EP2159895A2 - Connexion électriquement parallèle de modules photovoltaïques dans une chaîne pour fournir une tension CC à un bus de tension CC - Google Patents

Connexion électriquement parallèle de modules photovoltaïques dans une chaîne pour fournir une tension CC à un bus de tension CC Download PDF

Info

Publication number
EP2159895A2
EP2159895A2 EP09150712A EP09150712A EP2159895A2 EP 2159895 A2 EP2159895 A2 EP 2159895A2 EP 09150712 A EP09150712 A EP 09150712A EP 09150712 A EP09150712 A EP 09150712A EP 2159895 A2 EP2159895 A2 EP 2159895A2
Authority
EP
European Patent Office
Prior art keywords
voltage
photovoltaic module
connecting device
bus
voltage bus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP09150712A
Other languages
German (de)
English (en)
Other versions
EP2159895B8 (fr
EP2159895B1 (fr
EP2159895A3 (fr
Inventor
Robert Schaacke
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Femtogrid Energy Solutions BV
Original Assignee
Betronic Solutions BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Betronic Solutions BV filed Critical Betronic Solutions BV
Publication of EP2159895A2 publication Critical patent/EP2159895A2/fr
Publication of EP2159895A3 publication Critical patent/EP2159895A3/fr
Application granted granted Critical
Publication of EP2159895B1 publication Critical patent/EP2159895B1/fr
Publication of EP2159895B8 publication Critical patent/EP2159895B8/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J1/00Circuit arrangements for DC mains or DC distribution networks
    • H02J1/10Parallel operation of DC sources
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
    • H02J3/381Dispersed generators
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for AC mains or AC distribution networks
    • H02J3/38Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
    • H02J3/46Controlling the sharing of generated power between the generators, sources or networks
    • HELECTRICITY
    • H10SEMICONDUCTOR DEVICES; ELECTRIC SOLID-STATE DEVICES NOT OTHERWISE PROVIDED FOR
    • H10FINORGANIC SEMICONDUCTOR DEVICES SENSITIVE TO INFRARED RADIATION, LIGHT, ELECTROMAGNETIC RADIATION OF SHORTER WAVELENGTH OR CORPUSCULAR RADIATION
    • H10F77/00Constructional details of devices covered by this subclass
    • H10F77/95Circuit arrangements
    • H10F77/953Circuit arrangements for devices having potential barriers
    • H10F77/955Circuit arrangements for devices having potential barriers for photovoltaic devices
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2101/00Supply or distribution of decentralised, dispersed or local electric power generation
    • H02J2101/20Dispersed power generation using renewable energy sources
    • H02J2101/22Solar energy
    • H02J2101/24Photovoltaics
    • H02J2101/25Photovoltaics involving maximum power point tracking control for photovoltaic sources
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/10Photovoltaic [PV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers

Definitions

  • the invention relates to the field of photovoltaic modules, such as solar cell modules. More particularly, the invention relates to efficient harvesting of photovoltaic energy and for efficiently providing this energy to energy demanding devices, especially in a local environment.
  • a solar cell directly converting solar energy to electric energy has increasingly been expected to serve as a next-generation energy source in particular from a viewpoint of global environmental issues.
  • various types of solar cells such as a solar cell using a compound semiconductor or an organic material, a solar cell using silicon crystal is mainly employed these days.
  • other material compositions have been investigated and may proof to be advantageously employed in the future.
  • DE 40 32 569 discloses a photovoltaic system comprising a solar generator with a number of modules connected in series in a string, wherein multiple strings may be arranged in parallel.
  • a DC/AC converter is provided within each module allowing the obtained DC voltage to be converted into an AC feed voltage for a mains network.
  • the photovoltaic system is coupled to the mains network via a central monitoring and control device receiving the data from the individual modules via a common data bus.
  • the prior art photovoltaic system is disadvantageous in that the least efficient module (e.g. due to temporary shading of the module) in the series arrangement determines the efficiency of a complete string of modules. Moreover, each module has to be provided with a DC/AC converter.
  • An arrangement comprising at least a first photovoltaic module and a second photovoltaic module in a string is disclosed.
  • the first photovoltaic module and second photovoltaic module are electrically connected in parallel and arranged to provide a DC voltage to a voltage bus.
  • an electrical connecting device configured for connecting to a photovoltaic module.
  • the electrical connecting device comprises first and second contacts for receiving a first DC voltage from the photovoltaic module and third and fourth contacts configured for a connection to a DC voltage bus for providing a second DC voltage, dependent on the first DC voltage, to the DC voltage bus.
  • a method of installing a photovoltaic arrangement comprising at least a first and a second photovoltaic module and a DC voltage bus is disclosed.
  • the first and second photovoltaic modules are electrically connected in parallel to the DC voltage bus.
  • the first and second photovoltaic module in parallel within a string of photovoltaic modules, a reduced efficiency of one or both of these parallel connected photovoltaic modules has less influence on the total efficiency of the complete string of photovoltaic modules as compared to a string wherein all photovoltaic modules are electrically connected in series.
  • Such parallel connection is easily obtained using the connecting device.
  • the DC voltage parallel bus for the modules to release the generated DC photovoltaic energy obviates the need for a DC/AC converter for each module. From the perspective of installing the arrangement, the DC voltage bus reduces the amount of cabling typically required for prior art series connected photovoltaic modules. DC voltages are simple and efficient in operation as compared to AC voltages.
  • the embodiment of claim 2 provides the advantage that only a single inverter is required to convert the DC voltage of the voltage bus to an AC voltage for an AC mains grid.
  • the embodiments of the invention as defined in claims 3 and 15 provide an easy manner of connecting multiple photovoltaic modules to the DC voltage bus in parallel.
  • the electrical connection devices may either be plug-in modules for or be integrated in the photovoltaic modules.
  • the embodiments of the invention as defined in claims 4 and 10 provide an efficient means for boosting the first DC voltage (e.g. 0-100V, particularly 20-80 V) provided by each of the photovoltaic modules to a second DC voltage (e.g. 400 V) for the DC voltage bus.
  • the efficiency gain is of the order of 2-5%.
  • the switched-coil arrangement of the transformer sometimes also referred to as switched auto-transformer arrangement, provides for reduced inductive leakage and thus considerably boosts the efficiency of the DC-DC voltage conversion.
  • the coils may be flat coils comprising a planar ferrite core.
  • the switch may be a (MOS)FET or a IGBT for further reducing losses.
  • the control of the switch can be used to further boost the efficiency, e.g. by operating the switch with a combined frequency and pulse-width modulation switch scheme.
  • claims 5 and 11 provide a means for determining whether or not power can be supplied to the DC voltage bus using the measured momentary DC voltage of the voltage bus.
  • Claims 6 and 12 provide for a suitable and efficient DC voltage range for operating the arrangement.
  • the power point tracker monitors that the voltage and current supplied by the photovoltaic module is within the optimum range to obtain the optimum photovoltaic conversion efficiency.
  • Sparks can be formed in the photovoltaic modules, particularly in the contacts in case of e.g. bad contact. Sparks may lead to hotspots and subsequently may lead to fire.
  • an individual photovoltaic module or connection device may be preventively disabled to avoid fire. The disablement of the photovoltaic module is only marginally harmful for the total efficiency of the string comprising the disabled photovoltaic module as a result of the parallel connection to the DC voltage bus.
  • the measurements and other data may be reported wirelessly for each photovoltaic module to an external system, using e.g. ZigBee.
  • the connection devices may comprise a wireless transceiver for transmitting data and receiving commands from the external system.
  • Photovoltaic modules and/or connecting devices of these modules may also communicate with each other by building short range mesh networks.
  • the embodiment of claim 8 rests on the insight that a considerable amount of (household) appliances are capable of operating using a DC voltage input (e.g. those comprising a switch mode power supply) and that, accordingly, a DC-AC converter is not required by directly connecting appliance to the DC voltage bus.
  • a DC voltage input e.g. those comprising a switch mode power supply
  • FIG. 1 is a schematic illustration of an electricity grid system 1 comprising a plurality of energy supply arrangements (devices) or sources and energy demand arrangements (devices) and a DC voltage bus 2 to which the energy supply arrangements and energy demand arrangements are connected. Furthermore, the system 1 comprises a control network 3 connected to the energy supply arrangements and energy demand arrangements as well. Control network 3 may be a power connection. Control network 3 may be separate or be integrated in the DC voltage bus 2 and is used for providing power to and/or for communication with the energy supply and energy demand arrangements as will be explained in further detail below.
  • Energy supply arrangements preferably comprise sustainable energy supply arrangements, including photovoltaic arrangements, wind energy arrangements and/or fuel cell arrangements.
  • the present application primarily focuses on the photovoltaic supply arrangements comprising one or more solar cell modules.
  • Energy demand arrangements include devices that may operate on a DC voltage input of the DC voltage bus, including computers, light sources, televisions etc.
  • devices comprising a switched mode power supply are capable of operating with a DC voltage. Operation of devices at DC voltages saves power, while particular components (e.g. capacitors) can be saved or have an increased life time.
  • Other devices that operate on the DC voltage of the DC voltage bus include an energy management system, a large inverter system, an island inverter system (for stand alone AC power supply, typically used for providing AC power locally) and a double active DC/AC bridge.
  • the energy management system is configured for managing at least one of the energy supply and demand arrangements either via the control network 3 or wirelessly.
  • the energy management system may be used to overrule decisions made internally by the energy supply or demand arrangements, e.g. with regard to whether an arrangement may supply and/or demand energy from the voltage bus.
  • the inverters are used for converting the DC voltage to an AC voltage for an AC mains grid 4.
  • the double active bridge may also convert AC voltage of the AC mains grid to the DC voltage bus as a backup in case energy suppliers are not capable of supplying sufficient power to the DC bus.
  • the electricity grid system 1 also comprises energy supply arrangements configured for temporarily storing electric energy and for releasing the energy at a later stage for the energy demand arrangements.
  • these energy supply arrangements include a super capacitor and a battery.
  • the super capacitor may be used for supplying instantaneous peak energy demands from an energy demand arrangement during a limited period of time.
  • the DC voltage bus 2 of the electricity grid system 1 is capable of assuming a plurality of DC voltage states.
  • the energy supply arrangements and energy demand arrangements are configured for sensing the DC voltage state of the DC voltage bus 2 and to adapt the energy supply, respectively, the energy demand to the sensed DC voltage state. This sensing is particularly advantageous for sustainable energy supply arrangements as such arrangements are characterized by unpredictable behaviour.
  • the DC voltage state of the DC voltage bus 2 is directly visible for both the energy supply arrangements and the DC demand arrangements.
  • the decision to supply or demand energy from the DC voltage bus may be overruled by the energy management system as illustrated in FIG. 1 .
  • an energy supply arrangement may comprise a microprocessor connected such that the DC voltage of the DC voltage bus can be detected and compare the detected voltage with pre-set voltage levels.
  • energy may be supplied if the DC voltage of the DC voltage bus 2 is detected to be between a maximum DC voltage of e.g. 400 Vdc and a minimum DC voltage of e.g. 360 Vdc.
  • an energy demanding arrangement may be configured not to demand energy from the DC voltage bus 2 if the detected DC voltage is below a minimum DC voltage of e.g. 360 Vdc.
  • an energy supply arrangement configured for storing and releasing energy may be programmed to release energy as soon as the DC voltage of the voltage bus 2 is below a particular threshold. None of the energy supply arrangements and energy demand arrangement requires a dedicated inverter dependent on the type of supply or demand arrangement.
  • the energy demand arrangements have an energy surplus, this energy can be provided back to the DC voltage bus 2.
  • energy demand arrangements must be configured for sensing the DC voltage state of the DC voltage bus 2 and for supply the energy surplus to the DC voltage bus in dependence of the sensed DC voltage state as described above for an energy supply arrangement. This is generally not possible for an AC mains grid due to very strict requirements and complicated electronics for energy feedback to such an AC mains grid.
  • the DC voltage bus 2 may transport a power of 4-8 kW for a string of PV modules 10 (see FIG. 2 ). Such a voltage bus is particularly useful in a local environment, such as houses, ships, offices, etc. Use of the AC mains grid can be minimized if such a DC voltage bus 2 is provided.
  • FIGS. 2 and 3 provide schematic illustrations of a photovoltaic (PV) energy supply arrangement comprising a plurality of photovoltaic modules 10 and a DC voltage bus 2.
  • the control network 3 is integrated in the DC voltage bus 2 (see FIG. 3 ).
  • Photovoltaic modules 10 each comprise a plurality of solar cells 11 and are connected to the DC voltage bus 2 using connecting devices 12. Photovoltaic modules 10 are connected to the DC voltage bus 2 such that the modules are arranged in parallel.
  • each PV module 10 is provided with a connecting device 12.
  • a connecting device 12 comprises first and second contacts I, II for connecting to a PV module and third and fourth contacts III, IV for connecting the PV modules to the DC voltage bus 2 such that mutual PV modules 10 are electrically connected in parallel.
  • a contact V is used for connecting to the control network 3.
  • a PV module 10 generates a DC voltage (typically between 0-100 V, e.g. between 20-80 V) in response to radiation received by the solar cells 11.
  • the connecting device 12 boosts the voltage to the DC voltage of the DC voltage bus 2, e.g. to 400 Vdc as will be explained in further detail with reference to FIGS. 4-7 .
  • Connecting device 12 may be a separate module that can be attached to a PV module 10, but may also be integrated in the PV module 10.
  • the DC voltage bus 2 for the modules 10 to release the generated DC photovoltaic energy obviates the need for a DC/AC converter for each module 10 if an AC voltage is to be supplied.
  • a single DC/AC converter 13, e.g. the large system inverter, the island inverter or the dual bridge inverter of FIG. 1 may be connected to the DC voltage bus 2 in order to convert 400Vdc to 230Vac of the mains grid.
  • the DC parallel voltage bus 2 reduces the amount of cabling typically required for prior art series connected photovoltaic modules.
  • the connecting device 12 is employed for connecting PV module 10 to the DC voltage bus 2 in parallel with another PV module 10. Connecting device 12 is also used, amongst other functions, for boosting the voltage of the PV module 10 to a suitable voltage for the parallel voltage bus 2.
  • PV module 10 generates e.g. a DC voltage of 24 V that should be boosted to 400 Vdc. High voltages typically enable lower currents and, therefore, lower losses.
  • PV module 10 is connected to connecting device 12 using contacts I and II.
  • a transformer 20 is provided for EMC shielding purposes.
  • the DC voltage is increased using a first capacitor C1 and a second capacitor C2 connected in parallel using an inductive coil H and a diode D.
  • a switch here a field effect transistor FET, is provided to pump charge from the first capacitor C1 to the second capacitor C2 to obtain the DC voltage required for the voltage bus 2 using contacts III and IV. Switching is performed under the control of a microprocessor uC.
  • Microprocessor uC monitors the input voltage Vin and the input current Iin for power point tracker functionality. Microprocessor uC also monitors output voltage Vout and output current Iout for monitoring output power and for security purposes. Microprocessor uC also monitors the DC voltage of the DC voltage bus 2, Vdcbus in order to control the switching of switch S. If the voltage of the bus 2 is 400Vdc, no further energy is supplied as determined by preset voltage levels in the microprocessor uC.
  • the connecting device 12 operates using a local power supply unit, designated local PSU, that is connected via contacts IV and V forming communication network 3. Local PSU only powers the connecting device 12 if it receives an appropriated voltage over contacts IV, V, e.g. -48V. Otherwise, switch S is open and no energy is supplied to voltage bus 2.
  • local PSU local power supply unit
  • the voltage boost efficiency that can be obtained with the embodiment of the connecting device of FIG. 4 is about 80%.
  • a further efficiency gain can be obtained by using the electric circuit of FIG. 5 using a split coil transformer arrangement instead of the integral coil H of FIG. 4 .
  • the coils "Coil 1" and “Coil 2" may be flat core coils comprising a planar ferrite core separated by a capacitor C3.
  • the planar components allow integration of the components behind the PV modules 2.
  • a switch is again provided to pump charge from capacitor C1 to capacitor C2 and can be controlled using a processing device uC (not shown in FIG. 5 , see FIG. 4 .)
  • the current path between Coil 1 and capacitor C2 via diodes D2, D3 allows remaining energy to flow to the capacitor C2 in the open state of the switch.
  • the control of the switch can be used to further boost the efficiency, e.g. by operating the switch with a combined frequency and pulse-width modulation switch scheme.
  • a typical switching frequency varies between 20-70 kHz.
  • the microprocessor may further perform the same monitoring functions as discussed with reference to FIG. 4 .
  • the voltage boost efficiency that can be obtained with the planar ferrite core split coil transformer is about 97 % at 180W.
  • Microcontroller uC may comprise a power point tracker by measuring Vin and Iin for the PV module 10 to monitor whether the obtained power is within the optimum range to obtain the optimum photovoltaic conversion efficiency.
  • sparks can be formed in the photovoltaic modules 12, particularly at the contacts I, II and III, IV in case of e.g. bad contact. Sparks may lead to hotspots and subsequently may lead to fire.
  • the temperature e.g. of the first and second contacts I, II of the connecting device
  • the spark detector is provided within each connecting device 12.
  • the spark detector comprises a circuit that is configured for detecting sparks in the main current loop of a single PV module 10.
  • This measurement can be communicated to an external control system (e.g. the energy management system in FIG. 1 or another monitoring system) and an individual photovoltaic module 10 or connection device 12 may be preventively disabled to avoid fire.
  • the instruction to disable the photovoltaic module 10 may originate internally, e.g. from the microprocessor, of externally, e.g. from the monitoring system.
  • the disablement of the photovoltaic module 10 is only marginally harmful for the total efficiency of the string comprising the disabled photovoltaic module 10 as a result of the parallel connection to the DC voltage bus 2.
  • the measurements and other data may be transmitted wirelessly for each photovoltaic module 10 to an external system (a central gateway), using e.g. ZigBee.
  • Clusters of PV modules 10/connecting devices 12 may communicate with a particular central gateway.
  • the connection devices 12 may comprise a wireless transceiver for transmitting data and receiving commands from the external system.
  • Photovoltaic modules 10 and/or connecting devices 12 of these modules 10 may also communicate with each other by building short range mesh networks. The performance of a single PV module 10 can be monitored and, if need be, being serviced.
  • the microcontroller uC, measurement circuitry, the spark detector and/or the wireless transmitter or transceiver may also be part of the connecting device 12 of FIG. 5 .
  • the microcontroller uC, measurement circuitry, the spark detector and/or the wireless transmitter or transceiver may be provided on a printed circuit board in the connecting device 12.
  • FIG. 6 shows a block diagram of a PV module 10 and a connecting device 12, wherein connecting device 12 provides multiple contacts I, II for batches of solar cells 11 in parallel.
  • Each batch comprises 10-15 solar cells 11 to provide a DC voltage of 7-14 Vdc.
  • This DC voltage is boosted to 400 Vdc for each batch separately using the split coil transformer arrangement of FIG. 5 .
  • it is no longer required to provide a by-pass with a diode as is regularly observed in prior art PV modules, indicated by the cross through the diode in FIG. 6 .
  • conversion efficiency is increased and a potential source of defects and fire is omitted.
  • the microprocessor controls a switch S determining whether the boosted DC voltage of 400 V is supplied to the contacts III, IV and thus to the voltage bus 2.
  • the connecting device 12 is powered via contacts IV and V from e.g. the DC/AC converter connected to the DC voltage bus 2 as illustrated in FIG. 7 for an integral PV module 10.
  • contact IV is at a potential of -48V and contact V at a potential around 0V (thus, if the DC voltage bus should be at 400V, contact III is at a potential of 352 V).
  • Switch S is open by default if no voltage is applied to contacts IV and V for the connecting device 12.
  • the power for the local power supply is obtained from the DC/AC converter 13 as illustrated in FIG. 7 via the DC voltage bus 2, more particularly the lines related control network 3.
  • This control network can also be used for communication and security (e.g. UOVP: under-and-over voltage protection).
  • UOVP under-and-over voltage protection
  • the DC voltage can be modulated.
  • contact V may also be used as a security contact, e.g. last make, first break, to disable the connecting device 12 until contacts III, IV are securely connected.
  • Contact V may be a separate pin within e.g. contact III or IV.
  • FIGS. 8A and 8B illustrate operating diagrams for the PV module 10/connecting device 12 and the inverter 13, respectively.
  • the DC voltage of the DC voltage bus 2 amounts to 400 Vdc, the maximum voltage is reached and energy is available for energy demanding arrangements. This state of the DC voltage bus is sensed by the energy demanding arrangements. These energy demanding arrangements may comprise a microprocessor to sense this state and to control a switch for connecting to the DC voltage bus 2 for receiving the DC voltage.
  • the energy supplying arrangements sense that no further power is required for the bus, such that microcontroller uC of e.g. FIG.
  • both energy supply arrangements and energy demand arrangements may supply energy to, respectively, draw energy from the DC voltage bus 2 as signalled by the DC voltage state of the DC voltage bus 2 as sensed by these arrangements.
  • the DC voltage of the bus 2 is 360V, the load of bus 2 is maximum and energy demand arrangements sense that power can no longer be drawn from DC voltage bus 2.
  • the AC/DC double bridge converter of FIG. 1 may be used to obtain a DC voltage at the DC voltage bus 2 from the AC mains grid 4.
  • the DC/AC conversion of converter 13 is designed to be maximum at 380V.
  • the converter may also be designed to have maximum conversion over the entire range of 360-400V.

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Direct Current Feeding And Distribution (AREA)
  • Photovoltaic Devices (AREA)
EP09150712.9A 2008-08-26 2009-01-16 Connexion électriquement parallèle de modules photovoltaïques dans une chaîne pour fournir une tension CC à un bus de tension CC Active EP2159895B8 (fr)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
NL2001920 2008-08-26

Publications (4)

Publication Number Publication Date
EP2159895A2 true EP2159895A2 (fr) 2010-03-03
EP2159895A3 EP2159895A3 (fr) 2014-01-22
EP2159895B1 EP2159895B1 (fr) 2021-04-21
EP2159895B8 EP2159895B8 (fr) 2021-06-23

Family

ID=41372785

Family Applications (3)

Application Number Title Priority Date Filing Date
EP09150712.9A Active EP2159895B8 (fr) 2008-08-26 2009-01-16 Connexion électriquement parallèle de modules photovoltaïques dans une chaîne pour fournir une tension CC à un bus de tension CC
EP20198711.2A Active EP3796504B1 (fr) 2008-08-26 2009-01-16 Système électrique et procédé de fonctionnement d'un tel système
EP09150715.2A Active EP2159896B1 (fr) 2008-08-26 2009-01-16 Système électrique et procédé de fonctionnement d'un tel système

Family Applications After (2)

Application Number Title Priority Date Filing Date
EP20198711.2A Active EP3796504B1 (fr) 2008-08-26 2009-01-16 Système électrique et procédé de fonctionnement d'un tel système
EP09150715.2A Active EP2159896B1 (fr) 2008-08-26 2009-01-16 Système électrique et procédé de fonctionnement d'un tel système

Country Status (1)

Country Link
EP (3) EP2159895B8 (fr)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013156865A (ja) * 2012-01-30 2013-08-15 Toshiba Corp Pvパネル診断装置、診断方法及び診断プログラム
EP2528181A4 (fr) * 2010-10-29 2015-04-08 Shanghai Ghrepower Green Energy Co Ltd Système d'alimentation électrique avec intégration d'énergie éolienne, d'énergie solaire, de diesel et d'alimentation secteur
CN112534696A (zh) * 2018-08-13 2021-03-19 弗罗纽斯国际有限公司 光伏逆变器以及用于操作光伏逆变器的方法
CN118713139A (zh) * 2024-08-28 2024-09-27 柔储技术(佛山)有限公司 一种基于需量控制和防逆流控制的功率调控方法及系统

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104980091A (zh) * 2015-06-23 2015-10-14 四川蜀旺科技有限公司 一种光能储能逆变系统
GB202201109D0 (en) * 2022-01-28 2022-03-16 Pulsiv Ltd Solar panel architecture

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4032569A1 (de) 1990-10-13 1992-04-16 Flachglas Solartechnik Gmbh Netzgekoppelte photovoltaikanlage

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000174317A (ja) * 1998-12-01 2000-06-23 Toshiba Corp 太陽電池発電システム
JP3655831B2 (ja) * 2001-02-14 2005-06-02 シャープ株式会社 昇圧ユニット、パワーコンディショナ、およびそれらを用いた太陽光発電システム
US6369462B1 (en) * 2001-05-02 2002-04-09 The Aerospace Corporation Maximum power tracking solar power system
DE10136147B4 (de) * 2001-07-25 2004-11-04 Kolm, Hendrik, Dipl.-Ing. Photovoltaischer Wechselstromerzeuger
US7612283B2 (en) * 2002-07-09 2009-11-03 Canon Kabushiki Kaisha Solar power generation apparatus and its manufacturing method
JP2004055603A (ja) * 2002-07-16 2004-02-19 Canon Inc 太陽電池モジュール、太陽電池アレイ、及び太陽光発電システム
US7239044B1 (en) * 2004-12-09 2007-07-03 Sandia Corporation Enhanced distributed energy resource system
JP5124114B2 (ja) * 2006-08-28 2013-01-23 シャープ株式会社 蓄電機能を有するパワーコンディショナ
US8751053B2 (en) * 2006-10-19 2014-06-10 Tigo Energy, Inc. Method and system to provide a distributed local energy production system with high-voltage DC bus

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4032569A1 (de) 1990-10-13 1992-04-16 Flachglas Solartechnik Gmbh Netzgekoppelte photovoltaikanlage

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2528181A4 (fr) * 2010-10-29 2015-04-08 Shanghai Ghrepower Green Energy Co Ltd Système d'alimentation électrique avec intégration d'énergie éolienne, d'énergie solaire, de diesel et d'alimentation secteur
US9130387B2 (en) 2010-10-29 2015-09-08 Shanghai Ghrepower Green Energy Company Ltd. Of P.R. China Hybrid integrated wind-solar-diesel-city power supply system
JP2013156865A (ja) * 2012-01-30 2013-08-15 Toshiba Corp Pvパネル診断装置、診断方法及び診断プログラム
CN112534696A (zh) * 2018-08-13 2021-03-19 弗罗纽斯国际有限公司 光伏逆变器以及用于操作光伏逆变器的方法
CN112534696B (zh) * 2018-08-13 2023-07-14 弗罗纽斯国际有限公司 光伏逆变器以及用于操作光伏逆变器的方法
CN118713139A (zh) * 2024-08-28 2024-09-27 柔储技术(佛山)有限公司 一种基于需量控制和防逆流控制的功率调控方法及系统

Also Published As

Publication number Publication date
EP2159895B8 (fr) 2021-06-23
EP2159895B1 (fr) 2021-04-21
EP3796504A1 (fr) 2021-03-24
EP2159896B1 (fr) 2020-09-30
EP2159895A3 (fr) 2014-01-22
EP3796504B1 (fr) 2023-09-13
EP2159896A2 (fr) 2010-03-03
EP2159896A3 (fr) 2014-01-29

Similar Documents

Publication Publication Date Title
US8432143B2 (en) Electrically parallel connection of photovoltaic modules in a string to provide a DC voltage to a DC voltage bus
US11728645B2 (en) Enhanced system and method for string balancing
US11171490B2 (en) System and method for low-cost, high-efficiency solar panel power feed
US10819117B2 (en) Systems and methods to combine strings of solar panels
CN104713176B (zh) 光伏空调系统及其控制方法
US10312692B2 (en) Systems and methods to reduce the number and cost of management units of distributed power generators
KR100686281B1 (ko) 병렬 접속된 인버터를 갖는 전원 시스템을 동작시키는방법 및 전력 변환 시스템
US9190847B2 (en) Power distribution system distributing an alternating current (AC) power and a direct current (DC) power to load devices
US20090179499A1 (en) Multiple bi-directional input/output power control system
EP2159895B1 (fr) Connexion électriquement parallèle de modules photovoltaïques dans une chaîne pour fournir une tension CC à un bus de tension CC
KR20160129265A (ko) 태양광 컨버터 및 에너지 저장 컨버터를 이용한 계통 연계형 통합 장치
CN116868469A (zh) 使用ac发电机源的dc光伏输入仿真
JP5373528B2 (ja) 配電装置
JP2011078237A (ja) 電力供給システム
US10886744B2 (en) Power conversion system, power supply system and power conversion device
US20120306278A1 (en) Voltage Regulation Of A DC/DC Converter
KR101764651B1 (ko) 태양광 발전 장치 연계형 전력공급장치 및 이의 제어 방법
CN223379081U (zh) Dcdc双向充放电电路及装置
CN102170167A (zh) 光电模块行并联电连接以向dc电压总线提供dc电压

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA RS

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: FEMTOGRID ENERGY SOLUTIONS B.V.

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA RS

RIC1 Information provided on ipc code assigned before grant

Ipc: H01L 31/00 20060101ALI20131217BHEP

Ipc: H02J 1/10 20060101AFI20131217BHEP

Ipc: H02J 3/38 20060101ALI20131217BHEP

17P Request for examination filed

Effective date: 20140221

RBV Designated contracting states (corrected)

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

AKX Designation fees paid

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20200416

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20210118

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602009063595

Country of ref document: DE

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1385650

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210515

RAP4 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: FEMTOGRID ENERGY SOLUTIONS B.V.

REG Reference to a national code

Ref country code: CH

Ref legal event code: PK

Free format text: BERICHTIGUNG B8

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1385650

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210421

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210721

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210821

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210722

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210721

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210823

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602009063595

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20220124

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210821

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20220131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220116

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220131

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220116

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20090116

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210421

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20260122

Year of fee payment: 18

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20260126

Year of fee payment: 18

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20260126

Year of fee payment: 18

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20260127

Year of fee payment: 18

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20260126

Year of fee payment: 18