 20200128

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20200131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200801

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200201

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200828

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200131

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200131

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200131

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200128

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200128

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20210607

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200129