EP3480376B1 - Système de plancher - Google Patents

Système de plancher Download PDF

Info

Publication number
EP3480376B1
EP3480376B1 EP17199904.8A EP17199904A EP3480376B1 EP 3480376 B1 EP3480376 B1 EP 3480376B1 EP 17199904 A EP17199904 A EP 17199904A EP 3480376 B1 EP3480376 B1 EP 3480376B1
Authority
EP
European Patent Office
Prior art keywords
primary
joists
joist
slab
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Not-in-force
Application number
EP17199904.8A
Other languages
German (de)
English (en)
Other versions
EP3480376A1 (fr
Inventor
Akhnaton Stephen Imhotep Saint Rose
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to EP17199904.8A priority Critical patent/EP3480376B1/fr
Publication of EP3480376A1 publication Critical patent/EP3480376A1/fr
Application granted granted Critical
Publication of EP3480376B1 publication Critical patent/EP3480376B1/fr
Not-in-force legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/17Floor structures partly formed in situ
    • E04B5/23Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
    • E04B5/29Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated the prefabricated parts of the beams consisting wholly of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2415Brackets, gussets, joining plates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2448Connections between open section profiles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2457Beam to beam connections

Definitions

  • the present invention belongs to the field of structural sections for floor and building frames, particularly to the field of light gauge steel (LGS) structural flooring systems.
  • LGS light gauge steel
  • Sections which typically exhibit local buckling of elements in compression as the limit state of structural resistance are class-4 sections, such as light gauge steel (LGS) structural systems.
  • LGS light gauge steel
  • the geometry of the resultant section is such that the neutral axis of the system is located within said concrete topping, so that the entire LGS member section is in tension, as it is not embedded within the concrete. This facilitates the full tensile yield strength of the steel of the section of the LGS member.
  • LGS structural systems particularly LGS structural flooring systems only use the compressive strength of the concrete element in the direction wherein the beams are distributed, resulting in an inefficient use of said concrete element, which causes the need for a steel reinforcement throughout the entire concrete element and therefore the entire floor. This causes the flooring system to be heavy as well as expensive.
  • the present invention provides a solution to the aforementioned problems, by a structural flooring system according to claim 1 and a method for mounting a structural flooring system according to claim 13.
  • a structural flooring system according to claim 1 and a method for mounting a structural flooring system according to claim 13.
  • the invention provides a structural flooring system, comprising:
  • a built-up section will be understood as the section of a joist made from at least two individual plates fastened together, such as welded or bolted, thus achieving a structural member, in contrast with a non-composite, which is made of a unique formed plate.
  • the C section of the secondary joists is a non-composite section.
  • Every secondary joist is supported at least on one primary joist by means of a cantilever portion located on the first section end of the secondary joist.
  • Said cantilever portion of the secondary joist rests on the upper flange of the primary joist.
  • Said cantilever portion projects from the secondary joist in the longitudinal direction of the mentioned secondary joist.
  • the primary joists support the weight of the entire arrangement whereas the secondary joists provide also some support due to catenary action.
  • the secondary joist comprises a lower flange, located at the second section end of the secondary joist, in addition to the upper flange, located at the first section end of the secondary joist.
  • the primary joist comprises a lower flange, located at the second section end of said primary joist.
  • Said lower flanges of the secondary joist and primary joist are pressed together by means of a splice plate, which compresses both flanges, and by means of at least one shear connector which maintains the three aforementioned elements in place.
  • the lower flange of the secondary joist rests on the lower flange of the primary joist for additional support, remaining the lower flange of the primary joist between the lower flange of the secondary joist and the splice plate.
  • a flooring system as defined in the first inventive aspect behaves as a two-way spanning system, which utilizes the compressive strength of the slab in two directions, namely the first and second mounting directions (X, Y), both being different and perpendicular to the gravity direction (Z). Therefore, the slab is set into stress on both first and second mounting directions (X, Y) due to the plan and sectional geometric design of the system.
  • Such a behavior is in contrast to that of traditional LGS structural flooring systems, which act as one-way spanning systems, thus being less efficient.
  • the state of stress in the primary and secondary joists can be different, being greater in a particular embodiment in the primary joists. Said state of stress is similar to prestressed precast slab that later receives a topping, being the state of stress in the topping lower than in the slab.
  • the structural flooring system according to the present invention is, advantageously, more solid given that beams or joists are provided in two different directions and therefore loads can be distributed along both directions. Additionally, the present system is also cheaper, as the behavior of the system due to the orientation and sections of the different joists in combination with the slab eliminates the need for steel or fiber reinforcement on both faces of the slab.
  • reinforcement is present in one of the faces of the slabs, particularly for slabs of continuous edges, in order to resist live and superimposed dead loads.
  • Said continuous edges are those where the slab is able to transfer load to an adjacent slab through that edge.
  • the slabs embed the upper flange of the primary joists and the upper flange of the secondary joists.
  • the reinforcement is made of steel. This steel reinforcement is, in a particular embodiment, bonded and allows the resistance of the tensile stresses in the top part of the slab.
  • the slab is strengthened along the first (X) and second (Y) mounting directions by means of the loading of the primary and secondary joists.
  • the strengthening of the slab is such that said slab is set in compression along the first (X) and second (Y) mounting directions.
  • Said primary and secondary joists are loaded vertically by loads, such as live loads and superimposed dead loads, which then set the slab in compression in both directions perpendicular to the gravity direction (Z).
  • loads such as live loads and superimposed dead loads
  • the slab is set into stress on both first and second mounting directions (X, Y), being said stress a compression.
  • the plan and sectional geometric design of the system allows the slab to reliably support the mentioned stress.
  • the slab is therefore, in this particular embodiment, cast in situ and matures attaining the required crushing strength, through composite action with primary and secondary joists along the first (X) and second (Y) mounting directions, the slab increasing the vertical load carrying capacity of the overall structural flooring system in the gravity direction (Z). Any additional vertical load in the gravity direction (Z) applied to the structural flooring system is subsequently supported through composite action by the slab being set in stress along the first (X) and second (Y) mounting directions.
  • the slab behaves in a more efficient way when being set into compression compared to alternative stresses.
  • the present invention therefore provides a solution to the problems of the state of the art based on a two-way spanning flooring system, by means of beams or joists located in two directions wherein the slab, particularly of concrete, utilizes a compressive strength along said two directions.
  • the configuration of the secondary joist namely the cantilever portion or portions arranged at the end/ends of said secondary joist allows suitable connection between the primary and the secondary joists.
  • continuous primary joists are arranged along with non-continuous secondary joists supported on the primary joists.
  • the built-up section of the primary joist is made up of two elements, wherein each of said elements comprises:
  • the upper flange of the primary joist is formed by the curved top flanges of the two elements, and the right-angled bottom flanges of the two elements form the lower flange located at the second section end of the primary joist.
  • a right-angled flange is cheaper to manufacture, whilst a curved-flange offers a more resistant flange, localizing buckling when loaded.
  • the built-up section of the primary joist is made up of two elements, wherein each of said elements comprises:
  • the first right-angled top flanges of the elements form the upper flange of the primary joist, and the second right-angled bottom flanges form the lower flange of the primary joist.
  • the two elements of the built-up section of the primary joist are fastened together, preferably using welding and/or bolts.
  • the first mounting direction (X) is selected according to the smaller dimension available where the structural flooring system is to be placed
  • the second mounting direction (Y) is selected according to the larger dimension available where the structural flooring system is to be placed.
  • the primary joists are then mounted on the first mounting direction (X), being this first mounting direction (X) the one corresponding with the shortest distance available for the placing of the structural system
  • the secondary joists are mounted on the second mounting direction (Y), being this the one corresponding with the largest distance available for the placing of the structural system.
  • the load capacity varies according both to the section of the mounted joist as well as the distance available for said mounting, being in a particular embodiment the first mounting direction (X) the one with a higher load capacity.
  • first mounting direction (X) and the second mounting direction (Y) are perpendicular.
  • This provides the effect of sharing any additional load on the system by both the primary and secondary joists, being placed orthogonally.
  • this provides a compression stress on both orthogonal directions on the first face of the slab, thus eliminating the need of steel or fiber reinforcement on both first and second faces of the mentioned slab.
  • it also allows the reduction of the size of both the primary and secondary joists substantially, referring said size of the primary and secondary joists to the section area and to the thickness of the joists. It also allows the reduction of other properties such as section modulus, moment of inertia, etc.
  • shear connectors are arranged at the upper or lower flange of the primary joists, or both. Said shear connectors allow any additional load to be shared by both the primary and the secondary joists.
  • the splice plate or connecting plate is connected to the secondary joist by at least one shear connector.
  • an additional splice plate or connecting plate is placed on the upper flange of the secondary joist and is connected to said secondary joist by at least one shear connector.
  • one splice plate located at the upper flange of two different secondary joists joins the two secondary joists together.
  • the slab is made of concrete. Concrete allows a better performance under compression stress, which is here achieved on both first and second mounting directions (X, Y).
  • the slab reinforcement is steel or fibre reinforcement. This allows a better resistance of both the live and dead loads of the system so that a minimal seismic load is generated whilst reducing the weight of the whole system as the reinforcement is only present on the first face of the slab, achieving a safer lightweight structure. Additionally, this allows the inclusion of a thinner slab, particularly a concrete slab, than the ones used in the state of the art, thus the seismic load on the structure being reduced, that is, the structural flooring system allows the same seismic load with a slab thinner than the one allowed in known structural systems.
  • the system further comprises an insulation layer, located on the second face of the slab.
  • an insulation layer increases thermal and sound insulation of the system.
  • the insulation layer is a polystyrene panel or a combination of two or more such panels.
  • the insulation layer forms the underside of the slab thus being usable as the formwork for casting the slab, particularly a concrete slab. Additionally, if the concrete is cast on top of the insulation layer, said insulation layer remains in place, being the insulation layer dual purposed as formwork as well as for enhancing thermal and sound insulation.
  • the primary and secondary joists are made of light gauge steel. This allows a reduction in foundation costs for the structural flooring system, as well as a rapid construction of the same.
  • the slab is made of concrete whilst the primary and secondary joists are made of light gauge steel.
  • This system provides a structure which uses different materials, namely steel and concrete, achieving simultaneously a lightweight structure as well as below-normal imposed loads, which is relevant in the behavior of the structure on different situations, such as earthquakes redounding on an enhanced seismic performance.
  • the primary and secondary joists have both the same depth, wherein the depth is the height of the joist in the gravity direction (Z).
  • the same depth of the primary and secondary joists facilitates the assembling of the structural flooring system.
  • the invention provides a method for mounting a structural flooring system according to the first aspect of the invention, said method comprising the following steps:
  • Step a) of the present method requires the provision of a plurality of primary and secondary joists.
  • Said number of primary and secondary joists depends on the space available for the mounting of the structural flooring. That is, the room available where the structural flooring system is to be located and its mounting conditions in both mounting directions, as well as the number of primary joists and the number of secondary joists that can be used for the mentioned mounting.
  • Step b) of the method establishes a distance between adjacent joists of each type, that is, a distance between consecutive joists of the plurality of primary joists, and a distance between consecutive joists of the plurality of secondary joists. Both distances are conditioned by the dimension of the slab, which must be able to support the corresponding loads of the structural system.
  • step b) comprises selecting the first mounting direction (X) according to the smallest dimension of the space for building a floor, being said smallest dimension the smallest mounting dimension available, and selecting the second mounting direction (Y) according to the largest dimension of the space for building a floor, being said largest dimension the largest mounting dimension available.
  • the slab is formed adopting its shape from the formwork provided by the formwork panel and the primary and secondary joists, that is, the slab is molded over the formwork and embedding the upper flange of the primary joists and the upper flange of the secondary joists.
  • the slab is molded in the space available between the formwork and 50mm above the upper flange of the primary joists.
  • the method according to the invention provides a more simple and economic construction of a flooring system. Additionally, the mounting method of said system becomes modular, enhancing the speed of the construction of the structure.
  • the formwork panel of step d) comprises at least one insulation layer.
  • an insulation layer is the formwork used for casting the slab, particularly a concrete slab. The concrete is cast on top of the insulation layer and the insulation layer remains in place, being said insulation layer therefore dual purposed as formwork as well as for enhancing thermal and sound insulation.
  • the slab of the structural flooring system formed in step e) is poured in place or cast in situ. Therefore, said slab is formed during the mounting of the structural flooring system without the need of transporting a slab and adapting its shape and size to the available space provided by the formwork in each of the areas formed by the primary and secondary joists.
  • said primary joists are manufactured by means of a combination of steps which comprise:
  • the C-sections of the secondary joists are manufactured by means of a combination of steps which comprise:
  • the primary and secondary joists are, therefore, cold-formed profiles.
  • Figures 9A and 9B show two different one-way spanning LGS structure systems of the prior art.
  • figure 9A shows a decking system wherein a conformed joist (J) is embedded in a concrete slab (S).
  • the joist acquires a specific outline, and several joists are joined by means of welds (W).
  • W welds
  • Figure 9B shows a truss system wherein a stamped and shaped joist (J) is partially embedded in a concrete slab (S).
  • the system further comprises a metallic mesh (M), which provides the slab with rigidity.
  • This solution also available in the state of the art requires the same steel reinforcement throughout the top face of the slab (S) as in the decking system, but involves the problem of cracking along the top face of said slab (S) along the line of the joist (J) due to the development of tensile stresses.
  • the structure of figure 9B is limited to short distances when applied in buildings, particularly up to maximum 8m, whereas the present invention allows distance covering of up to 12m, with a more reliable structure.
  • Figures 1A and 1B show two different embodiments of a structural flooring system (1) according to the invention, comprising a primary joist (2) and two secondary joists (3), all made of steel, mounted in order to give rise to said structural flooring system (1), which also comprises two formwork panels (7) in these embodiments.
  • the primary joist (2) and the secondary joists (3) are both of the same depth in order to facilitate the assembly shown.
  • Figure 1A also shows a bracket (9), the bracket (9) being an additional element which is fixed on an end of the primary joist (2) in this embodiment and which allows an additional support for the structural flooring system (1) on a building frame (8), not shown in these figures.
  • the slabs (4) are placed on the formwork panels (7) and partially embedding the primary (2) and secondary (3) joists, as shown in following figures.
  • the primary joists (2) of both embodiments are oriented according to the first mounting direction (X), whereas the secondary joists (3) are oriented according to the second mounting direction (Y), being said directions (X, Y) perpendicular.
  • Figure 1A shows a first embodiment of a primary joist (2) made up of two elements fastened together, each element having right-angled top (2.1.4) and bottom (2.1.3) flanges. Said primary joist can be observed in detail in figures 2A and 4 .
  • Figure 2A shows a front view of this first embodiment of the section (2.1) of a primary joist (2).
  • the primary joist (2) comprises a first section end (2.2) and a second section end (2.3), being the first section end (2.2) located in an upper position to that of the second section end (2.3) according to the gravity direction (Z).
  • An upper flange (2.4) is located in the first section end (2.2) whilst a lower flange (2.5) is located in the second section end (2.3).
  • Figure 4 shows a perspective view of this embodiment of a primary joist (2) having a built-up section (2.1) and preferably made of steel.
  • the two elements forming the primary joist (2) can be seen, which when attached one to another configure the whole primary joist (2).
  • Said elements are located in mirror-shape fashion, so that the built-up section (2.1) of the joist (2) is symmetrical.
  • Each of the elements forming the primary joist (2) includes the following members:
  • both elements are located with their respective webs (2.1.1) facing one another such that the flanges (2.1.3, 2.1.4) of both elements extend along opposite directions.
  • Figure 4 also shows in the front of the primary joist (2) a portion of each element, particularly on the side of the first section end (2.2), with no right-angled flange (2.1.4). This portion facilitates the placement of a bearer or bracket (9) attached to the primary joist (2), particularly to the web (2.1.1) of the two elements of the primary joist (2), such as the bracket (9)shown in figure 1A to sit on top of an edge beam or wall of a building frame (8).
  • a bearer or bracket (9) attached to the primary joist (2) particularly to the web (2.1.1) of the two elements of the primary joist (2), such as the bracket (9)shown in figure 1A to sit on top of an edge beam or wall of a building frame (8).
  • FIG 2B a front view of said embodiment of the C-section (3.1) of the secondary joist (3) is shown.
  • the secondary joist (3) has a section (3.1) with the shape of a C, said section (3.1) comprising a first section end (3.2) and a second section end (3.3), the first section end (3.2) being located in an upper position to that of the second section end (3.3) according to the gravity direction (Z).
  • An upper flange (3.4) is located in the first section end (3.2) whilst a lower flange (3.5) is located in the second section end (3.3), the upper (3.4) and lower (3.5) flanges of the secondary joist (3) being right-angled flanges.
  • Figure 5 shows a perspective view of this embodiment of a secondary joist (3), with a section (3.1) in the form of a C and preferably made of steel.
  • the secondary joist (3) comprises an upper flange (3.4) located at the first section end (3.2) of the joist (3), and a lower flange (3.5) located at the second section end (3.3) of the secondary joist (3), being the upper flange (3.4) located in an upper position than the lower flange (3.5) according to the gravity direction (Z).
  • Reference numbers for the first (3.2) and second (3.3) section ends are not shown in the present figure, although they can be observed in figure 2B .
  • the secondary joist (3) of figure 5 also comprises a cantilever portion (3.6) located on the upper flange (3.4). Said cantilever portion (3.6) is placed on one end of the secondary joist (3). A second cantilever portion (3.6) can be provided on the opposite end of the secondary joist (3).
  • Figure 1B shows a second embodiment of a primary joist (2) wherein the primary joist (2) is made up of two elements, having a curved top flange (2.1.2) and a right-angled bottom flange (2.1.3).
  • the secondary joist (3) in the embodiment of Figure 1B is as the one disclosed in connection with Figure 1A .
  • the primary (2) and secondary (3) joists are connected by means of their upper flanges (2.4, 3.4).
  • the cantilever portion (3.6) of the secondary joist (3) rests on the upper flange of the primary joist (2).
  • FIGs 1A and 1B how the joint between the primary joist (2) and each secondary joist (3) is achieved by means of splice plates (6.2) or connecting plates (6.2) located on the upper flanges (2.4, 3.4) of both primary and secondary joists (2, 3) and fastened by means of shear connectors (6.1).
  • Said shear connectors (6.1) and connecting plates (6.2) are also placed on the lower flanges (2.5, 3.5) of the primary and secondary joists (2, 3), thus achieving a pressure of the lower flanges (2.5, 3.5) together.
  • the primary joists (2) support the weight of the whole structural flooring system (1), whereas the secondary joists (3) offer support through catenary action.
  • Figure 3 shows an schematic plan view of a structural flooring system (1) valid for every embodiment of the primary (2) and secondary (3) joists, wherein said primary joists (2) are oriented according to the first mounting direction (X) and said secondary joists (3) are oriented according to the second mounting direction (Y), being said directions perpendicular in the embodiment shown in figure 3 .
  • the first mounting direction (X) has been selected according to the smaller mounting dimension available, thus being the mounting distance available for the first mounting direction (X) smaller than the mounting distance available for the second mounting direction (Y), as said second mounting direction (Y) has been selected according to the larger mounting dimension available.
  • the state of stress in the primary (2) and secondary (3) joists is different in this embodiment, particularly greater in the primary joists (2).
  • a slab (4) (not shown) is located in each of the spaces which are surrounded by the primary (2) and secondary (3) joists, therefore being adjacent to said joists (2, 3), and is preferably set in compression along the along the first (X) and second (Y) mounting directions.
  • Figure 3 also shows the joint between the ends of the joists (2, 3) with the building frames (8).
  • Figures 6A and 6B show a section of an embodiment of a structural flooring system (1) when mounted.
  • the primary (2) and secondary (3) joists are mounted and joined by means of shear connectors (6.1) and connecting plates (6.2).
  • Figure 6A shows a primary joist (2) according to an embodiment as in figures 2A and 4 and two secondary joists (3) according to an embodiment as in figures 2B and 5 .
  • the secondary joists (3) are placed on the primary joist (2) such that the lower flanges (3.5) of the secondary joists (3) are supported on the lower flange (2.5) of the primary joist (2).
  • the lower flange (2.5) of the primary joist (2) and the lower flanges (3.5) of the secondary joists (3) are joined by means of a splice plate (6.2) and shear connectors (6.1) which pass through a common bore to the splice plate (6.2) and the lower flange (3.5) of the secondary joist (3).
  • This arrangement keeps the lower flange (2.5) of the primary joist (2.5) between the lower flanges (3.5) of the secondary joists (3) and the splice plate (6.2), whilst the splice plate (6.2) presses said lower flanges (2.5, 3.5) together, preventing the shift of any of them.
  • the upper flanges (3.4) of the secondary joists (3) rest on the upper flange (2.4) of the primary joist (2), and are preferably joined therewith, for example by welding or bolts.
  • an additional splice plate (6.2) is arranged on the upper flanges (3.4) of the two secondary joists (3) and is joined therewith by means of shear connectors (6.1).
  • Figure 6B shows the same mounting of the system (1) as in figure 6A but including the slab (4).
  • a concrete slab (4) is placed along with the primary joists (2) and the secondary joists (3), embedding the upper flanges (2.4, 3.4) of the primary and secondary joists (2, 3).
  • the shear connectors (6.1) and connecting plates (6.2) located on the upper flanges (2.4, 3.4) of the primary and secondary joists (2, 3) are also embedded in the concrete slab (4).
  • the concrete slab (4) has a first face (4.1) and a second face (4.2), wherein in this embodiment said second face (4.2) is located adjacent to an insulation layer (7), not shown in the figure.
  • Said insulation layer (7) shall be placed in the space available between the second face (4.2) of the slab (4) and the lower flange (3.5) of the secondary joist (3).
  • FIGs 7A and 7B show a perspective view, top and bottom respectively, of a mounting of a continuous primary joist (2) and two secondary joists (3), all made of steel, wherein the mounting gives rise to a structural flooring system (1).
  • Each primary joist (2) and secondary joist (3) is of the same depth in order to facilitate the assembly shown.
  • the structural flooring system (1) is complete once the slabs (4), slab reinforcements (5) and insulation layers (7) are arranged on the present mounting of joists (2, 3).
  • the primary joist (2) is configured as the embodiment shown in Figure 4
  • the secondary joists (3) are configured as the embodiment shown in Figure 5 .
  • the mounting of the joists (2, 3) is as the one shown in figure 1A .
  • the primary joist (2) is oriented according to the first mounting direction (X), whereas the secondary joist (3) is oriented according to the second mounting direction (Y), being said directions (X, Y) perpendicular.
  • FIG 7A It can be seen in figure 7A how the secondary joists (3) are mounted on a primary joist (2) by means of a cantilever portion (3.6).
  • Said cantilever portion (3.6) is supported by the upper flange (2.4) of the primary joist (2).
  • the cantilever portion (3.6) is fastened to the upper flange (2.4) of the primary joist (2) by means of a connecting plate (6.2) which is in turn secured to the primary (2) and secondary (3) joists by means of shear connectors (6.1).
  • the mounting has an additional connecting plate (6.2) secured by means of shear connectors (6.1) which fasten the lower flanges (2.5, 3.5) of the primary (2) and secondary (3) joists.
  • the mounting of the two secondary joists (3) is symmetric, given that the primary joist (2) is a built-up section configured in a mirror-shape fashion such that two secondary joists (3) can be mounted in the same way on the same primary joist (2).
  • figure 7A shows a bearer or bracket (9), which is the portion located next to the upper flange (2.4) of the primary joist (2).
  • Figure 7B shows the same mounting of figure 7A , although as a bottom perspective view.
  • the connecting plate (6.2) which presses together the lower flanges (2.5, 3.5) of the primary (2) and secondary (3) joists is clearly visible in this figure.
  • figure 7B shows how each right-angled bottom flange (2.1.3) of the section (2.1) of the primary joist (2) are covered by the connecting plate (6.2) and secured by means of shear connectors (6.1) to the lower flange (3.5) of the secondary joist (3).
  • a view of the bracket (9) from the bottom can also be seen, thus observing a portion of said bracket (9) which is flat, in order to help supporting the mounting of joists (2, 3) of figures 7A and 7B to the building frame (8) thus configuring a final structural flooring system (1).
  • Figure 8 shows an exploded view of the elements of the structural flooring system (1).
  • a primary joist (2) and two secondary joists (3) are depicted in the present figure, being thus only a part of a complete structural flooring system (1).
  • Said primary (2) and secondary (3) joists are joined by means of a connecting plate (6.2) along with shear connectors (6.1).
  • Said primary (2) and secondary (3) joists are made of light gauge steel.
  • the primary joist (2) has a built-up section with a right-angled upper flange (2.1.4) and a right-angled bottom flange (2.1.3), whereas the secondary joist (3) has a C-section.
  • the depth of both sections of the primary (2) and secondary (3) joists is the same, being in the present embodiment 300mm deep each.
  • a bracket (9) is fixed to the primary joist (2), which provides additional support to the mounting of joists (2, 3), as the bracket (9) rests in the building frame by means of the flat portion of the bracket (9), shown in figure 7B .
  • the primary joist (2) is oriented according to the first mounting direction (X), and the secondary joists (3) are oriented according to the second mounting direction (Y), perpendicular to the first mounting direction (X).
  • the gravity direction (Z) is perpendicular to both mounting directions (X, Y), as can be observed in figure 8 .
  • a concrete slab (4) is located embedding parts of the primary (2) and secondary (3) joists, and the slab (4) is reinforced by means of a slab reinforcement (5), made of steel in this embodiment.
  • the concrete slab (4) in the present embodiment is a 100mm thick deck slab.
  • This figure also shows an insulation layer (7), located on the second face (4.2) of the slab (4), in the present figure the face located lower according to the gravity direction (Z).
  • the insulation layer (7) when arranged, covers the space present between the second face (4.2) of the slab (4) and the lower flange (3.5) of the secondary joists (3).
  • steel elements can be seen in figure 8 , corresponding said elements to part of the building frame which supports the structural flooring system (1).
  • the real loading in the present structural flooring system (1) comprises dead loads (corresponding to self-weight of structural elements), construction loads (corresponding to loads due to workers on deck, concrete pouring equipment, etc.), superimposed dead loads (such as weight of non-structural elements such as partitions, tile, etc.) and live loads (those due to the system in use, that is, people occupying the building, furniture, etc.), being the sections (2.1, 3.1) of the primary (2) and secondary (3) joists able to support both the mentioned loads in combination as well as the effect due to attributed bending strength generated in the redistribution of the mentioned loads. Stress levels of the structural elements and deflections are kept within the standards due to the different joists (2, 3).

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)

Claims (15)

  1. Système de plancher structurel (1), comprenant :
    - au moins une première poutre (2),
    - au moins une seconde poutre (3),
    - au moins une plaque d'assemblage (6.2) et au moins une clavette (6.1),
    - au moins une dalle (4), la dalle (4) comprenant une première face (4.1) et une seconde face (4.2), la première face (4.1) étant disposée dans une position plus élevée que la seconde face (4.2) selon la direction de gravité (Z), et
    - au moins un renforcement de dalle (5),
    dans lequel
    - les poutres primaires (2) sont orientées selon une première direction de montage (X) perpendiculaire à la direction de gravité (Z),
    - les poutres secondaires (3) sont orientées selon une seconde direction de montage (Y) perpendiculaire à la direction de gravité (Z),
    - la section (2.1) des poutres primaires (2) est une section composée, ladite section (2.1) est constituée d'au moins deux plaques individuelles fixées ensemble, telles que soudées ou vissées, réalisant ainsi un élément structurel, ladite section (2.1) comprenant une première extrémité de section (2.2) et une seconde extrémité de section (2.3), la première extrémité de section (2.2) étant disposée dans une position plus élevée que la seconde extrémité de section (2.3) selon la direction de gravité (Z),
    - la section (3.1) des poutres secondaires (3) est une section C, ladite section (3.1) comprenant une première extrémité de section (3.2) et une seconde extrémité de section (3.3), la première extrémité de section (3.2) étant disposée dans une position plus élevée que la seconde extrémité de section (3.3) selon la direction de gravité (Z),
    - chaque poutre secondaire (3) comprend une bride supérieure (3.4) disposée sur la première extrémité de section (3.1) et une bride inférieure (3.5) disposée sur la seconde extrémité de section (3.2), et au moins une portion en porte-à-faux (3.6) disposée sur une ou les deux extrémités de la bride supérieure (3.4),
    - chaque poutre primaire (2) comprend une bride inférieure (2.5) sur la seconde extrémité de section (2.3) et une bride supérieure (2.4) sur la première extrémité de section (2.2), dans lequel la bride supérieure (2.5) supporte une portion en porte-à-faux (3.6) d'au moins une poutre secondaire (3),
    - la bride inférieure (2.5) de la poutre primaire (2) et la bride inférieure (3.5) de la poutre secondaire (3.5) sont pressées ensemble au moyen de la plaque d'assemblage (6.2) et de la au moins une clavette (6.1),
    - la dalle (4) est disposée à côté des poutres primaires (2) et des poutres secondaires (3), couvrant la première extrémité de section (2.2) de la poutre primaire (2) et la première extrémité de section (3.2) de la poutre secondaire (3), et
    - le renforcement de dalle (5) est disposé sur la première face (4.1) de la dalle (4).
  2. Système de plancher structurel (1) selon la revendication 1, dans lequel la dalle (4) est renforcée le long des première (X) et seconde (Y) directions de montage au moyen de la charge des poutres primaires (2) et secondaires (3).
  3. Système de plancher structurel (1) selon la revendication 2, dans lequel le renforcement de la dalle (4) est tel que ladite dalle (4) est prise en compression le long des première (X) et seconde (Y) directions de montage.
  4. Système de plancher structurel (1) selon l'une quelconque des revendications précédentes, dans lequel la section composée (2.1) de la poutre primaire (2) est constituée de deux éléments, dans lequel chacun desdits éléments comprend :
    - une bande (2.1.1), la bande (2.1.1) comprenant une première extrémité de bande et une seconde extrémité de bande,
    - une bride de haut courbée (2.1.2) disposée sur la première extrémité de bande, et
    - une bride de fond à angle droit (2.1.3), disposée sur la seconde extrémité de bande,
    et les deux éléments sont disposés avec leurs bandes respectives (2.1.1) se faisant face l'une à l'autre de sorte que les brides (2.1.4, 2.1.3) des deux éléments s'étendent le long de directions opposées.
  5. Système de plancher structurel (1) selon l'une quelconque des revendications 1 à 3, dans lequel la section composée (2.1) de la poutre primaire (2) est constituée de deux éléments, dans lequel chacun desdits éléments comprend :
    - une bande (2.1.1), la bande (2.1.1) comprenant une première extrémité de bande et une seconde extrémité de bande,
    - une bride de haut à angle droit (2.1.4), disposée sur la première extrémité de bande, et
    - une bride de fond à angle droit (2.1.3), disposée sur la seconde extrémité de bande,
    et les deux éléments sont disposés avec leurs bandes respectives (2.1.1) se faisant face l'une à l'autre de sorte que les brides (2.1.2, 2.1.3) des deux éléments s'étendent le long de directions opposées.
  6. Système de plancher structurel (1) selon l'une quelconque des revendications précédentes, dans lequel la première direction de montage (X) est choisie selon la plus petite dimension de montage disponible et la seconde direction de montage (Y) est choisie selon la plus grande dimension de montage disponible.
  7. Système de plancher structurel (1) selon l'une quelconque des revendications précédentes, dans lequel la première direction de montage (X) et la seconde direction de montage (Y) sont perpendiculaires.
  8. Système de plancher structurel (1) selon l'une quelconque des revendications précédentes, dans lequel la bride inférieure (2.5) de la poutre primaire (2) reste entre la bride inférieure (3.5) de la poutre secondaire (3) et la plaque d'assemblage (6.2).
  9. Système de plancher structurel (1) selon l'une quelconque des revendications précédentes, dans lequel le renforcement de dalle (5) est un renforcement d'acier ou de fibre.
  10. Système de plancher structurel (1) selon l'une quelconque des revendications précédentes comprenant de plus une couche d'isolation (7), située entre la seconde face (4.2) de la dalle (4) et la seconde extrémité de section (3.3) de la poutre secondaire (3).
  11. Système de plancher structurel (1) selon l'une quelconque des revendications précédentes, dans lequel les poutres primaires (2) et secondaires (3) sont constituées d'acier de faible épaisseur.
  12. Système de plancher structurel (1) selon l'une quelconque des revendications précédentes, dans lequel les poutres primaires (2) et secondaires (3) présentent toutes les deux la même profondeur.
  13. Système de montage d'un plancher structurel (1) selon l'une quelconque des revendications précédentes, comprenant les étapes suivantes :
    a) fournir plusieurs poutres primaires (2) et poutres secondaires (3) selon les dimensions de l'espace pour la construction d'un plancher,
    b) disposer les poutres primaires (2) le long de la première direction de montage (X) et les poutres secondaires (3) le long de la seconde direction de montage (Y), laissant une distance entre chacune des poutres primaires (2) et entre chacune des poutres secondaires (3) selon les dimensions de la dalle (4),
    c) fixer les extrémités des poutres primaires (2) et poutres secondaires (3),
    d) disposer d'au moins un panneau de coffrage (7) entre les poutres primaires et secondaires (2,3),
    e) former les dalles (4) sur le panneau de coffrage (7) placé entre les poutres primaires (2) et secondaires (3), la dalle formée (4) couvrant la première extrémité de section (2.2) de la poutre primaire (2) et la première extrémité de section (3.2) de la poutre secondaire (3), et
    f) renforcer les dalles (4) tant dans la première que dans la seconde direction de montage (X, Y).
  14. Procédé pour le montage d'un système de plancher structurel (1) selon la revendication précédente, dans lequel les panneaux de coffrage (7) de l'étape d) comprennent au moins une couche d'isolation.
  15. Procédé de montage d'un système de plancher structurel (1) selon la revendication 13 ou 14, dans lequel la dalle (4) formée dans l'étape e) est coulée sur place.
EP17199904.8A 2017-11-03 2017-11-03 Système de plancher Not-in-force EP3480376B1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP17199904.8A EP3480376B1 (fr) 2017-11-03 2017-11-03 Système de plancher

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP17199904.8A EP3480376B1 (fr) 2017-11-03 2017-11-03 Système de plancher

Publications (2)

Publication Number Publication Date
EP3480376A1 EP3480376A1 (fr) 2019-05-08
EP3480376B1 true EP3480376B1 (fr) 2021-01-06

Family

ID=60262775

Family Applications (1)

Application Number Title Priority Date Filing Date
EP17199904.8A Not-in-force EP3480376B1 (fr) 2017-11-03 2017-11-03 Système de plancher

Country Status (1)

Country Link
EP (1) EP3480376B1 (fr)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7811155B2 (ja) * 2022-07-26 2026-02-04 Jfeシビル株式会社 梁接合構造及び建築物

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050188638A1 (en) * 2002-06-22 2005-09-01 Pace Malcolm J. Apparatus and method for composite concrete and steel floor construction
US8341921B2 (en) * 2004-12-27 2013-01-01 1455454 Floor system with steel joists having openings with edge reinforcements and method
GB201321922D0 (en) * 2013-12-11 2014-01-22 Laing O Rourke Plc Constructions

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
EP3480376A1 (fr) 2019-05-08

Similar Documents

Publication Publication Date Title
US9518401B2 (en) Open web composite shear connector construction
US4646495A (en) Composite load-bearing system for modular buildings
KR100946940B1 (ko) 강관 기둥과 철근콘크리트 플랫슬래브 간의 전단보강 접합구조
CN112982824B (zh) 翼缘嵌入楼板的缺口钢梁及楼板结构和施工方法
US8381485B2 (en) Precast composite structural floor system
US20110271618A1 (en) Precast composite structural floor system
JP2011231543A (ja) 床組構造、プレキャストコンクリートスラブ版及びその施工方法、合成床版、及び耐火建築物
EP2325409B1 (fr) Procédé de fabrication d'une dalle avec des éléments préfabriqués plats et la dalle réalisée par ce procédé
EP3480376B1 (fr) Système de plancher
KR101212259B1 (ko) 파형 굴곡판으로 형성된 보강재를 이용한 합성바닥판 및 그 제작방법
KR101752285B1 (ko) 광폭 psc 하부플랜지와 단면확대용 상부플랜지를 갖는 하이브리드 보 및 이를 이용한 구조물
WO1996021069A1 (fr) Element de structure
KR101171061B1 (ko) 기둥의 수직결합이 용이한 난방배관 일체형 경량합성바닥판이 구비된 모듈러 유닛
CN215211883U (zh) 一种先张预应力框架装配结构体系
WO2020107129A1 (fr) Dalle composite en bois-béton semi-préfabriquée
KR100376486B1 (ko) 층고저감형 철골보 및 그 결합구조
RU2462563C2 (ru) Элемент перекрытия
CN113502979B (zh) 一种先张预应力框架装配结构体系及其施工方法
AU707101B2 (en) A structural member
KR102851832B1 (ko) 스트렌드를 이용한 장스팬 구조 시공 방법
JP7364510B2 (ja) 床構造
CN116290373B (zh) 一种梯形钢管混凝土柱钢框架装配式住宅体系及施工方法
CN116876653B (zh) 一种梁柱框架结构体系
CN222275897U (zh) 一种新型楼面预制混凝土叠合板
KR100197760B1 (ko) 건축물의 콘크리트기둥과 철골보연결용 접합구조물

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20191104

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20200305

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

GRAL Information related to payment of fee for publishing/printing deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR3

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTC Intention to grant announced (deleted)
INTG Intention to grant announced

Effective date: 20200803

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1352519

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210115

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602017030830

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20210106

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1352519

Country of ref document: AT

Kind code of ref document: T

Effective date: 20210106

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210407

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210506

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210406

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210406

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210506

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602017030830

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

26N No opposition filed

Effective date: 20211007

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210506

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211103

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211130

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20211130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211130

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211130

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20211130

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: IE

Payment date: 20221128

Year of fee payment: 6

Ref country code: GB

Payment date: 20221128

Year of fee payment: 6

Ref country code: DE

Payment date: 20221125

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20210206

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20171103

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602017030830

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20231103

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20210106

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20240601

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20231103

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20231103

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20231103

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20231103

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20240601