JP2002242580A - Tunnel construction method, drainage method and tunnel - Google Patents

Tunnel construction method, drainage method and tunnel

Info

Publication number
JP2002242580A
JP2002242580A JP2001038645A JP2001038645A JP2002242580A JP 2002242580 A JP2002242580 A JP 2002242580A JP 2001038645 A JP2001038645 A JP 2001038645A JP 2001038645 A JP2001038645 A JP 2001038645A JP 2002242580 A JP2002242580 A JP 2002242580A
Authority
JP
Japan
Prior art keywords
tunnel
pipe
ground
water
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001038645A
Other languages
Japanese (ja)
Inventor
Kazuyoshi Fujimoto
和義 藤本
Koichi Oniki
剛一 鬼木
Shigeo Hosokawa
茂夫 細川
Hiroshi Oya
博史 大屋
Harukage Takahashi
晴景 高橋
Mitsuisa Iwata
充功 岩田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2001038645A priority Critical patent/JP2002242580A/en
Publication of JP2002242580A publication Critical patent/JP2002242580A/en
Pending legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

(57)【要約】 【課題】 地山内で集水し、トンネルの周囲の地山の地
下水位を効果的に低下させるトンネルの構築方法等を提
供すること。 【解決手段】 計画トンネル位置3の両側方に、れき層
21に到達する改良体7を設け、地山からの湧水に対す
る遮水壁とし、先受け工11の上部に水抜きチューブ1
7を設け、れき層21からの湧水を集水して排水し、地
下水位を低下させる。
(57) [Summary] [PROBLEMS] To provide a tunnel construction method and the like that collects water in a ground and effectively lowers the groundwater level of the ground around the tunnel. SOLUTION: On both sides of a planned tunnel position 3, an improved body 7 which reaches a gravel layer 21 is provided as a water impervious wall against spring water from the ground, and a drain tube 1
7 is provided to collect and drain spring water from the gravel layer 21 to lower the groundwater level.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、トンネルの構築方
法、水抜き工法およびトンネルに関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tunnel construction method, a drainage method, and a tunnel.

【0002】[0002]

【従来の技術】従来、地下水を含む地山でNATM工法
を適用する場合、切羽前方に砂礫層等が存在すると、施
工中に湧水が発生し、先受け工の造成が不完全となった
り、切羽が不安定となる。そこで、先受け工や地下水対
策工等の補助工法の利点を組み合わせ、天端の地山およ
び切羽の安定を保つ。
2. Description of the Related Art Conventionally, when the NATM method is applied to a ground including groundwater, if a gravel layer or the like exists in front of a face, spring water will be generated during construction, and the construction of a precedent work may be incomplete. , And the face becomes unstable. Therefore, the advantages of auxiliary construction methods such as pre-installation work and groundwater countermeasure work are combined to maintain the stability of the top of the mountain and the face.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、トンネ
ル計画位置によっては、ディープウェル工法等の地上部
からの地下水対策は困難である。
However, depending on the location of the tunnel plan, it is difficult to take countermeasures against groundwater from above the ground, such as the deep well method.

【0004】本発明は、このような問題に鑑みてなされ
たもので、その目的とするところは、地山内で集水し、
トンネルの周囲の地山の地下水位を効果的に低下させる
トンネルの構築方法、水抜き工法およびトンネルを提供
することにある。
[0004] The present invention has been made in view of such a problem, and its object is to collect water in the ground,
An object of the present invention is to provide a tunnel construction method, a drainage method, and a tunnel that effectively lower the groundwater level of the ground around the tunnel.

【0005】[0005]

【課題を解決するための手段】前述した目的を達成する
ための第1の発明は、掘削・支保作業を交互に行うトン
ネルの構築方法であって、計画トンネル位置の両側方部
に地盤改良体を設ける工程と、前記計画トンネル位置の
上方に補助工と水抜き管を設ける工程とを具備すること
を特徴とするトンネルの構築方法である。第1の発明で
は、計画トンネル位置の両側方に地盤改良体を設け、計
画トンネル位置の上方に補助工と水抜き管を設け、支保
して掘削する工程を繰り返す。地盤改良体と補助工によ
り計画トンネル位置周囲の地山の地下水を遮断し、水抜
き管により、地山からの湧水を集水し、排出する。
According to a first aspect of the present invention, there is provided a method of constructing a tunnel for alternately performing excavation and support operations, wherein a ground improvement body is provided on both sides of a planned tunnel position. And a step of providing an auxiliary work and a drain pipe above the planned tunnel position. In the first invention, a ground improvement body is provided on both sides of the planned tunnel position, an auxiliary work and a drainage pipe are provided above the planned tunnel position, and the step of supporting and excavating is repeated. Groundwater around the site of the planned tunnel will be blocked by the ground improvement body and auxiliary works, and the drainage pipe will collect and discharge spring water from the ground.

【0006】第2の発明は、計画トンネル位置周辺の地
山からの湧水に対する水抜き工法であって、地山に削孔
して、孔が設けられた鋼管を設置する工程と、前記鋼管
の内部にパイプを挿入する工程と、前記地山と前記鋼
管、前記鋼管と前記パイプの空隙を充填材で充填する工
程と、前記パイプに導水管を接続する工程とを具備し、
前記地山からの湧水が前記パイプから前記導水管を伝っ
て排出されることを特徴とする水抜き工法である。第2
の発明では、地山に有孔の鋼管を設置し、鋼管の内部に
パイプを挿入し、地山と鋼管、鋼管とパイプの空隙を充
填材で充填し、パイプに導水管をつなぐ。地山からの湧
水は、パイプの先端で集水され、パイプと導水管の内部
を通って排出される。
A second invention is a drainage method for draining spring water from the ground near the planned tunnel position, wherein the step of drilling holes in the ground and installing a steel pipe provided with holes is provided. A step of inserting a pipe into the interior, a step of filling the gap between the ground and the steel pipe, the steel pipe and the pipe with a filler, and a step of connecting a water pipe to the pipe,
The drainage method is characterized in that spring water from the ground is discharged from the pipe through the water pipe. Second
According to the invention, a perforated steel pipe is installed in the ground, the pipe is inserted into the steel pipe, the gap between the ground and the steel pipe, and the gap between the steel pipe and the pipe are filled with the filler, and the water pipe is connected to the pipe. Spring water from the ground is collected at the tip of the pipe and discharged through the inside of the pipe and water pipe.

【0007】第3の発明は、第1の発明のトンネルの構
築方法により構築されたことを特徴とするトンネルであ
る。
[0007] A third invention is a tunnel constructed by the tunnel construction method of the first invention.

【0008】[0008]

【発明の実施の形態】以下、図面に基づいて、本発明の
実施例を詳細に説明する。図1は、改良体7設置後の断
面図である。改良体7は、例えばクロスジェット工法を
用いて形成し、計画トンネル位置の側方部の地盤を改良
する。まず、計画トンネル位置3の掘削に先行して、図
1に示すように、地表面1に削孔機5を設置する。そし
て、削孔機5で所定の深さまでガイドホール6を削孔し
た後、削孔機5を撤去して造成機を設置する。さらに、
ガイドホール6に三重管を挿入し、地盤を切削してスラ
イムを排出しつつ、硬化材を充填して改良体7を構築す
る。
Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 is a cross-sectional view after the improvement body 7 is installed. The improved body 7 is formed by using, for example, the cross jet method, and improves the ground at the side of the planned tunnel position. First, prior to excavation at the planned tunnel position 3, a drilling machine 5 is installed on the ground surface 1 as shown in FIG. Then, after drilling the guide hole 6 to a predetermined depth by the drilling machine 5, the drilling machine 5 is removed and a forming machine is installed. further,
A triple pipe is inserted into the guide hole 6, and the ground is cut to discharge the slime while filling the hardening material to construct the improved body 7.

【0009】図2は、図3のA―A断面図、図3は先受
け工11および水抜きチューブ17設置後のトンネル5
0の側面図である。図2および図3に示すように、切羽
15を安定させるために鏡補強工9を施工する。鏡補強
工9には、例えば、切羽15に吹付けコンクリートを施
した後、ロディンジェット工法を用いる。ロディンジェ
ット工法とは、地山を所定の深度まで削孔した後、ロッ
ドの先端から硬化材を超高圧で噴射しつつ引き抜くこと
で地山を切削・混合して円柱状の改良体を造成するもの
である。削孔穴から出水する場合、必要に応じて、セメ
ントミルクの代わりに水ガラス系の材料を噴射して孔壁
を安定させる等の湧水対策を行う。
FIG. 2 is a sectional view taken along line AA of FIG. 3, and FIG.
0 is a side view. As shown in FIGS. 2 and 3, a mirror reinforcement 9 is applied to stabilize the face 15. For the mirror reinforcement 9, for example, after spraying concrete on the face 15, a rodin jet method is used. Rodin jet method is to cut and mix the ground by drilling the ground to a predetermined depth and then ejecting the hardened material from the tip of the rod while injecting it at ultra-high pressure to create a columnar improved body. Things. When water is discharged from the drilled hole, if necessary, measures against spring water such as stabilizing the hole wall by injecting a water glass-based material instead of cement milk are taken.

【0010】そして、切羽15から計画トンネル位置3
の上方を削孔し、先受け工11を設置する。先受け工1
1には、例えばロディンチューブ工法を用いる。ロディ
ンチューブ工法とは、地山に注入用鋼管を建て込んで注
入材を注入し、地山を改良するものである。建て込んだ
鋼管からの湧水量により、ウレタンまたはセメント系の
注入材を選出する。図2、図3に示されるように、複数
の先受け工11がトンネル50の上方の地山に向けて所
定の間隔で設けられる。
Then, from the face 15 to the planned tunnel position 3
A hole is drilled in the upper part of, and the precedenter 11 is installed. First work 1
For example, a rodin tube method is used for 1. The rodin tube method is to build a steel pipe for injection into the ground and inject the injected material to improve the ground. Urethane or cement-based injection materials are selected based on the amount of spring water from the built steel pipes. As shown in FIGS. 2 and 3, a plurality of preloaders 11 are provided at predetermined intervals toward the ground above the tunnel 50.

【0011】次に、切羽15から計画トンネル位置3の
上方に水抜きチューブ17を設置する。図4は水抜きチ
ューブ17の詳細図である。まず、切羽15から、地山
を、先受け工11の掘削長をさらに数メートル延長して
削孔し、鋼管33を打設する。鋼管33は、複数の孔4
1を有し、先受け工11と同等かそれ以上の長さであ
る。そして、鋼管33の内部に塩化ビニル製パイプなど
の水抜き管29を設置する。
Next, a drain tube 17 is installed above the planned tunnel position 3 from the face 15. FIG. 4 is a detailed view of the drain tube 17. First, the ground is drilled from the face 15 by extending the excavation length of the precedenter 11 by several meters, and a steel pipe 33 is driven. The steel pipe 33 has a plurality of holes 4.
1 and the length is equal to or longer than that of the precedent 11. Then, a drain pipe 29 such as a vinyl chloride pipe is installed inside the steel pipe 33.

【0012】水抜き管29は、鋼管33の内部の導水部
29aと、その先の集水部29bからなり、導水部29
aの先端近くに穴35を有する。集水部29bの先端
は、れき層21に到達する。れき層21が切羽15の内
部に下がってきた場合は、水抜き管29の場所を適宜下
方にシフトする。
The drainage pipe 29 is composed of a water guide part 29a inside the steel pipe 33 and a water collector part 29b ahead of the water guide part 29a.
It has a hole 35 near the tip of a. The tip of the water collecting part 29b reaches the gravel layer 21. When the gravel layer 21 comes down inside the face 15, the location of the drainage pipe 29 is shifted downward as appropriate.

【0013】さらに、鋼管33の口元をコーキングし、
水抜き管(導水部)29aと鋼管33の隙間に充填材3
7を注入する。充填材37が鋼管33の先端まで充填さ
れ、水抜き管29の穴35から逆流したところで注入を
終了する。鋼管33は全長にわたり孔41を有するた
め、鋼管33と地山42の隙間にも充填材37aが充填
される。充填材37、充填材37aには、セメント系硬
化材等を用いる。そして、水抜き管(導水部)29aの
切羽15側に導水管40を接続する。
Further, the mouth of the steel pipe 33 is caulked,
Filler 3 is placed in the gap between drain pipe (water guide) 29a and steel pipe 33.
Inject 7 The filling is completed when the filler 37 is filled to the tip of the steel pipe 33 and flows backward through the hole 35 of the drain pipe 29. Since the steel pipe 33 has the hole 41 over the entire length, the gap between the steel pipe 33 and the ground 42 is also filled with the filler 37a. As the filler 37 and the filler 37a, a cement hardening material or the like is used. Then, the water guide pipe 40 is connected to the face 15 side of the drain pipe (water guide section) 29a.

【0014】鋼管33を先受け工11と同等以上の長さ
とすることにより、先受け工11の設置区間は不透水区
間となる。また、充填材37と充填材37aは、れき層
21からの湧水が、地山42と鋼管33の隙間や鋼管3
3と水抜き管29の隙間から切羽15へ流れこむのを防
ぐ。れき層21からの湧水は、水抜き管(集水部)29
bで集水され、水抜き管29の内部のみを通って、導水
管40から排出される。水抜きチューブ17の作用によ
る地下水位の経時変化は、観測井25で観測される。
尚、図2、図3に示されるように、水抜きチューブ17
は、トンネル50の上方の地山に向けて設けられる。
By setting the length of the steel pipe 33 to be equal to or longer than the length of the preloader 11, the installation section of the preloader 11 becomes an impermeable section. The filler 37 and the filler 37a are formed by the spring water from the gravel layer 21 and the gap between the ground 42 and the steel pipe 33 and the steel pipe 3
It is prevented from flowing into the face 15 from the gap between the drainage pipe 3 and the drain pipe 29. The spring water from the gravel layer 21 is drained from the drainage pipe (water collecting section) 29.
The water is collected at b, and is discharged from the water guide pipe 40 through only the inside of the drain pipe 29. The temporal change of the groundwater level due to the action of the drain tube 17 is observed at the observation well 25.
Note that, as shown in FIGS.
Is provided toward the ground above the tunnel 50.

【0015】改良体7は、計画トンネル位置3の両側方
に連続して形成され、計画トンネル位置3の側方の粘土
層23から、地層境界19を越えてれき層21に達す
る。粘土層23は透水性が悪く、改良体7をれき層21
まで延長することにより、計画トンネル位置3上部のれ
き層21における地下水の流れを抑え、切羽15や切羽
15の天端からの地下水の浸透を防ぐことができる。こ
のように、改良体7は、支保工13を支え、透水層であ
るれき層21の地下水を遮断し、透水係数を低下させ
る。
The improved body 7 is continuously formed on both sides of the planned tunnel position 3, and extends from the clay layer 23 on the side of the planned tunnel position 3 to the debris layer 21 across the stratum boundary 19. Clay layer 23 has poor water permeability, and
By extending the flow to the contaminated layer 21 above the planned tunnel position 3, the flow of the groundwater can be suppressed, and the permeation of the groundwater from the face 15 or the top end of the face 15 can be prevented. As described above, the improved body 7 supports the shoring 13, blocks the groundwater of the permeable layer 21, and lowers the permeability coefficient.

【0016】先受け工11は、計画トンネル位置3の上
部の地山(粘土層23とれき層21)の崩壊を防止し、
地下水を遮断し、透水係数を低下させる。水抜きチュー
ブ17は、れき層21の地下水を排水し、地下水位を低
下させる。
The pre-installation work 11 prevents collapse of the ground (clay layer 23 and gravel layer 21) above the planned tunnel position 3;
Blocks groundwater and reduces permeability. The drain tube 17 drains the groundwater of the gravel layer 21 and lowers the groundwater level.

【0017】計画トンネル位置3への湧水をQとする
と、Q=A×k×h/Lで表せる。Aは透水ゾーンと接
している面積、kは補助工法で形成したゾーンの透水係
数、hは補助工法で形成したゾーンの上部の地下水高
さ、Lは補助工法で形成したゾーンの厚さである。ここ
で、補助工法とは改良体7と先受け工11である。改良
体7と先受け工11は、kを小さくしたゾーン(厚さ
L)を形成する。また、水抜きチューブ17はhを小さ
くする。よって、湧水Qは少なくなる。
Assuming that spring water at the planned tunnel position 3 is Q, it can be expressed as Q = A × k × h / L. A is the area in contact with the permeability zone, k is the permeability coefficient of the zone formed by the auxiliary method, h is the height of the groundwater above the zone formed by the auxiliary method, and L is the thickness of the zone formed by the auxiliary method. . Here, the auxiliary construction method is the improved body 7 and the precedent construction 11. The improved body 7 and the preform 11 form a zone (thickness L) where k is reduced. The drain tube 17 reduces h. Therefore, spring water Q decreases.

【0018】トンネル50の施工は、図3に示すよう
に、スパン長27ごとに支保と掘削を繰り返して進め
る。図5は、トンネル上半部47の掘削時の断面図であ
る。掘削機45を用いて計画トンネル位置3の上半部を
掘削し、支保工13を建て込む。図6は、トンネル下半
部51の掘削時の断面図である。掘削機49を用いて計
画トンネル位置3の下半部を掘削し、支保工55を建て
込む。
The construction of the tunnel 50 proceeds as shown in FIG. FIG. 5 is a cross-sectional view of the upper half portion 47 of the tunnel at the time of excavation. The upper half of the planned tunnel position 3 is excavated using the excavator 45, and the shoring 13 is built. FIG. 6 is a sectional view of the lower half portion 51 of the tunnel at the time of excavation. The lower half of the planned tunnel position 3 is excavated using the excavator 49, and the shoring 55 is built.

【0019】図7はインバート53施工時の断面図、図
8は覆工コンクリート55施工時の断面図である。トン
ネル下半部51の下部にインバート53を施工し、トン
ネル50内部の覆工コンクリート55を打設して、トン
ネル50を完成する。
FIG. 7 is a sectional view when the invert 53 is constructed, and FIG. 8 is a sectional view when the lining concrete 55 is constructed. An invert 53 is constructed below the lower half portion 51 of the tunnel, and lining concrete 55 inside the tunnel 50 is cast to complete the tunnel 50.

【0020】このように、水抜きチューブ17を設けて
れき層21からの湧水を排水することにより、切羽15
からの湧水を防ぐことができる。また、改良体7をトン
ネル計画位置3の両側方に遮水壁として設けることによ
り、先受け工11の区間を不透水ゾーンとでき、計画ト
ンネル位置3の上部の地山への地下水の供給を遮断でき
る。
As described above, the drainage tube 17 is provided to drain the spring water from the gravel layer 21 so that the face 15
From spring water. In addition, by providing the improved body 7 as a water impervious wall on both sides of the tunnel planning position 3, the section of the precedent 11 can be made into an impermeable zone, and supply of groundwater to the ground above the planning tunnel position 3 can be achieved. Can be shut off.

【0021】なお、本実施の形態では、改良体7をれき
層21に到達させたが、支保工13を支えられるまでの
長さとしてもよい。すなわち、先受け工11の支保工1
3が乗るレベルに到達させる。また、改良体7の設置、
先受け工11、鏡補強工9などの各補助工法は、同等の
補助工法で置き換えてもよい。
In the present embodiment, the improved body 7 reaches the gravel layer 21, but may have a length sufficient to support the support 13. That is, the support 1 of the precedent 11
Reach level 3 riding. Also, installation of the improved body 7,
Each of the auxiliary construction methods such as the precedenter 11 and the mirror reinforcement 9 may be replaced with an equivalent auxiliary construction method.

【0022】[0022]

【発明の効果】以上、詳細に説明したように本発明によ
れば、地山内で集水し、トンネルの周囲の地山の地下水
位を効果的に低下させるトンネルの構築方法、水抜き工
法およびトンネルを提供できる。
As described above in detail, according to the present invention, a method of constructing a tunnel, a draining method, and a method of collecting water in a ground and effectively lowering the groundwater level of the ground around the tunnel are effectively provided. Can provide a tunnel.

【図面の簡単な説明】[Brief description of the drawings]

【図1】改良体7設置後の断面図FIG. 1 is a cross-sectional view after an improved body 7 is installed.

【図2】図3のA―A断面図FIG. 2 is a sectional view taken along line AA of FIG. 3;

【図3】先受け工11および水抜きチューブ17設置後
のトンネル50の側面図
FIG. 3 is a side view of the tunnel 50 after installation of the precedenter 11 and the drain tube 17;

【図4】水抜きチューブ17の詳細図FIG. 4 is a detailed view of a drain tube 17;

【図5】トンネル上半部47の掘削時の断面図FIG. 5 is a sectional view of the upper half portion 47 of the tunnel at the time of excavation.

【図6】トンネル下半部51の掘削時の断面図FIG. 6 is a cross-sectional view of the lower half portion 51 of the tunnel at the time of excavation.

【図7】インバート53施工時の断面図FIG. 7 is a cross-sectional view when the invert 53 is constructed.

【図8】覆工コンクリート55施工時の断面図FIG. 8 is a cross-sectional view when lining concrete 55 is applied.

【符号の説明】[Explanation of symbols]

1………地表面 3………計画トンネル位置 7………改良体 11………先受け工 13………支保工 15………切羽 17………水抜きチューブ 21………れき層 27………スパン長 29a、29b………水抜き管 33………鋼管 41………孔 DESCRIPTION OF SYMBOLS 1 ... Ground surface 3 ... Planned tunnel position 7 ... Improved body 11 ... Preceding work 13 ... Supporting work 15 ... Face face 17 ... Drainage tube 21 ... Brake layer 27 Span length 29a, 29b Drain pipe 33 Steel pipe 41 Hole

───────────────────────────────────────────────────── フロントページの続き (72)発明者 細川 茂夫 東京都港区元赤坂一丁目2番7号 鹿島建 設株式会社内 (72)発明者 大屋 博史 東京都港区元赤坂一丁目2番7号 鹿島建 設株式会社内 (72)発明者 高橋 晴景 東京都港区元赤坂一丁目2番7号 鹿島建 設株式会社内 (72)発明者 岩田 充功 東京都港区元赤坂一丁目2番7号 鹿島建 設株式会社内 Fターム(参考) 2D054 AC15 AC20 AD23 FA02 FA06 FA07  ──────────────────────────────────────────────────の Continued on the front page (72) Inventor Shigeo Hosokawa 1-2-7 Moto-Akasaka, Minato-ku, Tokyo Inside Kashima Construction Co., Ltd. (72) Inventor Hiroshi Oya 1-2-7 Moto-Akasaka, Minato-ku, Tokyo No. Kashima Construction Co., Ltd. (72) Inventor Harutaka Takahashi 1-2-7 Moto Akasaka, Minato-ku, Tokyo Kashima Construction Co., Ltd. (72) Inventor Mitsugu Iwata 1-2-2 Moto-Akasaka, Minato-ku, Tokyo No. 7 F-term in Kashima Construction Co., Ltd. (reference) 2D054 AC15 AC20 AD23 FA02 FA06 FA07

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】 掘削・支保作業を交互に行うトンネルの
構築方法であって、 計画トンネル位置の両側方部に地盤改良体を設ける工程
と、 前記計画トンネル位置の上方に補助工と水抜き管を設け
る工程と、 を具備することを特徴とするトンネルの構築方法。
1. A method for constructing a tunnel in which excavation and support operations are alternately performed, wherein a ground improvement body is provided on both sides of a planned tunnel position, and an auxiliary work and a drain pipe are provided above the planned tunnel position. A method for constructing a tunnel, comprising the steps of:
【請求項2】 前記地盤改良体の上部は、前記先受け工
の支保工が乗るレベルに到達することを特徴とする請求
項1記載のトンネルの構築方法。
2. The tunnel construction method according to claim 1, wherein an upper portion of the ground improvement body reaches a level at which the support of the precedent is mounted.
【請求項3】 前記地盤改良体の上部は、湧水層に到達
することを特徴とする請求項1記載のトンネルの構築方
法。
3. The tunnel construction method according to claim 1, wherein an upper portion of the ground improvement body reaches a spring layer.
【請求項4】 前記補助工は先受け工であることを特徴
とする請求項1記載のトンネルの構築方法。
4. The tunnel construction method according to claim 1, wherein the auxiliary work is a precedent work.
【請求項5】 地山内の前記水抜き管の長さを補助工の
長さより長くすることを特徴とする請求項1記載のトン
ネルの構築方法。
5. The tunnel construction method according to claim 1, wherein the length of the drainage pipe in the ground is longer than the length of the auxiliary work.
【請求項6】 計画トンネル位置周辺の地山からの湧水
に対する水抜き工法であって、 地山に削孔して、孔が設けられた鋼管を設置する工程
と、 前記鋼管の内部にパイプを挿入する工程と、 前記地山と前記鋼管、前記鋼管と前記パイプの空隙を充
填材で充填する工程と、 前記パイプに導水管を接続する工程と、 を具備し、 前記地山からの湧水が前記パイプから前記導水管を伝っ
て排出されることを特徴とする水抜き工法。
6. A draining method for draining spring water from a ground near a planned tunnel position, wherein a hole is drilled in the ground and a steel pipe provided with a hole is provided, and a pipe is provided inside the steel pipe. And filling the gap between the ground and the steel pipe, the steel pipe and the pipe with a filler, and connecting a water guide pipe to the pipe. A method for draining water, wherein water is discharged from the pipe along the water pipe.
【請求項7】 前記パイプの先端が、前記湧水層に到達
することを特徴とする請求項5記載の水抜き工法。
7. The draining method according to claim 5, wherein a tip of the pipe reaches the spring layer.
【請求項8】 請求項1記載のトンネルの構築方法によ
り構築されたことを特徴とするトンネル。
8. A tunnel constructed by the tunnel construction method according to claim 1.
JP2001038645A 2001-02-15 2001-02-15 Tunnel construction method, drainage method and tunnel Pending JP2002242580A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001038645A JP2002242580A (en) 2001-02-15 2001-02-15 Tunnel construction method, drainage method and tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001038645A JP2002242580A (en) 2001-02-15 2001-02-15 Tunnel construction method, drainage method and tunnel

Publications (1)

Publication Number Publication Date
JP2002242580A true JP2002242580A (en) 2002-08-28

Family

ID=18901579

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001038645A Pending JP2002242580A (en) 2001-02-15 2001-02-15 Tunnel construction method, drainage method and tunnel

Country Status (1)

Country Link
JP (1) JP2002242580A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008026019A (en) * 2006-07-18 2008-02-07 Shimizu Corp Vertical shaft construction of underground waste disposal facility and construction method of underground underground waste disposal facility
CN103306683A (en) * 2013-06-18 2013-09-18 中铁隧道集团有限公司 Construction method for comprehensive precipitation in hole in deep-buried tunnel excavation process
CN103628915A (en) * 2013-11-28 2014-03-12 中铁十三局集团有限公司 Dewatering and drainage method for large-section water-rich saturation fine-silt tunnel
CN103628887A (en) * 2013-11-28 2014-03-12 中铁十三局集团有限公司 Large-section water-rich saturated fine sand railway tunnel excavation method
CN104389634A (en) * 2014-09-16 2015-03-04 中国矿业大学 Mine vertical shaft/sieve shaft well wall structure and controllable dewatering method thereof
CN104790419A (en) * 2015-03-24 2015-07-22 中铁三局集团有限公司 Dewatering construction method applicable to tunnel in water-rich quicksand stratum
CN106988781A (en) * 2017-04-25 2017-07-28 中煤科工集团西安研究院有限公司 Coal mine down-hole tunnel is precisely to wearing draining hole construction method
CN107100671A (en) * 2017-05-31 2017-08-29 中铁七局集团第三工程有限公司 A kind of pressure surface shape of tunnel rich water country rock, which drops down, draws drainage mechanism in adfluxion
CN109555528A (en) * 2018-11-26 2019-04-02 中铁二十局集团有限公司 Pass through that high angle is inverse to rush rich water richness sand tomography tunnel excavation and method for protecting support
JP6917604B1 (en) * 2020-10-12 2021-08-11 株式会社カテックス Ground reinforcement method
CN115288718A (en) * 2022-08-08 2022-11-04 中国电建集团成都勘测设计研究院有限公司 Shallow Buried Deep Tunnel Excavation Support Method

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008026019A (en) * 2006-07-18 2008-02-07 Shimizu Corp Vertical shaft construction of underground waste disposal facility and construction method of underground underground waste disposal facility
CN103306683A (en) * 2013-06-18 2013-09-18 中铁隧道集团有限公司 Construction method for comprehensive precipitation in hole in deep-buried tunnel excavation process
CN103628915A (en) * 2013-11-28 2014-03-12 中铁十三局集团有限公司 Dewatering and drainage method for large-section water-rich saturation fine-silt tunnel
CN103628887A (en) * 2013-11-28 2014-03-12 中铁十三局集团有限公司 Large-section water-rich saturated fine sand railway tunnel excavation method
CN104389634A (en) * 2014-09-16 2015-03-04 中国矿业大学 Mine vertical shaft/sieve shaft well wall structure and controllable dewatering method thereof
CN104790419A (en) * 2015-03-24 2015-07-22 中铁三局集团有限公司 Dewatering construction method applicable to tunnel in water-rich quicksand stratum
CN106988781A (en) * 2017-04-25 2017-07-28 中煤科工集团西安研究院有限公司 Coal mine down-hole tunnel is precisely to wearing draining hole construction method
CN107100671A (en) * 2017-05-31 2017-08-29 中铁七局集团第三工程有限公司 A kind of pressure surface shape of tunnel rich water country rock, which drops down, draws drainage mechanism in adfluxion
CN109555528A (en) * 2018-11-26 2019-04-02 中铁二十局集团有限公司 Pass through that high angle is inverse to rush rich water richness sand tomography tunnel excavation and method for protecting support
CN109555528B (en) * 2018-11-26 2019-10-11 中铁二十局集团有限公司 Excavation and support methods for tunnels crossing high-angle thrust water-rich sand-rich faults
JP6917604B1 (en) * 2020-10-12 2021-08-11 株式会社カテックス Ground reinforcement method
CN115288718A (en) * 2022-08-08 2022-11-04 中国电建集团成都勘测设计研究院有限公司 Shallow Buried Deep Tunnel Excavation Support Method

Similar Documents

Publication Publication Date Title
CN110306593A (en) A kind of station construction method
JP4296549B2 (en) Underground support structure, its construction method and tunnel construction method
CN107542469A (en) A kind of underground mould bag stake method for protecting support
CN106917626A (en) Dewatering construction method in double side wall hole based on saturated loess
JP4485674B2 (en) Method for constructing continuous underground wall, method for lowering groundwater level, and method for restoring groundwater level
CN110762286A (en) Drainage pipe network artificial pipe jacking construction process
JP2002206232A (en) Groundwater drainage well and its construction method
JP4376760B2 (en) Groundwater absorption device and groundwater absorption method
JP4214033B2 (en) Construction method of shaft
CN109518684A (en) A kind of artificial digging pile drift sand formation steel pipe dado reinforced construction method
CN114033391B (en) Construction and monitoring method for shield underpass highway viaduct of water-rich sand layer
CN207063981U (en) A kind of underground mould bag stake suspension device
JP6441692B2 (en) Underground structure with flood control function and its construction method
JP4274898B2 (en) Groundwater flow conservation method
JP3620323B2 (en) How to renovate underground structures
KR102243585B1 (en) Structure of constructing non-excavation type tunnel using steel pipe loof and leading pipe
KR102243586B1 (en) Two-side semicircle arch type leading pipe and structure of non-excavation type tunnel using thereof and method of constructing thereof
JP4346078B2 (en) Ground improvement method
CN110284506A (en) A kind of foundation pit enclosure method for the expansion construction that deep basal pit is cheated to shallow foundation
JP2874906B2 (en) Shaft construction method
JP2008045352A (en) Landslide prevention construction method of valley-filling banking
JP2005090015A (en) Ground excavating method
JPH08109790A (en) Shield shaft reinforcement structure
JP3819902B2 (en) How to reach the shield machine
JP2004238981A (en) Tunnel construction method