JP2011069558A - 多缶設置ボイラ - Google Patents
多缶設置ボイラ Download PDFInfo
- Publication number
- JP2011069558A JP2011069558A JP2009221763A JP2009221763A JP2011069558A JP 2011069558 A JP2011069558 A JP 2011069558A JP 2009221763 A JP2009221763 A JP 2009221763A JP 2009221763 A JP2009221763 A JP 2009221763A JP 2011069558 A JP2011069558 A JP 2011069558A
- Authority
- JP
- Japan
- Prior art keywords
- boiler
- boilers
- steam
- priority
- changed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title claims abstract description 12
- 238000002485 combustion reaction Methods 0.000 claims description 79
- 239000002699 waste material Substances 0.000 abstract 1
- 230000007423 decrease Effects 0.000 description 7
- 238000001514 detection method Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000010926 purge Methods 0.000 description 3
- 239000000446 fuel Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 239000012141 concentrate Substances 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000010025 steaming Methods 0.000 description 1
Images
Landscapes
- Control Of Steam Boilers And Waste-Gas Boilers (AREA)
Abstract
【解決手段】
稼働優先順位を定めた複数台の蒸気ボイラ1と、各ボイラ1に対して運転の指令を出力する台数制御装置2からなる多缶設置ボイラにおいて、稼働優先順位の変更時、
1.稼働優先順位未変更ボイラの中で変更後の順位が最上位となるボイラの順位を変更し、
2.順位変更を行ったボイラの蒸気温度又は蒸気圧力が設定値以上となり、ボイラは燃焼中であることを検出するまではその順位を維持し、
3.順位変更ボイラの蒸気温度又は蒸気圧力が設定値を越え、ボイラは燃焼を行っていることを検出後、順位変更で順位が重複するボイラがある場合には、順位変更を行っていないボイラの稼働優先順位を変更することで重複を解消することとし、
すべての設置ボイラで稼働優先順位の変更が行われるまで、前記1から3の制御を繰り返し行う。
【選択図】図1
Description
稼働優先順位の変更時、まず各ボイラの変更後の稼働優先順位を算出しておき、
1.稼働優先順位の変更を行っていないボイラの中で変更後の稼働優先順位が最上位となるボイラの稼働優先順位を変更し、
2.順位変更を行ったボイラに対して燃焼指令の出力が行われている場合には、該ボイラの蒸気温度又は蒸気圧力が設定値以上となり、ボイラは燃焼中であることを検出するまではその稼働優先順位を維持し、
3.順位変更ボイラの蒸気温度又は蒸気圧力が設定値を越え、ボイラは燃焼を行っていることを検出後、稼働優先順位の変更で稼働優先順位が重複するボイラがある場合には、順位変更を行っていないボイラの稼働優先順位を変更することで重複を解消することとし、
すべての設置ボイラで稼働優先順位の変更が行われるまで、前記1から3の制御を繰り返し行う。
2 台数制御装置
3 蒸気圧力検出装置
4 蒸気ヘッダ
5 ボイラ運転制御装置
6 蒸気温度検出装置
Claims (1)
- 稼働優先順位を定めた複数台の蒸気ボイラと、各ボイラに対して運転の指令を出力する台数制御装置からなり、台数制御装置は稼働優先順位の高いボイラから必要台数分のボイラに対して燃焼指令を出力するようにしている多缶設置ボイラにおいて、
稼働優先順位の変更時、まず各ボイラの変更後の稼働優先順位を算出しておき、
1.稼働優先順位の変更を行っていないボイラの中で変更後の稼働優先順位が最上位となるボイラの稼働優先順位を変更し、
2.順位変更を行ったボイラに対して燃焼指令の出力が行われている場合には、該ボイラの蒸気温度又は蒸気圧力が設定値以上となり、ボイラは燃焼中であることを検出するまではその稼働優先順位を維持し、
3.順位変更ボイラの蒸気温度又は蒸気圧力が設定値を越え、ボイラは燃焼を行っていることを検出後、稼働優先順位の変更で稼働優先順位が重複するボイラがある場合には、順位変更を行っていないボイラの稼働優先順位を変更することで重複を解消することとし、
すべての設置ボイラで稼働優先順位の変更が行われるまで、前記1から3の制御を繰り返し行うものであることを特徴とする多缶設置ボイラ。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2009221763A JP5349235B2 (ja) | 2009-09-28 | 2009-09-28 | 多缶設置ボイラ |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2009221763A JP5349235B2 (ja) | 2009-09-28 | 2009-09-28 | 多缶設置ボイラ |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2011069558A true JP2011069558A (ja) | 2011-04-07 |
| JP5349235B2 JP5349235B2 (ja) | 2013-11-20 |
Family
ID=44014989
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2009221763A Active JP5349235B2 (ja) | 2009-09-28 | 2009-09-28 | 多缶設置ボイラ |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP5349235B2 (ja) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2013117350A (ja) * | 2011-12-02 | 2013-06-13 | Samson Co Ltd | 多缶設置ボイラ |
| JP2014149120A (ja) * | 2013-01-31 | 2014-08-21 | Miura Co Ltd | ボイラシステム |
| JP2014178042A (ja) * | 2013-03-13 | 2014-09-25 | Miura Co Ltd | ボイラシステム |
| JP2014211296A (ja) * | 2013-04-22 | 2014-11-13 | 株式会社サムソン | 多缶設置ボイラ |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH01151002U (ja) * | 1988-04-04 | 1989-10-18 | ||
| JP2003302003A (ja) * | 2002-04-11 | 2003-10-24 | Samson Co Ltd | 多缶設置ボイラの台数制御装置 |
-
2009
- 2009-09-28 JP JP2009221763A patent/JP5349235B2/ja active Active
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH01151002U (ja) * | 1988-04-04 | 1989-10-18 | ||
| JP2003302003A (ja) * | 2002-04-11 | 2003-10-24 | Samson Co Ltd | 多缶設置ボイラの台数制御装置 |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2013117350A (ja) * | 2011-12-02 | 2013-06-13 | Samson Co Ltd | 多缶設置ボイラ |
| JP2014149120A (ja) * | 2013-01-31 | 2014-08-21 | Miura Co Ltd | ボイラシステム |
| JP2014178042A (ja) * | 2013-03-13 | 2014-09-25 | Miura Co Ltd | ボイラシステム |
| JP2014211296A (ja) * | 2013-04-22 | 2014-11-13 | 株式会社サムソン | 多缶設置ボイラ |
Also Published As
| Publication number | Publication date |
|---|---|
| JP5349235B2 (ja) | 2013-11-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110940094B (zh) | 燃气热水器控制方法及燃气热水器 | |
| JP5349235B2 (ja) | 多缶設置ボイラ | |
| JP5086145B2 (ja) | 多缶設置ボイラ | |
| JP2016223686A (ja) | 多缶設置ボイラ | |
| JP3999024B2 (ja) | 多缶設置ボイラの台数制御装置 | |
| JP5465473B2 (ja) | ボイラ多缶設置システム | |
| JP2010236719A (ja) | 多缶設置ボイラ | |
| JP5410921B2 (ja) | 多缶設置ボイラ | |
| JP5692807B2 (ja) | 多缶設置ボイラ | |
| JP2004069086A (ja) | 多缶設置ボイラ | |
| JP6289119B2 (ja) | 送気弁を持った多缶設置ボイラ | |
| JP5579513B2 (ja) | 多缶設置ボイラ | |
| JP5455867B2 (ja) | 熱媒ボイラ多缶設置システム | |
| JP2010286180A (ja) | ボイラ多缶設置システム | |
| JP2011099600A (ja) | 多缶設置ボイラ | |
| JP5541781B2 (ja) | ボイラの多缶設置システム | |
| JP5777210B2 (ja) | パイロット燃焼を行うボイラ | |
| JP4176686B2 (ja) | パイロットバーナを持った燃焼装置 | |
| JP2010133672A (ja) | ボイラ多缶設置システム | |
| JP2011179730A (ja) | ボイラの多缶設置システム | |
| EP3287612A1 (en) | Hrsg control for optimized fresh air operation | |
| JP2006084094A (ja) | パイロット燃焼制御を行う燃焼装置 | |
| JP2025185883A (ja) | ボイラ制御システム及びボイラ制御方法 | |
| JP2004077043A (ja) | 負荷量に応じてパイロット燃焼設定台数を定める多缶設置ボイラ | |
| JP5473807B2 (ja) | 燃焼装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20120801 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20130808 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20130819 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20130820 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 5349235 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |