Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IndividualfiledCriticalIndividual
Priority to ES0314331ApriorityCriticalpatent/ES314331A1/en
Publication of ES314331A1publicationCriticalpatent/ES314331A1/en
A system of floor-ceiling forging, characterized by incorporating a network of double-T iron beams placed on the beams or load-bearing walls of the bays horizontally and parallel, as well as with the proposed separation; rows of vaults butt with the mission of covering the spans between joists, said vaults being composed of two ceramic pieces of similar dimensions and sensibly rectangular, which, in turn, have, on the opposite sides, two lashes to beams with the base of the hemibovedillas themselves and intended to cover below the contiguous semi-profile of the joists, a delivery of support on the lower flap of the joists themselves, and a diagonal recess from said delivery, on the one hand, as they are linked said hemibovedillas in the geometrical center of the span by their adjacent sides adapted with a solid anchoring device integrated by an angular galce and relative delivery, in the upper part, a wide recess in the middle part and corresponding spike, forming, both the cajeado the spike, lower teeth of reciprocal engagement, and a vertical opening intended in the base to allow convenient tilt of of the second hemibovedilla for its accommodation by the same operator presenting the hemibovedilla placed in the first place; a concrete fill of the delta channels from the meeting of sides of the rows of vaults with the resistance beams in the middle; and a superficial compression layer. (Machine-translation by Google Translate, not legally binding)
ES0314331A1965-06-181965-06-18A forged floor-ceiling system. (Machine-translation by Google Translate, not legally binding)
ExpiredES314331A1
(en)
A procedure for the forging of floors and bottles with nerved slabs and reticular structure (Machine-translation by Google Translate, not legally binding)