Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pinna VirgiliofiledCriticalPinna Virgilio
Priority to IT000522priorityCriticalpatent/IT222456Z2/it
Publication of ITMI910522V0publicationCriticalpatent/ITMI910522V0/it
Publication of ITMI910522U1publicationCriticalpatent/ITMI910522U1/it
Application grantedgrantedCritical
Publication of IT222456Z2publicationCriticalpatent/IT222456Z2/it
Struttura ad elementi modulari componibili, per la costruzione di facciate continue di edifici e/o per rivestimento a cappotto isolante di murature esistenti