EP2666955A2 - Procédé et dispositif d'ajustement semi-automatique d'un dispositif de manipulation - Google Patents
Procédé et dispositif d'ajustement semi-automatique d'un dispositif de manipulation Download PDFInfo
- Publication number
- EP2666955A2 EP2666955A2 EP13168558.8A EP13168558A EP2666955A2 EP 2666955 A2 EP2666955 A2 EP 2666955A2 EP 13168558 A EP13168558 A EP 13168558A EP 2666955 A2 EP2666955 A2 EP 2666955A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- drill string
- image
- handling device
- positioning
- camera
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B19/00—Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
- E21B19/16—Connecting or disconnecting pipe couplings or joints
- E21B19/165—Control or monitoring arrangements therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/002—Survey of boreholes or wells by visual inspection
Definitions
- the invention relates to a method for the semi-automatic adjustment of a handling device, in particular an automatic handling device, and a device provided for carrying out the method.
- the invention is in the context of considerations for better automation of operations on a rig, namely a drilling rig for deep wells, so for drilling holes on fossil energy sources or for the use of geothermal energy, etc., and on the basis of the older, not yet published German patent application 10 2010 060 823.8 from 26.11.2010 originated.
- An example of a handling device to be positioned when drilling holes is a per se known pincer system which is provided for connecting and separating linkage elements of a drill string and / or a so-called casing string with tubes for lining the borehole.
- a per se known pincer system which is provided for connecting and separating linkage elements of a drill string and / or a so-called casing string with tubes for lining the borehole.
- linkage elements or groups of linkage elements e.g. two or up to three linkage elements (so-called states), each separated from the drill string, so that it can be successively pulled up further out of the borehole.
- drill string or drill string are used in the following. However, this is without departing from a broader generality, so that any use of the term drill string is also intended to include a casing string and any use of the term drill string also includes one or more pipes (casings) for lining the wellbore.
- the clamp system For separating such a drill string, the clamp system is provided and the adjustment of the clamp system with respect to a connection point of the drill string has been done manually.
- the forceps system is first positioned over the wellbore, and for proper alignment with respect to the joint to be loosened, suitable mobility of the forceps system, e.g. a translational mobility provided, so that in this regard a manual adjustment of the pliers system takes place until reaching the respective height of the connection point.
- a laser pointer acting as a position indicator is proposed.
- the laser pointer allows a pivoting movement in one plane (pitch movement) to Depending on the position of the drill string to be able to designate different heights of the joint.
- the laser pointer as a position indicator is aligned with the respective junction and after positioning the respective orientation of the position indicator is confirmed. This orientation of the position indicator is recorded and converted into motion data for positioning the forceps system.
- a handling device eg a tong system as mentioned above
- WO 2009/148304 A is a method for welding pipe segments for underwater pipelines and concretely the detection of the end of a last segment of the pipeline and an end to be connected to another pipe segment described.
- the measuring device provided for this purpose is movable relative to the ends of the tube segments to be detected, and the acquired data serve to control a welding device.
- this movement data for example a height information derived from the position of the marking
- a positioning of the handling device in particular a tong system as a handling device
- a completion of the process of marking the joint is confirmed.
- the position of the marking given at the time of the confirmation is recorded and made available in the form of a position value for further processing.
- the position value determined in this way can then be converted into movement data for positioning the handling device.
- Based on this movement data can be automatically positioned as a handling device, a pliers system with respect to the connection point and activated a control of the pliers system or enabled for activation. Activation of the forceps system then involves subsequent steps of disconnecting the linkage members at the junction.
- This method is especially for use on a drilling rig, so a drilling rig for drilling deep wells, into consideration, so that the above-mentioned operator of such a drilling rig, such as a drill master, his tasks usually from a cab designed as cab (the Drillerkabine) performed in a simple and straightforward way for a correct positioning of the handling device and thus ensure a rapid and smooth distribution of the drill string.
- the approach presented here can also be used when connecting rod elements (boring bars or casings) to the drilling or casing string.
- rod elements boring bars or casings
- a new linkage element must be combined with the drillstring.
- a drilling device for example, a so-called top drive, or a so-called pipe manipulator - collectively referred to as a drilling device - brought a new linkage element and positioned above the drill string to then be connected to the pliers system with the drill string.
- Vertical movements of the drilling device are required to raise the new linkage vertically above the drill string and to bring the lower end of the new linkage near the drill string or in contact with the drill string.
- this last vertical movement can be automated if the vertical position of the upper end of the drill string is known.
- the vertical position of the upper end of the drill string may be marked as well as a joint between two linkage members in an image taken from the respective section of the drill string.
- the vertical position of the upper end of the drill string can then be converted into movement data for a drilling device of the above type. Thereafter, the drilling device with the new linkage element can automatically approach the upper end of the drill string, ie lower the new linkage element in the direction of the upper end of the drill string.
- the device comprises means for carrying out the method or its embodiments, in particular a Camera and means for confirming a position of the marker in the image captured by the camera and means for detecting a position of the marker in the image and means for converting the detected position into motion data for positioning the handling device.
- the operator in the picture denotes (marks) the connection point between two linkage elements of the drill string by means of a mark which is movable in the picture.
- a horizontal line that can be moved in the image is considered as a marking.
- This horizontal line is moved vertically in the image until coverage or sufficient coverage with the junction of two linkage elements is achieved.
- the thus achieved vertical position of the mark can be converted into movement data for adjusting the handling device.
- This embodiment of the method has the advantage of easy implementation. The camera takes exactly one picture of the drill string and the mark is moved in this picture.
- a section of the recorded image is displayed to the operator and that the operator marks the connection point between two linkage elements of the drill string by moving the section relative to the recorded image.
- This aspect of the invention takes into account that today suitable cameras are available for industrial use, which can produce digital images with a very high resolution; at eight megapixels, for example, 3,264 x 2,448 pixels, at 14 megapixels to Example 4,536 x 3,024 pixels.
- Such image dimensions and expected future even higher image dimensions can be displayed on conventional screens only if the image is reduced with a loss of detail shown. However, a loss of detail is sometimes problematic if, as here, it is important to reliably identify comparatively small details.
- the joint of two linkage elements appears in the captured image in the broadest sense as a horizontal line.
- a reduction of the image taken in each case for displaying an image on a screen can therefore result in such a line no longer being or no longer being reliably recognizable.
- the representation of the section is preferably matched to the resolution of the respective screen. If this permits a resolution of, for example, 1024 ⁇ 768 pixels, this specifies the dimensions of the detail.
- each snapshot pixel of the captured image within the snippet is represented by exactly one pixel of the screen. All recorded details of the image can thus also be displayed on the screen. A loss of detail does not arise.
- connection point between two linkage elements can lie in each section of the recorded image
- the section shown in each case can be moved relative to the recorded image.
- One for the operator Particularly practical embodiment consists in the fact that the section shown has a fixed marking, for example in the form of a horizontal line (line cursor) in the center of the picture, and that for marking a recognized connection point between two linkage elements of the cutout is moved relative to the overall picture, until the stationary line cursor and the connection point shown in the picture are brought into line. This has the advantage that a suitable movement of the cutout to designate the connection point is sufficient.
- the otherwise also possible movement of the section until it detects the junction between two linkage elements and a subsequent displacement of a line cursor within the section means two independent positioning operations and it is expected that two independent positioning operations take more time than the movement of a section with a fixed line cursor relative to the overall image.
- a position of the line cursor in the image is converted into movement data for positioning the handling device on the basis of a distance between the camera and the drill string.
- the determination of movement data for the handling device is thus attributed to simple trigonometric conditions in a right-angled or a general triangle. For calibration is only one Determining the distance between the location of the camera and the drill string necessary.
- a position of the line cursor in the image is converted into movement data for positioning the handling device on the basis of a correlation table.
- a correlation table can be deposited as part of a calibration, which height is detected on the drill string, for example, by the bottom and the top line of the image.
- By interpolation can then be determined for each line of the image, a corresponding height value.
- a corresponding height value can be determined on the basis of a position of the line cursor. The respectively determined height value can be used to control the handling device.
- an operating element For movement and positioning of the line cursor is an operating element in the manner of a trackball or the like into consideration.
- an operating device is used, which is already present on a control station, for example in a cab of the drill, and is used there for other control or positioning tasks, for example a so-called master switch. Then, by switching to the functionality for semi-automatic adjustment of a handling device, the already existing operating device as a control element to move and position the line cursor.
- the handling device is automatically adjustable relative to the joint and a related development of the method and its embodiments is that the respective handling device is automatically adjusted relative to the joint.
- a tong system for separating two linkage elements can be adjusted relative to the connection point.
- a Topdrive, a Pipe Manipulator or the like a new linkage element is adjusted relative to an upper end of the drill string as a marked joint, the approach presented here is not only in removing linkage elements and splitting the drill string, but also in installing linkage elements, ie Combining new linkage elements with the downhole drillstring usable.
- a drilling device in particular a top drive, a pipe manipulator or the like, functions as a handling device, in one embodiment of a method for determining movement data for the necessary adjustment processes or for the automatic Execution of the movements or movements required for the adjustment provided that the adjustment of the new linkage element initially with a first predetermined or predetermined speed and below a predetermined or predeterminable distance of the new linkage element to the upper end of the drill string with a reduced compared to the first speed, predetermined or predetermined second speed.
- the first speed can be set comparatively high, so that the installation of new linkage elements can proceed as quickly as possible.
- a further advantageous embodiment of a method for connecting drill pipe elements to the drill string takes into account that the drill string normally contains liquid, in particular drilling fluid with drilling residues. Then the free thread of the upper end of the drill string forming linkage element can not be cleaned. Usually, in addition to the cleaning and a Fettung (for example, with the so-called drill dope) provided or required. In order to be able to make at least the cleaning, possibly the cleaning and the subsequent greasing, it is necessary that a part of the liquid standing in the drill string is removed. So far, a displacement body is used, which is introduced into the upper end of the drill string and then removed again.
- a Fettung for example, with the so-called drill dope
- a portion of the liquid standing there is displaced from the drill string, so that after removing the displacement body, the thread can be cleaned and / or greased.
- This process can also be automated on the basis of the approach described here. If the position of the upper edge of the drill string is known, this can also be converted into motion data for automatically positioning a handling device with a displacer relative to the upper end of the drill string as a marked joint, so that the displacer with the handling device automatically displaces liquid from the drill string is introduced into the upper end of the drill string and the handling device is then moved away from the area of the drill string after the automatic removal of the displacer from the drill string.
- Both automatic positioning operations can also be combined to an automatic movement based on a known vertical position of the upper edge of the drill string: then, before the adjustment of the new drill string member with respect to the downhole drill string an automatic Displacement of liquid from the drill string by means of automatically moving with a corresponding handling device displacement body, possibly also a subsequent automatic cleaning and / or greasing with the same handling device or leading a cleaning tool handling device and then automatically the adjustment of the new drill string element with respect to the upper End of the drill string.
- Fig. 1 schematically shows a greatly simplified drill string 10 of a drill, not shown in detail, but known per se.
- the linkage elements 12 are connected in a conventional manner by screwing.
- connection point 14 In order to results in a connection point 14 in the region of a contact point of two sleeves 16 each of a linkage element 12.
- the connection point 14 is referred to in the technical terminology as Tooljointtrennstelle.
- FIG. 1 schematically greatly simplifies a control station 18 (Drillerkine) for operating the drilling rig or individual aggregates of the drilling rig.
- Drillerkine a control station 18 for operating the drilling rig or individual aggregates of the drilling rig.
- such a control station 18 includes a plurality of displays and controls with which the respective operator, eg the drill master, can influence the operation of the drilling rig or with which the operator is informed about the status of the drilling rig and / or the drilling operation. Such details are not shown for reasons of clarity.
- a camera 20 and a detection area 22 of the camera 20 illustrated with dashed lines are shown.
- the camera 20 is here shown slightly inclined.
- the specific orientation of the fixedly mounted camera 20 can be left to the individual case. It is only essential that an expected location of the connection point 14 falls within the detection range 22. If this is ensured, in the already fixedly mounted camera 20 and their orientation can be fixed so that in operation, both the position of the camera 20 as well as their orientation are fixed and immutable.
- the camera 20 may also be mounted outside the control station 18 at any other suitable location on the so-called Drillfloor.
- connection point 14 For marking the connection point 14, a control element 24 shown here as a trackball and a screen 26 are shown. Their use and the actual marking of the connection point 14 are explained in more detail below with further details.
- Fig. 2 shows the screen 26 in a schematically simplified illustration and as an example a display unit of a general kind.
- an image 28 taken by the camera 20 is displayed on the screen 26.
- the details included in the image 28 correspond to those parts and elements of the drilling rig that fall within the detection area 22 of the camera 20.
- a portion of the drill string 10 are shown with the ends of two linkage elements 12 and the connection point 14 resulting therebetween.
- the actual height of the joint 14 may vary as the drill string 10 is withdrawn segment by segment.
- the position of the representation of the connection point 14 in the image 28 taken by the camera 20 also varies.
- a vertical position of a line cursor 30 in the image 28 can be influenced.
- the variability of the vertical position of the line cursor 30 is illustrated by the two block arrows, which themselves are not part of the image 28 displayed on the screen 26.
- a control unit 32 with a microprocessor 34 or the like and a memory 36 is provided.
- a computer program 38 is loaded, which is executable by the microprocessor 34 and is executed in the operation of the control unit 32 by the microprocessor 34.
- an image 28 of a portion of the drill string 10 is taken with the camera 20 and displayed on the screen 26 (this is illustrated by the first downward arrow from the controller 32 to the screen 26). Furthermore, under control of the computer program 38, a position signal obtainable from the operating element 24 is received and evaluated (this is illustrated by the upward-pointing arrow from the operating element 24 to the control unit 32). In dependence on this position signal, the line cursor 30 is displayed as part of the image 28, wherein the illustrated position of the line cursor 30 can be influenced by operating actions on the control element 24 (this is illustrated by the second downward arrow from the control unit 32 to the screen 26).
- FIG. 3 shows in conjunction with Fig. 4 an alternative embodiment of the method. Unlike the in Fig. 2 the situation recorded by the camera 20 is not completely displayed on the screen 26, but the representation on the screen 26 is limited to a cutout 40 (FIG. Fig. 4 ).
- Fig. 4 2 shows that of the camera 20 according to the respective detection area 22 (FIG. Fig. 1 ).
- This captured image 28 is not identical to the image displayed on the screen 26.
- the image displayed on the screen 26 in this embodiment is limited to the image information included in the cutout 40, respectively.
- the cutout 40 is however - as in Fig. 4 is indicated with the block arrows pointing upwards and upwards-relative to the image 28 taken by the camera 20, so that after this image is moved vertically, for example, other image information is included.
- the cutout 40 can be pushed back and forth on the image 28 taken by the camera 20, so that it is possible in this way to determine which part of the portion of the drill string 10 received by the camera 20 appears on the screen 26.
- image 28 shown on the screen 26 corresponds to that of the cutout 40 its current position included image information.
- the representation of the cutout 40 comprises a representation of the line cursor 30 in a fixed relative position to the cutout, for example in the middle of the cutout 40.
- the line cursor 30 With a displacement of the cutout 40 relative to the overall image taken by the camera 20, the line cursor 30 also moves with it relative to the image information encompassed by the cutout 40 and relative to the overall image taken by the camera 20.
- the displacement of the cutout 40 takes place until a position of the cutout 40 relative to the overall image recorded by the camera 20 is reached, in which the line cursor 30 is brought to coincide with the representation of the connection point 14.
- the operator can confirm the current position of the line cursor 30.
- the operating element 24 comprises, for example, a corresponding key or the like. Any other conceivable type of confirmation is alternatively or additionally also possible.
- the vertical position of the line cursor 30 thus indicates a measure of the third spatial coordinate, that is to say a measure of a height above a floor or working surface level, also referred to as a drill floor.
- the calculation of the associated z-coordinate from the vertical position of the line cursor 30 is available as a result of simple calculations.
- Fig. 5 shows on the right side a portion of the drill string 10 and on the other hand on the left side thereof taken with the camera 20 image 28.
- the real drill string 10 and within the detection range 22 of the camera 20 recordable part can be measured in the context of a calibration process become. In this case, for example, a height of a lowermost edge and a top edge of the detection area 22 can be determined.
- h1 or h2 The image 28 taken by the camera 20 is a digital image and digital images are known to be organized in rows and columns due to the matrix-like structure of the sensors used in digital cameras.
- a digital image 28 has 768 lines in a simple camera 20.
- the lowest Line of the digital image 28 depicts the lower edge of the detection area 22.
- the uppermost line of the digital image 28 correspondingly depicts the upper edge of the detection area 22.
- the lowest line can be symbolically denoted by y1 and the uppermost line symbolically by y2.
- the actual value of these identifiers is then - depending on the resolution of the image 28 - for example "1" or "768".
- the numerical values of the above-mentioned identifiers can be stored in a correlation table 42, which is created as a data structure in the memory 36 of the control unit 32 (as shown in FIG Fig. 5 only the symbolic identifiers are shown).
- the correlation table 42 may comprise further lines, for example to provide for an even better linearization of the interpolation performed on the basis of the correlation table 42. If, after completion of the positioning of the line cursor 30, its vertical position in the image 28 is determined, the respective vertical position corresponds to that line of the image 28 in which the line cursor 30 is displayed.
- the relevant line is in Fig. 5 symbolically denoted by y.
- h is the vertical position of the line cursor 30 in the image 28 expressed in the form of a line number
- the line cursor 30 in the image 28 is made to coincide with the representation of the junction 14.
- This relationship may be implemented as part of the computer program 38 in software such that upon confirmation of the completion of the positioning of the line cursor 30 with the value h, the height of the joint 14 results, which may be converted into motion data for positioning the respective handling device.
- the angle correlated with the positions h1 and h2 can also be determined from the location of the camera 20. Depending on the orientation of the camera 20, conditions arise as in a right-angled triangle or a general triangle. If the distance between the place the camera 20 and the location of the course of the drill string 10 can be interpolated between the then stored in the correlation table 42 angle values and with the distance between the camera 20 and location of the drill string 10 after the trigonometric conditions in the right triangle or after the cosine set the Height of the junction 14 are determined.
- the illustrated forceps system 44 is known per se and shown only partially and only schematically simplified. It is also shown that the forceps system 44 includes, for example, an element that allows a translatory movement of the forceps 46, 48.
- the translational element can be realized for example with a lifting cylinder 50 or a rack.
- the translational element allows both tongs 46, 48 to be positioned such that the upper and lower tongs 46, 48 engage the drill string 10 on different sides of the joint 14.
- Activation of the forceps system 44 then causes the drill string 10 to be severed at the junction 14 by the two stringers 12 meeting at the juncture 14 with the tong system 44 in different directions be rotated.
- the forceps system 44 is brought into a position that allows the tongs 46, 48 to engage the drill string 10. Due to the constant position of the drill string 10 above the wellbore, automation of this motion requires no data other than the coordinates of the wellbore. The height of the tongs 46, 48 required for separating the linkage elements 12 results from the above-mentioned movement data.
- the translational element for positioning the forceps 46, 48 is mentioned here only by way of example. It is relevant that a positioning of the pliers 46, 48 - or in general a positioning of the handling device - is possible.
- the positioning of the handling device takes place on the basis of the previously recorded position of the line cursor 30, in particular on the basis of the height h determined from its position and the correlation table 42.
- a forceps system 44 as a handling device, its positioning is thus possible in such a way that as a result of the positioning, the upper forceps 46 acts above the connection point 14 and the lower forceps 48 correspondingly below the connection point 14 on the drill string 10.
- connection point 14 With the line cursor 30, so to speak, the connection point 14 is visited and marked and the forceps system 44 is positioned substantially so that the two tongs 46, 48 are positioned centrally about the connection point 14, so that each forceps 46, 48 at one of the at the junction 14 meeting muffs 16 attacks.
- FIG. 6 and Fig. 7 show in this regard snapshots when separating two linkage elements 12, wherein Fig. 6 shows a situation in which the forceps system 44 is already positioned with respect to the junction 14 and where Fig. 7 shows a situation in which the tong system 44 engages the linkage elements 12 meeting at the junction 14 to subsequently separate them.
- FIG. 6 This also shows a possible alignment of the camera 20, so that the camera 20 not only a portion of the drill string 10, but also the positioning of the pliers system 44 and the opening and closing of the pliers 46, 48 detected. The camera 20 is then effective not only to locate the joint 14 but also to further monitor the separation of the linkage members 12.
- the positioning of the forceps system 44 and / or its activation may occur automatically upon confirmation that the line cursor 30 has been registered with the representation of the junction 14.
- this confirmation immediately or after a predetermined or predeterminable waiting time, the positioning of the Pliers system 44 and immediately thereafter or after another waiting for a further predetermined or predeterminable waiting time causes the activation of the forceps system 44.
- the above-mentioned confirmation activates an activation possibility of the forceps system 44.
- the actual positioning and / or activation of the forceps system 44 then takes place later and, for example, on the basis of a manual release by an operator, eg the drill master or another member of the personnel of the drilling rig.
- a transmission of an activation or activation signal and furthermore a transmission of at least one movement data come into consideration.
- the value determined as the height h of the connection point 14 is transferred as the movement data.
- handling device is basically any other handling device into consideration, so for example, handling devices on the type of the above-mentioned top drive and / or on the type of the above-mentioned pipe manipulator.
- the operator can then switch between a first, the drill string 10 in the borehole detecting camera 20 and a second, the mouse hole detecting camera by means of the control element 24 or another operating device. To move the marker 30, the same screen and control 24 may be used.
- a method and a device for the semi-automatic adjustment of a handling device in particular an automatic handling device, eg a tongs system 44 for a drilling rig, are indicated, wherein an operator has a marking 30, in particular a line cursor 30 as a marker, in an image 28 of a section of a drill string 10 taken with a stationary and fixed camera 20 so positioned that the line cursor 30 is brought to a junction 14 between two rod elements 12 of the drill string 10 to cover and the junction is marked so.
- a resulting position of the line cursor 30 can be finally converted into movement data for positioning the handling device.
- the corresponding device has means for carrying out such a method, eg a camera 20, a screen 26 for displaying an image recorded with the camera 20, a control element 24 for moving the line cursor 30 and for marking the connection point 14, means for confirming the Position of the line cursor 30 and means for deriving movement data for positioning the handling device from the position of the line cursor 30.
- a control unit 32 with a processing means such as a microprocessor 34 or the like is considered.
- an implementation of the method in software namely in the form of a computer program 38 with program code means includes.
- an automation device in the form of or in the manner of a programmable logic controller is considered.
- the invention is also such an automation device in whose memory a control program with program code instructions for implementing the further automation aspects is loaded or loadable.
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
- Manipulator (AREA)
- Machine Tool Sensing Apparatuses (AREA)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PL13168558T PL2666955T3 (pl) | 2012-05-23 | 2013-05-21 | Sposób i urządzenie do półautomatycznej regulacji urządzenia manipulacyjnego |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE102012208676A DE102012208676A1 (de) | 2012-05-23 | 2012-05-23 | Verfahren und Vorrichtung zur halbautomatischen Justierung einer Handhabungseinrichtung |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP2666955A2 true EP2666955A2 (fr) | 2013-11-27 |
| EP2666955A3 EP2666955A3 (fr) | 2017-10-18 |
| EP2666955B1 EP2666955B1 (fr) | 2019-02-20 |
Family
ID=48536683
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP13168558.8A Active EP2666955B1 (fr) | 2012-05-23 | 2013-05-21 | Procédé et dispositif d'ajustement semi-automatique d'un dispositif de manipulation |
Country Status (3)
| Country | Link |
|---|---|
| EP (1) | EP2666955B1 (fr) |
| DE (1) | DE102012208676A1 (fr) |
| PL (1) | PL2666955T3 (fr) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3473799A1 (fr) * | 2017-10-20 | 2019-04-24 | Weatherford Technology Holdings, LLC | Appareil et procédé de recherche d'articulation d'outil |
| CN112627747A (zh) * | 2020-11-27 | 2021-04-09 | 四川宏华石油设备有限公司 | 一种扶管装置 |
| US10975681B2 (en) | 2019-04-09 | 2021-04-13 | Weatherford Technology Holdings, Llc | Apparatus and method for locating tool joint |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102024002172A1 (de) | 2024-07-04 | 2026-01-08 | Sina Ahsan | Ein Werkzeug zur Bestimmung und Markierung von zwei äquivalenten Indikatoren oben und unten an einem Bohrstand unter Verwendung eines Laserstrahlsenders und - empfängers |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4468959A (en) | 1982-05-10 | 1984-09-04 | Roberts Royce Glen | Method and apparatus for tallying pipe |
| WO2009148304A1 (fr) | 2008-06-05 | 2009-12-10 | Heerema Marine Contractors Nederland B.V. | Système de mesure, système de manipulation de tuyau et procédé de raccordement de sections de tuyau |
| US20090314137A1 (en) | 2008-06-06 | 2009-12-24 | Hawk Industries, Inc. | Self-adjusting pipe spinner |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| NO20055576A (no) * | 2005-11-25 | 2007-01-08 | V Tech As | Fremgangsmåte og anordning for å posisjonere en krafttang ved en rørskjøt |
| GB201007200D0 (en) * | 2010-04-29 | 2010-06-16 | Nat Oilwell Varco Lp | Videometric system and method for offshore and oil-well drilling |
| DE102010060823A1 (de) | 2010-11-26 | 2012-05-31 | Bentec Gmbh Drilling & Oilfield Systems | Verfahren und Vorrichtung zur halbautomatischen Justierung einer Handhabungseinrichtung |
-
2012
- 2012-05-23 DE DE102012208676A patent/DE102012208676A1/de not_active Withdrawn
-
2013
- 2013-05-21 PL PL13168558T patent/PL2666955T3/pl unknown
- 2013-05-21 EP EP13168558.8A patent/EP2666955B1/fr active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4468959A (en) | 1982-05-10 | 1984-09-04 | Roberts Royce Glen | Method and apparatus for tallying pipe |
| WO2009148304A1 (fr) | 2008-06-05 | 2009-12-10 | Heerema Marine Contractors Nederland B.V. | Système de mesure, système de manipulation de tuyau et procédé de raccordement de sections de tuyau |
| US20090314137A1 (en) | 2008-06-06 | 2009-12-24 | Hawk Industries, Inc. | Self-adjusting pipe spinner |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP3473799A1 (fr) * | 2017-10-20 | 2019-04-24 | Weatherford Technology Holdings, LLC | Appareil et procédé de recherche d'articulation d'outil |
| US10995570B2 (en) | 2017-10-20 | 2021-05-04 | Weatherford Technology Holdings, Llc | Tool joint finding apparatus and method |
| US10975681B2 (en) | 2019-04-09 | 2021-04-13 | Weatherford Technology Holdings, Llc | Apparatus and method for locating tool joint |
| CN112627747A (zh) * | 2020-11-27 | 2021-04-09 | 四川宏华石油设备有限公司 | 一种扶管装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| DE102012208676A1 (de) | 2013-11-28 |
| PL2666955T3 (pl) | 2019-07-31 |
| EP2666955B1 (fr) | 2019-02-20 |
| EP2666955A3 (fr) | 2017-10-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3329203B1 (fr) | Procédé et dispositif pour le nettoyage de faisceaux tubulaires | |
| EP3030359B1 (fr) | Presse à plier | |
| DE102017120613B4 (de) | Verfahren zum Bewegen einer Last mit einem Kran | |
| DE69736962T2 (de) | Matrizenanordnungsanzeigeverfahren in einer Abkantpresse sowie Vorrichtung zum Durchführen des Verfahrens | |
| EP3622114B1 (fr) | Procédé pour la commande d'un engin de pose de voie | |
| EP2958697B1 (fr) | Appareil pour couper une piéce le long d'une ligne de coupe | |
| EP2666955B1 (fr) | Procédé et dispositif d'ajustement semi-automatique d'un dispositif de manipulation | |
| DE102007060653A1 (de) | Positionsermittlung eines Objektes | |
| EP3974936B1 (fr) | Configuration d'un dispositif de visualisation pour une zone de machine | |
| EP2458135B1 (fr) | Procédé et dispositif d'ajustement semi-automatique d'un dispositif de manipulation | |
| DE102009051153A1 (de) | Industrieroboter mit sensorischer Assistenz | |
| EP2660501B1 (fr) | Procédé de visualisation de la position d'un véhicule pour emprunter un canal | |
| EP3141867B1 (fr) | Procede et dispositif de synchronisation d'une premiere carte d'environnement avec une seconde carte d'environnement dans un environnement d'un vehicule automobile | |
| DE2551215A1 (de) | Verfahren und vorrichtung zur steuerung einer selbsttaetigen inspektionsvorrichtung | |
| DE102014210752A1 (de) | Verfahren und Vorrichtung zum Überwachen einer Solltrajektorie eines Fahrzeugs | |
| DE102016106297A1 (de) | Vorrichtung zum Abtrennen eines Bauteilabschnitts | |
| EP3820805B1 (fr) | Détection fiable des grues à conteneurs et pallonier de conteneur | |
| DE102019201696B4 (de) | Steuerung einer Bearbeitungsmaschine | |
| EP2937753A1 (fr) | Procédé de mesure d'outils et machine-outil et/ou de production fonctionnant selon le procédé | |
| EP3533934B1 (fr) | Procédé de construction | |
| DE102016009516A1 (de) | Straßenfräse | |
| WO2016184667A1 (fr) | Procédé et outil de travail d'une installation de forage | |
| EP4284012A1 (fr) | Procédé de commande d'une caméra d'un appareil d'inspection de canalisations | |
| EP3790678B1 (fr) | Procédé mettant en oeuvre une installation de production permettant le formage d'une tôle | |
| WO2021083727A1 (fr) | Procédé et dispositif de commande du déplacement d'un dispositif de levage, et dispositif de levage |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
| AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: E21B 47/00 20120101ALI20170911BHEP Ipc: E21B 19/16 20060101AFI20170911BHEP |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20180413 |
|
| RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: E21B 47/00 20120101ALI20180914BHEP Ipc: E21B 19/16 20060101AFI20180914BHEP |
|
| INTG | Intention to grant announced |
Effective date: 20181012 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502013012199 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1098411 Country of ref document: AT Kind code of ref document: T Effective date: 20190315 |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
| REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
| REG | Reference to a national code |
Ref country code: NO Ref legal event code: T2 Effective date: 20190220 |
|
| REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190620 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190521 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190620 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190520 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502013012199 Country of ref document: DE |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 |
|
| PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
| 26N | No opposition filed |
Effective date: 20191121 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190531 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190531 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 |
|
| REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20190531 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190521 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190521 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190531 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20130521 |
|
| PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190220 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20250526 Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20250430 Year of fee payment: 13 Ref country code: DE Payment date: 20250321 Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NO Payment date: 20250520 Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20250522 Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20250526 Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20250520 Year of fee payment: 13 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20260309 Year of fee payment: 14 |