Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IndividualfiledCriticalIndividual
Priority to ES0260525ApriorityCriticalpatent/ES260525A1/es
Publication of ES260525A1publicationCriticalpatent/ES260525A1/es
Manufacturing Of Tubular Articles Or Embedded Moulded Articles
(AREA)
Abstract
Perfeccionamientos en la fabricación de tubos de hormigón armado, que consisten esencialmente en centrifugar el hormigón, mediante molde apropiado en el que se han dispuesto previamente las armaduras, procediéndose después a introducir en el interior del tubo un molde idóneo para transmitir una presión radil al hormigón centrifugado con la consiguiente expansión antes de iniciarse el fraguado, expansión que el hormigón transmite también a las armaduras, que quedan sometidas a tensiones previas, retirándose finalmente el molde interior después de curado el hormigón, con lo que resulta éste precomprimido por la acción de las armaduras previamente extendidas.
ES0260525A1960-08-111960-08-11Perfeccionamientos en la fabricaciën de tubos de hormigën armado
ExpiredES260525A1
(es)