JP2000257392A - Waterproof formwork and tunnel construction method using the same - Google Patents

Waterproof formwork and tunnel construction method using the same

Info

Publication number
JP2000257392A
JP2000257392A JP11065591A JP6559199A JP2000257392A JP 2000257392 A JP2000257392 A JP 2000257392A JP 11065591 A JP11065591 A JP 11065591A JP 6559199 A JP6559199 A JP 6559199A JP 2000257392 A JP2000257392 A JP 2000257392A
Authority
JP
Japan
Prior art keywords
water
stopping
mold
formwork
plate portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11065591A
Other languages
Japanese (ja)
Inventor
Moriaki Kurita
守朗 栗田
Shinji Urano
真次 浦野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP11065591A priority Critical patent/JP2000257392A/en
Publication of JP2000257392A publication Critical patent/JP2000257392A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

(57)【要約】 【課題】 止水性を高めることのできる止水用型枠およ
びそれを用いたトンネルの施工方法を提供することを課
題とする。 【解決手段】 内型枠3の外周側に止水用型枠11を配
置するようにし、さらに、止水用型枠11どうしの接合
部は、止水プレート部12と噛み合い段部13とを噛み
合わせる構成とした。そして、噛み合い段部13には、
止水剤注入孔を形成するようにした。
(57) [Summary] An object of the present invention is to provide a water-stopping formwork capable of increasing the water-stopping property and a tunnel construction method using the same. SOLUTION: A water stopping mold 11 is arranged on the outer peripheral side of an inner mold 3, and a joint between the water stopping molds 11 is formed by a water stopping plate portion 12 and an engagement step portion 13. It is configured to engage. And, in the meshing step 13,
A water blocking agent injection hole was formed.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、コンクリートやモ
ルタルなどの自硬性充填材を採用するトンネルを構築す
るに際して用いて好適な止水用型枠およびそれを用いた
トンネルの施工方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a water stopping mold suitable for constructing a tunnel employing a self-hardening filler such as concrete or mortar, and a method of constructing a tunnel using the same. .

【0002】[0002]

【従来の技術】周知のように、例えば軟弱で地下水位が
高いような地山に対してシールド工法によりトンネルを
施工する場合、一次覆工にはセグメントを使用すること
が一般的である。近年、セグメントを用いることに代え
て、シールド掘削機の後方において型枠を組み立て、そ
の型枠と地山との間に直接に自硬性硬化材としてコンク
リートを打設充填することによって覆工壁を形成する、
いわゆるECL工法(Extruded Concrete Lining Metho
d)の開発も進められている。
2. Description of the Related Art As is well known, for example, when a tunnel is constructed by a shield method for a soft ground having a high groundwater level, a segment is generally used for the primary lining. In recent years, instead of using segments, assembling a formwork behind a shield excavator and casting concrete as self-hardening material directly between the formwork and ground to fill the lining wall Form,
The so-called ECL method (Extruded Concrete Lining Metho
Development of d) is also underway.

【0003】ECL工法では、打設されたコンクリート
が硬化して覆工壁が形成された後は地山圧力(土圧およ
び地下水圧)に対して十分に耐え得ることは当然である
が、コンクリートを打設した直後の未硬化コンクリート
によっても地山圧力に対して抗し得るものでなければな
らない。特に地下水圧が高い地山に対してECL工法を
適用する場合には未硬化コンクリートによる十分な止水
性を確保するための方策が不可欠である。このため、本
出願人は先に、コンクリートの打設圧力を地山圧力より
常に高く維持することによって、未硬化のコンクリート
によっても止水性を確保するようにしたECL工法にお
けるトンネルの覆工方法を提供した(例えば特開平4ー
161599号等)。
In the ECL method, after the poured concrete is hardened and the lining wall is formed, it is natural that the concrete can sufficiently withstand the ground pressure (earth pressure and groundwater pressure). It must be able to withstand the ground pressure even with uncured concrete immediately after casting. In particular, when the ECL method is applied to a ground with a high groundwater pressure, a measure for securing sufficient waterproofness by uncured concrete is indispensable. For this reason, the present applicant has previously described a tunnel lining method in the ECL method in which the casting pressure of concrete is always maintained at a level higher than the ground pressure, so that the water stopping property is ensured even with uncured concrete. (For example, JP-A-4-161599).

【0004】[0004]

【発明が解決しようとする課題】しかしながら、上述し
たような従来の技術には以下のような問題が存在する。
このようなECL工法では、通常時において、コンクリ
ートを打設するときには、その打設圧力を、先行打設さ
れているコンクリートの圧力と同等あるいはやや高い所
定の圧力に保持し、これを先行打設したコンクリートが
固まる前に打設することによって、両者の打設コンクリ
ートを一体化する構成となっている。その結果、覆工壁
が打継ぎ目のない連続体とされ、これによって止水性が
確保されるものとなっている。
However, the above-mentioned conventional techniques have the following problems.
In such an ECL method, at the time of casting concrete in a normal state, the casting pressure is maintained at a predetermined pressure equal to or slightly higher than the pressure of the concrete that has been previously cast, and this is pre-cast. By casting before the set concrete is hardened, the two types of cast concrete are integrated. As a result, the lining wall is formed as a continuous body having no seams, thereby securing the water stopping property.

【0005】ところが、例えば工事の休業日等には、先
に打設したコンクリートが完全に硬化してしまうため、
休業日明けの最初の工程で打設するコンクリートとは一
体化せず、ここに打継ぎ目が形成されてしまうこととな
り、この部分からの漏水の恐れがあるため、打継ぎ目に
おける止水性の確保が要求されていた。
[0005] However, for example, on the days when construction is closed, the concrete poured first hardens completely.
It will not be integrated with the concrete to be cast in the first process after the holidays, and a seam will be formed here, and there is a risk of water leakage from this part. Had been requested.

【0006】この他にも、コンクリートを連続打設する
ことによって連続形成される覆工壁は、コンクリートの
硬化熱が徐々に低下するにともなって、その全体が収縮
し、その結果覆工壁にクラックが生じる恐れがある。特
に、周囲地山が堅固な場合には、覆工壁の外周面側が周
囲地山によって拘束されるため、収縮によるクラックが
生じやすい。このようなクラックは発生箇所の特定が困
難であるため、この部分からの漏水に対する対処も困難
となっている。
[0006] In addition, the lining wall continuously formed by continuously casting concrete is shrunk as the hardening heat of the concrete is gradually reduced, and as a result, the lining wall is formed on the lining wall. Cracks may occur. In particular, when the surrounding ground is solid, the outer peripheral surface side of the lining wall is constrained by the surrounding ground, and cracks are likely to occur due to shrinkage. Since it is difficult to specify the location of such a crack, it is also difficult to deal with water leakage from this location.

【0007】本発明は、以上のような点を考慮してなさ
れたもので、より止水性を高めることのできる止水用型
枠およびそれを用いたトンネルの施工方法を提供するこ
とを課題とする。
SUMMARY OF THE INVENTION The present invention has been made in view of the above points, and has as its object to provide a water-stopping formwork capable of further improving the water-stopping property and a tunnel construction method using the same. I do.

【0008】[0008]

【課題を解決するための手段】請求項1に係る発明は、
シールド掘削機により地山に掘削された坑の周壁と、該
周壁の内周側に間隔を隔てて組まれた内型枠との間に、
自硬性充填材が充填されることによって前記周壁の内面
が覆工されるトンネルに用いられる止水用型枠であっ
て、該止水用型枠は、前記内型枠の外周側に配置される
ものであり、かつ前記トンネル軸線方向において前方側
および後方側となる端部には、その一方の前記端部に前
方または後方に向けて突出する突出プレート部が形成さ
れ、他方の前記端部に前記突出プレート部に噛み合う噛
み合い部が形成されていることを特徴としている。
The invention according to claim 1 is
Between the peripheral wall of the pit excavated on the ground by the shield excavator and the inner formwork assembled at intervals on the inner peripheral side of the peripheral wall,
A water stopping mold used for a tunnel in which the inner surface of the peripheral wall is lining by being filled with a self-hardening filler, wherein the water stopping mold is arranged on an outer peripheral side of the inner mold. And a protruding plate portion protruding forward or rearward is formed at one of the ends at the front end and the rear end in the tunnel axis direction, and the other end is formed. And a meshing portion meshing with the protruding plate portion is formed.

【0009】内型枠の外周側に止水用型枠を配置するこ
とにより、打設したコンクリートが硬化して形成される
覆工壁からの漏水が防止される。しかも、止水用型枠ど
うしの接合部分においては、一方の止水用型枠の端部に
形成された突出プレート部と、他方の止水用型枠の端部
に形成された噛み合い部とを噛み合わせることにより、
この部分からの漏水も防止できる。
By arranging the water-stopping formwork on the outer peripheral side of the inner formwork, water leakage from the lining wall formed by hardening of the poured concrete is prevented. In addition, in the joint portion between the water stopping molds, a projecting plate portion formed at one end of the water stopping mold and a meshing portion formed at the end of the other water stopping mold. By engaging
Water leakage from this part can also be prevented.

【0010】請求項2に係る発明は、請求項1記載の止
水用型枠であって、前方側または後方側の前記端部のう
ちのいずれか一方にピンが形成され、他方に前記ピンが
挿入されるピン穴が形成されていることを特徴としてい
る。
According to a second aspect of the present invention, there is provided the water stopping mold according to the first aspect, wherein a pin is formed on one of the front end and the rear end, and the pin is formed on the other end. A pin hole into which the hole is inserted.

【0011】これにより、止水用型枠どうしを接合する
ときに、ピンとピン穴を噛み合わせることにより、その
位置決めを行うことができる。
Accordingly, when the water stopping molds are joined together, the pins can be engaged with the pin holes to perform the positioning.

【0012】請求項3に係る発明は、請求項1または2
記載の止水用型枠であって、前記噛み合い部には、他の
止水用型枠を接続するときに該他の止水用型枠の前記突
出プレート部との間に止水剤を注入するための止水剤注
入孔が形成されていることを特徴としている。
The invention according to claim 3 is the invention according to claim 1 or 2
The water stopping mold according to the above, wherein the meshing portion includes a water stopping agent between the projecting plate portion of the other water stopping mold when connecting another water stopping mold. It is characterized in that a water blocking agent injection hole for injection is formed.

【0013】止水剤注入孔から止水剤を止水用型枠どう
しの接合部に注入することにより、一方の止水用型枠の
突出プレート部と、他方の止水用型枠の噛み合い部との
隙間を塞ぐことができる。
[0013] By injecting the water-stopping agent into the joint between the water-stopping molds through the water-stopping agent injection hole, the projecting plate portion of one of the water-stopping molds and the other water-stopping formwork mesh with each other. The gap with the part can be closed.

【0014】請求項4に係る発明は、請求項1から3の
いずれかに記載の止水用型枠であって、前記止水用型枠
には、前記内型枠の外周面に接合するため、前記内型枠
の外周面に設けられる凸部に対応した凹部が形成されて
いることを特徴としている。
The invention according to claim 4 is the water stopping mold according to any one of claims 1 to 3, wherein the water stopping mold is joined to the outer peripheral surface of the inner mold. Therefore, a concave portion corresponding to the convex portion provided on the outer peripheral surface of the inner mold frame is formed.

【0015】止水用型枠に形成された凹部を、内型枠の
外周面に設けられた凸部に噛み合わせることにより、止
水用型枠のセットを行うことができる。
The water stopping mold can be set by engaging the recess formed in the water stopping mold with the projection provided on the outer peripheral surface of the inner mold.

【0016】請求項5に係る発明は、シールド掘削機で
地山を掘削しつつ、掘削された地山の周壁を所定の間隔
を空けて内型枠で覆うとともに、前記トンネルの前方側
または後方側となる端部のいずれか一方に突出して形成
された突出プレート部と、他方に前記突出プレート部に
噛み合うよう形成された噛み合い部とを有した止水用型
枠を、前記内型枠の外周面に沿ってセットして、該止水
用型枠の前記突出プレート部または噛み合い部を、掘進
方向後方側に先行して設置されている他の前記止水用型
枠の前記噛み合い部または突出プレート部に噛み合わ
せ、しかる後に、前記止水用型枠と前記周壁との間に自
硬性充填材を充填し、前記自硬性充填材が硬化した後に
前記内型枠を脱型することを特徴としている。
According to a fifth aspect of the present invention, while excavating the ground with a shield excavator, the peripheral wall of the excavated ground is covered with an inner form at a predetermined interval, and the front or rear of the tunnel is covered. A water stopping mold having a protruding plate portion formed to protrude on one of the side ends and a meshing portion formed to mesh with the protruding plate portion on the other side, Set along the outer peripheral surface, the projecting plate portion or the meshing portion of the water stopping mold, the meshing portion of the other water stopping mold installed ahead of the excavation direction rear side or Engaging with the protruding plate portion, and thereafter, filling the self-hardening filler between the water stopping mold and the peripheral wall, and removing the inner mold after the self-hardening filler is cured. Features.

【0017】これにより、自硬性充填材が硬化して形成
される覆工壁の内周面側には止水用型枠が存在すること
になり、覆工壁からの漏水を防止することができる。さ
らに、突出プレート部と噛み合い部とを嵌合させること
により止水用型枠どうしの接合部での止水性も確保でき
る。
As a result, the water-stopping formwork is present on the inner peripheral surface side of the lining wall formed by curing the self-hardening filler, thereby preventing water leakage from the lining wall. it can. Further, by fitting the protruding plate portion and the engagement portion together, it is possible to ensure the water stopping at the joint between the water stopping molds.

【0018】請求項6に係る発明は、請求項5記載のト
ンネルの施工方法であって、前記止水用型枠の噛み合い
部には、予め止水剤注入孔を形成しておき、前記止水用
型枠を後方側の前記止水用型枠に噛み合わせた後に、前
記止水剤注入孔から前記噛み合い部と突出プレート部と
の間に止水剤を注入することを特徴としている。
According to a sixth aspect of the present invention, there is provided the tunnel construction method according to the fifth aspect, wherein a water-stopping agent injection hole is formed in advance at a meshing portion of the water-stopping formwork, and After the water mold is engaged with the water-stopping mold on the rear side, a water-stopping agent is injected between the engagement portion and the protruding plate portion from the water-stopping-agent injection hole.

【0019】これにより、一方の止水用型枠の突出プレ
ート部と、他方の止水用型枠の噛み合い部との隙間を塞
ぐことができる。
Thus, it is possible to close the gap between the projecting plate portion of one of the water stopping molds and the meshing portion of the other water stopping mold.

【0020】[0020]

【発明の実施の形態】以下、本発明に係る止水用型枠お
よびそれを用いたトンネルの施工方法の実施の形態の一
例を、図1ないし図4を参照して説明する。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view showing an embodiment of a waterproofing form according to the present invention and a method for constructing a tunnel using the form. FIG.

【0021】図1において、符号1は、地山Gにおいて
トンネルTを掘削するシールド掘削機、2はシールド掘
削機1の外殻を成す例えば円筒状のスキンプレートを、
1aはスキンプレート2の先端部に設けられて地山Gを
掘削するためのカッタを、3はシールド掘削機1によっ
て掘削された坑の周壁Twの内方に所定間隔を隔てて組
み立てられた内型枠を、4は内型枠3と坑の周壁Twと
の間に打設充填されるコンクリートやモルタル等の自硬
性充填材を、それぞれ示している。さらに、符号5は、
推進ジャッキであり、内型枠3から反力を取って、シー
ルド掘削機1を前進させる役割を果たすものである。
In FIG. 1, reference numeral 1 denotes a shield excavator for excavating a tunnel T in a ground G, and 2 denotes a cylindrical skin plate forming an outer shell of the shield excavator 1, for example.
1a is a cutter provided at the tip of the skin plate 2 for excavating the ground G, and 3 is a cutter assembled at a predetermined interval inside the peripheral wall Tw of the pit excavated by the shield excavator 1. Reference numeral 4 denotes a mold, and reference numeral 4 denotes a self-hardening filler such as concrete or mortar which is cast and filled between the inner mold 3 and the peripheral wall Tw of the pit. Further, reference numeral 5 is
It is a propulsion jack that takes a reaction force from the inner formwork 3 and plays a role in advancing the shield excavator 1.

【0022】そして、スキンプレート2と、スキンプレ
ート2の内方で組み立てられる内型枠3との間の環状の
空間には、その全周にわたるリング状の板材からなる妻
型枠8が、シールド掘削機1の軸線方向に前後動自在に
収められている。この妻型枠8は、空間の前方において
スキンプレート2に固定された押圧ジャッキ9によっ
て、空間内で前後方向に進退駆動されるようになってい
る。
In the annular space between the skin plate 2 and the inner mold 3 assembled inside the skin plate 2, a shield mold 8 made of a ring-shaped plate material is provided over the entire periphery thereof. The excavator 1 is housed so as to be movable back and forth in the axial direction. The end form 8 is driven forward and backward in the space by a pressing jack 9 fixed to the skin plate 2 in front of the space.

【0023】妻型枠8の外周部には、スキンプレート2
側と内型枠3に接触する部分に図示しないシール部材が
配設されている。また、妻型枠8の先端面すなわち自硬
性充填材4を直接的に押圧する面には、自硬性充填材4
の圧力を検出するため、例えば歪み計型の土圧計等の圧
力センサ(図示なし)が取り付けられており、この圧力
センサは、押圧ジャッキ9の駆動を制御する制御手段
(図示なし)に接続され、妻型枠8によって押圧される
自硬性充填材4の圧力を刻々と検出して制御手段(図示
なし)に入力するようになっている。
A skin plate 2 is provided on the outer periphery of the wife form 8.
A seal member (not shown) is provided at a portion in contact with the side and the inner mold frame 3. Further, the self-hardening filler 4 is provided on the tip end surface of the wife form 8, that is, the surface that directly presses the self-hardening filler 4.
In order to detect the pressure, a pressure sensor (not shown) such as a strain gauge type earth pressure gauge is attached, and this pressure sensor is connected to control means (not shown) for controlling the driving of the pressing jack 9. The pressure of the self-hardening filler 4 pressed by the wand mold 8 is detected every moment and inputted to a control means (not shown).

【0024】ここでトンネルTの覆工に用いる止水用型
枠11について説明する。図2に示すように、止水用型
枠11は、内型枠3の外周面側に沿って配置されるもの
で、内型枠3と同様の形状であり、かつその内周面側が
内型枠3の外周面に沿うよう形成されている。止水用型
枠11は、例えば鋼繊維ビニロン、ポリプロピレン等の
繊維を混入したモルタル等、高強度、高靭性を有する無
機系の材料でプレキャストされたものである。
Here, the water stopping mold 11 used for lining the tunnel T will be described. As shown in FIG. 2, the water stopping mold 11 is arranged along the outer peripheral surface of the inner mold 3, has the same shape as the inner mold 3, and has an inner peripheral surface having the inner surface. It is formed along the outer peripheral surface of the mold 3. The water stopping mold 11 is precast with an inorganic material having high strength and high toughness, such as mortar mixed with fibers such as steel fiber vinylon and polypropylene.

【0025】図2および図3に示すように、止水用型枠
11には、これを内型枠3の外周面側にセットした状態
でシールド掘削機1の掘進方向前方側となる端部11a
に、前方に向けて突出する止水プレート部(突出プレー
ト部)12が形成され、後方側となる端部11bに噛み
合い段部(噛み合い部)13が形成されている。
As shown in FIGS. 2 and 3, the water-stopping formwork 11 has an end portion which is set on the outer peripheral surface side of the inner formwork 3 and which is located on the forward side in the excavation direction of the shield excavator 1. 11a
A water blocking plate portion (projecting plate portion) 12 protruding forward is formed, and a meshing step portion (meshing portion) 13 is formed at an end 11b on the rear side.

【0026】図3に示したように、止水プレート部12
は、止水用型枠11の外周面に連続して前方に所定寸法
突出し、かつ止水用型枠11の周方向に連続して形成さ
れている。一方、噛み合い段部13は、止水用型枠11
の外周面に対し、止水プレート部12の厚さに対応した
寸法の段部13aが、止水用プレート部12の突出寸法
に対応した長さを有して形成されることによって構成さ
れている。
As shown in FIG. 3, the water stopping plate portion 12
Is formed to protrude forward by a predetermined size continuously on the outer peripheral surface of the water stopping mold 11 and is formed continuously in the circumferential direction of the water stopping mold 11. On the other hand, the engaging step 13 is provided with the water stopping mold 11.
Is formed by forming a step 13a having a size corresponding to the thickness of the water blocking plate portion 12 with a length corresponding to the protrusion size of the water blocking plate portion 12 with respect to the outer peripheral surface of the water blocking plate portion 12. I have.

【0027】このような構成により、二枚の止水用型枠
11どうしを掘進方向前後に接合するときには、一方の
止水用型枠11の止水プレート部12が、他方の止水用
型枠11の噛み合い段部13に重なって互いに噛み合う
形態となる。
With such a configuration, when the two water-blocking molds 11 are joined to each other in the excavation direction, the water-blocking plate portion 12 of one of the water-blocking molds 11 is connected to the other water-blocking mold. The frame 11 overlaps with the meshing step 13 so as to mesh with each other.

【0028】噛み合い段部13には、その内周面側と外
周面側を連通する止水剤注入孔15が形成されている。
止水剤注入孔15は、例えば、水膨潤性のポリマー等の
止水剤を内型枠3の内周面側から注入することにより、
この止水剤が噛み合い段部13とこれに重なる止水プレ
ート部12との隙間に充填されるようになっている。
The meshing step 13 is formed with a water blocking agent injection hole 15 which communicates the inner peripheral surface side and the outer peripheral surface side.
The water-stopping agent injection hole 15 is formed by, for example, injecting a water-stopping agent such as a water-swellable polymer from the inner peripheral surface side of the inner mold 3.
The water-stopping agent is filled in the gap between the meshing step 13 and the water-stopping plate 12 overlapping therewith.

【0029】さらに、このような止水用型枠11の内周
面には、所定の位置に凹部16が複数箇所に形成されて
いる。そして、内型枠3の外周面には、前記凹部16に
対応する位置に、図示しない凸部が一体に設けられてい
る。
Further, on the inner peripheral surface of the water stopping mold 11, a plurality of concave portions 16 are formed at predetermined positions. On the outer peripheral surface of the inner mold 3, a projection (not shown) is integrally provided at a position corresponding to the recess 16.

【0030】次に、上記止水用型枠11を用いたトンネ
ルTの施工方法について説明する。図1に示したよう
に、トンネルTを掘削するには、まずシールド掘削機1
の前部に備えたカッタ1aで地山Gを掘削して坑を形成
しつつ、スキンプレート2の後方において内型枠3を所
定形状に組み上げる。
Next, a method of constructing the tunnel T using the water stopping mold 11 will be described. As shown in FIG. 1, to excavate the tunnel T, first, the shield excavator 1
The inner mold 3 is assembled into a predetermined shape behind the skin plate 2 while excavating the ground G with the cutter 1a provided at the front of the skin plate 2 to form a pit.

【0031】図2に示したように、内型枠3を組み上げ
るときには、予め内型枠3の外周面側の凸部(図示な
し)に止水用型枠11の凹部16に挿入することによっ
て、これらを一体にセットした状態で組み上げ作業を行
う。そして、内型枠3と止水用型枠11を組み付けると
きには、掘進方向後方に先行して組み付けられている内
型枠3および止水用型枠11に接合するわけであるが、
新たに組み付ける止水用型枠11は、その噛み合い段部
13を、先行組み付けされている止水用型枠11の止水
プレート部12に噛み合わせるようにする。
As shown in FIG. 2, when assembling the inner mold 3, the inner mold 3 is previously inserted into the concave portion 16 of the water-stopping mold 11 in a convex portion (not shown) on the outer peripheral surface side of the inner mold 3. The assembling work is performed in a state where these are integrally set. And when assembling the inner formwork 3 and the water stopping mold 11, it is joined to the inner formwork 3 and the water stopping form 11 which are assembled earlier in the excavation direction.
The water stopping mold 11 to be newly assembled has its engaging step 13 engaged with the water stopping plate part 12 of the water stopping mold 11 previously assembled.

【0032】このようにして内型枠3と止水用型枠11
とが所定形状に組み上げられた後、組み上げた止水用型
枠11と、その外周側の坑の周壁Twと、妻型枠8との
間の空間に、例えば妻型枠8に形成した図示しない充填
口からコンクリート圧送管17で自硬性充填材4を充填
する。このときには、押圧ジャッキ9を駆動させて、打
設した自硬性充填材4を妻型枠8で加圧し、その圧力
が、周囲地山の圧力よりも常に高く、かつ先行打設され
ている自硬性充填材4の圧力と同等あるいはやや高い所
定の圧力となるように圧力を維持する。このとき、押圧
ジャッキ9の作動は、妻型枠8に設けられた圧力センサ
(図示なし)で検出される自硬性充填材4の圧力に基づ
き、制御手段(図示なし)で制御され、これによって自
硬性充填材4の圧力が、周囲地山の圧力を上回る所定範
囲内の値に自動的に保持されるようになっている。
In this manner, the inner mold 3 and the water stopping mold 11
Are assembled into a predetermined shape, and then, in the space between the assembled water-stopping formwork 11, the peripheral wall Tw of the outer peripheral side thereof, and the wife formwork 8, for example, the figure formed on the wife formwork 8 The self-hardening filler 4 is filled with the concrete pumping pipe 17 from the filling port not to be filled. At this time, the pressing jack 9 is driven to press the poured self-hardening filler material 4 with the end mold 8, and the pressure is always higher than the pressure of the surrounding ground, and the self-dried filling material 4 is previously driven. The pressure is maintained so that the predetermined pressure is equal to or slightly higher than the pressure of the hard filler 4. At this time, the operation of the pressing jack 9 is controlled by a control means (not shown) based on the pressure of the self-hardening filler material 4 detected by a pressure sensor (not shown) provided on the end form 8. The pressure of the self-hardening filler 4 is automatically maintained at a value within a predetermined range exceeding the pressure of the surrounding ground.

【0033】このようにして、打設された自硬性充填材
4は、先行打設した自硬性充填材4に一体化され、しか
もそのとき周囲地山から地下水が進入してくることが防
止される。また、自硬性充填材4の打設を、先行打設し
た後方のリングの自硬性充填材4が硬化する前に行うこ
とによって、通常は両者の自硬性充填材4に打継ぎ目が
形成されず、これにより覆工壁Wが連続体として形成さ
れることとなる。また、打設した自硬性充填材4の圧力
によって、止水用型枠11どうしの噛み合い部分の突出
プレート部12と噛み合い段部13とは互いに密着す
る。
In this manner, the self-hardening filler material 4 that has been cast is integrated with the self-hardening filler material 4 that has been previously placed, and at that time, groundwater is prevented from entering from surrounding ground. You. In addition, by performing the setting of the self-hardening filler 4 before the self-hardening filler 4 of the rear ring that has been previously set is hardened, the seam is not normally formed in both the self-hardening fillers 4. Thus, the lining wall W is formed as a continuous body. In addition, due to the pressure of the self-hardening filler material 4 that has been cast, the protruding plate portion 12 and the engaging step portion 13 of the engaging portion of the water stopping molds 11 come into close contact with each other.

【0034】次いで、打設した自硬性充填材4の圧力を
押圧ジャッキ9で保持したまま、推進ジャッキ5で組み
立てた内型枠3に反力を得てシールド掘削機1を前方に
掘進させ、次のリングにおいて新たな内型枠3および止
水用型枠11の組立を行う。そして、押圧ジャッキ9を
縮めて妻型枠8を前方に移動させながら、自硬性充填材
4の充填−妻型枠8による自硬性充填材4の押圧を行
い、しかる後には、上記作業を順次繰り返し、トンネル
Tを構築していく。
Next, while holding the pressure of the self-hardening filler material 4 that has been cast by the pressing jack 9, a reaction force is obtained by the inner formwork 3 assembled by the propulsion jack 5, and the shield excavator 1 is excavated forward. In the next ring, a new inner mold 3 and a new waterproof mold 11 are assembled. Then, while the pressing jack 9 is contracted and the wife form 8 is moved forward, the self-hardening filler 4 is filled, and the self-hardening filler 4 is pressed by the wife form 8, and after that, the above operation is sequentially performed. The tunnel T is constructed repeatedly.

【0035】そして、自硬性充填材4の硬化後には、内
型枠3を脱型する。これにより止水用型枠11の内周面
がトンネルTの覆工壁Wの表面を形成することとなる。
After the self-hardening filler 4 is cured, the inner mold 3 is released. Thereby, the inner peripheral surface of the water stopping mold 11 forms the surface of the lining wall W of the tunnel T.

【0036】このような止水用型枠11およびそれを用
いたトンネルTの施工方法では、覆工壁Wの内側の全面
が止水用型枠11で覆われた形態となるので、例え休業
日の前後において覆工壁Wに打継ぎ目が存在する箇所等
においても、覆工壁Wからの漏水を防止することができ
る。また、不特定箇所に発生する可能性のあるクラック
等に伴う漏水も確実に防止される。しかも、止水用型枠
11どうしの接合部は、止水プレート部12と噛み合い
段部13とが重なり合っているのでこの部分での止水性
を高めることができる。このように、止水用型枠11を
用いることによって、特に地下水位の下方で施工される
トンネルT等においても、止水性を大幅に向上させるこ
とが可能となる。
In such a water stopping mold 11 and the method of constructing the tunnel T using the same, the entire inside surface of the lining wall W is covered with the water stopping mold 11, so that, for example, it is closed. Water leakage from the lining wall W can be prevented even at places where a seam exists on the lining wall W before and after the day. In addition, water leakage due to a crack or the like that may occur at an unspecified location is reliably prevented. In addition, since the water-stopping plate portion 12 and the meshing step portion 13 overlap at the joint between the water-stopping molds 11, the water-stopping at this portion can be enhanced. As described above, by using the water stopping mold 11, it is possible to greatly improve the water stopping performance even in a tunnel T or the like constructed particularly below the groundwater level.

【0037】加えて、トンネルTの覆工壁Wの内周面が
止水用型枠11によって形成されることになるが、止水
用型枠11は前記したようにプレキャストで形成されて
いるため、したがって覆工壁Wの内周面が非常に滑らか
な表面となり、従来仕上げの目的で行われていた二次覆
工を省略することも可能となり、工期短縮化およびコス
ト削減効果を得ることもできる。
In addition, the inner peripheral surface of the lining wall W of the tunnel T is formed by the water stopping mold 11, which is formed by precasting as described above. Therefore, the inner peripheral surface of the lining wall W becomes a very smooth surface, and it is possible to omit the secondary lining which has been conventionally performed for the purpose of finishing, thereby shortening the construction period and obtaining cost reduction effects. Can also.

【0038】また、止水用型枠11には、その内周面側
に凹部16が複数箇所に形成されているため、内型枠3
の外周面に設けられた凸部(図示なし)を凹部16に挿
入することにより、止水用型枠11を内型枠3に一体に
セットすることができる。したがって、止水用型枠11
を内型枠3に予めセットしておくことにより、内型枠3
の組立と同時に止水用型枠11のセットを行うことがで
きる。その結果、上記のような高い止水性を得るにあた
り、特に施工に面倒になったりすることもなく、コスト
上昇および工期の長期化を抑えることができる。加え
て、自硬性充填材4の打設時に、止水用型枠11がずれ
るのを防止することができる。
Since the water-stopping mold 11 has a plurality of recesses 16 on the inner peripheral surface thereof, the inner mold 3
By inserting a convex portion (not shown) provided on the outer peripheral surface of the watertight mold 11 into the concave portion 16, the water stopping mold 11 can be set integrally with the inner mold 3. Therefore, the water stopping mold 11
Is set in the inner mold 3 in advance, so that the inner mold 3
The setting of the water stopping mold 11 can be performed simultaneously with the assembling. As a result, it is possible to suppress an increase in cost and a prolonged construction period without particularly troublesome construction in obtaining the high water-stopping property as described above. In addition, it is possible to prevent the water stopping mold 11 from shifting when the self-hardening filler 4 is cast.

【0039】さらに、止水用型枠11には、噛み合い段
部13に止水剤注入孔15が形成されているので、内型
枠3の脱型後に、万が一止水用型枠11どうしの接合部
等に漏水が認められた場合等には、止水剤注入孔15か
ら止水剤等を注入することによりこの部分の止水処理を
行うことができる。
Further, since the water-stopping agent injection hole 15 is formed in the engagement step portion 13 of the water-stopping form 11, the water-stopping form 11 is removed after the inner form 3 is removed from the mold. In the case where water leakage is observed at the joint or the like, the water stopping process can be performed on this portion by injecting a water stopping agent or the like from the water stopping agent injection hole 15.

【0040】なお、上記実施の形態で、止水用型枠11
の構成について述べたが、本発明の主旨を逸脱しない限
り、適宜他の構成とすることが可能である。また、図4
(a)に示すように、一方の端部11aと他方の端部1
1bとに、ピン20とピン穴21とを形成するようにし
ても良い。これにより、止水用型枠11どうしを接合す
るときに、ピン20をピン穴21に挿入することによっ
て、止水用型枠11の位置決めおよび双方の接合が確実
に行われる。また、この図に示すように、ピン穴21と
止水剤注入孔15と兼ねるようにすれば、製作の手間を
省くとともに、ピン20とピン穴21の接合部分にも止
水剤の注入を行うことが可能となる。また、図4(b)
に示すように、止水用型枠11の一方の端部11aと他
方の端部11bに、前後方向に延在するピン22とピン
穴23とを形成するようにしても良い。もちろん、止水
用型枠11の材質等については、上記に挙げたものに限
らず、適宜他の材料を採用することが可能である。この
他、止水用型枠11については、例えばその外周面を、
自硬性充填材4との付着性を高めるため、表面を粗にし
ておいてもよい。
In the above embodiment, the water stopping mold 11 is used.
Has been described, but other configurations may be appropriately adopted without departing from the gist of the present invention. FIG.
As shown in (a), one end 11a and the other end 1
1b, a pin 20 and a pin hole 21 may be formed. Thereby, when joining the water stopping molds 11, the pins 20 are inserted into the pin holes 21, whereby the positioning of the water stopping mold 11 and the joining of both are ensured. Also, as shown in this figure, if the pin hole 21 and the water-stopping agent injection hole 15 are also used, it is possible to save the trouble of manufacturing and to inject the water-stopping agent into the joint portion between the pin 20 and the pin hole 21. It is possible to do. FIG. 4 (b)
As shown in (1), a pin 22 and a pin hole 23 extending in the front-rear direction may be formed at one end 11a and the other end 11b of the water stopping mold 11. Of course, the material and the like of the water stopping mold 11 are not limited to those described above, and other materials can be appropriately used. In addition, for the water stopping mold 11, for example,
The surface may be roughened in order to increase the adhesion to the self-hardening filler 4.

【0041】また上記実施の形態で、内型枠3と止水用
型枠11とを前後方向に揃えてセットする構成とした
が、止水用型枠11を内型枠3に対して前後にずらして
施工を行うことも考えられる。このような場合には、止
水プレート部12と噛み合い段部13とを省略したよう
な構成とすることも考えられる。
In the above embodiment, the inner mold 3 and the water stopping mold 11 are set to be aligned in the front-rear direction. It is also conceivable to shift the construction. In such a case, it is conceivable to adopt a configuration in which the water stop plate portion 12 and the engagement step portion 13 are omitted.

【0042】さらに、止水剤注入孔15への止水剤の注
入を漏水が認められた場合等に必要に応じて行う構成と
したが、もちろんこれを必ず行うような構成としても良
い。
Further, the construction is such that the injection of the water-stopping agent into the water-stopping agent injection hole 15 is performed as necessary when water leakage is observed, but it is needless to say that the water-stopping agent injection hole 15 may be necessarily injected.

【0043】なお、本工法に用いるシールド掘削機1の
構造については何ら限定するものではなく、ECL工法
を実施することができるのであれば、いかなる構成のシ
ールド掘削機1を適用しても良い。
The structure of the shield excavator 1 used in the present construction method is not limited at all, and any configuration of the shield excavator 1 may be applied as long as the ECL method can be implemented.

【0044】加えて、上記実施の形態では、断面視円形
のトンネルTを構築する場合を例に挙げたが、構築する
トンネル自体の構成については限定する意図はなく、断
面視矩形のものをはじめとした他の形状のトンネル等に
も本発明の技術を適用することが可能である。
In addition, in the above embodiment, the case of constructing the tunnel T having a circular cross section is taken as an example. However, there is no intention to limit the configuration of the tunnel itself to be constructed. It is also possible to apply the technology of the present invention to tunnels having other shapes.

【0045】これ以外にも、本発明の主旨を逸脱しない
範囲内であれば、いかなる構成を採用しても良く、また
上記したような構成を適宜選択的に組み合わせたものと
しても良いのは言うまでもない。
Other than this, any configuration may be adopted as long as it does not depart from the gist of the present invention, and it is needless to say that the above-described configurations may be appropriately combined selectively. No.

【0046】[0046]

【発明の効果】以上説明したように、請求項1に係る止
水用型枠によれば、内型枠の外周側に止水用型枠を配置
することによりコンクリートが硬化して形成される覆工
壁からの漏水が防止され、さらに止水用型枠どうしの接
合部分においては、一方の止水用型枠の突出プレート部
と他方の止水用型枠の噛み合い部とを噛み合わせること
により、この部分からの漏水も防止できる。このように
して、地下水位の下方で施工されるトンネル等であって
も、コンクリートの打継ぎ目が存在する場合や、覆工壁
にクラックが生じた場合に、止水性を確保することがで
き、止水性を大幅に向上させることが可能となる。加え
て、止水用型枠を予め成型しておくことにより、トンネ
ル内周面の仕上げが不要となる。
As described above, according to the water stopping mold according to the first aspect, the concrete is hardened and formed by disposing the water stopping mold on the outer peripheral side of the inner mold. Water is prevented from leaking from the lining wall, and at the joint between the water stopping molds, the projecting plate portion of one of the water stopping molds and the engagement portion of the other water stopping form are engaged. Thereby, water leakage from this portion can also be prevented. In this way, even in a tunnel or the like constructed below the groundwater level, if there is a seam of concrete, or if a crack occurs in the lining wall, it is possible to secure water stoppage, Water stoppage can be greatly improved. In addition, by forming the water stopping mold in advance, it is not necessary to finish the inner peripheral surface of the tunnel.

【0047】請求項2に係る止水用型枠によれば、止水
用型枠どうしを接合するときに、ピンとピン穴を噛み合
わせることにより、その位置決めおよび双方の接合を確
実に行うことができる。
According to the water stopping mold according to the second aspect, when the water stopping molds are joined together, the pins and the pin holes are engaged with each other, whereby the positioning and the joining of both can be reliably performed. it can.

【0048】請求項3に係る止水用型枠によれば、止水
剤注入孔から止水剤を止水用型枠どうしの接合部に注入
することにより、突出プレート部と噛み合い部との隙間
を塞ぐことができ、この部分の止水性を高めることがで
き、上記効果を一層顕著なものとすることができる。
According to the water-stopping mold of the third aspect, the water-stopping agent is injected into the joint between the water-stopping molds through the water-stopping agent injection hole, so that the projecting plate portion and the meshing portion are connected to each other. The gap can be closed, the waterproofness of this portion can be increased, and the above effect can be further remarkable.

【0049】請求項4に係る止水用型枠によれば、止水
用型枠に形成した凹部を、内型枠の外周面に設けられた
凸部に噛み合わせることにより、止水用型枠のセットを
容易に行うことができ、しかも、自硬性充填材の打設時
に止水用型枠がずれるのを防止することができる。
According to the water stopping mold according to the fourth aspect, the concave portion formed on the water stopping mold is engaged with the convex portion provided on the outer peripheral surface of the inner mold, whereby the water stopping mold is formed. The frame can be easily set, and the water stopping mold can be prevented from shifting when the self-hardening filler is poured.

【0050】請求項5に係るトンネルの施工方法によれ
ば、地下水位の下方で施工されるトンネル等であって
も、コンクリートの打継ぎ目が存在する場合や、覆工壁
にクラックが生じた場合に、止水性を大幅に向上させる
ことが可能となる。加えて、止水用型枠を予め成型して
おくことによりトンネル内周面の仕上げが不要となる。
According to the method for constructing a tunnel according to the fifth aspect, even in the case of a tunnel or the like constructed below the groundwater level, when a concrete joint is present or when a crack occurs in a lining wall. In addition, it is possible to greatly improve the water stoppage. In addition, finishing the inner peripheral surface of the tunnel becomes unnecessary by molding the water stopping mold in advance.

【0051】請求項6に係るトンネルの施工方法によれ
ば、止水剤注入孔から止水剤を止水用型枠どうしの接合
部に注入することにより、突出プレート部と噛み合い部
との隙間を防ぐことができ、この部分の止水性を高める
ことができる。
According to the tunnel construction method of the sixth aspect, the gap between the projecting plate portion and the meshing portion is formed by injecting the waterproofing agent into the joint portion between the waterproofing molds from the waterproofing agent injection hole. Can be prevented, and the water stopping property of this portion can be increased.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明に係る止水用型枠およびそれを用いた
トンネルの施工方法の実施の形態の一例を示す側断面図
である。
FIG. 1 is a side sectional view showing an example of an embodiment of a water stopping mold and a tunnel construction method using the same according to the present invention.

【図2】 前記止水用型枠の設置状態を示す側断面図で
ある。
FIG. 2 is a side sectional view showing an installation state of the water stopping mold.

【図3】 前記止水用型枠の一例を示す側断面図であ
る。
FIG. 3 is a side sectional view showing an example of the water stopping mold.

【図4】 同止水用型枠の他の例を示す側断面図であ
る。
FIG. 4 is a side sectional view showing another example of the water stopping mold.

【符号の説明】[Explanation of symbols]

1 シールド掘削機 3 内型枠 4 自硬性充填材 11 止水用型枠 11a,11b 端部 12 止水プレート部(突出プレート部) 13 噛み合い段部(噛み合い部) 15 止水剤注入孔 16 凹部 20,22 ピン 21,23 ピン穴 G 地山 T トンネル Tw 周壁 DESCRIPTION OF SYMBOLS 1 Shield excavator 3 Inner form 4 Self-hardening filler material 11 Water stopping form 11a, 11b End part 12 Water stopping plate part (projecting plate part) 13 Meshing step part (meshing part) 15 Water stopping agent injection hole 16 Concave part 20,22 pin 21,23 pin hole G Chiyama T Tunnel Tw Surrounding wall

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 シールド掘削機により地山に掘削された
坑の周壁と、該周壁の内周側に間隔を隔てて組まれた内
型枠との間に、自硬性充填材が充填されることによって
前記周壁の内面が覆工されるトンネルに用いられる止水
用型枠であって、 該止水用型枠は、前記内型枠の外周側に配置されるもの
であり、かつ前記トンネル軸線方向において前方側およ
び後方側となる端部には、その一方の前記端部に前方ま
たは後方に向けて突出する突出プレート部が形成され、
他方の前記端部に前記突出プレート部に噛み合う噛み合
い部が形成されていることを特徴とする止水用型枠。
1. A self-hardening filler is filled between a peripheral wall of a pit excavated in the ground by a shield excavator and an inner formwork spaced apart from the inner peripheral side of the peripheral wall. A water stopping mold used for a tunnel in which the inner surface of the peripheral wall is lining, wherein the water stopping mold is arranged on an outer peripheral side of the inner form, and the tunnel A projecting plate portion projecting forward or rearward is formed at one of the ends at the front and rear ends in the axial direction,
A water-stopping formwork, wherein a meshing portion meshing with the protruding plate portion is formed at the other end.
【請求項2】 請求項1記載の止水用型枠であって、前
方側または後方側の前記端部のうちのいずれか一方にピ
ンが形成され、他方に前記ピンが挿入されるピン穴が形
成されていることを特徴とする止水用型枠。
2. The water stopping mold according to claim 1, wherein a pin is formed at one of the front and rear ends and a pin hole is inserted at the other. A water-stopping formwork characterized by having a shape formed thereon.
【請求項3】 請求項1または2記載の止水用型枠であ
って、前記噛み合い部には、他の止水用型枠を接続する
ときに該他の止水用型枠の前記突出プレート部との間に
止水剤を注入するための止水剤注入孔が形成されている
ことを特徴とする止水用型枠。
3. The water-stopping formwork according to claim 1, wherein when the other water-stopping formwork is connected to the engagement portion, the other water-stopping formwork protrudes. A water-stopping form, wherein a water-stopping agent injection hole for injecting a water-stopping agent is formed between the plate portion and the plate portion.
【請求項4】 請求項1から3のいずれかに記載の止水
用型枠であって、前記止水用型枠には、前記内型枠の外
周面に接合するため、前記内型枠の外周面に設けられる
凸部に対応した凹部が形成されていることを特徴とする
止水用型枠。
4. The water stopping mold according to claim 1, wherein the water stopping mold is joined to an outer peripheral surface of the inner forming form. Wherein a concave portion corresponding to the convex portion provided on the outer peripheral surface of the mold is formed.
【請求項5】 シールド掘削機で地山を掘削しつつ、 掘削された地山の周壁を所定の間隔を空けて内型枠で覆
うとともに、 前記トンネルの前方側または後方側となる端部のいずれ
か一方に突出して形成された突出プレート部と、他方に
前記突出プレート部に噛み合うよう形成された噛み合い
部とを有した止水用型枠を、前記内型枠の外周面に沿っ
てセットして、該止水用型枠の前記突出プレート部また
は噛み合い部を、掘進方向後方側に先行して設置されて
いる他の前記止水用型枠の前記噛み合い部または突出プ
レート部に噛み合わせ、 しかる後に、前記止水用型枠と前記周壁との間に自硬性
充填材を充填し、前記自硬性充填材が硬化した後に前記
内型枠を脱型することを特徴とするトンネルの施工方
法。
5. Excavating the ground with a shield excavator, covering the peripheral wall of the ground excavated with an inner form at a predetermined interval, and forming a front end or a rear end of the tunnel. A water stopping mold having a protruding plate portion formed to protrude on one side and a meshing portion formed to mesh with the protruding plate portion on the other side is set along the outer peripheral surface of the inner mold. Then, the protruding plate portion or the engaging portion of the water stopping mold is engaged with the engaging portion or the protruding plate portion of the other water stopping mold which is provided in advance in the excavation direction rear side. Thereafter, a self-hardening filler is filled between the water stopping mold and the peripheral wall, and the inner mold is removed from the mold after the self-hardening filler is cured. Method.
【請求項6】 請求項5記載のトンネルの施工方法であ
って、前記止水用型枠の噛み合い部には、予め止水剤注
入孔を形成しておき、 前記止水用型枠を後方側の前記止水用型枠に噛み合わせ
た後に、前記止水剤注入孔から前記噛み合い部と突出プ
レート部との間に止水剤を注入することを特徴とするト
ンネルの施工方法。
6. The method for constructing a tunnel according to claim 5, wherein a water-stopping agent injection hole is formed in advance at a meshing portion of the water-stopping formwork, and the water-stopping formwork is moved backward. A water-stopping agent is injected between the engagement portion and the protruding plate portion from the water-stopping agent injection hole after being engaged with the water-stopping formwork on the side of the tunnel.
JP11065591A 1999-03-11 1999-03-11 Waterproof formwork and tunnel construction method using the same Pending JP2000257392A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11065591A JP2000257392A (en) 1999-03-11 1999-03-11 Waterproof formwork and tunnel construction method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11065591A JP2000257392A (en) 1999-03-11 1999-03-11 Waterproof formwork and tunnel construction method using the same

Publications (1)

Publication Number Publication Date
JP2000257392A true JP2000257392A (en) 2000-09-19

Family

ID=13291423

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11065591A Pending JP2000257392A (en) 1999-03-11 1999-03-11 Waterproof formwork and tunnel construction method using the same

Country Status (1)

Country Link
JP (1) JP2000257392A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009068209A (en) * 2007-09-12 2009-04-02 Kumagai Gumi Co Ltd Form for lining composed of cast-in-place concrete
JP2009228391A (en) * 2008-03-25 2009-10-08 Ohbayashi Corp Tunnel construction method, inner mold, tunnel lining body, and tunnel structure
JP2010019066A (en) * 2008-06-13 2010-01-28 Mitsubishi Heavy Industries Mechatronics Systems Ltd Inner mold and tunnel excavator with inner mold
JP2022530596A (en) * 2020-03-26 2022-06-30 中鉄三局集団有限公司 Secondary lining high-speed construction structure and method in excavation tunnels with various variable cross sections

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009068209A (en) * 2007-09-12 2009-04-02 Kumagai Gumi Co Ltd Form for lining composed of cast-in-place concrete
JP2009228391A (en) * 2008-03-25 2009-10-08 Ohbayashi Corp Tunnel construction method, inner mold, tunnel lining body, and tunnel structure
JP2010019066A (en) * 2008-06-13 2010-01-28 Mitsubishi Heavy Industries Mechatronics Systems Ltd Inner mold and tunnel excavator with inner mold
JP2022530596A (en) * 2020-03-26 2022-06-30 中鉄三局集団有限公司 Secondary lining high-speed construction structure and method in excavation tunnels with various variable cross sections
JP7229368B2 (en) 2020-03-26 2023-02-27 中鉄三局集団有限公司 High-speed construction structure and method for secondary lining in excavated tunnels with various cross-sections

Similar Documents

Publication Publication Date Title
JP2009228391A (en) Tunnel construction method, inner mold, tunnel lining body, and tunnel structure
JP3765045B2 (en) Shield tunnel construction method
JPH09217584A (en) Pipe roof pipe joint, vertical shaft water-stop packing, and water-stop method for pipe roof method
JP3769717B2 (en) Tunnel lining method
JP5117369B2 (en) Underpass construction method
JPH07324595A (en) Inner formwork and secondary lining method of shield tunnel for internal water pressure
JP3298100B2 (en) Waterproof segment for shield tunnel and its construction method
JP2634883B2 (en) Construction method of tunnel lining
JPH02132295A (en) Constructing method for tunnel lining work
JP2001295580A (en) High-water-pressure joint structure of centrifugal reinforced concrete pipe for propulsion and manufacturing method of the pipe
JPH0519000B2 (en)
JPH10325299A (en) Shield excavator and tunnel lining method using the same
JP2676691B2 (en) Construction method of shield and lining using shield
JP4392577B2 (en) Tunnel construction method and shield excavator
JP3783120B2 (en) Start method of shield excavator
JPH01192999A (en) Shield excavator
JPH0643799B2 (en) Lining sealing method in cast-in-place lining shield method
JP2527912B2 (en) Shield tunnel lining method
JPH02292497A (en) Shield excavator and lining constructing method using its shield excavator
JPH05195694A (en) Sealing method for lining in cast-in-place lining shield construction method
JP2855153B2 (en) Cast-in-place lining method
JPH05149096A (en) Lining shield method
JPH0377000A (en) Reinforcing member for tunnel lining and constructing method of tunnel lining by using said reinforcing member
JPH04250294A (en) Lining method of shield tunnel and device thereof
JP2001234698A (en) Tunnel lining method and tunnel lining wall

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050127

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050816

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20051220