ES2710182T3 - Method of manufacturing a wind turbine tower structure - Google Patents

Method of manufacturing a wind turbine tower structure Download PDF

Info

Publication number
ES2710182T3
ES2710182T3 ES09755898T ES09755898T ES2710182T3 ES 2710182 T3 ES2710182 T3 ES 2710182T3 ES 09755898 T ES09755898 T ES 09755898T ES 09755898 T ES09755898 T ES 09755898T ES 2710182 T3 ES2710182 T3 ES 2710182T3
Authority
ES
Spain
Prior art keywords
tubular
wind turbine
center
tower
production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
ES09755898T
Other languages
Spanish (es)
Inventor
Jonas Kristensen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vestas Wind Systems AS
Original Assignee
Vestas Wind Systems AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Vestas Wind Systems AS filed Critical Vestas Wind Systems AS
Priority claimed from PCT/EP2009/065348 external-priority patent/WO2010060833A2/en
Application granted granted Critical
Publication of ES2710182T3 publication Critical patent/ES2710182T3/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Landscapes

  • Wind Motors (AREA)

Abstract

Un método de fabricación de una estructura de torre tubular de turbina eólica, que comprende las etapas de: proporcionar una pluralidad de subsecciones de estructura de torre tubular en un centro de producción (200) de estructuras de torres de turbinas eólicas móvil; en donde dicha etapa de proporcionar la pluralidad de subsecciones de estructura de torre tubular comprende fabricar las subsecciones tubulares en el centro de producción (200) móvil; y soldar dicha pluralidad de subsecciones tubulares (222a, 222b) para formar dicha estructura de torre tubular de turbina eólica.A method of manufacturing a wind turbine tubular tower structure, comprising the steps of: providing a plurality of tubular tower structure subsections in a mobile wind turbine tower structure production center (200); wherein said step of providing the plurality of tubular tower structure subsections comprises manufacturing the tubular subsections at the mobile production center (200); and welding said plurality of tubular subsections (222a, 222b) to form said tubular wind turbine tower structure.

Description

DESCRIPCIONDESCRIPTION

Metodo de fabricacion de una estructura de torre de turbina eolicaMethod of manufacturing a wind turbine tower structure

Campo tecnicoTechnical field

La presente invencion se refiere a un metodo de fabricacion de una estructura de torre para una turbina eolica, y a un centro de produccion de estructuras de torres de turbinas eolicas.The present invention relates to a method of manufacturing a tower structure for a wind turbine, and to a center for the production of wind turbine tower structures.

Antecedentes de la invencionBackground of the invention

Tradicionalmente, en la construccion de turbinas eolicas, se producen secciones de torre de acero en una fabrica, y cada seccion de torre completa se transporta al emplazamiento donde va a desplegarse la turbina eolica. Despues pueden ensamblarse una pluralidad de secciones de torre unas sobre otras para formar una torre de turbina eolica. Una creciente demanda de turbinas eolicas con mayor capacidad, para emplazamientos de despliegue terrestres y marinos, genera una necesidad de torres de turbinas eolicas con una mayor resistencia estructural que las torres que hay actualmente en uso.Traditionally, in the construction of wind turbines, steel tower sections are produced in a factory, and each complete tower section is transported to the location where the wind turbine is to be deployed. A plurality of tower sections can then be assembled one above the other to form a wind turbine tower. A growing demand for wind turbines with greater capacity, for land and marine deployment sites, generates a need for wind turbine towers with greater structural strength than the towers that are currently in use.

Para torres de turbinas eolicas tubulares, dicha mayor resistencia estructural puede conseguirse aumentando el grosor de pared y/o el diametro de la torre. Esto hace que sea diffcil transportar las secciones de torre, especialmente para las secciones de base tubular de la torre de turbina eolica, ya que las secciones de torre tienden a llegar a ser muy pesadas, debido al grosor de pared aumentado, o a tener un diametro superior al lfmite ffsico impuesto por la infraestructura, por ejemplo, el espacio debajo de un puente o en un tunel.For tubular wind turbine towers, said higher structural strength can be achieved by increasing the wall thickness and / or the diameter of the tower. This makes it difficult to transport the tower sections, especially for the tubular base sections of the wind turbine tower, since the tower sections tend to become very heavy, due to the increased wall thickness, or to have a diameter higher than the physical limit imposed by the infrastructure, for example, the space under a bridge or in a tunnel.

El problema del transporte se aborda, por ejemplo, en el documento WO 02/38952 A2, que desvela la soldadura de anillos de torres entre sf en el emplazamiento de la torre.The problem of transport is addressed, for example, in WO 02/38952 A2, which discloses the welding of tower rings between themselves at the site of the tower.

Ademas, con el fin de superar el problema del transporte, el documento US 2006/0272244 desvela un metodo donde las secciones mas anchas de un molino de viento pueden dividirse a lo largo de lmeas verticales, por lo que los segmentos de cubierta resultantes pueden extenderse a lo largo con un peso de carga adecuado para el transporte. En consecuencia, el documento US 2006/0272244 desvela una solucion al problema del transporte que parece muy adecuado, en particular en el caso de que se despliegue una turbina eolica o unas pocas en un emplazamiento. Sin embargo, sena conveniente tener una forma mas racional de proporcionar las torres, especialmente cuando va a desplegarse un mayor numero de turbinas eolicas.In addition, in order to overcome the transportation problem, US 2006/0272244 discloses a method where the wider sections of a windmill can be divided along vertical lines, whereby the resulting cover segments can be extended. along with a suitable load weight for transport. Accordingly, US 2006/0272244 discloses a solution to the transport problem that seems very suitable, in particular in the event that a wind turbine or a few are deployed at a location. However, it would be convenient to have a more rational way of providing the towers, especially when a greater number of wind turbines will be deployed.

Sumario de la invencionSummary of the invention

En vista de lo anterior, un objeto de la invencion es solucionar o al menos reducir al menos uno de los problemas comentados anteriormente. En particular, un objeto es proporcionar una forma mas racional de proporcionar las torres cuando va a desplegarse un mayor numero de turbinas eolicas.In view of the foregoing, an object of the invention is to solve or at least reduce at least one of the problems discussed above. In particular, one object is to provide a more rational way of providing the towers when a larger number of wind turbines is to be deployed.

De acuerdo con un primer aspecto de la invencion, se proporciona un metodo de fabricacion de una estructura de torre de turbina eolica, que comprende las etapas de: proporcionar una pluralidad de subsecciones de estructura de torre tubular en un centro de produccion de estructuras de torres de turbinas eolicas movil; y soldar la pluralidad de subsecciones tubulares juntas para formar la estructura de torre de turbina eolica.According to a first aspect of the invention, there is provided a method of manufacturing a wind turbine tower structure, comprising the steps of: providing a plurality of subsections of tubular tower structure in a tower structures production center of mobile wind turbines; and welding the plurality of tubular subsections together to form the wind turbine tower structure.

Debena entenderse que el termino “estructura de torre de turbina eolica”, en el contexto de la presente aplicacion, incluye diversas estructuras de torre que pueden utilizarse para soportar el rotor y las palas de una turbina eolica, tal como, una torre entera, una estructura de soporte tubular utilizada para anclar la turbina eolica (dicha estructura de torre se suele denominar “monopilar”), o una torre de turbina eolica entera de “una pieza”.It should be understood that the term "wind turbine tower structure", in the context of the present application, includes various tower structures that can be used to support the rotor and blades of a wind turbine, such as, an entire tower, a tubular support structure used to anchor the wind turbine (said tower structure is often referred to as "monopilar"), or a whole "one piece" wind turbine tower.

La presente invencion esta basada en el entendimiento de que el despliegue de turbinas eolicas con estructuras de torres tubulares de gran diametro se puede racionalizar proporcionando un centro de fabricacion de estructuras de torres en un lugar que no necesite mas transporte por carretera para proporcionar las estructuras de torres al emplazamiento de despliegue, que puede ser un emplazamiento de despliegue marino o un emplazamiento de despliegue terrestre.The present invention is based on the understanding that the deployment of wind turbines with large diameter tubular tower structures can be rationalized by providing a center for the manufacture of tower structures in a location that does not need more road transport to provide the structures of Towers to the deployment site, which may be a marine deployment site or a land deployment site.

Por la presente invencion, puede conseguirse una produccion racional de las torres facilitando al mismo tiempo al menos el transporte por carretera de material para las estructuras de torres.By the present invention, rational production of the towers can be achieved while facilitating at least the road transport of material for the tower structures.

Mediante la soldadura de las subsecciones tubulares, puede reducirse la cantidad de mano de obra necesaria, lo que permite una fabricacion rentable de las estructuras de torres, en comparacion con el ensamblaje in situ de acuerdo con la tecnica anterior. By welding the tubular subsections, the amount of labor required can be reduced, which allows a cost-effective manufacture of the tower structures, as compared to the on-site assembly according to the prior art.

Ademas, las subsecciones tubulares que se proporcionan en el centro de produccion de estructuras de torres movil pueden transportarse ventajosamente al centro verticalmente sobre un vetnculo adecuado, tal como un trailer para transporte por carretera.In addition, the tubular subsections provided in the production center of mobile tower structures can advantageously be transported to the center vertically on a suitable vehicle, such as a road transport trailer.

Por “verticalmente” debera entenderse que la base de la subseccion tubular esta orientada hacia el chasis del vetnculo cuando tiene lugar el transporte.By "vertically" it should be understood that the base of the tubular subsection is oriented towards the vehicle chassis when transport takes place.

Para el transporte por carretera en general, el tamano de los artfculos que se pueden transportar suele estar limitado por la altura total del vetnculo cargado (debido a los tuneles, etc.). Transportando las subsecciones tubulares verticalmente y seleccionando la altura de las subsecciones tubulares dependiendo de las propiedades de la ruta desde la fabrica hasta el centro movil, pueden transportarse subsecciones de mayor diametro que si las subsecciones se hubiesen transportado horizontalmente.For road transport in general, the size of the articles that can be transported is usually limited by the total height of the loaded vehicle (due to the tunnels, etc.). By transporting the tubular subsections vertically and selecting the height of the tubular subsections depending on the properties of the route from the factory to the mobile center, subsections of greater diameter can be transported than if the subsections had been transported horizontally.

Ademas, cuando todas las estructuras de torres de turbinas eolicas se han finalizado para un emplazamiento particular, el centro de produccion movil puede trasladarse a otro emplazamiento. El centro de produccion movil proporciona asf un centro de fabricacion flexible que puede ubicarse donde haga falta mas capacidad de fabricacion. Esto puede ser una caractenstica muy ventajosa, ya que la ubicacion de turbinas eolicas a menudo puede tener motivaciones polfticas y/o estar sujeta a cambios durante la etapa de planificacion.In addition, when all wind turbine tower structures have been completed for a particular site, the mobile production center can be moved to another location. The mobile production center thus provides a flexible manufacturing center that can be located where more manufacturing capacity is needed. This can be a very advantageous feature, since the location of wind turbines can often have political motivations and / or be subject to changes during the planning stage.

Las subsecciones tubulares pueden ser cilmdricas o ahusadas.The tubular subsections can be cylindrical or tapered.

La etapa de proporcionar las subsecciones tubulares puede comprender, para cada subseccion tubular, proporcionar una placa de acero; enrollar la placa de acero en un laminador para curvar la placa de acero de tal manera que dos extremos de la placa de acero queden uno frente al otro; y soldar los dos extremos de la placa de acero enfrentados, formando asf la subseccion tubular.The step of providing the tubular subsections may comprise, for each tubular subsection, providing a steel plate; rolling the steel plate in a laminator to bend the steel plate in such a way that two ends of the steel plate are facing each other; and welding the two ends of the steel plate facing each other, thus forming the tubular subsection.

Mediante la fabricacion de las subsecciones tubulares en el centro de produccion movil, puede facilitarse cualquier transporte por carretera de materia prima al centro de produccion movil. En particular, el transporte por carretera de laminas de acero requiere menos vehnculos y una planificacion de ruta menos complicada que el transporte por carretera de subsecciones tubulares. Ademas, pueden formarse subsecciones tubulares mas altas, que pueden racionalizar mas la produccion de la seccion de base (y de las demas secciones de la torre).By manufacturing the tubular subsections in the mobile production center, any road transport of raw material to the mobile production center can be facilitated. In particular, road transport of steel sheets requires fewer vehicles and less complicated route planning than road transport of tubular subsections. In addition, higher tubular subsections can be formed, which can further rationalize the production of the base section (and of the other sections of the tower).

Asimismo, las laminas de acero pueden seleccionarse para que tengan un ancho estandar, tal como 3 metros, lo cual significa que pueden ser suministradas practicamente por cualquier proveedor de laminas de acero. Por la presente invencion, la produccion de las estructuras de torres puede hacerse independiente de la presencia de una fabrica de estructuras de torres permanente. Esta caractenstica de la presente realizacion de la invencion puede mejorar notablemente la disponibilidad y eficacia de la produccion de estructuras de torres de turbinas eolicas, especialmente para emplazamientos de despliegue alejados de una fabrica de estructuras de torres permanente. Ademas, la etapa de soldar la pluralidad de subsecciones tubulares puede comprender las etapas de: disponer un extremo superior de una primera subseccion tubular junto a un extremo de base de una segunda subseccion tubular; y proporcionar una costura de soldadura circunferencial entre la primera y segunda subseccion tubular.Also, the steel sheets can be selected to have a standard width, such as 3 meters, which means that they can be supplied practically by any supplier of steel sheets. By the present invention, the production of tower structures can be made independent of the presence of a permanent tower structure factory. This feature of the present embodiment of the invention can remarkably improve the availability and efficiency of the production of wind turbine tower structures, especially for deployment sites remote from a factory of permanent tower structures. In addition, the step of welding the plurality of tubular subsections may comprise the steps of: arranging an upper end of a first tubular subsection adjacent a base end of a second tubular subsection; and providing a circumferential weld seam between the first and second tubular subsections.

Tambien puede ser ventajoso introducir montajes en la estructura de torre de turbina eolica antes de que sea trasladada desde el centro de produccion movil al emplazamiento de despliegue, reduciendo asf el trabajo necesario en el emplazamiento de despliegue. Para facilitar el transporte de las estructuras de torres de turbinas eolicas terminadas, el metodo de acuerdo con la presente invencion tambien puede comprender la etapa de disponer la estructura de torre sobre una parte del centro de produccion movil que es accesible desde fuera del centro para permitir el transporte de la estructura de torre a su emplazamiento de despliegue.It may also be advantageous to introduce assemblies in the wind turbine tower structure before it is moved from the mobile production center to the deployment site, thereby reducing the work required at the deployment site. To facilitate the transport of finished wind turbine tower structures, the method according to the present invention may also comprise the step of arranging the tower structure on a part of the mobile production center that is accessible from outside the center to allow the transport of the tower structure to its deployment site.

De acuerdo con un segundo aspecto de la invencion, se proporciona un centro de produccion movil de estructuras de torres de turbinas eolicas que comprende una primera unidad de soldadura para soldar una pluralidad de subsecciones tubulares juntas para formar una estructura de torre de turbina eolica tubular.According to a second aspect of the invention, there is provided a mobile production center for wind turbine tower structures comprising a first welding unit for welding a plurality of tubular subsections together to form a tubular wind turbine tower structure.

La primera unidad de soldadura puede comprender ventajosamente una estructura de soporte para soportar una primera y una segunda subseccion tubular de tal manera que un extremo superior de la primera subseccion tubular se oriente hacia un extremo de base de la segunda subseccion tubular; y una disposicion de soldadura para proporcionar una costura de soldadura circunferencial que una el extremo superior de la primera subseccion tubular y el extremo de base de la segunda subseccion tubular.The first welding unit may advantageously comprise a supporting structure for supporting a first and a second tubular subsection such that an upper end of the first tubular subsection is oriented towards a base end of the second tubular subsection; and a welding arrangement for providing a circumferential weld seam that connects the upper end of the first tubular subsection and the base end of the second tubular subsection.

De manera adicional, el centro de produccion de torres movil puede comprender: un laminador; un segundo conjunto de unidades de soldadura; y/o un puesto para el tratamiento de la superficie.Additionally, the mobile tower production center may comprise: a laminator; a second set of welding units; and / or a post for surface treatment.

El centro de produccion de torres movil de acuerdo con la presente invencion puede proporcionarse como un centro terrestre o como un centro flotante en vista de las circunstancias particulares para un determinado montaje en un emplazamiento de despliegue. Para un emplazamiento de despliegue para turbinas eolicas marinas o para turbinas eolicas terrestres cerca de un emplazamiento de amarre adecuado, puede preferirse un centro de produccion de torres de turbinas eolicas flotante movil, mientras que un centro de produccion de estructuras de torres de turbinas eolicas movil terrestre puede ser la eleccion para un emplazamiento de despliegue que este lejos de un emplazamiento de amarre adecuado y/o cerca de un centro de produccion de estructuras de torres permanente. Un centro de produccion de estructuras de torres eolicas flotante movil, que puede proporcionarse ventajosamente en forma de barcaza o buque autopropulsado, puede ser especialmente adecuado para manejar toda la produccion de la torre (desde la placa de acero hasta la estructura de torre terminada) debido a la capacidad inherente de un centro flotante para poder soportar el laminador, habitualmente de gran peso, necesario para dicho flujo de produccion.The mobile tower production center according to the present invention can be provided as a terrestrial center or as a floating center in view of the particular circumstances for a given assembly at a deployment site. For a deployment site for marine wind turbines or turbines In the case of land-based wind turbines near a suitable mooring site, a mobile floating wind turbine tower production center may be preferred, while a land mobile wind turbine tower production center may be the choice for a deployment site that is away from a suitable mooring site and / or near a permanent tower structure production center. A center of production of movable floating wind tower structures, which can advantageously be provided in the form of a barge or self-propelled vessel, can be especially suitable for handling all tower production (from the steel plate to the finished tower structure) to the inherent capacity of a floating center to be able to support the laminator, usually of great weight, necessary for said production flow.

Por un lado, un centro de produccion de estructuras de torres eolicas movil terrestre, que puede incluir ventajosamente uno o varios trailers, puede desplegarse en un numero aun mayor de ubicaciones, independientemente de la presencia de un emplazamiento de amarre adecuado.On the one hand, a center for the production of land mobile wind turbine structures, which can advantageously include one or more trailers, can be deployed in an even greater number of locations, independently of the presence of a suitable mooring site.

De acuerdo con una realizacion del centro de produccion de estructuras de torres de turbinas eolicas flotante movil mencionado anteriormente, puede comprender ventajosamente una cabina para los trabajadores, por lo que la ubicacion del centro se vuelve practicamente independiente de que haya algun centro terrestre cerca o no.According to an embodiment of the movable floating wind turbine tower production center mentioned above, it can advantageously comprise a cabin for the workers, so that the location of the center becomes practically independent of whether there is a ground center nearby or not. .

Otros objetivos, caractensticas y ventajas se pondran de manifiesto a partir de la siguiente divulgacion detallada, a partir de las reivindicaciones dependientes adjuntas y de los dibujos.Other objects, features and advantages will become apparent from the following detailed disclosure, from the attached dependent claims and the drawings.

Breve descripcion de los dibujosBrief description of the drawings

Lo anterior, asf como objetos, caractensticas y ventajas adicionales de la presente invencion, se entenderan mejor mediante la siguiente descripcion ilustrativa y no limitativa de realizaciones preferidas de la presente invencion, con referencia a los dibujos adjuntos, donde los mismos numeros de referencia se utilizaran para elementos similares, en donde:The foregoing, as well as additional objects, features and advantages of the present invention, will be better understood by the following illustrative and non-limiting description of preferred embodiments of the present invention, with reference to the accompanying drawings, wherein the same reference numbers will be used. for similar elements, where:

la Figura 1 ilustra esquematicamente un emplazamiento de turbinas eolicas marino ejemplar;Figure 1 illustrates schematically an exemplary marine wind turbine location;

la Figura 2 ilustra esquematicamente una realizacion de un centro de produccion de estructuras de torres de turbinas eolicas flotante movil;Figure 2 schematically illustrates an embodiment of a mobile floating tower turbine tower production center;

la Figura 3 es un diagrama de flujo que ilustra esquematicamente una realizacion del metodo de acuerdo con la invencion de fabricacion de una estructura de torre de turbina eolica en el centro de la Figura 2;Figure 3 is a flow chart schematically illustrating an embodiment of the method according to the invention of manufacturing a wind turbine tower structure in the center of Figure 2;

la Figura 4 ilustra esquematicamente una realizacion de un centro de produccion de estructuras de torres de turbinas eolicas terrestre movil; yFigure 4 illustrates schematically an embodiment of a center of production of structures of turbine towers of mobile land-based turbines; Y

la Figura 5 es un diagrama de flujo que ilustra esquematicamente una realizacion del metodo de acuerdo con la invencion de fabricacion de una estructura de torre de turbina eolica en el centro de la Figura 4.Figure 5 is a flow chart schematically illustrating an embodiment of the method according to the invention of manufacturing a wind turbine tower structure in the center of Figure 4.

Descripcion detallada de realizaciones preferidasDetailed description of preferred embodiments

La Figura 1 ilustra esquematicamente un emplazamiento de turbinas eolicas marino 100 que comprende una pluralidad de turbinas eolicas 102. Cada turbina eolica 102 comprende un rotor 104 provisto de un conjunto de palas 106. El rotor se dispone encima de una torre de turbina eolica 107 sobre una cimentacion (no mostrada) fijada al fondo del mar. La cimentacion puede proporcionarse, por ejemplo, en forma de otra estructura de torre (un denominado “monopilar”). A medida que sopla el viento, las palas 106 hacen que gire el rotor 104. El rotor 104 acciona un generador (dispuesto en un alojamiento 108) generando asf energfa. La Figura 2 ilustra esquematicamente un centro de produccion 200 de estructuras de torres de turbinas eolicas flotante movil, que en este caso es una barcaza que tiene una cubierta de almacenamiento 201 abierta y una cubierta de produccion 202 con centros de fabricacion situados debajo de la cubierta de almacenamiento 201 abierta.Figure 1 schematically illustrates a marine wind turbine site 100 comprising a plurality of wind turbines 102. Each wind turbine 102 comprises a rotor 104 provided with a set of paddles 106. The rotor is disposed above a wind turbine tower 107 over a foundation (not shown) fixed to the bottom of the sea. The foundation can be provided, for example, in the form of another tower structure (a so-called "monopilar"). As the wind blows, the blades 106 rotate the rotor 104. The rotor 104 drives a generator (arranged in a housing 108) thus generating energy. Figure 2 schematically illustrates a production center 200 of movable floating wind turbine tower structures, which in this case is a barge having an open storage cover 201 and a production cover 202 with manufacturing centers located under the cover Storage 201 open.

El centro de fabricacion en este caso incluye un laminador 204, unidades de soldadura 206 para formar subsecciones tubulares, unidades de soldadura 208 para unir una pluralidad de subsecciones tubulares para formar una estructura de torre tubular (en el caso ilustrado actualmente secciones de torre tubulares con el fin de ensamblarse para formar la torre finalizada en el emplazamiento de despliegue), y un puesto para el tratamiento de la superficie 210. Ademas, se proporciona un conjunto de gruas 212 para trasladar artfculos entre las unidades. Aunque no se ilustra explfcitamente en la Figura 2, el centro de produccion 200 tambien puede incluir disposiciones para fijar conectores, tales como pestanas, a las secciones de torre para permitir el ensamblaje final en el emplazamiento de despliegue.The manufacturing center in this case includes a rolling mill 204, welding units 206 for forming tubular subsections, welding units 208 for joining a plurality of tubular subsections to form a tubular tower structure (in the present case illustrated tubular tower sections with in order to assemble to form the finished tower at the deployment site), and a location for the treatment of the surface 210. In addition, a set of cranes 212 is provided for moving articles between the units. Although not explicitly illustrated in Figure 2, the production center 200 may also include arrangements for attaching connectors, such as tabs, to the tower sections to allow final assembly at the deployment site.

Habitualmente, dichos conectores se soldanan a las secciones de torre en las mismas unidades de soldadura 208 utilizadas para unir las subsecciones tubulares.Usually, said connectors are welded to the tower sections in the same welding units 208 used to join the tubular subsections.

Una escotilla de carga 214 se dispone en la cubierta 201, para permitir mover una seccion de torre terminada desde la cubierta de produccion 202 a un area encima de la cubierta 201. El centro de produccion flotante movil tambien puede comprender una cabina para los trabajadores 214.A cargo hatch 214 is provided in the cover 201, to allow moving a finished tower section from the production deck 202 to an area above the deck 201. The mobile floating production center also it can include a booth for workers 214.

Mientras vaya a desplegarse un nuevo conjunto de turbinas eolicas en un emplazamiento de turbinas eolicas marino (o un emplazamiento terrestre), la barcaza puede remolcarse a un puerto cercano para permitir la fabricacion local de al menos las secciones de la torre de turbina eolica no adecuadas para el transporte por carretera.While a new set of wind turbines is to be deployed at a marine wind turbine site (or a land site), the barge can be towed to a nearby port to allow local manufacture of at least the sections of the wind turbine tower not suitable for road transport.

A continuacion se describira una realizacion del metodo de acuerdo con la invencion de fabricacion de una estructura de torre de turbina eolica con referencia a la Figura 2 y la Figura 3.In the following, an embodiment of the method according to the invention for manufacturing a wind turbine tower structure will be described with reference to Figure 2 and Figure 3.

En primer lugar, en la etapa 301, se proporcionan placas de acero 216 al centro de produccion 200 de torres flotante movil, por ejemplo, mediante transporte por carretera. Las placas de acero se cargan entonces en el centro de produccion situado debajo de la cubierta.First, in step 301, steel plates 216 are provided to the production center 200 of mobile floating towers, for example, by road transport. The steel plates are then loaded into the production center located under the cover.

En la etapa 302, se proporciona una placa de acero 216 al laminador 204. El laminador 204 enrolla la placa de acero 216 y produce una placa de acero enrollada 218 con una curvatura de sustancialmente 360 °.In step 302, a steel plate 216 is provided to the laminator 204. The laminator 204 rolls up the steel plate 216 and produces a rolled steel plate 218 with a curvature of substantially 360 °.

La placa de acero enrollada 218 es trasladada entonces por una de las gruas 212 a una unidad de soldadura, donde, en la etapa 303, se proporciona una costura de soldadura longitudinal 220 para formar una subseccion tubular.The rolled steel plate 218 is then translated by one of the cranes 212 to a welding unit, where, in step 303, a longitudinal weld seam 220 is provided to form a tubular subsection.

La subseccion tubular es trasladada entonces a otra unidad de soldadura por una de las gruas 212 donde, en la etapa 304, se suelda una pluralidad de subsecciones tubulares para formar una estructura de torre tubular 224 de la siguiente manera. Esto puede conseguirse disponiendo una primera 222a y una segunda 222b subseccion tubular de extremo a extremo. La estructura de soporte 226 se suele configurar para permitir el giro sincronico de la primera y la segunda subseccion. Por consiguiente, se puede proporcionar una costura de soldadura circunferencial, soldando la primera 222a y la segunda 222b subseccion tubular.The tubular subsection is then transferred to another welding unit by one of the cranes 212 where, in step 304, a plurality of tubular subsections are welded to form a tubular tower structure 224 in the following manner. This can be achieved by arranging a first 222a and a second 222b tubular subsection end to end. The support structure 226 is usually configured to allow the synchronous rotation of the first and second subsections. Accordingly, a circumferential weld seam can be provided by welding the first 222a and the second 222b tubular subsection.

Despues pueden anadirse subsecciones tubulares adicionales (una a una) y soldarse a la subseccion tubular fijada por ultima vez hasta conseguir una estructura de torre completa. En este caso, nueve subsecciones tubulares forman una seccion de torre. Sin embargo, se reconoce que el numero de subsecciones tubulares que forman una estructura de torre puede variar dependiendo del tipo de estructura de torre y las propiedades de la turbina eolica. Posteriormente, la estructura de torre tubular 224 completa se traslada al puesto para el tratamiento de la superficie 210, donde, en la etapa 305, se pinta para proporcionar proteccion contra la corrosion. Sin embargo, tambien son posibles otros tipos de tratamiento de la superficie.Then additional tubular subsections can be added (one by one) and welded to the tubular subsection fixed for the last time until a complete tower structure is achieved. In this case, nine tubular subsections form a tower section. However, it is recognized that the number of tubular subsections forming a tower structure can vary depending on the type of tower structure and the properties of the wind turbine. Subsequently, the complete tubular tower structure 224 is moved to the post for the treatment of the surface 210, where, in step 305, it is painted to provide protection against corrosion. However, other types of surface treatment are also possible.

La estructura de torre tubular completa puede trasladarse entonces a un area sobre la cubierta de almacenamiento abierta 201 donde, en la etapa 306, puede introducirse cualquier montaje necesario en la seccion de torre. Esto puede incluir normalmente una seccion de escalera, plataforma de trabajo, iluminacion, y elementos de cable. Este tipo de montajes se suele denominar “internos”.The entire tubular tower structure can then be moved to an area on the open storage deck 201 where, in step 306, any necessary assembly can be introduced into the tower section. This can typically include a stair section, work platform, lighting, and cable elements. This type of assemblies is usually called "internal".

Por ultimo, en la etapa 307, la estructura de torre tubular se puede cargar en un buque para el transporte al emplazamiento de turbinas eolicas marino.Finally, in step 307, the tubular tower structure can be loaded onto a ship for transport to the marine wind turbine site.

Si la torre de turbina eolica completa se ensambla in situ a partir de secciones de torre, las secciones superiores se pueden fabricar en una fabrica convencional debido a que el menor tamano y el peso mas reducido de dichas secciones pueden permitir un transporte por carretera convencional. Sin embargo, se reconoce que las secciones superiores tambien se pueden fabricar en el centro de produccion flotante movil.If the entire wind turbine tower is assembled on site from tower sections, the upper sections can be manufactured in a conventional factory because the smaller size and the smaller weight of said sections can allow conventional road transport. However, it is recognized that the upper sections can also be manufactured in the mobile floating production center.

Tambien cabe senalar que se puede fabricar una torre completa en el centro de produccion 200 flotante movil y transportarse al emplazamiento de despliegue en una pieza. Este procedimiento puede ser especialmente ventajoso para un emplazamiento de despliegue marino.It should also be noted that a complete tower can be manufactured in the mobile floating production center 200 and transported to the deployment site in one piece. This method can be especially advantageous for a marine deployment site.

Tras haber descrito una realizacion ejemplar de un centro de produccion de estructuras de torres de turbinas eolicas flotante movil y un metodo de fabricacion adecuado para dicho centro con referencia a las Figuras 2 y 3, a continuacion se describira una realizacion ejemplar de un centro de produccion de estructuras de torres de turbinas eolicas terrestre movil y, por lo tanto, se describira un metodo de fabricacion adecuado con referencia a las Figuras 4 y 5.After having described an exemplary embodiment of a mobile floating wind turbine tower production center and a suitable manufacturing method for said center with reference to Figures 2 and 3, an exemplary embodiment of a production center will be described below. of mobile terrestrial eolic turbine towers structures and, therefore, a suitable manufacturing method will be described with reference to Figures 4 and 5.

La Figura 4 ilustra esquematicamente un centro de produccion 400 de estructuras de torres de turbinas eolicas terrestre movil que comprende una plataforma de trabajo 401, formada en este caso por dos trailers 402a-b que han sido transportados a un lugar cerca de emplazamiento de despliegue de turbinas eolicas y dispuestos de extremo a extremo como se ilustra en la Figura 4. Como entendera el experto en la materia, la plataforma de trabajo 401 puede estar formada por trailers dispuestos de firma diferente a como se ilustra en la Figura 4, y/o utilizando otro material especializado que haya sido transportado a la ubicacion. Figure 4 schematically illustrates a production center 400 of mobile land-based wind turbine tower structures comprising a work platform 401, formed in this case by two trailers 402a-b which have been transported to a location near the deployment site of wind turbines and arranged end-to-end as illustrated in Figure 4. As will be understood by the person skilled in the art, the work platform 401 can be formed by trailers arranged with a different signature than that illustrated in Figure 4, and / or using other specialized material that has been transported to the location.

Sobre la plataforma de trabajo 401, se proporcionan una unidad de soldadura 403 y estructuras de soporte 404a-b para unir una pluralidad de subsecciones tubulares 405 (solo una de ellas ha sido indicada aqu con un numero de referencia) para formar una estructura de torre tubular 406 (en el caso ilustrado actualmente, secciones de torre tubulares con el fin de ensamblarse para formar una torre completa en el emplazamiento de despliegue), y un puesto para el tratamiento de la superficie 407. Ademas, se proporciona una grua 408 para desplazar artfculos desde un vehuculo 409 utilizado para transportar las subsecciones tubulares 404 a la ubicacion de produccion y la plataforma de trabajo 401. Puede utilizarse la misma grua 408, u otra grua (no mostrada en la Figura 4) para desplazar una estructura de torre 405 desde la plataforma de trabajo 401 al puesto para el tratamiento de la superficie 407.On the work platform 401, a welding unit 403 and support structures 404a-b are provided for joining a plurality of tubular subsections 405 (only one of them has been indicated here with a reference number) to form a tower structure tubular 406 (in the case currently illustrated, tubular tower sections for the purpose of assembling to form a complete tower at the deployment site), and a station for surface treatment 407. In addition, a crane 408 is provided to displace articles from a vehicle 409 used to transport the tubular subsections 404 to the production location and the work platform 401. The same crane 408, or another crane (not shown in Figure 4) can be used to move a tower structure 405 from the work platform 401 to the post for the treatment of the surface 407.

Aunque no se ilustra explfcitamente en la Figura 4, el centro de produccion 400 tambien puede incluir disposiciones para fijar conectores, tales como pestanas, a las secciones de torre para permitir el ensamblaje final en el emplazamiento de despliegue.Although not explicitly illustrated in Figure 4, the production center 400 may also include arrangements for attaching connectors, such as tabs, to the tower sections to allow final assembly at the deployment site.

Habitualmente, dichos conectores se soldanan a las secciones de torre en la misma unidad de soldadura 403 utilizada para unir las subsecciones tubulares 404.Usually, said connectors are welded to the tower sections in the same welding unit 403 used to join the tubular subsections 404.

Como se ilustra esquematicamente en la Figura 4, las subsecciones tubulares 404 de gran diametro han sido transportadas al lugar del centro de produccion lugar verticalmente sobre el chasis del trailer 409. Por la presente invencion, la altura y la longitud del vehuculo pueden adaptarse a la/s ruta/s disponible/s entre la fabrica donde se fabrican las subsecciones tubulares 404 y el emplazamiento de despliegue (de forma mas precisa, la ubicacion del centro de produccion movil 400). La combinacion de este tipo de transporte y la soldadura racional permitida por el centro de produccion movil 400, permite una fabricacion de estructuras de torres mas racional para estructuras de torres de turbinas eolicas de gran diametro. Que la disposicion del centro de produccion movil de acuerdo con la presente realizacion de la invencion haga este tipo de transporte posible desde un punto de vista economico es una percepcion importante e inventiva por parte del actual inventor.As illustrated schematically in Figure 4, the tubular subsections 404 of large diameter have been transported to the place of the production center vertically on the chassis of the trailer 409. By the present invention, the height and length of the vehicle can be adapted to the The route (s) available between the factory where the 404 tubular subsections are manufactured and the deployment site (more precisely, the location of the mobile production center 400). The combination of this type of transport and the rational welding allowed by the mobile production center 400, allows a more rational manufacture of tower structures for tower structures of large diameter wind turbines. That the disposition of the mobile production center according to the present embodiment of the invention makes this type of transport possible from an economic point of view is an important and inventive perception on the part of the current inventor.

A continuacion se describira una realizacion del metodo de acuerdo con la invencion de fabricacion de una estructura de torre de turbina eolica con referencia a la Figura 4 y la Figura 5.In the following, an embodiment of the method according to the invention of manufacturing a wind turbine tower structure will be described with reference to Figure 4 and Figure 5.

En primer lugar, en la etapa 501, se proporcionan subsecciones tubulares 404 al centro de produccion 400 de torres movil verticalmente sobre un trailer 409. Las subsecciones tubulares 405 son desplazadas a la plataforma de trabajo 401 por la grua 408.First, in step 501, tubular subsections 404 are provided to the production center 400 of vertically movable towers on a trailer 409. The tubular subsections 405 are moved to the work platform 401 by the crane 408.

En la etapa 502, una pluralidad de subsecciones tubulares 405 se sueldan para formar una estructura de torre tubular 406. Esto se puede conseguir disponiendo dos subsecciones tubulares de extremo a extremo y uniendo despues las subsecciones con una costura de soldadura circunferencial. Para este fin, las estructuras de soporte 404a-b pueden configurarse para permitir el giro sincronico de las dos subsecciones que van a unirse.In step 502, a plurality of tubular subsections 405 are welded to form a tubular tower structure 406. This can be achieved by arranging two end-to-end tubular subsections and then joining the subsections with a circumferential weld seam. For this purpose, the support structures 404a-b can be configured to allow the synchronous rotation of the two subsections to be joined.

Despues pueden anadirse subsecciones tubulares adicionales (una a una) y soldarse a la subseccion tubular fijada por ultima vez hasta conseguir una estructura de torre completa. En este caso, catorce subsecciones tubulares 405 forman una seccion de torre 406. Sin embargo, se reconoce que el numero de subsecciones tubulares que forma una estructura de torre puede variar dependiendo del tipo de estructura de torre y las propiedades de la turbina eolica.Then additional tubular subsections can be added (one by one) and welded to the tubular subsection fixed for the last time until a complete tower structure is achieved. In this case, fourteen tubular subsections 405 form a tower section 406. However, it is recognized that the number of tubular subsections forming a tower structure can vary depending on the type of tower structure and the properties of the wind turbine.

Posteriormente, la estructura de torre tubular 406 completa se desplaza al puesto para el tratamiento de la superficie 407, donde, en la etapa 503, se pinta para proporcionar proteccion contra la corrosion. Sin embargo, tambien son posibles otros tipos de tratamiento de la superficie. Como alternativa, las subsecciones tubulares 405 pueden prepintarse parcialmente y recibir solamente un “retoque” final en el centro de produccion 400 terrestre movil.Subsequently, the complete tubular tower structure 406 is moved to the post for the treatment of the surface 407, where, in step 503, it is painted to provide protection against corrosion. However, other types of surface treatment are also possible. Alternatively, the tubular subsections 405 may be partially pre-coated and receive only a final "touch-up" at the mobile terrestrial production center 400.

Finalmente, en la etapa 504, puede introducirse cualquier montaje necesario en la seccion de torre. Esto puede incluir normalmente una seccion de escalera, plataforma de trabajo, iluminacion, y elementos de cable. Este tipo de montajes suelen denominarse “internos”.Finally, in step 504, any necessary assembly in the tower section can be introduced. This can typically include a stair section, work platform, lighting, and cable elements. These types of assemblies are often called "internal".

Si la torre de turbina eolica completa se ensambla in situ a partir de secciones de torre, las secciones superiores se pueden fabricar en una fabrica convencional debido a que el menor tamano y el peso mas reducido de dichas secciones pueden permitir un transporte por carretera convencional. Sin embargo, se reconoce que las secciones superiores tambien se pueden fabricar en el centro de produccion 400 terrestre movil.If the entire wind turbine tower is assembled on site from tower sections, the upper sections can be manufactured in a conventional factory because the smaller size and the smaller weight of said sections can allow conventional road transport. However, it is recognized that the upper sections can also be manufactured in the mobile terrestrial production center 400.

La invencion se ha descrito antes principalmente con referencia a algunas realizaciones. Sin embargo, como un experto en la materia entendera facilmente, son igualmente posibles otras realizaciones que las desveladas previamente dentro del alcance de la invencion, como se define en las reivindicaciones adjuntas.The invention has been described above primarily with reference to some embodiments. However, as will be readily understood by one skilled in the art, other embodiments than those previously disclosed within the scope of the invention, as defined in the appended claims, are likewise possible.

Por ejemplo, aunque se describa en forma de barcaza en la presente descripcion detallada, el centro de produccion de estructuras de torres de turbinas eolicas flotante movil puede ser igualmente un buque autopropulsado. Ademas, las estructuras de torres terminadas pueden desplazarse desde el centro de produccion flotante al emplazamiento de despliegue, o a un centro de almacenamiento temporal, que puede encontrarse en tierra o en el mar. Diversas etapas de produccion, tal como la introduccion de los montajes internos en las estructuras de torres pueden realizarse en dicho centro de almacenamiento temporal. De manera adicional, las etapas descritas en relacion con la Figura 3 pueden realizarse utilizando un centro de produccion terrestre movil adecuado, mientras que las etapas descritas en relacion con la Figura 5 pueden realizarse utilizando un centro de produccion flotante movil adecuado. For example, although described in the form of a barge in the present detailed description, the center of production of movable floating wind turbine tower structures can also be a self-propelled vessel. In addition, completed tower structures can be moved from the floating production center to the deployment site, or to a temporary storage center, which can be found on land or at sea. Various production stages, such as the introduction of the internal assemblies in the tower structures can be performed in said temporary storage center. Additionally, the steps described in relation to Figure 3 can be performed using a suitable mobile land production center, while the steps described in relation to Figure 5 can be performed using a suitable mobile floating production center.

Claims (15)

REIVINDICACIONES 1. Un metodo de fabricacion de una estructura de torre tubular de turbina eolica, que comprende las etapas de: proporcionar una pluralidad de subsecciones de estructura de torre tubular en un centro de produccion (200) de estructuras de torres de turbinas eolicas movil;A method of manufacturing a wind turbine tubular tower structure, comprising the steps of: providing a plurality of subsections of tubular tower structure in a production center (200) of mobile wind turbine tower structures; en donde dicha etapa de proporcionar la pluralidad de subsecciones de estructura de torre tubular comprende fabricar las subsecciones tubulares en el centro de produccion (200) movil; ywherein said step of providing the plurality of subsections of tubular tower structure comprises manufacturing the tubular subsections in the mobile production center (200); Y soldar dicha pluralidad de subsecciones tubulares (222a, 222b) para formar dicha estructura de torre tubular de turbina eolica.welding said plurality of tubular subsections (222a, 222b) to form said wind turbine tubular tower structure. 2. El metodo de acuerdo con la reivindicacion 1, en donde dicha etapa de soldar la pluralidad de subsecciones tubulares comprende las etapas de:The method according to claim 1, wherein said step of welding the plurality of tubular subsections comprises the steps of: disponer un extremo superior de una primera subseccion tubular adyacente a un extremo de base de una segunda subseccion tubular; yarranging an upper end of a first tubular subsection adjacent a base end of a second tubular subsection; Y proporcionar una costura de soldadura circunferencial entre dicha primera y segunda subseccion tubular.providing a circumferential weld seam between said first and second tubular subsections. 3. El metodo de acuerdo con la reivindicacion 1 o 2, que comprende ademas la etapa de:3. The method according to claim 1 or 2, further comprising the step of: tratar la superficie de la estructura de torre.treat the surface of the tower structure. 4. El metodo de acuerdo con una cualquiera de las reivindicaciones anteriores, que comprende ademas la etapa de:4. The method according to any one of the preceding claims, further comprising the step of: introducir montajes en la estructura de torre.introduce mounts in the tower structure. 5. El metodo de acuerdo con una cualquiera de las reivindicaciones anteriores, en donde dicha etapa de proporcionar las subsecciones tubulares comprende, para cada subseccion tubular:The method according to any one of the preceding claims, wherein said step of providing the tubular subsections comprises, for each tubular subsection: proporcionar una placa de acero;provide a steel plate; enrollar dicha placa de acero en un laminador para curvar la placa de acero de tal manera que dos extremos de dicha placa de acero queden uno frente al otro; ywinding said steel plate in a laminator to bend the steel plate in such a manner that two ends of said steel plate are facing each other; Y soldar los dos extremos de la placa de acero enfrentados, formando asf dicha subseccion tubular.welding the two ends of the steel plate facing each other, thus forming said tubular subsection. 6. El metodo de acuerdo con una cualquiera de las reivindicaciones anteriores, en donde dicho centro de produccion movil es un centro de produccion flotante movil.6. The method according to any one of the preceding claims, wherein said mobile production center is a center of mobile floating production. 7. El metodo de acuerdo con una cualquiera de las reivindicaciones anteriores, que comprende ademas la etapa de: disponer la estructura de torre tubular sobre una parte del centro de produccion movil que es accesible desde fuera del centro para permitir el transporte de la estructura de torre tubular a su emplazamiento de despliegue. The method according to any one of the preceding claims, further comprising the step of: arranging the tubular tower structure on a part of the mobile production center that is accessible from outside the center to allow transportation of the structure of the tower. tubular tower to its deployment site. 8. Un centro de produccion (200) de estructuras de torres de turbinas eolicas movil que comprende:8. A production center (200) of mobile wind turbine tower structures comprising: una primera unidad de soldadura (208) para soldar una pluralidad de subsecciones tubulares para formar una estructura de torre de turbina eolica, ya first welding unit (208) for welding a plurality of tubular subsections to form a wind turbine tower structure, and un laminador (204) y una segunda unidad de soldadura (206) para formar las subsecciones tubulares.a laminator (204) and a second welding unit (206) to form the tubular subsections. 9. El centro de produccion de estructuras de torres de turbinas eolicas movil de acuerdo con la reivindicacion 8, en donde dicha primera unidad de soldadura comprende:9. The mobile wind turbine towers structure production center according to claim 8, wherein said first welding unit comprises: una estructura de soporte para soportar una primera y una segunda subseccion tubular de tal manera que un extremo superior de dicha primera subseccion tubular se orienta hacia un extremo de base de dicha segunda subseccion tubular; ya supporting structure for supporting a first and a second tubular subsection such that an upper end of said first tubular subsection faces a base end of said second tubular subsection; Y una disposicion de soldadura para proporcionar una costura de soldadura circunferencial que une dicho extremo superior de la primera subseccion tubular y dicho extremo de base de la segunda subseccion tubular.a welding arrangement for providing a circumferential weld seam connecting said upper end of the first tubular subsection and said base end of the second tubular subsection. 10. El centro de produccion de estructuras de torres de turbinas eolicas movil de acuerdo con la reivindicacion 8 o 9, en donde:10. The center for the production of mobile wind turbine tower structures according to claim 8 or 9, wherein: el laminador es para enrollar una placa de acero con el fin de curvar la placa de acero de tal manera que dos extremos de dicha placa de acero queden uno frente al otro; ythe laminator is for winding a steel plate in order to bend the steel plate in such a way that two ends of said steel plate are facing each other; Y la segunda unidad de soldadura es para soldar los dos extremos de la placa de acero enfrentados, formando asf una subseccion tubular. the second welding unit is for welding the two ends of the facing steel plate, thus forming a tubular subsection. 11. El centro de produccion de estructuras de torres de turbinas eolicas movil de acuerdo con una cualquiera de las reivindicaciones 8 a 10, que comprende ademas:The mobile wind turbine towers structure production center according to any one of claims 8 to 10, further comprising: un puesto para el tratamiento de la superficie de dicha estructura de torre.a post for the treatment of the surface of said tower structure. 12. El centro de produccion de estructuras de torres de turbinas eolicas movil de acuerdo con una cualquiera de las reivindicaciones 8 a 11, que comprende ademas una disposicion de traslado de estructuras de torres para trasladar una estructura de torre terminada a un lugar accesible desde un exterior del centro de produccion de estructuras de torres de turbinas eolicas movil para permitir el transporte de la estructura de torre desde el centro de produccion de estructuras de torres de turbinas eolicas movil a un emplazamiento de despliegue.The center for the production of mobile wind turbine tower structures according to any one of claims 8 to 11, further comprising an arrangement for transferring tower structures for transferring a finished tower structure to a location accessible from a exterior of the center of production of mobile wind turbine tower structures to allow the transport of the tower structure from the center of production of structures of mobile wind turbine towers to a deployment site. 13. El centro de produccion de estructuras de torres de turbinas eolicas movil de acuerdo con una cualquiera de las reivindicaciones 8 a 12, que es un centro de produccion de estructuras de torres de turbinas eolicas flotante movil.13. The center for the production of mobile wind turbine tower structures according to any one of claims 8 to 12, which is a center for the production of movable turbine wind turbine tower structures. 14. El centro de produccion de estructuras de torres de turbinas eolicas movil de acuerdo con la reivindicacion 13, en donde dicha disposicion de traslado comprende una grua para levantar dicha estructura de torre terminada desde una cubierta de produccion a una cubierta de almacenamiento abierta.14. The mobile wind turbine tower construction center according to claim 13, wherein said transfer arrangement comprises a crane for lifting said finished tower structure from a production cover to an open storage cover. 15. El centro de produccion de estructuras de torres de turbinas eolicas movil de acuerdo con una cualquiera de las reivindicaciones 8 a 12, que es un centro de produccion de estructuras de torres de turbinas eolicas terrestre movil. 15. The center for the production of mobile wind turbine tower structures according to any one of claims 8 to 12, which is a center for the production of turbine structures for mobile land-based wind turbines.
ES09755898T 2008-11-25 2009-11-18 Method of manufacturing a wind turbine tower structure Active ES2710182T3 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US11760408P 2008-11-25 2008-11-25
DKPA200801660 2008-11-25
PCT/EP2009/065348 WO2010060833A2 (en) 2008-11-25 2009-11-18 Method of manufacturing a wind turbine tower structure

Publications (1)

Publication Number Publication Date
ES2710182T3 true ES2710182T3 (en) 2019-04-23

Family

ID=65629497

Family Applications (1)

Application Number Title Priority Date Filing Date
ES09755898T Active ES2710182T3 (en) 2008-11-25 2009-11-18 Method of manufacturing a wind turbine tower structure

Country Status (2)

Country Link
DK (1) DK2350454T3 (en)
ES (1) ES2710182T3 (en)

Also Published As

Publication number Publication date
DK2350454T3 (en) 2019-03-11

Similar Documents

Publication Publication Date Title
ES2296058T3 (en) TOWER FOR A WIND TURBINE, PREFABRICATED METAL WALL PIECE FOR USE IN THE TOWER FOR A WIND TURBINE AND METHOD TO BUILD A TOWER FOR A WIND TURBINE.
CN103010415B (en) Support the prestressed concrete floating platform of offshore wind turbine and ocean power generator
ES2620732T3 (en) Installation and floating transport structure for installation and transport of a floating wind turbine, a floating wind turbine and a method for installation and transport of the same
JP5745688B2 (en) Floating wind power generation facility with energy storage equipment
ES2776798T3 (en) Construction, Assembly, and Launch Method of a Floating Wind Turbine Platform
ES2952964T3 (en) Maritime structure for the foundation of buildings and its installation method
ES2224995T3 (en) PROCEDURE FOR ASSEMBLING MAIN COMPONENTS IN THE GONDOLA OF A WIND GENERATOR.
ES2764375T3 (en) Improvements related to component handling, in particular handling of wind turbine components
ES2387342B2 (en) Semi-submersible triangular platform for open sea applications
KR102155394B1 (en) Floating offshore wind power generation facility
US9388599B2 (en) Wind tower erection system
ES2462765T3 (en) Transport system
ES2878035T3 (en) Low profile wind tower system for onshore and offshore applications
ES2387232B2 (en) Semi-submersible platform for open sea applications
EP2350454B1 (en) Method of manufacturing a wind turbine tower structure
BR112016018088B1 (en) METHOD OF ASSEMBLY OF PLATFORMS OF A FLOATING WIND TURBINE
US20110302879A1 (en) Method for erecting a facility for producing electrical energy from wind
US20120304588A1 (en) Method for Erecting a Wind Turbine Tower
US20240308630A1 (en) Modular semi-submersible offshore platform
KR101510864B1 (en) Offshore wind power generator installation method and floating dock used at this
KR20250077503A (en) Offshore floating platform for manufacturing, assembling, maintaining and/or dismantling floating wind turbines
ES2710182T3 (en) Method of manufacturing a wind turbine tower structure
JP2025509101A (en) Renewable energy platform assembly kit and method
WO2023057671A1 (en) Semi-submersible floating platform for marine wind turbine
CN115107939A (en) Offshore floating type wind power combined semi-submersible platform foundation and installation method thereof