JP2000219135A - Formation of railway schedule supporting system - Google Patents

Formation of railway schedule supporting system

Info

Publication number
JP2000219135A
JP2000219135A JP11021730A JP2173099A JP2000219135A JP 2000219135 A JP2000219135 A JP 2000219135A JP 11021730 A JP11021730 A JP 11021730A JP 2173099 A JP2173099 A JP 2173099A JP 2000219135 A JP2000219135 A JP 2000219135A
Authority
JP
Japan
Prior art keywords
train
information
schedule
day
holiday
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11021730A
Other languages
Japanese (ja)
Inventor
Tatsuya Nakamura
達也 中村
Masayuki Teramura
誠之 寺村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
West Japan Railway Co
Original Assignee
West Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by West Japan Railway Co filed Critical West Japan Railway Co
Priority to JP11021730A priority Critical patent/JP2000219135A/en
Publication of JP2000219135A publication Critical patent/JP2000219135A/en
Pending legal-status Critical Current

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

PROBLEM TO BE SOLVED: To register the diagrams in a railway data base as the same file without distinguishing the kinds of diagrams such as a diagram for weekday, that for holiday and the like, by providing the train information called 'line' with a running date pattern of every train. SOLUTION: The operation is started by inputting the information necessary for determining the railway schedule such as a starting station, a terminal station, a starting time, an arrival time, a standard travelling time, a standard stop time and the like relative to a corresponding train from an input device 2 (S101). Then the information corresponding to the predetermined running date pattern is input (S102). In this running date patterns, the items are classified into monday - friday, saturday, sunday, two days before holiday, day before holiday, holiday and the like, and the running data of the corresponding train is patternized. By providing each train with the running date pattern, a diagram for weekday, that for holiday and the like can be registered in the same file as one train information, and the data is not overlapped to one another. After the determination, the formed instruction is executed (S103).

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、1列車毎に運転日
パタンを持たせ、また日付を跨がって運転される列車に
は別個の識別コードを付与することにより、列車情報を
重複することなく登録することができ、また24時間を
通して切れ目のないダイヤ作成が可能な列車ダイヤ作成
支援システムに関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention duplicates train information by providing a train-day pattern for each train, and assigning a separate identification code to trains that run across the dates. The present invention relates to a train schedule creation support system that can be registered without any interruption and that can create a seamless schedule throughout 24 hours.

【0002】[0002]

【従来の技術】従来において、列車ダイヤを作成する場
合は、作成対象となる線区をいくつかのグループに分け
てそれぞれをダイヤ面とし、各ダイヤ面ごとに列車運行
の基本となる列車ダイヤを作成していた。列車ダイヤに
は、平日ダイヤと休日ダイヤ等から成る基本ダイヤと、
基本ダイヤに臨時列車を含めた日々の実際に運行される
実施ダイヤとがある。例えば、東海道・山陽本線の米原
駅−加古川駅間の線区の場合、米原駅−京都駅間のダイ
ヤ面と、京都駅−神戸駅間のダイヤ面と、神戸駅−加古
川駅間のダイヤ面とにグループ分けし、それぞれのダイ
ヤ面ごとに平日ダイヤと休日ダイヤと実施ダイヤとを作
成していた。つまり、各ダイヤ面のダイヤ種別ごとに、
専門の担当者を配置して個別に列車ダイヤを作成し、作
成されたダイヤごとにこれらの線区を管理する親コンピ
ュータへ入力し、保存していた。
2. Description of the Related Art Conventionally, when a train schedule is created, the line segments to be created are divided into several groups, each of which is a train surface, and a train schedule which is a basic train operation for each train surface. Had been created. The train schedule includes a basic schedule consisting of weekday schedules and holiday schedules,
The basic schedule includes an actual schedule that is actually operated on a daily basis including a temporary train. For example, in the case of a line section between Yonehara Station and Kakogawa Station on the Tokaido / Sanyo Main Line, a diamond plane between Maibara Station and Kyoto Station, a diamond plane between Kyoto Station and Kobe Station, and a diamond plane between Kobe Station and Kakogawa Station. And weekly schedules, holiday schedules, and implementation schedules for each schedule. In other words, for each diamond type on each diamond surface,
A trained train was created by arranging a specialist person, and the train schedule was input to the parent computer that manages these trains for each train and stored.

【0003】[0003]

【発明が解決しようとする課題】このように従来の列車
ダイヤの作成は、一つの線区を複数に分割したダイヤ面
におけるダイヤ種別ごとに、専門の担当者が個別に列車
ダイヤを作成しており、平日と休日を通して毎日運転さ
れる多数の列車の情報は、重複して登録されていた。そ
のため、これらを管理するコンピュータのデータを記憶
する領域が増え、大容量のコンピュータが必要であっ
た。またこれらの登録されたファイルは、連続した情報
として取り出すことのできないものであり、各ダイヤ面
ごとの情報を相互に取り込んでダイヤ作成に共用するこ
とができないでいた。しかも、運転当日の実施ダイヤ
は、臨時列車の情報を基本ダイヤに組み入れて作成しな
ければならず、日毎に列車ダイヤ情報をバッチ処理して
作成する必要があり、煩わしい作業となっていた。
As described above, a conventional train diagram is created by a trained expert who individually creates a train diagram for each diagram type on a diagram surface obtained by dividing one line section into a plurality. In addition, information on a large number of trains operated daily throughout weekdays and holidays was duplicated and registered. Therefore, an area for storing data of a computer that manages them has increased, and a large-capacity computer has been required. In addition, these registered files cannot be taken out as continuous information, and the information for each diamond surface cannot be mutually taken in and used for creating a diamond. In addition, the schedule on the day of operation must be created by incorporating the information on the temporary train into the basic schedule, and it is necessary to create the train schedule information by batch processing every day, which is a cumbersome operation.

【0004】更に、一つのダイヤ面には、当該作成者の
担当以外の駅間/線区が含まれていることも多く、それ
らの範囲については担当者以外の人が作成した情報をも
とに出力した別のダイヤ図や、運転時刻表から正しく作
成されているかどうかを確認する必要があった。それに
加えて、複数日を跨がって運行される列車は、他線区作
成担当者との間で、境界駅等にて調整を実施し、日跨が
り列車を正しく1本の列車として作成しなければ、同一
の列車が前日の日付に運行していることになる等のダイ
ヤ作成ミスが生じる虞れがあった。
[0004] Further, one train surface often includes stations / lines other than those in charge of the creator, and their ranges are determined based on information created by persons other than the creator. It was necessary to confirm that the data was correctly created from another diagram output to the user and the operation timetable. In addition, for trains that operate over multiple days, make adjustments at border stations, etc., with the person in charge of creating other lines, and create a day-over train correctly as one train Otherwise, there is a risk that a diagram creation error may occur, such as the same train operating on the date of the previous day.

【0005】[0005]

【課題を解決するための手段】本発明は従来の前記課題
に鑑みてこれを改良除去したものであって、1列車ごと
に運転日パタンを持たせた列車情報とすることにより、
一つのファイルから各種別のダイヤを表示又は作成する
ことができるようにし、また日跨がり情報を付与するこ
とにより24時間切れ目のない列車ダイヤを作成するこ
とのできる支援システムを提供せんとするものである。
SUMMARY OF THE INVENTION The present invention has been improved and eliminated in view of the above-mentioned conventional problems, and is provided with train information in which each train has an operating day pattern.
To provide a support system that can display or create various types of timetables from one file and that can create a train timetable without interruption by giving information over the day It is.

【0006】而して、前記課題を解決するために本発明
が採用した請求項1の手段は、スジと呼ばれる列車情報
に、1列車毎の運転日パタンを持たせることにより、平
日ダイヤと休日ダイヤ等のダイヤ種別を区別することな
く、同一ファイルとして列車データベースに登録してお
くことを特徴とする列車ダイヤ作成支援システムであ
る。列車データベースに登録された一つの列車が、実際
に運転される曜日の運転日パタンを持っているので、列
車ダイヤ作成に際し、列車データベースへ登録するスジ
と呼ばれる列車情報は、一つの列車について一つであ
り、従来のように同一列車をダイヤ種別ごとに重複して
登録する必要がないので、データ量を大幅に削減するこ
とが可能である。
[0006] In order to solve the above-mentioned problems, the means of claim 1 employed in the present invention is to provide a train information called a streak with an operating day pattern for each train so that weekday schedules and holidays can be set. This is a train diagram creation support system characterized by registering in the train database as the same file without discriminating a diagram type such as a diagram. Since one train registered in the train database has a driving day pattern of the day of the week when it is actually operated, when creating a train schedule, the train information called a line registered in the train database is one for each train Since it is not necessary to register the same train redundantly for each diagram type as in the related art, the data amount can be significantly reduced.

【0007】本発明が採用した請求項2の手段は、運転
日パタンに応じて列車情報を出力することにより、同一
の列車データベースから平日又は休日等の種別毎のダイ
ヤを表示又は作成することができるようにした請求項1
に記載の列車ダイヤ作成支援システムである。スジと呼
ばれる列車情報が運転日パタンを持っているので、運転
日パタンごとに列車情報を出力すれば、目的とする列車
ダイヤを表示又は作成することが瞬時に可能である。
According to the second aspect of the present invention, by outputting train information in accordance with a driving day pattern, it is possible to display or create a diagram for each type of weekday or holiday from the same train database. Claim 1 made possible
Is a train schedule creation support system described in (1). Since the train information called a line has the operation day pattern, if the train information is output for each operation day pattern, the target train diagram can be displayed or created instantaneously.

【0008】本発明が採用した請求項3の手段は、運転
日パタンより運転実日での列車ダイヤを表示又は作成す
ることができる請求項1に記載の列車ダイヤ作成支援シ
ステムである。臨時列車等の列車情報も運転日パタンを
持って登録されているので、運転実日のダイヤを表示又
は作成することも瞬時に可能である。
According to a third aspect of the present invention, there is provided a train schedule creation support system according to the first aspect, which is capable of displaying or creating a train schedule on an actual day of operation from an operation day pattern. Since the train information of the temporary train and the like is also registered with the operation day pattern, it is possible to instantaneously display or create the actual operation timetable.

【0009】本発明が採用した請求項4の手段は、日付
を跨がって運転される列車には、識別コード化した情報
を加えることにより、24時間を通して切れ目のないダ
イヤが作成可能な請求項1に記載の列車ダイヤ作成支援
システムである。日付を跨がる列車は、運転日パタンと
日付を跨がる識別コードとが付与されているので、日付
を間違うことなく、瞬時にダイヤ作成が可能である。
[0009] The means of claim 4 adopted by the present invention is that a train operated over a date can be made to have a seamless diamond through 24 hours by adding information encoded in an identification code. It is a train schedule creation support system according to item 1. Since a train that straddles the date is provided with a driving date pattern and an identification code that straddles the date, it is possible to instantaneously create a diagram without erroneous dates.

【0010】本発明が採用した請求項5の手段は、他線
区の列車データベースの列車情報を読み込み、複数ファ
イルの情報を同時に表示又はダイヤ作成することができ
る請求項1〜4のいずれか一つに記載の列車ダイヤ作成
支援システムである。運転日パタン及び日付を跨がる識
別コードが付与されていることにより、他線区の列車情
報をも呼び出して来て表示することが可能であり、全体
として一つのダイヤや時刻表を作成することも可能であ
る。
[0010] The means of claim 5 adopted by the present invention can read train information of a train database of another line section, and simultaneously display or create a diagram of information of a plurality of files. This is a train schedule creation support system described in (1). Since the operation day pattern and the identification code extending across the dates are given, it is possible to call and display the train information of another line section, and to create a single diagram or timetable as a whole. It is also possible.

【0011】[0011]

【発明の実施の形態】以下に、本発明の構成を図面に示
す発明の実施の形態に基づいて説明すると次の通りであ
る。図1〜図7は本発明の一実施の形態に係るものであ
り、図1はシステムの構成を示すブロック図、図2〜図
7は列車ダイヤ作成の各作業メニューの手順を示すフロ
ーチャート図、図8は運転日パタンの登録例を示す図面
である。図1に示す如く、この列車ダイヤ作成支援シス
テムは、電子計算機(コンピュータ)1と、その周辺機
器である入力装置2,表示装置3,第1記憶装置(内部
記憶装置)4,第2記憶装置(外部記憶装置)5及び出
力装置6とから構成されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS The configuration of the present invention will be described below with reference to the embodiments of the invention shown in the drawings. 1 to 7 relate to an embodiment of the present invention, FIG. 1 is a block diagram showing a configuration of a system, FIGS. 2 to 7 are flowcharts showing procedures of each work menu for creating a train diagram, FIG. 8 is a drawing showing an example of registration of a driving day pattern. As shown in FIG. 1, this train schedule creation support system includes an electronic computer (computer) 1 and its input devices 2, a display device 3, a first storage device (internal storage device) 4, and a second storage device. (External storage device) 5 and an output device 6.

【0012】入力装置2は、各種列車情報,始発駅,終
着駅,出発時刻,到着時刻,運転日パタン等の入力操作
を行うためのものであり、通常のコンピュータと同様
に、キーボード,マウス,タッチパネル等により実現さ
れる。表示装置3は、液晶やCRT等のディスプレイで
ある。第1記憶装置4は、ハードディスク等の内部記憶
装置であり、入力装置1から入力された情報や第2記憶
装置5から読み込んだ情報を格納し、各種計算及び計算
処理等を行う手段である。第2記憶装置5は、列車ダイ
ヤを作成するために必要な駅情報,駅間走行時分,運転
日パタン等の情報及び作成した列車ダイヤ情報を記憶す
る手段であり、例えばRAM,磁気ディスク,光ディス
ク等により実現される。また出力装置6は、作成した列
車ダイヤ情報をもとに作成した時刻表,統計資料,ダイ
ヤ図等を出力する手段であり、例えば、ページプリン
タ,静電プロッタ,インクジエットプロッタ等で実現さ
れる。
The input device 2 is for inputting various kinds of train information, starting station, ending station, departure time, arrival time, driving day pattern, etc., and a keyboard, a mouse, It is realized by a touch panel or the like. The display device 3 is a display such as a liquid crystal display or a CRT. The first storage device 4 is an internal storage device such as a hard disk, and stores information input from the input device 1 and information read from the second storage device 5 and performs various calculations and calculation processes. The second storage device 5 is a means for storing station information necessary for creating a train schedule, information on the time between stations, running day patterns, and the like, and the created train schedule information, such as a RAM, a magnetic disk, It is realized by an optical disk or the like. The output device 6 is a means for outputting a timetable, statistical data, a diagram, and the like created based on the created train diagram information, and is realized by, for example, a page printer, an electrostatic plotter, an ink jet plotter, or the like. .

【0013】次に、図2〜図6のフローチャート図を参
照して本システムにおける作業メニューの手順を説明す
る。本発明の作業メニューは、大別すると次の三つとな
る。 (1)運転日パタンによる列車ダイヤ作成メニュー (2)日跨がりコードによる24時間対応ダイヤ作成メ
ニュー (3)運転日パタン及び日跨がりコードを参照した他線
区ダイヤ読み込みメニュー 先ず、(1)運転日パタンによる列車ダイヤ作成メニュ
ーの手順を、図2及び図3と図8を参照して説明する。
図2は、一つのスジ情報と呼ばれる一列車のダイヤ作成
を行う場合を示すものである。従って、列車ダイヤの全
体を完成させるためには、当該線区において運行される
列車のすべてについて、図2の要領で一つのスジ情報を
作成することが必要である。作業は、ステップS101
において、該当する列車の発駅,着駅,発時刻,着時
刻,標準走行時分,標準停車時分等の列車ダイヤ設定に
必要な情報を入力装置2から入力する。
Next, the procedure of the work menu in this system will be described with reference to the flowcharts of FIGS. The work menu of the present invention is roughly classified into the following three. (1) Menu for creating train schedules based on operating day patterns (2) Menu for creating 24-hour schedules based on day straddling codes (3) Menu for reading other line sections with reference to operating day patterns and day straddling codes First, (1) The procedure of the train schedule creation menu based on the driving day pattern will be described with reference to FIGS. 2, 3, and 8.
FIG. 2 shows a case where a diagram of one train called one line information is created. Therefore, in order to complete the entire train schedule, it is necessary to create one line information as shown in FIG. 2 for all the trains operated in the line section. The operation is performed in step S101
, Information necessary for setting the train schedule, such as the departure station, arrival station, departure time, arrival time, standard travel time, and standard stop time of the corresponding train, is input from the input device 2.

【0014】そして、次のステップS102において、
予め図8に示すように設定しておいた運転日パタンに対
応した情報を入力する。この運転日パタンは、月曜〜金
曜,土曜,日曜,休前々,休前,休日等の項目に分類し
ておき、該当する列車がどの曜日のどの曜日に運転され
るかをパタン化したものである。このように、一つの列
車に運転日パタンを持たせることにより、平日ダイヤで
あっても、休日ダイヤであっても、一つの列車情報とし
て同一ファイルに登録しておけばよく、データの重複は
ない。
Then, in the next step S102,
Information corresponding to a driving day pattern set in advance as shown in FIG. 8 is input. The operation day patterns are classified into items such as Monday to Friday, Saturday, Sunday, before holidays, before holidays, holidays, and the like, and the corresponding trains are operated on which days of the week. It is. In this way, by giving the operating day pattern to one train, whether it is a weekday schedule or a holiday schedule, it is sufficient to register it as one train information in the same file, and the duplication of data is Absent.

【0015】このようにして一つの列車についてのスジ
作成条件の設定及び運転日パタンの設定が完了すると、
S103で示すように、作成指示を実行する。そして、
S104において、入力条件の情報チエックを行う。S
104は、S101及びS102で設定した情報が、列
車データ作成において正しく設定されているかのチエッ
クを行うステップである。入力条件が正しければ次のS
106へシフトし、間違いであればS101へ戻ってS
101及びS102での入力作業を繰り返して正しく入
力する。
When the setting of the line creation condition and the setting of the operating day pattern for one train are completed in this way,
As shown in S103, a creation instruction is executed. And
In S104, an information check of the input condition is performed. S
Step 104 is a step for checking whether the information set in S101 and S102 is correctly set in the train data creation. If the input condition is correct, the next S
Shift to 106, and if wrong, return to S101 and return to S
The input operation at 101 and S102 is repeated to input correctly.

【0016】S106は、S101にて設定した発駅,
着駅,発時刻,着時刻と標準走行時分,標準停車時分よ
り各駅間の走行時分,各駅での停車時分を設定し、発駅
から着駅までの全駅の設定を行うことで一つの列車のス
ジ情報(列車ダイヤ)を作成するステップである。次の
S107は、S106にて作成された列車情報に、S1
02で設定された運転日パタンの付加を行い、第1記憶
装置4及び第2記憶装置5に登録するステップである。
以下は、上述したS101〜S107までの作業を繰り
返して、当該線区で運行される全ての列車について、一
つの列車ごとに登録を行う。これにより、各線区ごとの
列車ダイヤを作成することが可能である。このようにし
て作成された列車ダイヤは、平日ダイヤ、休日ダイヤ及
び実施ダイヤ等の全ての種類のダイヤの内容が含まれた
ものである。また登録された情報は、従来のダイヤ種別
ごとに列車ダイヤを作成していた場合に比較して、重複
した列車ダイヤの作成作業を行う必要がなく、列車ダイ
ヤ作成作業の効率向上が図れる。しかも、列車情報の重
複登録がなく、記憶装置4及び5へ記憶させる容量を少
なくすることができ、記憶装置4及び5の有効活用が図
れる。
S106 is the departure station set in S101,
Set the arrival time, departure time, arrival time and standard travel time, standard stop time, travel time between stations, stop time at each station, and set all stations from the departure station to the arrival station. This is a step of creating line information (train diagram) of one train. In the next S107, the train information created in S106 is added to S1.
In this step, the operation day pattern set in 02 is added and registered in the first storage device 4 and the second storage device 5.
In the following, the operations of S101 to S107 described above are repeated, and all the trains operated in the line section are registered for each train. Thereby, it is possible to create a train schedule for each line section. The train schedule created in this way includes the contents of all types of schedules such as weekday schedules, holiday schedules, and implementation schedules. In addition, compared to the case where train schedules are created for each conventional train type, the registered information does not require duplication of train schedules, and the efficiency of train schedule creation can be improved. Moreover, there is no duplicate registration of train information, the capacity to be stored in the storage devices 4 and 5 can be reduced, and the storage devices 4 and 5 can be effectively used.

【0017】図3は、平日、休日等の運転日パタンに応
じて該当する列車を表示し、作成された列車データが正
しく入力されているか否かをチエックするための作業メ
ニューを示するフローチャートである。チエックした列
車は、この作業メニューの中で順次消去され、全列車に
ついてのチエックが行われる。具体的な作業は、先ず、
S201で、表示したい列車ダイヤの種別を、図8に示
す運転日パタン一覧より選択して設定する。そして、S
202で設定した運転日パタンの表示指示を行う。S2
03では、S202での表示指示に基づいて、第2記憶
装置5から列車データの読み込みを行う。次に、S20
4で読み込んだスジ情報の有無を判断し、スジ情報が有
る場合はS205へシフトし、無い場合はS208へシ
フトする。このS208の内容については後述する。
FIG. 3 is a flowchart showing a work menu for displaying a train corresponding to a driving day pattern such as a weekday or a holiday, and checking whether or not the created train data is correctly input. is there. The trains that have been checked are sequentially deleted in this work menu, and a check is performed for all trains. First of all,
In S201, the type of the train schedule to be displayed is selected and set from the operation day pattern list shown in FIG. And S
The display instruction of the operation day pattern set in 202 is performed. S2
At 03, train data is read from the second storage device 5 based on the display instruction at S202. Next, S20
The presence or absence of the line information read in step 4 is determined. If there is line information, the process shifts to step S205. The contents of S208 will be described later.

【0018】S205では、S201で表示指示した運
転日パタンと、読み込んだ列車データの運転日パタンと
が一致するかどうかをチエックする。チエックは、運転
日パタンの入力コードにて行う方式と、図8に示す運転
日パタンの項目ごとに行う方式とがある。入力コードの
みでチエックする場合は、図8に示す項目が全て一致し
た場合のみ該当列車として表示する。また図8に示す項
目ごとにチエックを行う方式では、項目の全部が一致し
た場合のみの表示と、一部が一致した場合の表示が選択
的に可能となる。全項目一致の列車データと、一部一致
の列車データとは、色/線種を変えて表示する等の工夫
を行うことにより、より見やすいダイヤ作成が可能であ
る。
In S205, it is checked whether or not the driving day pattern indicated and displayed in S201 matches the driving day pattern of the read train data. The check can be performed by a method using an input code of a driving day pattern or a method of performing each item of the driving day pattern shown in FIG. When the check is performed only by the input code, the corresponding train is displayed only when all the items shown in FIG. 8 match. In the method of checking for each item shown in FIG. 8, it is possible to selectively display only when all of the items match, or display when some of the items match. It is possible to create a more easily viewable diagram by devising, for example, changing the color / line type and displaying the train data that matches all items and the train data that partially matches.

【0019】S206では、S205でチエックした結
果、表示条件に該当するか否かを判定し、該当しない場
合はS203へ戻って次の列車データの読み込みを行
い、該当した場合はS207へシフトする。S207で
は、チエック後の列車データをもとに、横軸(X軸)に
時刻、縦軸(Y軸)に駅を配した列車ダイヤに表示する
ために、各駅ごとの時刻のベクトルポイントと、駅のベ
クトルポイントとを計算する。そして、これを全ての駅
について計算する。S208では、前記S207で計算
した各駅毎のベクトルポイントをもとに表示装置3又は
出力装置6へ出力し、ベクトルポイントを順次線にて描
画することで列車ダイヤを表示する。
In S206, as a result of the check in S205, it is determined whether or not the display condition is satisfied. If not, the flow returns to S203 to read the next train data, and if so, shifts to S207. In S207, based on the train data after the check, a time vector point at each station and a time point at each station are displayed in order to display the time on the horizontal axis (X axis) and the train timetable on the vertical axis (Y axis), Calculate the station vector points. Then, this is calculated for all the stations. In S208, the train points are output to the display device 3 or the output device 6 based on the vector points for each station calculated in S207, and the train points are displayed by sequentially drawing the vector points by lines.

【0020】次に、運転日パタンより実日での列車ダイ
ヤ表示/作成方法について、図4を参照して説明する。
これは、季節列車や臨時列車等のように、特定の期間又
は曜日だけ運行される列車があるので、このような列車
の情報も漏れなくダイヤに組み込まれている必要があ
り、運転日当日のダイヤを個別に表示/作成することに
したものである。先ず、S301で、入力装置2からカ
レンダーの表示条件である日付(実日)を入力し、S3
02でその表示指示を行う。S303では、設定した表
示条件の実日の状態を割り出す。これは、表示条件の実
日の曜日と、実日が休日であるか又は休日でない場合は
休日の前日であるか、休日の前々日であるかなどをカレ
ンダーから取得するものである。次に、S304で前記
取得情報をもとに運転日パタンを設定する。この運転日
パタンの設定は、図8に示す運転日パタン一覧より一致
する運転日パタンのコードを取得する方式と、各項目に
該当する項目に有効データを設定する方式とがある。S
305は、第2記憶装置5より列車データを読み込み、
データがある場合はS307へシフトし、ない場合はS
310へシフトする。S310の作業内容については後
述する。
Next, a method of displaying / creating a train schedule on a real day from the operation day pattern will be described with reference to FIG.
This is because some trains, such as seasonal trains and temporary trains, are operated only for a specific period or day of the week. Diamonds are displayed / created individually. First, in S301, a date (actual day), which is a display condition of a calendar, is input from the input device 2, and S3 is entered.
02, the display instruction is given. In S303, the real-day state of the set display condition is determined. This is to acquire from the calendar, the display day of the actual day of the week and, if the actual day is a holiday or not a holiday, whether it is the day before the holiday, the day before the holiday, or the like. Next, in S304, a driving day pattern is set based on the acquired information. The setting of the operation day pattern includes a method of acquiring a code of the operation day pattern that matches from the operation day pattern list shown in FIG. 8 and a method of setting valid data in an item corresponding to each item. S
305 reads train data from the second storage device 5,
If there is data, shift to S307; otherwise, S
Shift to 310. The details of the operation in S310 will be described later.

【0021】S307は、S304で設定した実日に該
当する運転日パタンに該当するか否かのチエックを行
う。チエック方式には、S304で設定した運転日パタ
ンにより運転日コードのみのチエックを行う方式と、図
8に示す各項目ごとのチエックを行う方式とがある。運
転日コードのみのチエックを行う場合は、設定した運転
日コードと読み込んだ列車データの運転日コードとのチ
エックを行う。また各項目ごとのチエックを行う場合
は、全ての項目が一致しているかのチエック又は一部の
項目が一致しているかのチエックを行う。全項目又は一
部の項目のチエック方式は、選択することが可能であ
る。そして、S308では、該当する運転日の有無を確
認し、運転日が有る場合は、S309へシフトし、運転
日がない場合はS305へシフトして次の列車のスジ情
報の読み込みを行う。S309では、前述したS207
での作業内容と同じように、X,Y軸のベクトルポイン
トを計算する。S310でS208の場合と同様にスジ
表示を行う。これにより、一つの列車データから運転実
日の列車ダイヤを作成することが可能である。
In step S307, a check is performed to determine whether or not the operation day pattern corresponds to the actual day set in step S304. The check method includes a method in which only the operation day code is checked based on the operation day pattern set in S304, and a method in which each item shown in FIG. 8 is checked. In the case of checking only the operation day code, the set operation day code and the operation day code of the read train data are checked. When a check is performed for each item, a check is performed to determine whether all items match or a check is performed to determine whether some items match. The check method of all items or some items can be selected. Then, in S308, the presence or absence of the corresponding driving day is confirmed. If there is a driving day, the process shifts to S309, and if there is no driving day, the process shifts to S305 to read the line information of the next train. In step S309, the above-described step S207 is performed.
Calculate the vector points of the X and Y axes in the same manner as in the above operation. In S310, the streak display is performed in the same manner as in S208. As a result, it is possible to create a train schedule of the actual driving day from one train data.

【0022】次に、(2)日跨がりコードによる24時
間対応ダイヤ作成メニューの作業内容について、図5を
参照して説明する。図5は、24時間対応ダイヤの作成
手順を示すフローチャートである。S901〜S906
までの作業内容は、S101〜S106までの作業内容
と同じであり、ここでの重複した説明は省略する。S9
07は、S906で列車データを計算した結果、午前0
時を跨がる(日を跨がり)列車データが作成された場
合、0時以前の各駅には、S902で設定した運転日パ
タンに対して同一パタンであることを示すためのコード
“0”を設定し、0時を跨がった駅に対しては、S90
2で設定した運転日パタンに対して次の日であるため、
S902での運転日パタンの各項目が1日分進むことを
示すコード“1”を設定する。なお、この日跨がりコー
ドは、S901の列車データ作成条件設定時に設定可能
である。
Next, (2) the work contents of the 24-hour diagram creation menu based on the day span code will be described with reference to FIG. FIG. 5 is a flowchart showing a procedure for creating a 24-hour diamond. S901 to S906
The operation contents up to are the same as the operation contents of S101 to S106, and the duplicate description is omitted here. S9
07 is 0 am in the morning as a result of calculating the train data in S906.
When the train data that straddles the time (straddling the day) is created, the code “0” for each station before 0:00 indicates that the pattern is the same as the driving day pattern set in S902. Is set, and for a station that crosses midnight, S90
Since it is the next day for the driving day pattern set in 2,
A code “1” indicating that each item of the operation day pattern in S902 advances by one day is set. Note that this day straddling code can be set when setting the train data creation conditions in S901.

【0023】例えば、運転される列車が日曜日の場合、
0時を跨がった列車の運転日パタンは月曜日となり、日
跨がりコードは“1”の列車となる。これは、実際の列
車は日曜日に発車しているが、0時以降の駅では月曜日
の運転となるからである。この場合、列車ダイヤ作成担
当者が0時前後で異なった場合、0時前までの線区対応
の列車ダイヤ作成担当者は日曜日運転の休日ダイヤとし
て作成するが、0時以降の列車ダイヤ作成担当者は担当
線区において、月曜日運転の列車として登録することが
あり、平日ダイヤとして間違って作成されるおそれがあ
るので、これを防止するための対策である。次のS90
8では、S107の場合と同じようにスジ情報に運転日
パタンを付与し、登録を行えばよい。
For example, if the train to be operated is Sunday,
The operating day pattern of the train straddling 0:00 is Monday, and the day straddling code is a train of “1”. This is because the actual train starts on Sunday, but the station after 0:00 operates on Monday. In this case, if the train schedule creator is different before and after 0:00, the train schedule creator corresponding to the line section until 0:00 is created as a holiday schedule for Sunday operation, but the train schedule creator after 0:00 is in charge. May be registered as a train operated on Monday in the line in charge and may be erroneously created as a weekday schedule. This is a measure to prevent this. Next S90
In S8, a driving day pattern may be added to the line information and registration may be performed as in the case of S107.

【0024】図6は、24時間対応ダイヤ作成メニュー
において、作成された列車データを平日、休日などの運
転日により該当する列車を表示する機能を説明するため
のものであり、基本的には図3に示す場合と同じであ
る。S401〜S404の作業内容は、S201〜20
4の作業内容と同じである。S405では、表示運転日
パタンと読み込んだ列車データの運転日パタンをチエッ
クする際に、日跨がりコードによる補正を行い、実際の
列車の運転日に合わせた表示を可能としている。以下の
S406以降のステップは、図3に示すS206以降の
ステップと同じであり、ここでの説明は省略する。
FIG. 6 is a diagram for explaining a function of displaying the created train data on a train schedule corresponding to the operating day such as a weekday or a holiday in the 24-hour schedule creation menu. This is the same as the case shown in FIG. The work contents of S401 to S404 are described in S201 to S20.
4 is the same as the work content. In S405, when checking the display operation day pattern and the operation date pattern of the read train data, correction is performed using the straddling code to enable display according to the actual operation day of the train. The following steps after S406 are the same as the steps after S206 shown in FIG. 3, and a description thereof will be omitted.

【0025】次に、(3)運転日パタン及び日跨がりコ
ードを参照した他線区ダイヤ読み込み作業メニューの内
容について、図7を参照して説明する。この他線区ダイ
ヤ読み込み作業メニューは、作業ダイヤ面の該当駅で他
線区の列車への乗換え接続がスムーズに行くか否かを確
認したり、又は同一線区の分割したダイヤ面ごとに列車
ダイヤを作成した場合の担当者どうしのファイルで同一
列車が一本のスジとなって作成されているか否かの確認
を行うためのものである。S501は、表示装置3に列
車ダイヤを表示している状態で、他ファイル上で作成さ
れた列車ダイヤの情報を取り込んで同時に表示したい場
合に、追加して取り込みをしたい線区が含まれている他
ファイルを指定するためのステップである。S502
は、前記S501で指定した他ファイルで作成された情
報の読み込みを指示するステップであり、次のステップ
S503で実際に読み込まれる。S504では、読み込
んだデータの有無を確認するステップであり、データが
ある場合はS505へシフトし、無い場合はS510へ
シフトする。
Next, the contents of the (3) other line section diagram reading work menu with reference to the operation day pattern and the day straddling code will be described with reference to FIG. This other line section schedule reading work menu is used to check whether the transfer connection to the train on the other line section goes smoothly at the corresponding station on the work timetable, or to check the train This is for confirming whether or not the same train has been created as one line by using a file between persons in charge when the schedule is created. In step S501, when the train diagram is displayed on the display device 3 and the information of the train diagram created on another file is to be fetched and simultaneously displayed, a line segment to be additionally fetched is included. This is a step for specifying another file. S502
Is a step of instructing reading of information created in the other file specified in S501, and is actually read in the next step S503. S504 is a step of checking the presence or absence of the read data. If there is data, the process shifts to S505. If there is no data, the process shifts to S510.

【0026】S505では、読み込んだ列車データ(ス
ジ情報)の中に、既に表示している列車ダイヤの表示し
ている駅に該当する駅が存在するか否かのチエックを行
う。そして、S506において、S505でチエックし
た結果、該当する駅が無い場合はS503へ戻って次の
スジ情報の読み込みを行い、該当する駅が有る場合はS
507へシフトする。S507では、既に表示されてい
る列車ダイヤの各列車データと読み込んだ列車データの
中に、実際の列車の運行では、同一列車として走行され
ている列車が有るか否かのチエックを行っている。チエ
ック方法は、同一駅間でユニークに設定される列車番
号、各列車ダイヤの接続駅に停車するか通過するかの停
車/通過の種別、及び同一運転日パタンであること等の
条件により同一列車であるか否かを判断している。同一
列車であると判断した場合は、S509において、これ
らの表示ファイル及び他線区のファイルに内部通番を設
定し、両ファイルの該当する列車データに相手の内部通
番を付与することで、接続相手であることを認識させる
ことができる。これにより、他線区での乗換え接続駅や
同一線区における分割されたダイヤ面の接続駅での着時
刻、発時刻の時刻反転や着番線、発番線のチエック等が
行え、列車ダイヤ作成担当者間の相互チエックが可能で
ある。
In step S505, a check is performed to determine whether or not a station corresponding to the station indicated by the already displayed train diagram exists in the read train data (streak information). In step S506, as a result of checking in step S505, if there is no corresponding station, the process returns to step S503 to read the next line information.
Shift to 507. In S507, a check is performed to determine whether or not there is a train running as the same train in the actual train operation among the train data and the read train data of the train diagram already displayed. The check method is based on the conditions such as the train number that is uniquely set between the same stations, the type of stop / pass to stop or pass at the connecting station of each train schedule, and the pattern of the same operation day. Is determined. If it is determined that the trains are the same, an internal serial number is set in the display file and the file of the other line section in S509, and the internal train number of the other party is assigned to the corresponding train data in both files, so that the connection partner Can be recognized. By doing this, you can perform the reverse of arrival time and departure time, check the arrival and departure lines, check the arrival and departure lines, etc. at the transfer connection station on another line section or the connection station on the divided diagram on the same line section, A mutual check between the parties is possible.

【0027】[0027]

【発明の効果】以上説明したように本発明にあっては、
スジと呼ばれる列車情報に、1列車毎の運転日パタンを
持たせることにより、平日ダイヤと休日ダイヤ等のダイ
ヤ種別を区別することなく、同一ファイルとして列車デ
ータベースに登録したから、列車データベースへ登録す
るスジと呼ばれる列車情報は、一つの列車について一つ
であり、従来のように同一列車をダイヤ種別ごとに重複
して登録する必要がないので、データ量を大幅に削減す
ることが可能である。
As described above, in the present invention,
The train information called "suji" is provided with an operating day pattern for each train, so that it is registered in the train database as the same file without discrimination between the schedule types such as weekday schedules and holiday schedules, and is then registered in the train database. The number of train information called a line is one for one train, and there is no need to register the same train redundantly for each diagram type as in the related art, so that the data amount can be significantly reduced.

【0028】また前記列車情報は、運転日パタンに応じ
てこれを出力することができ、同一の列車データベース
から平日又は休日ダイヤ、実施ダイヤ等の種別毎のダイ
ヤを表示又は作成することが可能であり、更には、他線
区の列車データベースの列車情報を読み込み、複数ファ
イルの情報を同時に表示したり又はダイヤ作成すること
も可能である。
The train information can be output in accordance with the operation day pattern, and it is possible to display or create a diagram for each type of weekday or holiday schedule, execution schedule, etc. from the same train database. In addition, it is also possible to read train information in the train database of another line section and display information of a plurality of files at the same time or create a diagram.

【0029】それに加えて、日付を跨がって運転される
列車には、識別コード化した情報を加えることにより、
24時間を通して切れ目のないダイヤが作成可能であ
る。
In addition, for trains that operate across the date, by adding identification-coded information,
Seamless diamonds can be created throughout 24 hours.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係るシステムの全体を示すブロック図
である。
FIG. 1 is a block diagram showing an entire system according to the present invention.

【図2】本発明係る列車ダイヤ作成時のフローチャート
である。
FIG. 2 is a flowchart at the time of creating a train schedule according to the present invention.

【図3】本発明に係る該当列車を表示するフローチャー
トである。
FIG. 3 is a flowchart showing a relevant train according to the present invention.

【図4】本発明に係る実施ダイヤの作成フローチャート
である。
FIG. 4 is a flow chart for creating an implementation diagram according to the present invention.

【図5】本発明に係る24時間対応ダイヤの作成フロー
チャートである。
FIG. 5 is a flowchart for creating a 24-hour diamond according to the present invention.

【図6】本発明に係る24時間対応ダイヤの該当列車表
示フローチャートである。
FIG. 6 is a flowchart for displaying a corresponding train of a 24-hour schedule according to the present invention.

【図7】本発明に係る他ファイルデータ読み込み時のフ
ローチャートである。
FIG. 7 is a flowchart at the time of reading other file data according to the present invention.

【図8】本発明に係る運転日パタンの登録例を示す図面
である。
FIG. 8 is a drawing showing an example of registration of a driving day pattern according to the present invention.

【符号の説明】[Explanation of symbols]

1…電子計算機(コンピュータ) 2…入力装置 3…表示装置 4…第1記憶装
置 5…第2記憶装置 6…出力装置
DESCRIPTION OF SYMBOLS 1 ... Computer (Computer) 2 ... Input device 3 ... Display device 4 ... 1st storage device 5 ... 2nd storage device 6 ... Output device

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】スジと呼ばれる列車情報に、1列車毎の運
転日パタンを持たせることにより、平日ダイヤと休日ダ
イヤ等のダイヤ種別を区別することなく、同一ファイル
として列車データベースに登録しておくことを特徴とす
る列車ダイヤ作成支援システム。
1. A train information called a line is provided with an operating day pattern for each train, so that it is registered in the train database as the same file without discriminating between diamond types such as weekdays and holidays. A train schedule creation support system characterized in that:
【請求項2】運転日パタンに応じて列車情報を出力する
ことにより、同一の列車データベースから平日又は休日
等の種別毎のダイヤを表示又は作成することができるよ
うにした請求項1に記載の列車ダイヤ作成支援システ
ム。
2. The train according to claim 1, wherein the train information is output in accordance with the operation day pattern, so that a schedule for each type such as weekdays or holidays can be displayed or created from the same train database. Train schedule creation support system.
【請求項3】運転日パタンより運転実日での列車ダイヤ
を表示又は作成することができる請求項1に記載の列車
ダイヤ作成支援システム。
3. The train schedule creation support system according to claim 1, wherein the train schedule on the actual day of operation can be displayed or created from an operation day pattern.
【請求項4】日付を跨がって運転される列車には、識別
コード化した情報を加えることにより、24時間を通し
て切れ目のないダイヤが作成可能な請求項1に記載の列
車ダイヤ作成支援システム。
4. A train schedule creation support system according to claim 1, wherein a train that is operated over the date can be created without interruption by adding identification-coded information over a 24-hour period. .
【請求項5】他線区の列車データベースの列車情報を読
み込み、複数ファイルの情報を同時に表示又はダイヤ作
成することができる請求項1〜4のいずれか一つに記載
の列車ダイヤ作成支援システム。
5. The train schedule creation support system according to any one of claims 1 to 4, wherein the train information of the train database of another line section is read, and information of a plurality of files can be simultaneously displayed or a schedule is created.
JP11021730A 1999-01-29 1999-01-29 Formation of railway schedule supporting system Pending JP2000219135A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11021730A JP2000219135A (en) 1999-01-29 1999-01-29 Formation of railway schedule supporting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11021730A JP2000219135A (en) 1999-01-29 1999-01-29 Formation of railway schedule supporting system

Publications (1)

Publication Number Publication Date
JP2000219135A true JP2000219135A (en) 2000-08-08

Family

ID=12063206

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11021730A Pending JP2000219135A (en) 1999-01-29 1999-01-29 Formation of railway schedule supporting system

Country Status (1)

Country Link
JP (1) JP2000219135A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003002203A (en) * 2001-06-27 2003-01-08 Railway Technical Res Inst Schedule data editing information, storage medium, and schedule data editing device related to execution train schedule creation
JP2006123749A (en) * 2004-10-29 2006-05-18 West Japan Railway Co Operation schedule management device and program

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003002203A (en) * 2001-06-27 2003-01-08 Railway Technical Res Inst Schedule data editing information, storage medium, and schedule data editing device related to execution train schedule creation
JP2006123749A (en) * 2004-10-29 2006-05-18 West Japan Railway Co Operation schedule management device and program

Similar Documents

Publication Publication Date Title
JP4703917B2 (en) Rental system and rental business support method
EP0142067B1 (en) A method of scheduling a meeting among several terminal users
US4591840A (en) Calendar event description abbreviation
US5709410A (en) Development and construction job scheduling method
JP2001278052A (en) Method and system for supporting train schedule creation
JPWO2005007483A1 (en) Vehicle replacement plan creation support device
JP2000219135A (en) Formation of railway schedule supporting system
JP3933562B2 (en) Construction work integrated management system and method
JP2004249804A (en) Vehicle maintenance reservation system
JP4585150B2 (en) Schedule data editing program, storage medium, and diamond data editing apparatus for train schedule creation
JPH10275187A (en) Display method of work process diagram and its device
JP2776836B2 (en) Data processing device
JP7324042B2 (en) TRANSPORT PLANNING SUPPORT SYSTEM AND METHOD
JPH1166151A (en) Work shift generation support system and recording medium
JP2002269057A (en) Schedule display method and display device, schedule display program, and medium recording the program
JP2017081262A (en) Vehicle operation support system
JP2006199244A (en) Information processing apparatus control method, information processing apparatus, and program
JPH10134040A (en) Time scale management method and time expression display device
JP2021165997A (en) Candidate selecting system, candidate selecting method, and program
JP5051605B2 (en) Operation schedule management device and program
JP3867200B2 (en) Electronic device, electronic device control program, and electronic device control method
JPH0222705A (en) Super-express production indicating device for process control system
JPH11144069A (en) Equipment layout drawing creation apparatus and recording medium recording equipment layout drawing creation processing program
JP4225650B2 (en) Customer negotiation support device
JP3945567B2 (en) Organization table creation device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060126

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080314

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080401

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080602

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080909

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081107

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20081216