Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lando GiuseppefiledCriticalLando Giuseppe
Priority to IT85539/78ApriorityCriticalpatent/IT1115410B/it
Publication of IT7885539A0publicationCriticalpatent/IT7885539A0/it
Application grantedgrantedCritical
Publication of IT1115410BpublicationCriticalpatent/IT1115410B/it
IT85539/78A1978-03-221978-03-22Sostegno a squadra, per mantenere verticale il montante per rete metallica od altro,all'atto di bloccarlo con cemento
IT1115410B
(it)