JP2017011804A - 電力管理装置、装置システム、電力管理方法、およびプログラム - Google Patents
電力管理装置、装置システム、電力管理方法、およびプログラム Download PDFInfo
- Publication number
- JP2017011804A JP2017011804A JP2015122446A JP2015122446A JP2017011804A JP 2017011804 A JP2017011804 A JP 2017011804A JP 2015122446 A JP2015122446 A JP 2015122446A JP 2015122446 A JP2015122446 A JP 2015122446A JP 2017011804 A JP2017011804 A JP 2017011804A
- Authority
- JP
- Japan
- Prior art keywords
- power
- amount
- period
- power failure
- commercial
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Landscapes
- Stand-By Power Supply Arrangements (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
本発明の実施形態1に係る電力管理機能を備える装置システム1000の構成について、図1を参照して説明する。装置システム1000は、図1に示すように、電力管理装置100からの制御命令に応じて自己の運転状態を変更する機器1(1A、1B、1C)を備える。また、各電力供給路に流れる電流を検出する電流検出装置2(2A、2B、2C、2D、2E、2F)と、各電流検出装置2が供給する電流情報から機器1の消費電力量を測定するエネルギー測定装置3とを備える。さらに、電力系統(商用電源)10を補助する発電装置4と、直流電力と交流電力の変換を行う電力変換装置5と、充放電により電力の蓄積と供給を行う蓄電装置6とを備える。装置システム1000を管理する電力管理装置100は、インターネット等の通信ネットワーク8を介して、電力管理装置100に停電に関する情報や気象情報等を供給する外部サーバ7と接続される。また、装置システム1000は、電力管理装置100の入出力インタフェースとして機能する入出力端末9を備える。機器1は、平常時には、電力系統(商用電源)10から分電盤11を介して電力の供給を受け、停電時には、発電装置4と蓄電装置6から電力の供給を受ける。なお、図1中の太実線は電力線を、細実線は電流検出装置2からエネルギー測定装置3への信号線を、破線は通信線を表している。
実施形態1では、ユーザが設定した機器使用計画に基づいて、機器1の使用可能時間を算出する技術について説明した。実施形態2では、停電推定期間が終了するまで、機器1を継続使用できるように機器使用計画を電力管理装置100が作成する技術について説明する。
機器使用計画の設定と機器使用可能時間の表示方法の変形例について図15を用いて説明する。図15に示す機器使用計画画面は、機器名300と、平均消費電力301と、機器使用予定時間302と、平均消費電力301と機器使用予定時間302から求まる機器の消費電力量を表す消費電力量予測303と、予め指定した使用予定時間を超過した場合に自動的に機器1の運転を停止させるように制御するか否かを選択するOFFタイマー設定ボタン304と、累計消費電力量予測305と、蓄電装置残電力量306と、予想発電量307と、から構成される。
Claims (13)
- 停電の原因となり得る事象に関する情報を取得する第1の通信手段と、
前記第1の通信手段が取得した前記停電の原因となり得る事象に関する情報と、機器の使用スケジュールを規定する機器使用計画とを記憶する記憶手段と、
商用電源が停電した時に、前記記憶手段から前記停電の原因となり得る事象に関する情報を取得し、前記商用電源の停電期間を推定する停電期間推定手段と、
前記機器使用計画に基づいて電力の供給を受けて動作する機器を使用した場合に、前記停電期間推定手段が推定した前記商用電源の停電期間内に、前記機器が消費する消費電力量を算出する消費電力量算出手段と、
蓄電装置に蓄電されている電力量と、前記消費電力量算出手段が算出した消費電力量とから、前記商用電源の停電期間中に前記蓄電装置に蓄電されている電力量で前記機器の前記機器使用計画に基づく使用可能時間を算出する電力収支算出手段と、
前記電力収支算出手段が算出した前記機器の使用可能時間を含む情報を表示装置に送信する第2の通信手段と、
を備える電力管理装置。 - 前記商用電源の停電期間の気象情報から、前記停電期間推定手段が推定した前記商用電源の停電期間内に前記商用電源を補助する発電装置が発電する発電量を推定する発電量推定手段をさらに備え、
前記電力収支算出手段は、前記蓄電装置に蓄電されている電力量と、前記発電量推定手段が推定した発電量と、前記消費電力量算出手段が算出した消費電力量とから、前記商用電源の停電期間中に前記蓄電装置に蓄電されている電力量と前記発電量推定手段が推定した発電量で、前記機器使用計画に基づいて前記機器を使用可能な時間を算出する、請求項1に記載の電力管理装置。 - 前記発電装置は、自然エネルギーを利用する発電装置であって、
前記発電量推定手段は、前記停電期間推定手段が推定した前記商用電源の停電期間内の気象情報に基づいて前記停電期間内の日射量を推定し、推定した日射量から前記停電期間中に前記発電装置が発電する発電量を推定する、請求項2に記載の電力管理装置。 - 前記蓄電装置に蓄電されている電力量と前記発電量推定手段が推定した発電量との合計電力量よりも前記消費電力量算出手段が算出した消費電力量を小さくするように、前記停電期間推定手段が推定した停電期間中の前記機器使用計画を作成する、請求項2又は3に記載の電力管理装置。
- 前記停電期間推定手段は、前記記憶手段が記憶した前記商用電源の停電原因となり得る気象もしくは事故に関する情報の中から停電前に取得した停電原因となり得る情報を取得し、取得した停電原因となり得る情報と、前記商用電源の停電原因となり得る気象もしくは事故に対応する過去の停電期間のデータと、から停電期間を推定する、請求項1から4の何れか1項に記載の電力管理装置。
- 前記停電期間推定手段は、停電期間に関する情報を外部サーバから取得可能な場合、前記外部サーバから停電期間に関する情報を取得する、請求項1から4の何れか1項に記載の電力管理装置。
- 前記発電量推定手段は、外部サーバから取得した気象情報から前記停電期間推定手段が推定した停電期間内の日射量を推定し、前記記憶手段に予め記憶した日射量に対応する前記発電装置が発電する発電量のデータから、前記停電期間推定手段が推定した停電期間内に前記発電装置が発電する発電量を推定する、請求項2から4の何れか1項に記載の電力管理装置。
- 前記発電量推定手段は、ユーザが入力した気象情報と前記記憶手段に予め記憶した気象情報に対応する日射量のデータから前記停電期間推定手段が推定した停電期間内の日射量を推定し、前記記憶手段に予め記憶した日射量に対応する前記発電装置が発電する発電量のデータから、前記停電期間推定手段が推定した停電期間内に前記発電装置が発電する発電量を推定する、請求項2から4の何れか1項に記載の電力管理装置。
- 前記発電量推定手段は、停電期間に前記発電装置が発電する発電量の推定情報を外部サーバから取得可能な場合、前記外部サーバから停電期間に前記発電装置が発電可能な発電量の推定情報を取得する、請求項2から4の何れか1項に記載の電力管理装置。
- 前記機器使用計画に基づいて、機器の使用時間もしくは機器の消費電力を決める動作モードを制御する機器運転管理手段を備える、請求項1から9の何れか1項に記載の電力管理装置。
- 商用電源を補助する電力を供給する発電装置、
前記商用電源の電力、もしくは、前記発電装置が発電した電力を蓄電する蓄電装置、及び、
停電の原因となり得る情報を取得する第1の通信手段と、
前記第1の通信手段が取得した停電の原因となり得る情報を記憶する記憶手段と、
前記商用電源が停電した時に、前記記憶手段から前記商用電源の停電の原因となり得る情報を取得し、前記商用電源の停電期間を推定する停電期間推定手段と、
前記商用電源、前記発電装置、前記蓄電装置のいずれかから電力の供給を受けて動作する機器が、前記停電期間推定手段が推定した前記商用電源の停電期間内に消費する消費電力量を算出する消費電力量算出手段と、
前記蓄電装置に蓄電されている電力量と、前記消費電力量算出手段が算出した消費電力量とから、前記商用電源の停電期間中に前記蓄電装置に蓄電されている電力量で前記機器を使用可能な時間を算出する電力収支算出手段と、
前記電力収支算出手段が算出した前記機器の使用可能時間を含む情報を送信する第2の通信手段と、
を備える電力管理装置、
を備える装置システム。 - 商用電源の停電の原因となり得る情報から前記商用電源の停電期間を推定する工程と、
前記商用電源、発電装置、蓄電装置のいずれかから電力の供給を受けて動作する機器が、推定した前記商用電源の停電期間内に消費する消費電力量を算出する工程と、
前記蓄電装置に蓄電されている電力量と、算出した消費電力量とから、前記商用電源の停電期間中に前記蓄電装置に蓄電されている電力量で前記機器を使用可能な時間を算出する工程と、
を含む電力管理方法。 - コンピュータを
商用電源が停電した時、前記商用電源の停電の原因となり得る情報から前記商用電源の停電期間を推定する停電期間推定手段、
前記商用電源、発電装置、蓄電装置のいずれかから電力の供給を受けて動作する機器が、前記停電期間推定手段が推定した前記商用電源の停電期間内に消費する消費電力量を算出する消費電力量算出手段、
前記蓄電装置に蓄電されている電力量と、前記消費電力量算出手段が算出した消費電力量とから、前記商用電源の停電期間中に前記蓄電装置に蓄電されている電力量で前記機器を使用可能な時間を算出する電力収支算出手段、
として機能させるためのプログラム。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2015122446A JP6029713B1 (ja) | 2015-06-17 | 2015-06-17 | 電力管理装置、装置システム、電力管理方法、およびプログラム |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2015122446A JP6029713B1 (ja) | 2015-06-17 | 2015-06-17 | 電力管理装置、装置システム、電力管理方法、およびプログラム |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP6029713B1 JP6029713B1 (ja) | 2016-11-24 |
| JP2017011804A true JP2017011804A (ja) | 2017-01-12 |
Family
ID=57358734
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2015122446A Expired - Fee Related JP6029713B1 (ja) | 2015-06-17 | 2015-06-17 | 電力管理装置、装置システム、電力管理方法、およびプログラム |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6029713B1 (ja) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2019075849A (ja) * | 2017-10-12 | 2019-05-16 | 株式会社Nttファシリティーズ | 給電装置 |
| CN109831019A (zh) * | 2019-01-25 | 2019-05-31 | 格林美股份有限公司 | 一种储能式智能家居系统的功率控制方法及系统 |
| JP2019162004A (ja) * | 2018-03-16 | 2019-09-19 | 株式会社東芝 | 電力監視システム |
| JP2021052498A (ja) * | 2019-09-25 | 2021-04-01 | 住友電気工業株式会社 | 判断装置、判断方法およびコンピュータプログラム |
| JP2022034105A (ja) * | 2020-08-18 | 2022-03-03 | 三菱電機株式会社 | 給湯機制御装置、給湯システム、給湯機制御方法およびプログラム |
| JP2022177550A (ja) * | 2021-05-18 | 2022-12-01 | 株式会社村田製作所 | 電力供給システム |
| WO2023149050A1 (ja) * | 2022-02-03 | 2023-08-10 | パナソニック インテレクチュアル プロパティ コーポレーション オブ アメリカ | 停電時における機器の使用に関する情報の提供 |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP4307511A1 (en) * | 2022-07-15 | 2024-01-17 | Solaredge Technologies Ltd. | Systems and methods for climate control during insufficient supply of power |
| JP2025147568A (ja) * | 2024-03-25 | 2025-10-07 | 株式会社日立製作所 | 制御設計支援方法、および、制御設計支援装置 |
| CN118549832A (zh) * | 2024-05-28 | 2024-08-27 | 东莞市电小超智能科技有限公司 | 一种家用储能装置的电量使用时长估算方法及系统 |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4606389B2 (ja) * | 2006-06-28 | 2011-01-05 | 大阪瓦斯株式会社 | 分散型発電機の制御システム |
| JPWO2011045925A1 (ja) * | 2009-10-13 | 2013-03-04 | パナソニック株式会社 | 電源装置および車両 |
| JP2014222980A (ja) * | 2013-05-14 | 2014-11-27 | 三菱電機株式会社 | 自立運転支援装置 |
-
2015
- 2015-06-17 JP JP2015122446A patent/JP6029713B1/ja not_active Expired - Fee Related
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7283858B2 (ja) | 2017-10-12 | 2023-05-30 | 株式会社Nttファシリティーズ | 給電装置 |
| JP2019075849A (ja) * | 2017-10-12 | 2019-05-16 | 株式会社Nttファシリティーズ | 給電装置 |
| JP7123586B2 (ja) | 2018-03-16 | 2022-08-23 | 株式会社東芝 | 電力監視システム |
| JP2019162004A (ja) * | 2018-03-16 | 2019-09-19 | 株式会社東芝 | 電力監視システム |
| CN109831019B (zh) * | 2019-01-25 | 2021-02-19 | 格林美股份有限公司 | 一种储能式智能家居系统的功率控制方法及系统 |
| CN109831019A (zh) * | 2019-01-25 | 2019-05-31 | 格林美股份有限公司 | 一种储能式智能家居系统的功率控制方法及系统 |
| JP2021052498A (ja) * | 2019-09-25 | 2021-04-01 | 住友電気工業株式会社 | 判断装置、判断方法およびコンピュータプログラム |
| JP7354720B2 (ja) | 2019-09-25 | 2023-10-03 | 住友電気工業株式会社 | 判断装置、判断方法およびコンピュータプログラム |
| JP2022034105A (ja) * | 2020-08-18 | 2022-03-03 | 三菱電機株式会社 | 給湯機制御装置、給湯システム、給湯機制御方法およびプログラム |
| JP7503962B2 (ja) | 2020-08-18 | 2024-06-21 | 三菱電機株式会社 | 給湯機制御装置、給湯システム、給湯機制御方法およびプログラム |
| JP2022177550A (ja) * | 2021-05-18 | 2022-12-01 | 株式会社村田製作所 | 電力供給システム |
| JP7452490B2 (ja) | 2021-05-18 | 2024-03-19 | 株式会社村田製作所 | 電力供給システム |
| WO2023149050A1 (ja) * | 2022-02-03 | 2023-08-10 | パナソニック インテレクチュアル プロパティ コーポレーション オブ アメリカ | 停電時における機器の使用に関する情報の提供 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP6029713B1 (ja) | 2016-11-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6029713B1 (ja) | 電力管理装置、装置システム、電力管理方法、およびプログラム | |
| US10243396B2 (en) | Control device, power control system, and power control method | |
| US9651971B2 (en) | Control device, power control system, and power control method | |
| US20180262003A1 (en) | Power control device, operation plan planning method, and recording medium | |
| US9638545B2 (en) | Power management apparatus, power management system and power management method | |
| EP3082096A1 (en) | Demand prediction device and program | |
| US9851734B2 (en) | Alert presentation apparatus and alert presentation method | |
| JP2016100956A (ja) | 直流電源の制御装置、直流電源システム、および直流電源の制御装置の制御方法 | |
| JP6148631B2 (ja) | 蓄電装置の放電開始時刻決定システム | |
| JP2012130126A (ja) | 電力供給制御装置及びそれを用いた電力供給システム | |
| EP2871750A1 (en) | Electrical power management device and electrical power management method | |
| US20150326017A1 (en) | Power management apparatus and power management method | |
| JP2015142460A (ja) | 電力制御装置、電力制御システム、および電力制御方法 | |
| JP7078358B2 (ja) | 制御装置、電力管理システム、制御方法及びプログラム | |
| JP5942769B2 (ja) | 電力供給システム | |
| JP6664479B2 (ja) | 制御装置、電力管理システム、充放電の制御方法及びプログラム | |
| JPWO2016031065A1 (ja) | 消費電力推定装置、機器管理システム、消費電力推定方法及びプログラム | |
| JP6246091B2 (ja) | 電力供給システム | |
| KR20210060076A (ko) | 태양광 발전 및 전력 소비 패턴 분석을 통한 에너지저장 관리 시스템 | |
| JP2013042575A (ja) | 発電量予測装置、サーバ、および発電システム | |
| JP2018038229A (ja) | 蓄電システム | |
| KR20220026387A (ko) | 신재생에너지 발전원의 환경 및 상태정보를 이용한 에너지 관리 시스템 | |
| JP6213645B1 (ja) | 制御装置 | |
| US20190067948A1 (en) | System and method for integrally managing electric energy | |
| JP2013236519A (ja) | 蓄電池充放電制御装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20160914 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20160920 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20161018 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6029713 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |