ES304367A1 - Procedure to carry out the manufacture of technical-accounting elements (Machine-translation by Google Translate, not legally binding)
- Google Patents
Procedure to carry out the manufacture of technical-accounting elements (Machine-translation by Google Translate, not legally binding)
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IMO SL
Original Assignee
IMO SL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IMO SLfiledCriticalIMO SL
Priority to ES304367ApriorityCriticalpatent/ES304367A1/en
Publication of ES304367A1publicationCriticalpatent/ES304367A1/en
Procedure for carrying out the manufacture of technical-accounting elements, characterized in that a staggered superposition is made of three groups of documents, independent of each other by construction, but related in the structuring of their divisions and spaces to be filled, thereby achieving and of a single inscription, to obtain a series of identical transcripts and without error, by the action of intercalated tracing sheets and carbonaceous zones of which the printed on its back is endowed, all this on the various precise documents, all of them remaining soldered when introducing the holes equidistant from which they are endowed, in the pivots placed on the margin of the working base plate. (Machine-translation by Google Translate, not legally binding)
ES304367A1964-09-241964-09-24Procedure to carry out the manufacture of technical-accounting elements (Machine-translation by Google Translate, not legally binding)
ExpiredES304367A1
(en)
Improvements introduced in the manufacture of construction elements that include perforations (Machine-translation by Google Translate, not legally binding)
A bridge support made of a plurality of elements that each include a metal plate and a rubber layer (Machine-translation by Google Translate, not legally binding)