Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IRIARTE HERRANZ JOSE LUIS - GONZALEZ DOMINGUEZ MANUEL - RIO DIEZ ELADIO - TERRENO CARMONA MANUEL
Original Assignee
IRIARTE HERRANZ JOSE LUIS - GONZALEZ DOMINGUEZ MANUEL - RIO DIEZ ELADIO - TERRENO CARMONA MANUEL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IRIARTE HERRANZ JOSE LUIS - GONZALEZ DOMINGUEZ MANUEL - RIO DIEZ ELADIO - TERRENO CARMONA MANUELfiledCriticalIRIARTE HERRANZ JOSE LUIS - GONZALEZ DOMINGUEZ MANUEL - RIO DIEZ ELADIO - TERRENO CARMONA MANUEL
Priority to ES0204940ApriorityCriticalpatent/ES204940A2/es
Publication of ES204940A2publicationCriticalpatent/ES204940A2/es
Mejoras introducidas en la patente principal nº 202.580 por procedimiento para la construcción de acequias con elementos prefabricados caracterizadas porque las piezas prefabricadas que ensartadas en las armaduras y que han de constituir el canal o acequia pueden ser bien porciones de cauce completo en su sentido transversal o bien cauce incompleto o fracción de cauce de forma que por acoplamiento de piezas semejantes en sentido transversal y grupos de éstas en sentido longitudinal se construya un cauce-canal o acequia de la sección más conveniente y deseada.
ES0204940A1952-08-091952-08-09UN PROCEDIMIENTO PARA LA FABRICACIoN DE ACEQUIAS CON ELEMENTOS PREFABRICADOS
ExpiredES204940A2
(es)