JP2017154536A - 乗務員運用管理システムおよび乗務員運用管理方法 - Google Patents
乗務員運用管理システムおよび乗務員運用管理方法 Download PDFInfo
- Publication number
- JP2017154536A JP2017154536A JP2016037418A JP2016037418A JP2017154536A JP 2017154536 A JP2017154536 A JP 2017154536A JP 2016037418 A JP2016037418 A JP 2016037418A JP 2016037418 A JP2016037418 A JP 2016037418A JP 2017154536 A JP2017154536 A JP 2017154536A
- Authority
- JP
- Japan
- Prior art keywords
- crew
- information
- train
- travel
- travel time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/18—Crew rosters; Itineraries
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
ードの属性に基づいて同じ資源を用いて連続した運行が可能な輸送行程を表すノード間を接続したパスを作成して、輸送行程のネットワークモデルを作成し、更に、各資源の運用開始場所と車両を識別する情報を少なくとも属性として有する運用開始ノードと、運用終了場所と該資源を識別する情報を少なくとも属性として有する運用終了ノードを作成し、運用開始ノードの属性とその他ノードの属性に基づいて、運用開始ノードが表す資源を割り当て可能な輸送行程を表すノードと運用開始ノードとを接続するパスを作成し、運用終了ノードの運用終了場所の属性値とその他ノードの終着場所の属性値が一致するノード間とを接続するパスを作成し、同じ資源識別情報を属性とする運用開始ノードと運用終了ノードとを接続するパスを作成し、作成したネットワークモデルに追加するネットワーク作成部と、該運行スケジュール情報に基づいて、資源の運用終了場所を元の計画から変更しないという条件を達成するために複数の資源を割り当てる候補となる輸送行程を抽出する併合候補判定部と、複数の資源を割り当て可能な輸送行程を表すノードを複製して併合ノードを作成し、併合ノードの属性とネットワークモデルを構成する他のノードの属性とに基づいて、併合列車ノードとその他のノードを接続するパスをネットワークモデルに追加する併合候補反映部と、ネットワークモデルを構成する併合ノード以外の各ノードに、一つの資源が割り当てられるような複数のパスから構成されるパスの組合せをネットワークモデルから抽出し、更に抽出された組合せについて、該組合せを構成する複数のパスの各々に資源を割り当てることで、運用終了場所を元の計画から変更しないという条件を満たす資源の運用計画を作成して該運用計画を、該出力部に出力する計画作成部とを有する、ことを特徴とする資源運用計画作成装置(特許文献2参照)なども提案されている。
記移動手段として、前記列車ダイヤに記載の列車のほかに、1つ以上の移動手段について、前記乗務員が前記移動手段で前記駅に到達するための移動時間を求められるように構成されており、前記変更案作成部は、前記移動手段を用いて乗務員が移動する変更案を、前記移動時間算出部が求めた移動時間を用いて作成することを特徴とする。
以下に本発明の実施形態について図面を用いて詳細に説明する。図1は、第1実施形態の乗務員運用管理システム100を含むネットワーク構成図である。図1に示す乗務員運用管理システム100は、ダイヤ乱れ等に際し、適切な乗務員運用情報の変更案を効率的に生成可能とするコンピュータシステムである。また、乗務員運用管理システム100は
、運行当日にダイヤ乱れが生じた際に、変更後のダイヤ上の列車に対して運用制約に対する違反(以下、運用違反)がないように乗務員の再割り当てを自動で行う。
次に、本実施形態における乗務員運用管理方法の全体概要を、図2を用いて説明する。図2は第1実施形態の乗務員運用管理システム100において変更案を作成する際の全体処理の概略を表すブロック図である。
乗務員運用情報を作成し、変更後運用情報112として出力する。
以下、本実施形態における乗務員運用管理方法の実際手順について図に基づき説明する。以下で説明する乗務員運用管理方法に対応する各種動作は、乗務員運用管理システム100がメモリ等に読み出して実行するプログラムによって実現される。そして、このプログラムは、以下に説明される各種の動作を行うためのコードから構成されている。
図4は、乗務員運用管理システム100のCPU103が移動時間算出部108に従っ
て実施する移動時間算出処理のフローチャートである。
図3の運用情報解候補作成処理(S152)においては、解候補を乗務員運用情報のネットワークモデルとして作成する。図7は、図8の運用情報を反映した乗務員の運用情報ネットワークモデル700、710である。このネットワークモデル700、710は、乗務員ノード、列車ノード、終端ノード、接続リンクで構成される。こうした図7で例示するネットワークモデル700、710は、車両運用に関する特許文献2を適宜に利用したものであり、乗務員ノードが特許文献2の車両ノードに相当する。
変更案作成部109は、列車ノード間の接続リンクを、列車ノードが表す列車の始発駅と始発時刻と終着駅と終着時刻を基に、時刻と駅の接続が成り立つように作成する。
列車ノード間の接続リンクには、他移動手段を活用した接続も含むものとする。他移動手段を活用した接続リンクでは、前運用の列車の終着駅と、後運用の列車の始発駅が異なっていても、前運用の列車の終着時刻と後運用の列車の始発時刻を比較し、終着時刻から始発時刻までの時間の間に終着駅から始発駅まで、他移動手段を用いて移動可能であれば、接続可能と判断する。
列車ノードと乗務員ノードの間の接続リンクは、列車ノードが表す列車の始発駅と始発時刻と終着駅と終着時刻と、乗務員ノードが表す乗務員の利用可能な時間帯の開始時刻と終了時刻と運用開始時の乗務員の位置を基に、時刻と場所の接続が成り立つように作成する。
列車ノードと終端ノードの間の接続リンクは、運用情報の最終列車として設定可能な列車ノードから終端ノードへ向かって作成する。
図3のフローにおける運用違反判定処理(S151)では、変更案作成部109は、上述のように作成した接続リンクに基づき運用違反判定を行う。この運用違反の判定は、運用情報をネットワークとして置き換え、乗務員の接続において運用違反が存在するか否かについて判定することとなる。
ことができる。
以下、本発明の第2実施形態について、図10、図11A〜図11Cを参照して説明する。この第2実施形態は、例えば、出勤途中の乗務員の行路を変更し、計画とは異なる駅から乗務を開始するような運用整理案を作成する場合に適用するに好適な例である。
とすることもできる。この場合、乗務員運用管理システム100は、ダイヤ修正時点における気象情報などの背景情報を用い、乗務員が駅に到達するまでの移動時間を算定する。例えば、乗務員が利用する移動手段の経路上で、大雪が降っているとの背景情報が得られた場合、乗務員運用管理システム100は、大雪時での当該移動手段の移動時間実績(移動履歴情報113における、「手段」が該当移動手段のレコードで、「要因」が「大雪」の場合の移動時間212の値)に基づき、移動時間を算定することとなる。
以上、本発明の実施形態について詳細に説明したが、本発明はこれに限定されるものではなく、その要旨を逸脱しない範囲で種々変更可能である。
運行管理システムの管理対象外の移動手段を活用する場合においても、適切な変更案を作成することが可能となる。ひいては、鉄道運行に関する各種システムにおける処理の効率化、高速化が図られることになる。
合、当該変更案を当該他移動手段の情報とともに所定装置に出力する処理を更に実行する、としてもよい。
20 運行管理システム
30 気象情報管理システム
40 位置情報取得装置
100 乗務員運用管理システム
101 表示部
102 入力部
103 CPU(演算部)
104 通信部
105 メモリ
107 記憶部
108 移動時間算出部
109 変更案作成部
110 ダイヤ情報
111 変更前運用情報
112 変更後運用情報
113 移動履歴情報
Claims (12)
- 列車ダイヤを用いて、乗務員の乗務する列車及び駅区間を含んで構成される運用情報を管理する乗務員運用管理システムであって、
前記列車ダイヤの変更時に前記運用情報の変更案を作成する変更案作成部と、
1つ以上の駅と、1つ以上の移動手段について、前記乗務員が前記移動手段で前記駅に到達するための移動時間を求める移動時間算出部と、
を備え、
前記移動時間算出部は、前記移動手段として、前記列車ダイヤに記載の列車のほかに、1つ以上の移動手段について、前記乗務員が前記移動手段で前記駅に到達するための移動時間を求められるように構成されており、
前記変更案作成部は、前記移動手段を用いて乗務員が移動する変更案を、前記移動時間算出部が求めた移動時間を用いて作成すること、
を特徴とする乗務員運用管理システム。 - 前記演算部は、
前記変更案作成処理において、前記他移動手段を用いて乗務員が移動する前記変更案を作成した場合、当該変更案を当該他移動手段の情報とともに所定装置に出力する処理を更に実行するものである、
ことを特徴とする請求項1に記載の乗務員運用管理システム。 - 前記演算部は、
前記移動時間算出処理において、前記他移動手段の情報が示す、当該他移動手段による過去の移動履歴の情報を用いて前記移動時間の算出を実行するものである、
ことを特徴とする請求項1に記載の乗務員運用管理システム。 - 前記演算部は、
前記移動時間算出処理において、前記他移動手段の情報が示す、前記他移動手段に関して予め求めた所定距離ないし所定地点間の移動時間の情報に基づき前記移動時間の算出を実行するものである、
ことを特徴とする請求項1に記載の乗務員運用管理システム。 - 前記演算部は、
前記移動時間算出処理において、前記乗務員が保持する所定の位置取得装置から、当該乗務員の位置情報を取得し、当該位置情報に基づき前記移動時間を算出し、
前記変更案作成処理において、前記位置情報の得られている当該乗務員が、前記列車および前記他移動手段の少なくともいずれかを用いて移動する場合の前記変更案を、前記位置情報に基づき算定した移動時間を用いて作成するものである、
ことを特徴とする請求項1に記載の乗務員運用管理システム。 - 前記演算部は、
前記移動時間算出処理において、前記列車ダイヤの変更時における、事故発生曜日、事故発生時刻、事故発生からの経過時間、遅延原因、降雨量、および降雪量、のうち少なくともいずれかの情報に更に基づいて前記移動時間を算出するものである、
ことを特徴とする請求項1に記載の乗務員運用管理システム。 - 列車ダイヤと、各乗務員の乗務する列車及び駅区間を含んで構成される運用情報と、前記列車ダイヤで規定する列車以外の他移動手段の情報と、を保持する記憶部備えた情報処理システムが、
所定乗務員が、前記列車ダイヤに記載の列車および前記他移動手段の少なくともいずれ
かを用いた場合に、所定の場所から所定駅に到達するための移動時間を算定する移動時間算出処理と、
前記列車ダイヤの変更時に、前記列車および前記他移動手段の少なくともいずれかを用いて乗務員が移動する場合の前記運用情報の変更案を、前記算定した移動時間を用いて作成する変更案作成処理と、
を実行することを特徴とする乗務員運用管理方法。 - 前記情報処理システムが、
前記変更案作成処理において、前記他移動手段を用いて乗務員が移動する前記変更案を作成した場合、当該変更案を当該他移動手段の情報とともに所定装置に出力する処理を更に実行する、
ことを特徴とする請求項7に記載の乗務員運用管理方法。 - 前記情報処理システムが、
前記移動時間算出処理において、前記他移動手段の情報が示す、当該他移動手段による過去の移動履歴の情報を用いて前記移動時間の算出を実行する、
ことを特徴とする請求項7に記載の乗務員運用管理方法。 - 前記情報処理システムが、
前記移動時間算出処理において、前記他移動手段の情報が示す、前記他移動手段に関して予め求めた所定距離ないし所定地点間の移動時間の情報に基づき前記移動時間の算出を実行する、
ことを特徴とする請求項7に記載の乗務員運用管理方法。 - 前記情報処理システムが、
前記移動時間算出処理において、前記乗務員が保持する所定の位置取得装置から、当該乗務員の位置情報を取得し、当該位置情報に基づき前記移動時間を算出し、
前記変更案作成処理において、前記位置情報の得られている当該乗務員が、前記列車および前記他移動手段の少なくともいずれかを用いて移動する場合の前記変更案を、前記位置情報に基づき算定した移動時間を用いて作成する、
ことを特徴とする請求項7に記載の乗務員運用管理方法。 - 前記情報処理システムが、
前記移動時間算出処理において、前記列車ダイヤの変更時における、事故発生曜日、事故発生時刻、事故発生からの経過時間、遅延原因、降雨量、および降雪量、のうち少なくともいずれかの情報に更に基づいて前記移動時間を算出する、
ことを特徴とする請求項7に記載の乗務員運用管理方法。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016037418A JP6649121B2 (ja) | 2016-02-29 | 2016-02-29 | 乗務員運用管理システムおよび乗務員運用管理方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016037418A JP6649121B2 (ja) | 2016-02-29 | 2016-02-29 | 乗務員運用管理システムおよび乗務員運用管理方法 |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2017154536A true JP2017154536A (ja) | 2017-09-07 |
| JP2017154536A5 JP2017154536A5 (ja) | 2018-10-25 |
| JP6649121B2 JP6649121B2 (ja) | 2020-02-19 |
Family
ID=59809099
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2016037418A Active JP6649121B2 (ja) | 2016-02-29 | 2016-02-29 | 乗務員運用管理システムおよび乗務員運用管理方法 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6649121B2 (ja) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2021037925A (ja) * | 2019-08-30 | 2021-03-11 | Assest株式会社 | ダイヤ修正プログラム及びシステム、後続列車遅延時間推定プログラム |
| CN114872767A (zh) * | 2022-03-29 | 2022-08-09 | 交控科技股份有限公司 | 基于区间单向缓行的列车运图调整方法及系统 |
| CN115285179A (zh) * | 2022-08-05 | 2022-11-04 | 交控科技股份有限公司 | 基于站后折返缓行条件下的运行图调整方法、设备、介质 |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2006048346A (ja) * | 2004-08-04 | 2006-02-16 | Aisin Aw Co Ltd | 情報提供システム及び情報提供方法のプログラム |
| JP2007045216A (ja) * | 2005-08-08 | 2007-02-22 | Mitsubishi Electric Corp | 車両・乗務員運用復旧装置 |
| JP2009078573A (ja) * | 2007-09-25 | 2009-04-16 | Railway Technical Res Inst | プログラム、情報記憶媒体、運転整理案評価装置及び運転整理案作成装置 |
| JP2010086187A (ja) * | 2008-09-30 | 2010-04-15 | Oki Electric Ind Co Ltd | 移動時間算出装置及び移動時間算出システム |
| JP2012008655A (ja) * | 2010-06-22 | 2012-01-12 | Ntt Docomo Inc | サーバ装置及びプログラム |
| JP2013071575A (ja) * | 2011-09-27 | 2013-04-22 | Hitachi Ltd | 資源運用計画作成装置及びその方法、及びプログラム |
| JP2014199192A (ja) * | 2013-03-29 | 2014-10-23 | キャンバスマップル株式会社 | ナビゲーション装置、及びナビゲーションプログラム |
-
2016
- 2016-02-29 JP JP2016037418A patent/JP6649121B2/ja active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2006048346A (ja) * | 2004-08-04 | 2006-02-16 | Aisin Aw Co Ltd | 情報提供システム及び情報提供方法のプログラム |
| JP2007045216A (ja) * | 2005-08-08 | 2007-02-22 | Mitsubishi Electric Corp | 車両・乗務員運用復旧装置 |
| JP2009078573A (ja) * | 2007-09-25 | 2009-04-16 | Railway Technical Res Inst | プログラム、情報記憶媒体、運転整理案評価装置及び運転整理案作成装置 |
| JP2010086187A (ja) * | 2008-09-30 | 2010-04-15 | Oki Electric Ind Co Ltd | 移動時間算出装置及び移動時間算出システム |
| JP2012008655A (ja) * | 2010-06-22 | 2012-01-12 | Ntt Docomo Inc | サーバ装置及びプログラム |
| JP2013071575A (ja) * | 2011-09-27 | 2013-04-22 | Hitachi Ltd | 資源運用計画作成装置及びその方法、及びプログラム |
| JP2014199192A (ja) * | 2013-03-29 | 2014-10-23 | キャンバスマップル株式会社 | ナビゲーション装置、及びナビゲーションプログラム |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2021037925A (ja) * | 2019-08-30 | 2021-03-11 | Assest株式会社 | ダイヤ修正プログラム及びシステム、後続列車遅延時間推定プログラム |
| CN114872767A (zh) * | 2022-03-29 | 2022-08-09 | 交控科技股份有限公司 | 基于区间单向缓行的列车运图调整方法及系统 |
| CN114872767B (zh) * | 2022-03-29 | 2024-01-30 | 交控科技股份有限公司 | 基于区间单向缓行的列车运图调整方法及系统 |
| CN115285179A (zh) * | 2022-08-05 | 2022-11-04 | 交控科技股份有限公司 | 基于站后折返缓行条件下的运行图调整方法、设备、介质 |
| CN115285179B (zh) * | 2022-08-05 | 2024-01-30 | 交控科技股份有限公司 | 基于站后折返缓行条件下的运行图调整方法、设备、介质 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP6649121B2 (ja) | 2020-02-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6895325B2 (ja) | 交通需要予測装置、交通需要予測方法、及び交通需要予測プログラム | |
| US8082071B2 (en) | System and method of multi-generation positive train control system | |
| US20190057327A1 (en) | Cumulative model for scheduling and resource allocation for airline operations | |
| JP7273524B2 (ja) | 運行管理システム | |
| Lai et al. | Real-time rescheduling and disruption management for public transit | |
| CN105303245B (zh) | 交通分析系统以及交通分析方法 | |
| JP7022039B2 (ja) | 車両割当支援システム、方法、およびプログラム | |
| US20220147664A1 (en) | Systems and Methods for Multi-Modal Transportation Simulation Verification | |
| JP6454222B2 (ja) | データ処理システム、及び、データ処理方法 | |
| EP3086268A1 (en) | Resource operation planning assist apparatus and resource operation planning assist method | |
| US20200356931A1 (en) | Resource mediation system and resource mediation apparatus | |
| Shalaby et al. | Rail transit disruption management: a comprehensive review of strategies and approaches | |
| JP6649121B2 (ja) | 乗務員運用管理システムおよび乗務員運用管理方法 | |
| JP6999519B2 (ja) | 輸送力調整装置、輸送力調整システムおよび輸送力調整方法 | |
| US10402755B2 (en) | Transportation service information providing apparatus, and transportation service information providing method | |
| Bolkovska et al. | Simulation-based public transport multi-modal hub analysis and planning | |
| JP7778574B2 (ja) | 遅延予測システム、遅延予測プログラム及び遅延予測方法 | |
| US20220335351A1 (en) | Resource Operation Planning Assistance Apparatus and Resource Operation Planning Assistance Method | |
| JP7449192B2 (ja) | ダイヤ情報管理システム、ダイヤ情報管理方法および運行案内システム | |
| JP7611759B2 (ja) | 連携システム、及び連携支援方法 | |
| US20240383514A1 (en) | Timetable plan creation system, timetable plan creation method, timetable plan creation program, and transportation plan system | |
| WO2022180680A1 (ja) | コンテナ管理装置、コンテナ積載管理システム、方法、および、プログラム | |
| US20260094227A1 (en) | Operation plan creation device, operation plan creation system, and operation plan creation method | |
| JP7480909B2 (ja) | コンテナ積載管理システム、および、コンテナ積載管理方法 | |
| Pour et al. | Towards signalling maintenance scheduling for european railway traffic management system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20171215 |
|
| A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20171215 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20171215 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180910 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20180910 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20190624 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20190716 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20190910 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20200107 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20200116 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6649121 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |