Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cliffbury Holdings LtdfiledCriticalCliffbury Holdings Ltd
Priority to IES940885priorityCriticalpatent/IES62983B2/en
Publication of IES940885A2publicationCriticalpatent/IES940885A2/en
Publication of IES62983B2publicationCriticalpatent/IES62983B2/en
Conveying And Assembling Of Building Elements In Situ
(AREA)
Abstract
An office building construction has a floor area (9) defined by front and left blocks (11,12). The floor area includes two groups of workstation modules (W) running parallel to said left block. The left block and the workstation groups are mutually separated by respective corridors (13, 14).
IES9408851994-11-111994-11-11An office building construction
IES62983B2
(en)