Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Marko ZelifiledCriticalMarko Zeli
Priority to HRP920175priorityCriticalpatent/HRP920175A2/en
Publication of HRP920175A2publicationCriticalpatent/HRP920175A2/en
HRP9201751992-06-181992-06-18Reinforced supports made of insulating concrete - manually prefabricated system of walls, ceilings and buildings
HRP920175A2
(en)
Method for forming the subsequent pillar-ceiling connection of buildings, constructions having after-stretched, three-dimensional frame-structure consist of column and coffered ceiling units of reinforced concrete material