EP2201207A1 - Vorrichtung, vorzugsweise zur durchführung einer bohrung in erdschichten oder gestein - Google Patents

Vorrichtung, vorzugsweise zur durchführung einer bohrung in erdschichten oder gestein

Info

Publication number
EP2201207A1
EP2201207A1 EP08829579A EP08829579A EP2201207A1 EP 2201207 A1 EP2201207 A1 EP 2201207A1 EP 08829579 A EP08829579 A EP 08829579A EP 08829579 A EP08829579 A EP 08829579A EP 2201207 A1 EP2201207 A1 EP 2201207A1
Authority
EP
European Patent Office
Prior art keywords
unit
high pressure
pressure compressor
load vehicle
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP08829579A
Other languages
English (en)
French (fr)
Other versions
EP2201207A4 (de
Inventor
Conny HÅKANSSON
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Svenska Maskin Och Tryckluft I Balsta AB
Original Assignee
Svenska Maskin Och Tryckluft I Balsta AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Svenska Maskin Och Tryckluft I Balsta AB filed Critical Svenska Maskin Och Tryckluft I Balsta AB
Publication of EP2201207A1 publication Critical patent/EP2201207A1/de
Publication of EP2201207A4 publication Critical patent/EP2201207A4/de
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B4/00Drives for drilling, used in the borehole
    • E21B4/06Down-hole impacting means, e.g. hammers
    • E21B4/14Fluid operated hammers
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
    • E21B7/201Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes with helical conveying means
    • E21B7/203Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes with helical conveying means using down-hole drives
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60KARRANGEMENT OR MOUNTING OF PROPULSION UNITS OR OF TRANSMISSIONS IN VEHICLES; ARRANGEMENT OR MOUNTING OF PLURAL DIVERSE PRIME-MOVERS IN VEHICLES; AUXILIARY DRIVES FOR VEHICLES; INSTRUMENTATION OR DASHBOARDS FOR VEHICLES; ARRANGEMENTS IN CONNECTION WITH COOLING, AIR INTAKE, GAS EXHAUST OR FUEL SUPPLY OF PROPULSION UNITS IN VEHICLES
    • B60K25/00Auxiliary drives
    • B60K25/06Auxiliary drives from the transmission power take-off

Definitions

  • a device preferably for performing of a drilling in earth-layer and rock
  • the present invention refers to a device in the first place for performing of a drilling in earth-layers and rocks, whereby a first unit is used comprising a countersink hammer, which by aid of its strokes acts towards a bore crown for drilling of a bore hole at the same time as a driving downwards can be provided by a casing pipe in the bore hole made together with the bore crown used and a second unit for feeding pressurized air to in the first place to the first unit for its operation.
  • a first unit comprising a countersink hammer, which by aid of its strokes acts towards a bore crown for drilling of a bore hole at the same time as a driving downwards can be provided by a casing pipe in the bore hole made together with the bore crown used and a second unit for feeding pressurized air to in the first place to the first unit for its operation.
  • One object of the present invention is to eliminate those drawbacks existing with known drilling devices of the type i.a. mentioned above by providing a new thinking and a new device in the first place in connection with drilling in earth-layers and rocks.
  • the characterizing features of the present invention are set forth in the claims enclosed.
  • the energy consumption has been able to be lowered to about. 20.000 - 30.000 litres of oil and year.
  • the high pressure compressor integrated with the load vehicle can of course also be used for other purposes such as i.e. transporting bulk material in pipe lines when i.e. emptying of ships and cleaning and regenerating of pipes in oil refinerys.
  • Fig. 1 shows a schematic perspective view of a device according to the invention comprising a load vehicle with an integrated high pressure compressor
  • Fig. 2 shows a schematic perspective view of the high pressure compressor itself illustrated in fig. 1 ,
  • Fig. 3 shows a schematic side view of the power transmission between the power take off from the gear box of the load vehicle and the primary shaft to the high pressure compressor
  • Fig. 4 shows a perspective view in a greater scale of the operating unit according to the invention.
  • the same consists of a device for performing of a drilling in earth layer and rocks.
  • a first unit comprising a counter sink hammer, which by its strokes acts towards a bore crown for drilling a bore hole at the same time as a driving downwards can be done of a casing pipe into the bore hole made together with the bore crown used.
  • a second unit is on the other especially intended to feed that pressure air needed for the operation of the first unit.
  • the second unit 1 comprises a high pressure compressor 3 mounted on a load vehicle 2, which is connected to and is driven by a power take off 4 of that gear box 5 belonging to existing motor 6 of the load vehicle 2.
  • a control unit 7 is connected to the motor 6 of the load vehicle 2 for adjusting of its motor speed and hence that pressure which the high pressure compressor is delivering.
  • Pressure sensors 8 are further used in order to sense and maintain predetermined working pressures.
  • the control unit 7 comprises at least three function buttons 9, of which the first one is provided by an electric signal or radio signal with a predetermined frequency to start the load vehicle 2 and the high pressure compressor 3 in different steps or gradually by at least two depressions , whereupon the pressure sensors 8 in the form of a last-pressure sensor and a control pressure sensor in a way known per se are provided to sense the correct working pressure, of which function buttons 9 the second one is provided to shut off or unload the operation in steps and of which the third function button is provided by an electric signal or a predetermined radio frequency signal to give an impulse to the motor 6 for increasing the pressure or decreasing the pressure of the high pressure compressor 3 to manually determined values.
  • the function buttons of the control unit 7 also can be distance controlled via a cable or predetermined radio frequency signals by a portable distance control unit, so that the second unit is adjustable in distance from the same i.e. from the first unit. Instead of using the function buttons in the control unit these can of course by replaced by icons belonging to a menu of a computer.
  • the power take off 4 of the gear box 5 is via an universal joint 10 and belt pulleys 11 completed with driving belts 12 connected to the primary shaft 13 of the high pressure compressor 3 in order to bridge over a vertical height difference between the two.
  • This height difference can be varied upwards to about 800 mm between the power take off 4 of the gear box 5 and the primary shaft 13 of the high pressure compressor 3, which is connectable by aid of a splined coupling or creep wedge coupling.
  • the actual rotation speed of the primary shaft 13 of the high pressure compressor 3 is about 1100 - 1500 r/min and preferably about 1350 r/min during normal drilling by the first unit and the actual working pressure then amounts to maximum about 30 bar.
  • the load vehicle 2 and the high pressure compressor 3 mounted on the same are integrated connected to each other at the same time as the load vehicle 2 having a loading space 14 after or just behind the high pressure compressor 3, which admits space for the first unit in one and the same equipage.

Landscapes

  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Transportation (AREA)
  • Earth Drilling (AREA)
EP08829579.5A 2007-09-07 2008-09-06 Vorrichtung, vorzugsweise zur durchführung einer bohrung in erdschichten oder gestein Withdrawn EP2201207A4 (de)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
SE0702013A SE531521C2 (sv) 2007-09-07 2007-09-07 Anordning vid utförande av borrning i jordlager och berg
PCT/SE2008/000500 WO2009031963A1 (en) 2007-09-07 2008-09-06 A device preferably for performing of a drilling in earth-layer and rock

Publications (2)

Publication Number Publication Date
EP2201207A1 true EP2201207A1 (de) 2010-06-30
EP2201207A4 EP2201207A4 (de) 2016-01-13

Family

ID=40429127

Family Applications (1)

Application Number Title Priority Date Filing Date
EP08829579.5A Withdrawn EP2201207A4 (de) 2007-09-07 2008-09-06 Vorrichtung, vorzugsweise zur durchführung einer bohrung in erdschichten oder gestein

Country Status (3)

Country Link
EP (1) EP2201207A4 (de)
SE (1) SE531521C2 (de)
WO (1) WO2009031963A1 (de)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109555512A (zh) * 2017-09-26 2019-04-02 中国石油天然气股份有限公司 套管所受应力的计算方法和装置

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2783971A (en) * 1953-03-11 1957-03-05 Engineering Lab Inc Apparatus for earth boring with pressurized air
US3823902A (en) * 1972-07-12 1974-07-16 H Bumueller Articulated vehicle
US6019702A (en) * 1998-05-14 2000-02-01 Caterpillar Inc. Automatic elevated idle speed control and method of operating same
ATE361854T1 (de) * 2002-03-22 2007-06-15 Ponte Vecchio Consult Sagl Angetriebene zusatzeinrichtung an einem kraftfahrzeug
US6981855B2 (en) * 2002-09-30 2006-01-03 Sandvik Ab Drilling rig having a compact compressor/pump assembly
US7004456B2 (en) * 2002-10-03 2006-02-28 Key Energy Services, Inc. Engine speed limiter for a hoist
FR2849413B1 (fr) * 2002-12-30 2005-07-08 Rentforce S A Vehicule utilitaire a compresseur integre
SE526923C2 (sv) * 2003-12-29 2005-11-22 Atlas Copco Rock Drills Ab Metod, system och anordning för att styra effektförbrukningen under en bergborrningsprocess
EP1731708B1 (de) * 2005-06-10 2007-08-08 Geomechanik Wasser- und Umwelttechnik GmbH Senkhammer-Bohrvorrichtung und -verfahren

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO2009031963A1 *

Also Published As

Publication number Publication date
EP2201207A4 (de) 2016-01-13
WO2009031963A1 (en) 2009-03-12
SE531521C2 (sv) 2009-05-05
SE0702013L (sv) 2009-03-08

Similar Documents

Publication Publication Date Title
US9010459B2 (en) Air compressor system and method of operation
CN102803642B (zh) 用于在自主采矿钻机上结合传感器的方法和系统
US7004456B2 (en) Engine speed limiter for a hoist
US20100226197A1 (en) Drum Drive for a Truck Mixer
CN103061238B (zh) 自行进的施工机械和用来调节自行进的施工机械的方法
US7721825B2 (en) Portable concrete boring machine
US10443306B2 (en) Drilling machine with optimized tool unloading system
US10071885B2 (en) Vacuum lift attachment
KR100812336B1 (ko) 다목적 도로관리차량의 동력제어방법
CN109798118A (zh) 一种适用于深海富钴结壳开采的采矿头
CN112253159A (zh) 一种横轴掘锚机
EP2201207A1 (de) Vorrichtung, vorzugsweise zur durchführung einer bohrung in erdschichten oder gestein
AU2004258133B2 (en) Instrumented drill head, related drilling/bolting machines, and methods
US4949795A (en) Rotary rapid excavation system
US3367427A (en) Hole drilling machine
US3240278A (en) Drilling apparatus
JP6535614B2 (ja) 地盤改良施工機
CN101906791A (zh) 一种智能化破碎装载巷道修护机
CN201135897Y (zh) 破料机
EP2949533B1 (de) Verfahren zur steuerung des primären motors einer lasttransportmaschine, steuersystem für den primären motor einer lasttransportmaschine und lasttransportmaschine
CN113123776A (zh) 一种用于双轮搅拌钻机的气保压系统
KR102415382B1 (ko) 토크렌치 다중제어시스템
CN208702354U (zh) 一种钻具移运设备
WO2015123195A1 (en) Pump drive for a work machine
JP2008274712A (ja) 破砕削孔装置

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20100407

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR

AX Request for extension of the european patent

Extension state: AL BA MK RS

DAX Request for extension of the european patent (deleted)
RA4 Supplementary search report drawn up and despatched (corrected)

Effective date: 20151215

RIC1 Information provided on ipc code assigned before grant

Ipc: E21B 7/02 20060101AFI20151209BHEP

Ipc: B60K 25/06 20060101ALI20151209BHEP

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20160722