EP3088101A1 - Verfahren zum kombinierten stranggiessen und walzen von kupferlegierungen aus altkupfer - Google Patents
Verfahren zum kombinierten stranggiessen und walzen von kupferlegierungen aus altkupfer Download PDFInfo
- Publication number
- EP3088101A1 EP3088101A1 EP13900141.6A EP13900141A EP3088101A1 EP 3088101 A1 EP3088101 A1 EP 3088101A1 EP 13900141 A EP13900141 A EP 13900141A EP 3088101 A1 EP3088101 A1 EP 3088101A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- copper
- temperature
- stage
- melt
- cast section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22F—CHANGING THE PHYSICAL STRUCTURE OF NON-FERROUS METALS AND NON-FERROUS ALLOYS
- C22F1/00—Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working
- C22F1/08—Changing the physical structure of non-ferrous metals or alloys by heat treatment or by hot or cold working of copper or alloys based thereon
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/001—Continuous casting of metals, i.e. casting in indefinite lengths of specific alloys
- B22D11/004—Copper alloys
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22B—PRODUCTION AND REFINING OF METALS; PRETREATMENT OF RAW MATERIALS
- C22B15/00—Obtaining copper
- C22B15/0026—Pyrometallurgy
- C22B15/006—Pyrometallurgy working up of molten copper, e.g. refining
Definitions
- the invention relates to nonferrous metallurgy, particularly to the secondary copper-bearing raw material processing methods, for further use of metal in the articles of electrical engineering purpose.
- the method of processing of the secondary copper-bearing raw material in the form of copper wires with varnish, polymeric and cotton insulation including loading of the initial batch into molten salt, melting in the salt-bath furnace at the temperature exceeding copper melting point, with the subsequent ingot and semifinished product pouring, is known.
- Iron is preliminary removed from the secondary raw material, the batch is loaded into molten salt of alkaline and alkaline-earth metals and is melted higher than the copper melting temperature by 10-310°C, then the liquid copper is recovered, the formed carbon deposit is removed from the salt surface, thereafter the cycle is repeated, in this case the correlation of volumes of loaded batch and molten salt is maintained within the limits of (2-3,4):1 ( RU 2181386, cl. C22B7/00, 2002 ).
- the method of fire refining of copper at processing of the secondary copper-bearing raw material ( RU 2391420, cl. C22B15/14, C22B9/10, 2010 ) is known.
- the method involves the slug feed of batch materials and metal batch.
- the temperature of copper melt is maintained at the level of 1220-1240°C.
- the oxidation refining of the copper melt is conducted by air blasting of the melt with loading into the bath of flux containing the mixture of aegirine concentrate and quartz sand into the bath.
- the flux is loaded portionwise proportionally to its melting in the bath and to the temperature of slag melting in the furnace 1220-1240°C.
- the concentrate includes, in mass %: 82,5 of aegirine - Na, Fe[Si 2 O 6 ]; 6,7 of nepheline - KNa 3 [AlSiO 4 ] 4 ; 4,3 of sphene- CaTiSiO 4 ; 3.1 of apatite - Ca 10 (PO 4 ) 6 ; 3,4 of the other substances comprising mainly of the titanomagnetite.
- Upon the completion of oxidation refining of the copper melt its air blasting was shut off and the slag was removed. After slag removal the copper melt was deoxidized according to the familiar technology with the aid of natural gas.
- the method of combined casting and rolling of copper alloys ( RU 2163855, cl. B22D11/12, 2001 ), including the recovery of melt, its accumulation in mixers, alloying, feeding of melt by chute to the receiving pit of casting machine, formation of continuous casting in the rotary-type mold, yield of cast section from the mold, feeding of the case section to the continuous rolling mill and reeling on of the rods into bulls, is known.
- Prior to entry of the melt into the receiving pit of casting machine the oxygen is removed from the melted copper by the way of formation on the way of the liquid copper running of the part filled with the ignited pet coke and/or with the graphite pieces.
- the melt mirror in the receiving pit of casting machine is covered with the pet coke and/or the graphite pieces.
- the prototype is the method of horizontal casting of copper including the copper melting at the temperature of 1084°C by the way of covering of the surface with the ignited charcoal and carbon oxide atmosphere creation over the melt.
- the copper refining and recovery at the temperature of 1180-1200°C to the oxygen content in it of no more than 8 ppm is made.
- the melt is stabilized by the chemical composition and temperature with simultaneous removing of the gas products of the reaction.
- the casting is made through the graphite mold with the stepwise pulling of the article. Speed, step and frequency of steps are calculated depending on the type of the recovered articles.
- the preparation of the produced articles for further transportation and storage is made ( RU 2458758, cl. B22D11/04, C22B15/14, 2012 ).
- the task of this invention is the development of the method of combined casting and rolling of the cast section with the increased physical and technical characteristics complying with State standard due to the decrease of oxygen in the copper melt to 3-5 ppm.
- the technical result of invention is the possibility of recovery of the articles of electrical engineering purpose from 100% copper scrap with the content of copper in them of at least than 98%.
- the task set and, as a consequence, the specified technical result are achieved due to the fact that the method of combined casting and rolling of copper alloys from copper scraps includes melt preparation, by the way of copper melting at the first stage, copper refining and recovery at the second stage with the use of the carbon-bearing material and temperature increase, formation and pulling of continuous cast section, preparation of the produced articles for the further transportation and storage.
- the cast section is rolled by the way of its passing with the linear speed of 1,5 - 2,5 m/sec through a induction heater providing the high temperature heating to 650-800°C with the subsequent shock cooling to 50-55°C. So, the cast section is subject to double metal structure recrystallization, at the first stage - at rolling, and at the second stage - at high-speed and high-temperature heating and shock cooling.
- the area of channels of the perforated graphite element should make 10 - 23 m 2 , and the copper melt outflow speed to the distribution chamber through the perforated graphite element - 0,1-0,12 m/sec.
- Passing of the copper melt to the distribution chamber through the graphite provides the additional copper recovery to the content in it of the oxygen to 5 ppm and lower.
- the temperature should be increased to 1140-1175°C, it will allow to decrease the copper density. If the temperature of melt in the crossflow area decreases lower than 1140°C, the crystallization of metal can occur in the graphite channels, as well as the blocking of perforation channels and graphite pores, and the temperature rise higher than 1175°C is inexpedient, because it results in the excessive energy consumption.
- the copper viscosity due to the maintenance of temperature mode of crossflow is maintained at the level of 7860 kg/m 3 , it creates its free egress at the speed of 0,1-0,12 m/sec and conducts the compliance with the required capacity of the unit.
- Choice of the graphite with density of 1,56-2,2 g/cm 3 in the form of perforated element encourages the efficient copper deoxidation.
- the graphite parameters were chosen experimentally, because at decrease in its density less than for 1,56 g/cm 3 , the deoxidation efficiency decreases and the extraction of oxygen from the melt decreases due to the decrease in the weight percentage of carbon, and increase in density for more than 2,2 g/cm 3 increases the graphite value resulting in the increase in the cost of production.
- Graphite block perforation channel area is also chosen by practical consideration and should be within the limits 10-23m 2 , because the deoxidation efficiency decreases in case of decrease in the contact area, and its increase decreases the physical and mathematical characteristics of the graphite itself and results in the fast deterioration of the graphite perforated element.
- the cast section pulling is made on the rolling mill with recovery of "rod” which is subject to combined high-temperature heating and shock cooling.
- the high-temperature heating provides the soft condition of the "rod” allowing to expand the range of “rod” sections from 30 to 100mm 2 , in this case the linear speed of rod passing through the induction heater, heating and cooling temperature were chosen experimentally.
- the chosen parameters provide the close-bodied, homogeneous structure of the "rod", increase its physical and mechanical characteristics required for the articles of electrical engineering purpose.
- the delivery of batch materials included the fractional loading through the charging door of the melting bath of furnace with the help of the power-driven loader.
- the batch was loaded into the bath in portions by 500 kg - the secondary copper-mine tailings with copper content of at least 95% - at the switched on burner and natural gas burning with the excess air coefficient of 1,1.
- Loading of the subsequent batch portion was made after melting of the previous portion.
- the melting temperature was maintained at the level of 1200 - 1260°C. Due to welding deposition by the melting chamber, the metal was fed by crossflow into the degassing chamber of the furnace, where it was adjusted to the predetermined chemical composition and to the oxygen content level of no more than 100 ppm.
- the further copper deoxidation was made on the way of metal crossflow from the degassing chamber into the reduction chamber by the way of passing of the melt through the high-carbon perforated element - graphite.
- the graphite with density of 1,75g/cm 3 was used in our case.
- the total contact area with graphite made 20m2, the melt egress speed at the unit capacity of up to 2t/hour made 0,11m/sec.
- the melt temperature in the crossflow area was maintained by the way of induction heating at the level of 1168°C.
- the oxygen content in melt at the entry to the distribution chamber in those conditions made 10 ppm.
- the oxygen in melt was additionally decreased to the level of 5 ppm and lower, after that the melting was fed to the water-cooling vertical mold for formation of the round cast section with the diameter of 18,5mm.
- the rolling into bulls up to 6,0 tons was made after cooling of the cast section.
- the cast section was welded for the purpose of provision of process continuity and directed to the cold pilger mill, where the rod with the diameter 8,0 mm was produced by the way of unidirectional deformation and the total relative reduction by 81,3%, i.e. the rolling from the diameter of less than 18,5 mm.
- the rod in the continuous process was fed to the high-speed heating by the way of its passing with the linear speed of 2,4 m/sec though the built-in annealing (heating) to the temperature of 800°C with the subsequent combined shock cooling to the temperature of 54°C
- the finished rod took the soft condition, i.e. the strain and the breaking strength complying with State standard, moreover, the highly efficient gas-shielded unit was used in the applied method, where the main source of energy was the natural gas (or any liquid fuel), it essentially decrease the expenses for production of 1 ton of article in comparison with the prototype.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Manufacturing & Machinery (AREA)
- Manufacture And Refinement Of Metals (AREA)
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/RU2013/001155 WO2015099555A1 (ru) | 2013-12-23 | 2013-12-23 | Способ совмещенного литья и прокатки медных сплавов из медных ломов |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| EP3088101A1 true EP3088101A1 (de) | 2016-11-02 |
| EP3088101A4 EP3088101A4 (de) | 2017-08-09 |
Family
ID=53479284
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP13900141.6A Withdrawn EP3088101A4 (de) | 2013-12-23 | 2013-12-23 | Verfahren zum kombinierten stranggiessen und walzen von kupferlegierungen aus altkupfer |
Country Status (3)
| Country | Link |
|---|---|
| EP (1) | EP3088101A4 (de) |
| RU (1) | RU2637454C1 (de) |
| WO (1) | WO2015099555A1 (de) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106544527A (zh) * | 2016-11-25 | 2017-03-29 | 安徽天大铜业有限公司 | 一种杂质铜连铸连轧低氧铜杆生产工艺 |
Family Cites Families (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| BE757200A (fr) * | 1969-10-07 | 1971-03-16 | Westinghouse Electric Corp | Procede perfectionne pour produire du fil machine de cuivre |
| DE3714139A1 (de) * | 1987-04-28 | 1987-10-22 | Werner S Horst | Stranggiessvorrichtung |
| RU2089334C1 (ru) * | 1995-05-17 | 1997-09-10 | Валентин Янович Берент | Способ совмещенного непрерывного литья и прокатки меди и ее сплавов |
| JPH1192837A (ja) * | 1997-09-19 | 1999-04-06 | Kobe Steel Ltd | 銅合金の精錬方法 |
| KR100331152B1 (ko) * | 1999-06-28 | 2002-04-01 | 황해웅 | 무산소동이나 특수합금동의 일체형 수평연속주조 설비 및 탈산·정제방법 |
| RU2163855C2 (ru) * | 1999-12-01 | 2001-03-10 | Общество с ограниченной ответственностью "ФИНАО" | Способ совмещенного непрерывного литья и прокатки медных сплавов |
| RU2181386C1 (ru) | 2000-10-02 | 2002-04-20 | Институт металлургии Уральского отделения РАН | Способ переработки медьсодержащего вторичного сырья |
| RU2391420C1 (ru) | 2009-06-24 | 2010-06-10 | Игорь Олегович Попов | Способ огневого рафинирования меди |
| RU2458758C2 (ru) * | 2010-02-19 | 2012-08-20 | Общество с ограниченной ответственностью "Реверс-Импэкс" | Способ непрерывного горизонтального литья меди |
-
2013
- 2013-12-23 WO PCT/RU2013/001155 patent/WO2015099555A1/ru not_active Ceased
- 2013-12-23 RU RU2016127390A patent/RU2637454C1/ru not_active IP Right Cessation
- 2013-12-23 EP EP13900141.6A patent/EP3088101A4/de not_active Withdrawn
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106544527A (zh) * | 2016-11-25 | 2017-03-29 | 安徽天大铜业有限公司 | 一种杂质铜连铸连轧低氧铜杆生产工艺 |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2015099555A1 (ru) | 2015-07-02 |
| RU2637454C1 (ru) | 2017-12-04 |
| EP3088101A4 (de) | 2017-08-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR102679132B1 (ko) | 초미세 초고강도 강선, 선재 및 선재의 생산 방법 | |
| JP5343856B2 (ja) | 銅合金線製造方法 | |
| CN103820685B (zh) | 导电率60%iacs中强度铝合金线及其制备方法 | |
| CN109047600B (zh) | 冷轧辊坯的锻造方法 | |
| CN104959393A (zh) | 一种高质量航空叶片用铝合金热挤压棒材的制造方法 | |
| CN113444890B (zh) | 高质量大吨位电渣锭的补缩生产方法 | |
| RU2672651C1 (ru) | Способ получения высоколегированного жаропрочного сплава ХН62БМКТЮ на никелевой основе | |
| CN103056624B (zh) | 使用大型立式连铸圆坯生产优质锻材的方法、产品及其应用 | |
| CN106350696B (zh) | 铜合金材料及其制造方法 | |
| CN101763910A (zh) | 一种用于电气化铁道的低锡铜合金接触线及其制造方法 | |
| CN110551928A (zh) | 一种5654铝合金焊丝线坯的生产方法 | |
| EP3088101A1 (de) | Verfahren zum kombinierten stranggiessen und walzen von kupferlegierungen aus altkupfer | |
| CN101882478B (zh) | 用于高速电气化铁道的高强铜锡合金接触线及其制造方法 | |
| US3298070A (en) | Method of producing oxygen-free high conductivity copper | |
| CN110195194A (zh) | 一种热作模具钢的制备方法 | |
| CN116426760A (zh) | 一种无表面杂波且液析可控的冷轧辊的制备方法及冷轧辊 | |
| CN105177304A (zh) | 一种电子束冷床炉熔炼生产tb6板坯的方法 | |
| JPH04272147A (ja) | チタンの製造方法 | |
| CN117139404A (zh) | 一种适用于400km/h高铁的高强高导铜镁合金接触线制备方法 | |
| CN117564231B (zh) | 一种aq80m镁合金超大锭坯及其制备方法和应用 | |
| CN117926383B (zh) | 一种铜线生产工艺 | |
| RU2833062C9 (ru) | Способ получения катанки из медного сырья | |
| RU2833062C1 (ru) | Способ получения катанки из медного сырья | |
| JP2005042162A (ja) | 銅の精錬方法 | |
| CN108467917A (zh) | 一种23CrNi3MoA钻头用钢棒的制造方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 20160722 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| AX | Request for extension of the european patent |
Extension state: BA ME |
|
| DAX | Request for extension of the european patent (deleted) | ||
| A4 | Supplementary search report drawn up and despatched |
Effective date: 20170712 |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: C22F 1/08 20060101ALI20170706BHEP Ipc: C22B 15/00 20060101ALI20170706BHEP Ipc: B22D 11/12 20060101AFI20170706BHEP Ipc: B22D 11/00 20060101ALI20170706BHEP |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: C22F 1/08 20060101ALI20190307BHEP Ipc: B22D 11/00 20060101ALI20190307BHEP Ipc: C22B 15/00 20060101ALI20190307BHEP Ipc: B22D 11/12 20060101AFI20190307BHEP |
|
| INTG | Intention to grant announced |
Effective date: 20190325 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
| 18D | Application deemed to be withdrawn |
Effective date: 20190806 |