Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IndividualfiledCriticalIndividual
Priority to ES114145UpriorityCriticalpatent/ES114145Y/es
Publication of ES114145UpublicationCriticalpatent/ES114145U/es
Application grantedgrantedCritical
Publication of ES114145YpublicationCriticalpatent/ES114145Y/es
Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes
(AREA)
Soil Conditioners And Soil-Stabilizing Materials
(AREA)
Abstract
Suelo de drenaje prefabricado que se caracteriza por comprender una pluralidad de piezas elásticas anulares de sección trapecial las cuales presentan escotaduras opuestas a modo de cola de milano mediante las cuales se entrelazan.
ES114145U1965-05-221965-05-22Suelo de drenaje prefabricado.
ExpiredES114145Y
(es)