FR2995506A1 - Water level control structure for pike spawning ground, has compartmentalized concrete structure resting on concrete slab of diving wall, where dividing wall includes pivoting valve formed in sealing plate with hinges on support - Google Patents

Water level control structure for pike spawning ground, has compartmentalized concrete structure resting on concrete slab of diving wall, where dividing wall includes pivoting valve formed in sealing plate with hinges on support Download PDF

Info

Publication number
FR2995506A1
FR2995506A1 FR1202492A FR1202492A FR2995506A1 FR 2995506 A1 FR2995506 A1 FR 2995506A1 FR 1202492 A FR1202492 A FR 1202492A FR 1202492 A FR1202492 A FR 1202492A FR 2995506 A1 FR2995506 A1 FR 2995506A1
Authority
FR
France
Prior art keywords
pike
valve
spawning
hinges
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR1202492A
Other languages
French (fr)
Other versions
FR2995506B1 (en
Inventor
Pascal Michel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HYDROSPHERE
Original Assignee
HYDROSPHERE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HYDROSPHERE filed Critical HYDROSPHERE
Priority to FR1202492A priority Critical patent/FR2995506B1/en
Publication of FR2995506A1 publication Critical patent/FR2995506A1/en
Application granted granted Critical
Publication of FR2995506B1 publication Critical patent/FR2995506B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20Movable barrages; Lock or dry-dock gates
    • E02B7/40Swinging or turning gates
    • E02B7/44Hinged-leaf gates
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01KANIMAL HUSBANDRY; AVICULTURE; APICULTURE; PISCICULTURE; FISHING; REARING OR BREEDING ANIMALS, NOT OTHERWISE PROVIDED FOR; NEW BREEDS OF ANIMALS
    • A01K61/00Culture of aquatic animals
    • A01K61/10Culture of aquatic animals of fish
    • A01K61/17Hatching, e.g. incubators
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/80Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in fisheries management
    • Y02A40/81Aquaculture, e.g. of fish

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Marine Sciences & Fisheries (AREA)
  • Zoology (AREA)
  • Animal Husbandry (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Catching Or Destruction (AREA)

Abstract

La présente invention concerne la conception d'un ouvrage de régulation des niveaux d'eau pour frayère à brochets. Le dispositif selon l'invention ne s'applique pas seulement à l'espèce des brochets, mais à toutes les espèces aquatiques utilisant un mode de reproduction identique. Ouvrage de régulation des niveaux d'eau pour frayère à brochets, formé par un ouvrage en béton (1) compartimenté, reposant sur un radier béton (la) de 3,00m x 3,00m et de 400 mm d'épaisseur, d'une paroi séparative (2) qui possède des ouvertures (2a) et (2b) qui vient s'abouter sur les parois (3) et (4), des parois perpendiculaires (5) et (6) avec des ouvertures de passage sensiblement identiques (7) ayant des évidements récepteurs de fermeture (8) pourvus de grilles (9) ; - en ce que la paroi séparative (2) possède un clapet pivotant (10) formé d'une plaque étanche (11) des charnières (12) sur un support (14) possédant des supports latéraux (14a) et (14b) pour un axe principal (15) supportant un mécanisme pivotant avec un flotteur (16) et d'un mécanisme d'actionnement (17) du clapet dont l'ouverture est limitée par une butée (18).The present invention relates to the design of a structure for regulating water levels for pike spawning grounds. The device according to the invention does not only apply to the species of pike, but to all aquatic species using an identical reproduction mode. Water level regulation system for pike spawning, consisting of a compartmentalized concrete structure (1) resting on a 3.00m x 3.00m concrete rim (la) and 400mm thick, a partition wall (2) which has openings (2a) and (2b) which abuts on the walls (3) and (4), perpendicular walls (5) and (6) with substantially identical passage openings (7) having closure receiving recesses (8) provided with grilles (9); in that the separating wall (2) has a pivoting valve (10) formed of a sealing plate (11) of the hinges (12) on a support (14) having lateral supports (14a) and (14b) for a main axis (15) supporting a pivoting mechanism with a float (16) and an actuating mechanism (17) of the valve whose opening is limited by a stop (18).

Description

OUVRAGE DE REGULATION DES NIVEAUX D'EAU POUR FRAYERE A BROCHETS La présente invention concerne la conception d'un ouvrage de régulation des niveaux d'eau pour frayère à brochets. Le dispositif selon l'invention ne s'applique pas seulement à l'espèce des brochets, mais à toutes les espèces aquatiques utilisant un mode de reproduction identique. 05 Depuis plusieurs années, les efforts se sont intensifiés pour rétablir un équilibre des habitats naturels de la faune et de la flore et préserver un écosystème. Dans un premier temps, ces actions visent, à préserver le fonctionnement hydrologique des dépressions inondables et des prairies les plus longuement inondables, et plus spécifiquement à préserver ou restaurer les habitats naturels de la faune piscicole dans le 10 lit majeur, notamment ceux du brochet (excellent indicateur du bon état de conservation et de fonctionnement de l'hydrosystème par la durée d'inondation, le ressuyage lent... et des habitats aquatiques et rivulaires. L'art antérieur renseigne sur la mise en oeuvre d'outils et de techniques permettant de, maintenir, restaurer et gérer les sites de frayères de la faune piscicole dans le lit majeur. 15 Les moyens actuels sont, le rétablissement d'une connexion hydraulique fonctionnelle entre les frayères et la rivière en période d'inondation, par : - la restauration et l'entretien de fossés (curages, désencombrement des embâcles, restauration des arbres têtard de la berge), - la pose et/ou la restauration et/ou la gestion d'ouvrages hydrauliques, 20 - le développement de conventions de gestion et/ou de conventions d'usage entre les organismes publiques et les propriétaires privés, - la maîtrise foncière et la gestion environnementale des terrains. Les actions complémentaires portent sur les mesures agro-environnementales, et notamment l'option « frayère à brochet » par laquelle l'exploitant s'engage à conserver 25 l'eau jusqu'au 15 mai dans les parties les plus hydro morphes/inondables. Le résultat des actions se vérifie par la présence de brochets matures dans les zones aménagées en période hivernale et celle d'alevins dans et à proximité de ces zones en fin de printemps qui matérialisent la fonctionnalité des frayères ainsi que celle des dispositifs de retour vers le milieu. 30 Ainsi, la conception et la pose d'ouvrages hydrauliques sont nécessaires à plus d'un titre. En effet, les crues hivernales stimulent la reproduction des brochets, qui utilisent préférentiellement les végétaux inondés comme supports de ponte (reproduction). Après la ponte, les oeufs et les larves de brochet restent collés à cette végétation durant près de deux mois. 35 Or, la gestion actuelle des barrages tend à abaisser au plus vite les niveaux de crues pour en limiter les impacts sur la navigation et les infrastructures riveraines. Cette baisse rapide et volontaire des niveaux d'eaux entraîne une exondation mortelle des pontes de brochets.The present invention relates to the design of a structure for regulating water levels for pike spawning grounds. The device according to the invention does not only apply to the species of pike, but to all aquatic species using an identical reproduction mode. 05 For several years, efforts have been intensified to restore a balance of natural habitats of fauna and flora and to preserve an ecosystem. Initially, these actions are aimed at preserving the hydrological functioning of flood plains and the longest floodable grasslands, and more specifically at preserving or restoring the natural habitats of the fish fauna in the 10 major river, especially those of pike ( excellent indicator of the good state of conservation and functioning of the hydrosystem by the duration of flooding, the slow draining ... and aquatic and riparian habitats.The prior art provides information on the implementation of tools and techniques to maintain, restore and manage the spawning grounds of the fish fauna in the major bed 15 The current means are, the restoration of a functional hydraulic connection between the spawning grounds and the river during the flood season, by: - restoration and maintenance of ditches (cleaning, decluttering of ice jams, restoration of tadpole trees on the bank), - laying and / or restoration and / or u management of hydraulic structures, 20 - development of management agreements and / or conventions of use between public bodies and private owners, - land control and environmental management of land. The complementary actions concern agri-environmental measures, and in particular the "pike spawning" option whereby the operator undertakes to conserve water until 15 May in the most hydro-morphic / floodable areas. The results of the actions are confirmed by the presence of mature pike in the winter and fry areas in and near these areas in late spring, which reflect the functionality of the spawning grounds as well as that of the return devices. middle. 30 Thus, the design and laying of hydraulic structures are necessary for more than one reason. In fact, the winter floods stimulate the reproduction of pike, which preferentially use the flooded plants as laying supports (reproduction). After egg-laying, the eggs and pike larvae remain stuck to this vegetation for nearly two months. 35 However, the current management of dams tends to reduce flood levels as quickly as possible in order to limit their impact on navigation and riparian infrastructures. This rapid and deliberate drop in water levels results in a deadly explosion of pike clutches.

L'entretien des systèmes actuels demande des ressources financières et humaines importantes. La gestion des ouvrages de régulation des niveaux doit être assurée par du personnel compétent pour garantir un bon fonctionnement des frayères et assurer dans le même temps la reproduction des poissons.The maintenance of current systems requires significant financial and human resources. Management of level control structures must be carried out by competent personnel to ensure proper functioning of the spawning grounds and at the same time ensure the reproduction of fish.

05 La mise en place d'un ouvrage, selon la présente invention, intégrant un dispositif de gestion de la régulation des eaux aura pour objectif, le maintien des hauteurs d'eau favorables à la reproduction, malgré la décrue. L'invention permettra de palier aux inconvénients précédemment cités, de favoriser une bonne inondation de la frayère et de ne pas obstruer la montée des géniteurs.05 The establishment of a structure, according to the present invention, incorporating a water regulation management device will have for objective, the maintenance of water heights favorable to reproduction, despite the recession. The invention will overcome the drawbacks mentioned above, to promote a good flood of the spawning ground and not to obstruct the rise of parents.

10 Enfin, l'invention selon une réalisation simple et résistante limitera drastiquement les besoins d'entretiens (humains et financiers). L'invention servira d'éviter, dans une mesure substantielle, les inconvénients cités et d'autres encore, et même d'y remédier. La présente invention et ses avantages apparaîtront mieux dans la description du principe 15 de fabrication d'un ouvrage de régulation des niveaux d'eau pour frayère à brochets. Le dessin annexé illustre l'invention : La figure 1, représente l'ouvrage béton compartimenté. La figure 2 représente le clapet et le support de fixation sur un plan frontal et sagittal. La figure 3 représente, vu du haut, le support et les mécanismes.Finally, the invention in a simple and resistant embodiment will drastically limit the need for maintenance (human and financial). The invention will serve to avoid, to a substantial extent, the disadvantages mentioned and still others, and even to remedy. The present invention and its advantages will become more apparent in the description of the principle of manufacturing a pike spawning pond water control structure. The attached drawing illustrates the invention: FIG. 1 represents the compartmentalised concrete structure. Figure 2 shows the valve and the mounting bracket on a frontal and sagittal plane. 3 shows, seen from above, the support and the mechanisms.

20 Les figures 4 et 5 représentent le fonctionnement du clapet en début de crue et en début de décrue, l'actionnement du clapet. En référence aux figures 1-2-3 : La présente invention d'ouvrage de régulation des niveaux d'eau pour frayère à brochets se constitue d'un ouvrage en béton (1) compartimenté, reposant sur un radier béton (1a) de 3M x 3M et de 400 mm d'épaisseur. Il est à noter que la structure béton peut accuser 25 des dimensions et des épaisseurs variables. Le bâti en béton (1) est, selon une préférence, de forme géométrique rectangulaire. Une paroi séparative horizontale (2) vient s'abouter sur les parois (3) et (4). Elle possède des ouvertures (2a) et (2b). Les parois perpendiculaires (5) et (6) présentent des ouvertures de passage sensiblement identiques (7). Les extrémités internes des ouvertures des parois (5) et (6) présentent des 30 évidements récepteurs de fermeture (8). Les évidements récepteurs (8) seront pourvus de grilles (9). Des grilles, constituées par un assemblage à clairevoie de barreaux entrecroisés ou non, peuvent être de différents diamètres et sections. Les grilles seront amovibles. Les grilles (9) positionnées en amont auront pour but de protéger un clapet pivotant (10) 35 et son mécanisme des flottants qui, provenant de la frayère en eau, pourraient obstruer ou bloquer temporairement la fermeture totale dudit clapet (10). Ces grilles sont situées à 2,00m du clapet (10) et délimitent le bassin en amont. Les grilles (9) en aval protègent le clapet et son mécanisme (10) des flottants provenant de la rivière lors de la crue. Elles sont situées à 1,50m en aval du clapet (10) et délimitent le bassin 05 aval. Le clapet (10) est formé d'une plaque étanche (11) épousant parfaitement un bâti métallique (13). L'extrémité haute de la plaque (11) adoptera des charnières pivotantes auto lubrifiées (12) de part et d'autre. Les charnières viennent se solidariser sur une plaque support (14). La plaque support sera splitter ou visser sur la paroi séparative (2) de 10 l'ouvrage en béton (1). La plaque support (14) adoptera des supports latéraux (14a) et (14b) traversés par une tige formant l'axe principal récepteur (15) du mécanisme monobloc permettant le déclenchement de la porte lorsque le niveau d'eau baisse et arrive à une certaine côte déterminée.FIGS. 4 and 5 show the operation of the valve at the beginning of the flood and at the beginning of the recession, the actuation of the valve. With reference to FIGS. 1-2-3: The present invention of a control structure for water levels for pike spawning consists of a concrete structure (1) compartmentalized, resting on a concrete slab (1a) of 3M x 3M and 400 mm thick. It should be noted that the concrete structure can have variable dimensions and thicknesses. The concrete frame (1) is, according to a preference, of rectangular geometric shape. A horizontal dividing wall (2) is abrade on the walls (3) and (4). It has openings (2a) and (2b). The perpendicular walls (5) and (6) have substantially identical through-openings (7). The inner ends of the openings of the walls (5) and (6) have closure receiving recesses (8). The receiving recesses (8) will be provided with grilles (9). Grids, constituted by a jointed assembly of intercrossed bars or not, can be of different diameters and sections. The grilles will be removable. The grids (9) positioned upstream are intended to protect a pivoting valve (10) 35 and its floating mechanism that, from the spawning water, could obstruct or temporarily block the total closure of said valve (10). These grids are located 2.00m from the valve (10) and delimit the basin upstream. The grids (9) downstream protect the valve and its mechanism (10) of the floating from the river during the flood. They are located at 1.50m downstream of the valve (10) and delimit the basin downstream. The valve (10) is formed of a sealing plate (11) perfectly matching a metal frame (13). The upper end of the plate (11) will adopt self-lubricating pivot hinges (12) on both sides. The hinges are solidariser on a support plate (14). The support plate will be splitter or screw on the partition wall (2) of the concrete structure (1). The support plate (14) will adopt lateral supports (14a) and (14b) traversed by a rod forming the main receiving axis (15) of the one-piece mechanism for triggering the door when the water level drops and arrives at a certain determined coast.

15 Sur l'axe principal du mécanisme (15) viendra prendre position à l'une des extrémités du support latéral (14a), un dispositif mécanique pivotant, adjoint d'un flotteur (16), favorisant la mise en service du clapet (10). L'autre extrémité étant ajointe au mécanisme d'actionnement du clapet (17). L'ouverture du clapet sera limitée par une butée (18). En référence à la figure 4 : 20 Position 1 : Le système armé Le flotteur cylindrique sera fixé au mécanisme et permettra le déclenchement et l'actionnement du clapet automatiquement en position armée. Le flotteur est libre de monter lors de l'élévation du niveau d'eau. La vanne à clapet de la porte est maintenue ouverte par un loquet.On the main axis of the mechanism (15) will take position at one of the ends of the lateral support (14a), a pivoting mechanical device, deputy float (16), promoting the commissioning of the valve (10). ). The other end being attached to the actuating mechanism of the valve (17). The opening of the valve will be limited by a stop (18). Referring to Figure 4: Position 1: The Armed System The cylindrical float will be attached to the mechanism and will allow the release and actuation of the valve automatically in the armed position. The float is free to ride when raising the water level. The gate valve is held open by a latch.

25 En référence à la figure 5 : Position 2 : en crue Le flotteur monte avec l'eau, libère le mécanisme qui libère la porte et ferme le clapet. L'ensemble des pièces composant les mécanismes, les charnières, le clapet, le bâti pourra être réalisé en métaux ferreux ou non ferreux, alliages, composites....With reference to FIG. 5: Position 2: Flooding The float rises with the water, releases the mechanism which releases the door and closes the flap. All parts making up mechanisms, hinges, valve, frame can be made of ferrous or non-ferrous metals, alloys, composites ....

30 Selon un autre mode de réalisation l'actionnement du mécanisme monobloc d'ouverture et de fermeture du clapet intégrera un dispositif d'assistance électrique et/ou électronique directement relié au réseau électrique ou de façon autonome à des batteries conventionnelles ou des panneaux photovoltaïques. Il est entendu que l'invention ainsi que les améliorations substantielles qui pourront en 35 découler, ne se limitent pas aux domaines d'activités précédemment décrits.According to another embodiment, the actuation of the one-piece mechanism for opening and closing the valve will integrate an electrical and / or electronic assistance device directly connected to the electrical network or autonomously to conventional batteries or photovoltaic panels. It is understood that the invention as well as the substantial improvements that may result therefrom are not limited to the fields of activity previously described.

Claims (8)

REVENDICATIONS1. Ouvrage de régulation des niveaux d'eau pour frayère à brochets, formé par un ouvrage en béton (1) compartimenté, reposant sur un radier béton (1a) de 3,OOm x 3,OOm et de 400 mm d'épaisseur, d'une paroi séparative (2) qui possède des ouvertures (2a) et (2b) qui vient s'abouter sur les parois (3) et (4), des parois perpendiculaires (5) et (6) avec 05 des ouvertures de passage sensiblement identiques (7) ayant des évidements récepteurs de fermeture (8) pourvus de grilles (9) ; - en ce que la paroi séparative (2) possède un clapet pivotant (10) formé d'une plaque étanche (11) des charnières (12) sur un support (14) possédant des supports latéraux (14a) et (14b) pour un axe principal (15) supportant un mécanisme pivotant avec un 10 flotteur (16) et d'un mécanisme d'actionnement (17) du clapet dont l'ouverture est limitée par une butée (18).REVENDICATIONS1. Pike spawning pond water control structure, consisting of a compartmentalized concrete structure (1) resting on a concrete slab (1a) of 3.00 mx 3.00 m and 400 mm in thickness, a separating wall (2) which has openings (2a) and (2b) which abuts on the walls (3) and (4), perpendicular walls (5) and (6) with substantially passage openings; identical (7) having closure receiving recesses (8) provided with grilles (9); in that the separating wall (2) has a pivoting valve (10) formed of a sealing plate (11) of the hinges (12) on a support (14) having lateral supports (14a) and (14b) for a main axis (15) supporting a pivoting mechanism with a float (16) and an actuating mechanism (17) of the valve whose opening is limited by a stop (18). 2. Ouvrage de régulation des niveaux d'eau pour frayère à brochets selon la revendication 1, caractérisé en ce que les grilles (9) seront amovibles et que les entrecroisements seront de différentes sections et de différents diamètres. 152. Regulation of water levels for pike spawning system according to claim 1, characterized in that the grids (9) will be removable and that the intersections will be of different sections and of different diameters. 15 3. Ouvrage de régulation des niveaux d'eau pour frayère à brochets selon la revendication 1 caractérisé en ce que les grilles (9) sont situées à 1,50m du clapet (10) et délimitent le bassin amont et à 1,50m en aval du clapet (10) et délimitent le bassin aval.3. Control structure of the water levels for pike spawning ground according to claim 1 characterized in that the grids (9) are located at 1.50m of the valve (10) and delimit the upstream basin and at 1.50m downstream of the valve (10) and delimit the downstream basin. 4. Ouvrage de régulation des niveaux d'eau pour frayère à brochets selon la revendication 1 caractérisé en ce que la plaque support (14) est fixée d'une manière permanente ou 20 vissée sur l'ouvrage en béton.4. A pike spawning water level regulator according to claim 1, characterized in that the support plate (14) is permanently fixed or screwed onto the concrete structure. 5. Ouvrage de régulation des niveaux d'eau pour frayère à brochets selon la revendication 1 caractérisé en ce que le flotteur cylindrique est fixé au mécanisme (16) et permet le déclenchement et l'actionnement du clapet automatiquement en position armée et que le flotteur est libre de monter lors de l'élévation du niveau d'eau et la vanne à clapet de la 25 porte est maintenue ouverte par un loquet.5. Regulation of water levels for pike spawning system according to claim 1 characterized in that the cylindrical float is attached to the mechanism (16) and allows the triggering and actuation of the valve automatically in the armed position and that the float It is free to mount when the water level is raised and the gate valve is held open by a latch. 6. Ouvrage de régulation des niveaux d'eau pour frayère à brochets selon la revendication 1 caractérisé en ce que le flotteur monte avec l'eau, libère le mécanisme qui libère la porte et ferme le clapet.6. Regulation of water levels for pike spawning system according to claim 1 characterized in that the float rises with water, releases the mechanism that releases the door and closes the valve. 7. Ouvrage de régulation des niveaux d'eau pour frayère à brochets selon l'une 30 quelconque des revendications précédentes caractérisé en ce que l'ensemble des pièces composant les mécanismes, les charnières, le clapet, le bâti, sera réalisée en métaux ferreux ou non ferreux, alliages, composites.7. Regulation of the water levels for pike spawning system according to any one of the preceding claims characterized in that all the components of the mechanisms, the hinges, the valve, the frame, will be made of ferrous metals or non-ferrous, alloys, composites. 8. Ouvrage de régulation des niveaux d'eau pour frayère à brochets selon la revendication 1 caractérisé en ce que l'actionnement du mécanisme monobloc d'ouverture et de 35 fermeture du clapet intègre un dispositif d'assistance électrique et/ou électronique directement relié au réseau électrique ou de façon autonome à des batteries conventionnelles ou des panneaux photovoltaïques.8. Regulation of the water levels for pike spawning system according to claim 1 characterized in that the actuation of the monobloc mechanism for opening and closing the valve incorporates a directly connected electrical and / or electronic assistance device. to the grid or autonomously to conventional batteries or photovoltaic panels.
FR1202492A 2012-09-19 2012-09-19 WORKING REGULATION OF WATER LEVELS FOR FRYER WITH PELLETS Active FR2995506B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR1202492A FR2995506B1 (en) 2012-09-19 2012-09-19 WORKING REGULATION OF WATER LEVELS FOR FRYER WITH PELLETS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR1202492A FR2995506B1 (en) 2012-09-19 2012-09-19 WORKING REGULATION OF WATER LEVELS FOR FRYER WITH PELLETS

Publications (2)

Publication Number Publication Date
FR2995506A1 true FR2995506A1 (en) 2014-03-21
FR2995506B1 FR2995506B1 (en) 2015-04-17

Family

ID=47750733

Family Applications (1)

Application Number Title Priority Date Filing Date
FR1202492A Active FR2995506B1 (en) 2012-09-19 2012-09-19 WORKING REGULATION OF WATER LEVELS FOR FRYER WITH PELLETS

Country Status (1)

Country Link
FR (1) FR2995506B1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2955569A (en) * 1956-09-28 1960-10-11 John G Dahlin Prepared spawning ground
US3733830A (en) * 1971-06-07 1973-05-22 M Jacobs Tidal flow system and method for causing water to flow through waterways
FR2367150A1 (en) * 1976-10-06 1978-05-05 Alsthom Atlantique Automatic sluice gate for canal tall bay - controls has bucket construction contg. water mass to damp vibration
FR2689533A1 (en) * 1992-04-02 1993-10-08 Dupuy Christian Modular river bed fish protection structure - comprises one or more modules with openings & barriers in front to stop poaching hands & food distributor on top
US20020088408A1 (en) * 2001-01-06 2002-07-11 Lee Keun-Hee Vegetation zone facility
FR2932501A1 (en) * 2008-06-16 2009-12-18 Sb Moltech Water retaining device for being positioned in opening of bank, has guillotine valve opening or closing water channel, and setting unit provided in lateral walls of case, where unit sets bank to specific height

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2955569A (en) * 1956-09-28 1960-10-11 John G Dahlin Prepared spawning ground
US3733830A (en) * 1971-06-07 1973-05-22 M Jacobs Tidal flow system and method for causing water to flow through waterways
US3733830C1 (en) * 1971-06-07 2001-08-14 Jacobs Edna D Canal bank retaining wall means and method
FR2367150A1 (en) * 1976-10-06 1978-05-05 Alsthom Atlantique Automatic sluice gate for canal tall bay - controls has bucket construction contg. water mass to damp vibration
FR2689533A1 (en) * 1992-04-02 1993-10-08 Dupuy Christian Modular river bed fish protection structure - comprises one or more modules with openings & barriers in front to stop poaching hands & food distributor on top
US20020088408A1 (en) * 2001-01-06 2002-07-11 Lee Keun-Hee Vegetation zone facility
FR2932501A1 (en) * 2008-06-16 2009-12-18 Sb Moltech Water retaining device for being positioned in opening of bank, has guillotine valve opening or closing water channel, and setting unit provided in lateral walls of case, where unit sets bank to specific height

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
ANRAS, L. ET AL: "Les petits aménagements piscicoles en marais doux", 28 October 2007 (2007-10-28), pages 1 - 14, XP002699683, Retrieved from the Internet <URL:http://web.archive.org/web/20071028190853/http://www.forum-marais-atl.com/iso_album/amenagements-piscicoles-marais.pdf> [retrieved on 20130625] *

Also Published As

Publication number Publication date
FR2995506B1 (en) 2015-04-17

Similar Documents

Publication Publication Date Title
Tramoy et al. Transfer dynamics of macroplastics in estuaries–New insights from the Seine estuary: Part 2. Short-term dynamics based on GPS-trackers
Collier et al. Dams and rivers: a primer on the downstream effects of dams
O'Donnell Living shorelines: A review of literature relevant to New England coasts
Solomon et al. Fish pass design for eel and elver (Anguilla anguilla)
Shields Jr et al. Environmental aspects of clearing and snagging
KR101231655B1 (en) Fish-breeding strucrute and eco-incubator strucrute using the same
FR2995506A1 (en) Water level control structure for pike spawning ground, has compartmentalized concrete structure resting on concrete slab of diving wall, where dividing wall includes pivoting valve formed in sealing plate with hinges on support
Chaput et al. Recovery Potential Assessment for the American Eel (Anguilla rostrata) for eastern Canada: mitigation options
Andonaegui Salmon, steelhead, and bull trout habitat limiting factors
Biron et al. Results of a Multi-year Control and Eradication Program for Smallmouth Bass (Micropterus Dolomieu) in Miramichi Lake, New Brunswick, 2011-2012
Charland Tide gate modifications for fish passage and water quality enhancement
KR20120058693A (en) Eco-incubator strucrute and reservoir strucrute using the same
Hirkala Matt Hirkala Project Manager California Delta Section US Army Corps of Engineers 1325 J Street
Jenkins Chandra Jenkins Chief, CA Delta Section Regulatory Division US Army Corps of Engineers 1325 J Street
Abadie William D. Abadie Chief, Regulatory Branch US Army Corps of Engineers, Portland District PO Box 2946 Portland, OR 97208-2946
County Todd Tillinger US Army Corps of Engineers Seattle District East Marginal Way South, BLDG 1202 Seattle, Washington 98134-2388
Fazzari Chris Fazzari Associate Environmental Planner Caltrans District 2 1657 Riverside Drive Redding, California 96001
Machias et al. ENDANGERED SPECIES ACT SECTION 7 CONSULTATION BIOLOGICAL OPINION
Kirchner Alicia E. Kirchner Chief, Planning Division US Army Corps of Engineers 1325 J Street Sacramento, CA 95814-2922
Harper Mr. Kevin Harper Chief, Environmental Resources Branch US Army Corps of Engineers, Sacramento District 1325 J Street Sacramento, California 95814
Erickson Walla Walla, WA 99362-1876 Re: Endangered Species Act Section 7 (a)(2) Biological Opinion for the Mill Creek General Investigation Feasibility Study, Mill Creek Watershed (1707010202), in Walla Walla County, Washington Dear Mr. Erickson
Caldwell Colonel Chad Caldwell District Commander, Sacramento District US Army Corps of Engineers 1325 J Street Sacramento, California 95814-2922
Fazzari et al. Re: Endangered Species Act Section 7 (a)(2) Biological Opinion and Magnuson–Stevens Fishery Conservation and Management Act Essential Fish Habitat Response for the Jelly’s Ferry Bridge Replacement Project Reinitiation 2023. Dear Mr. Fazzari: Thank you for your letter of January 4, 2023, requesting initiation of consultation with NOAA’s
Regnart Hillary Regnart Project Manager, CA North Section US Army Corps of Engineers 1325 J Street Sacramento, CA 95814-2922
Ness William Ness Senior Project Manager California South Section US Army Corps of Engineers 1325 J Street

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 5

PLFP Fee payment

Year of fee payment: 6

PLFP Fee payment

Year of fee payment: 7

PLFP Fee payment

Year of fee payment: 8

PLFP Fee payment

Year of fee payment: 9

PLFP Fee payment

Year of fee payment: 11

PLFP Fee payment

Year of fee payment: 12

PLFP Fee payment

Year of fee payment: 13

PLFP Fee payment

Year of fee payment: 14