JP2017192252A - 分析装置、分析方法、およびプログラム - Google Patents
分析装置、分析方法、およびプログラム Download PDFInfo
- Publication number
- JP2017192252A JP2017192252A JP2016081876A JP2016081876A JP2017192252A JP 2017192252 A JP2017192252 A JP 2017192252A JP 2016081876 A JP2016081876 A JP 2016081876A JP 2016081876 A JP2016081876 A JP 2016081876A JP 2017192252 A JP2017192252 A JP 2017192252A
- Authority
- JP
- Japan
- Prior art keywords
- data
- time
- factor element
- series
- factor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Testing Electric Properties And Detecting Electric Faults (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Photovoltaic Devices (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
本実施の形態において、格納されている入力データから要因要素を抽出し、要因別に傾向を推定し、推定した要因要素データを取得する分析装置について説明する。なお、入力データとは、例えば、太陽光発電システムに関するセンサにより取得された日射量、気温、太陽光発電システムの出力量等であり、その詳細は後述する。
(1)晴れの日における日射計の時系列データを取得する。(2)手順(1)と同一日の直流出力電力の時系列データを取得する。(3)手順(1)のデータをパネル出力定格倍する。そして、これを理想発電量とする。(4)理想発電量の時系列データをn倍して手順(2)のデータとの誤差をRMSE等で評価する。(5)手順(4)のnを1.0〜0.5の範囲内で少なくして手順(4)と同等の計算をする。(6)手順(4)〜(5)を繰り返して、RMSE等が最小のものを求める。なお、これを最適発電量とする。(7)最適発電量と(1)の時系列データで各時刻の差分を陰による損失要因とする。なお、上記の手法を用いれば、特定の1日で比較できる。
11 格納部
12 受付部
13 処理部
14 出力部
15 通知部
111 入力データ格納部
112 実データ格納部
131 要因要素抽出部
132 推定用モデリング部
133 評価部
141 推定データ出力部
Claims (12)
- 太陽光発電システムに関する1種類以上の各センサにより取得された1種類以上の入力データの時系列データまたは当該時系列データを加工した加工時系列データである1以上の時系列入力データが格納される入力データ格納部と、
前記1以上の時系列入力データを要因要素別に分解し、2以上の各要因要素別の時系列データである2以上の時系列要因要素別データを取得する要因要素抽出部と、
前記2以上の各時系列要因要素別データから、要因要素別に、1以上の異なる時点の推定データを取得する推定用モデリング部と、
前記要因要素別の1以上の推定データを出力する推定データ出力部とを具備する分析装置。 - 前記1以上の推定データの時刻に対応する時刻の2以上のデータの集合であり、1以上の時系列入力データを要因要素別に分解して得られた2以上の要因要素別実データの集合であり、時系列データである1以上の時系列要因要素別実データが、要因要素別に格納される実データ格納部と、
要因要素別に、前記1以上の時系列要因要素別実データが有する1以上の各要因要素別実データと当該各要因要素別実データの時刻に対応する1以上の各推定データとを比較し、比較の結果である評価情報を取得する評価部とをさらに具備する請求項1記載の分析装置。 - 前記推定用モデリング部は、
前記2以上の各要因要素のうち、少なくとも一の要因要素に対して、2種類以上の傾向推定方法を用いて、前記一の要因要素の時系列要因要素別データから、傾向推定方法ごとに1以上の異なる時点の推定データを取得する請求項2記載の分析装置。 - 前記2種類以上の傾向推定方法のうち、一の傾向推定方法に対する指示を受け付ける受付部をさらに具備し、
前記推定用モデリング部は、
前記一の要因要素に対して、前記受付部が受け付けた指示に対する傾向推定方法を用いて取得した1以上の異なる時点の推定データを採用する請求項3記載の分析装置。 - 前記評価部は、
前記2種類以上の各傾向推定方法に対応する1以上の異なる時点の推定データを用いて、前記2種類以上の各傾向推定方法を評価し、
前記推定用モデリング部は、
前記一の要因要素に対して、前記評価部が最も良い評価をした傾向推定方法を用いて取得した1以上の異なる時点の推定データを採用する請求項3記載の分析装置。 - 前記要因要素抽出部は、
2以上の要因要素抽出方法を用いて、前記1以上の時系列入力データを要因要素別に分解し、要因要素抽出方法ごとに、2以上の各要因要素別の時系列データである2以上の時系列要因要素別データを取得し、
前記推定用モデリング部は、
前記2以上の各要因要素抽出方法ごとに、前記2以上の各時系列要因要素別データから、要因要素別に、1以上の異なる時点の推定データを取得し、
前記推定データ出力部は、
要因要素抽出方法ごと、要因要素別に、1以上の推定データを出力する請求項1から請求項5いずれか一項に記載の分析装置。 - 前記評価部が取得した評価情報を予め決められた通知先に通知する通知部をさらに具備する請求項1から請求項5いずれか一項に記載の分析装置。
- 前記通知部は、
要因要素によって、異なる通知先に前記評価情報を通知する請求項7記載の分析装置。 - 前記入力データは、
日射量、気温、太陽光発電システムへの入力量、および太陽光発電システムの出力量のうちの1種類以上の情報である請求項1から請求項8いずれか一項に記載の分析装置。 - 前記2以上の要因要素は、陰の影響、汚れの影響、インバーターの影響のうちのいずれか2以上である請求項1から請求項9いずれか一項に記載の分析装置。
- 記録媒体は、
太陽光発電システムに関する1種類以上の各センサにより取得された1種類以上の入力データの時系列データまたは当該時系列データを加工した加工時系列データである1以上の時系列入力データが格納される入力データ格納部を具備し、
要因要素抽出部、推定用モデリング部、および推定データ出力部により実現される分析方法であって、
前記要因要素抽出部が、前記1以上の時系列入力データを要因要素別に分解し、2以上の各要因要素別の時系列データである2以上の時系列要因要素別データを取得する要因要素抽出ステップと、
前記推定用モデリング部が、前記2以上の各時系列要因要素別データから、要因要素別に、1以上の異なる時点の推定データを取得する推定用モデリングステップと、
前記推定データ出力部が、前記要因要素別の1以上の推定データを出力する推定データ出力ステップとを具備する分析方法。 - コンピュータがアクセス可能な記録媒体は、
太陽光発電システムに関する1種類以上の各センサにより取得された1種類以上の入力データの時系列データまたは当該時系列データを加工した加工時系列データである1以上の時系列入力データが格納される入力データ格納部を具備し、
コンピュータを、
前記1以上の時系列入力データを要因要素別に分解し、2以上の各要因要素別の時系列データである2以上の時系列要因要素別データを取得する要因要素抽出部と、
前記2以上の各時系列要因要素別データから、要因要素別に、1以上の異なる時点の推定データを取得する推定用モデリング部と、
前記要因要素別の1以上の推定データを出力する推定データ出力部として機能させるためのプログラム。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016081876A JP6634333B2 (ja) | 2016-04-15 | 2016-04-15 | 分析装置、分析方法、およびプログラム |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016081876A JP6634333B2 (ja) | 2016-04-15 | 2016-04-15 | 分析装置、分析方法、およびプログラム |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2017192252A true JP2017192252A (ja) | 2017-10-19 |
| JP6634333B2 JP6634333B2 (ja) | 2020-01-22 |
Family
ID=60084997
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2016081876A Active JP6634333B2 (ja) | 2016-04-15 | 2016-04-15 | 分析装置、分析方法、およびプログラム |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6634333B2 (ja) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2020009325A (ja) * | 2018-07-11 | 2020-01-16 | 富士通株式会社 | 異常検知プログラム、異常検知方法及び異常検知装置 |
| JP2021144637A (ja) * | 2020-03-13 | 2021-09-24 | 株式会社東芝 | 情報処理装置、情報処理方法およびプログラム |
| CN114729971A (zh) * | 2020-01-07 | 2022-07-08 | 株式会社Lg新能源 | 模拟系统和数据分布方法 |
| KR102462909B1 (ko) * | 2022-06-07 | 2022-11-04 | 비케이엠 주식회사 | 태양광패널의 음영감지방법 및 시스템 |
| CN120354315A (zh) * | 2025-06-20 | 2025-07-22 | 深圳市德兰明海新能源股份有限公司 | 光伏发电异常检测方法、设备及存储介质 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2008141918A (ja) * | 2006-12-05 | 2008-06-19 | Nippon Telegr & Teleph Corp <Ntt> | 太陽光発電システム評価装置、方法、およびプログラム |
| JP2013191719A (ja) * | 2012-03-14 | 2013-09-26 | Tokyo Electron Ltd | 太陽電池モジュールの効能監視システム及びその監視方法 |
| WO2013179655A1 (ja) * | 2012-05-29 | 2013-12-05 | 東京エレクトロン株式会社 | 太陽光発電監視方法及びその方法に用いられる太陽光発電監視システム |
| US20140188410A1 (en) * | 2012-12-28 | 2014-07-03 | Locus Energy, Llc | Methods for Photovoltaic Performance Disaggregation |
-
2016
- 2016-04-15 JP JP2016081876A patent/JP6634333B2/ja active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2008141918A (ja) * | 2006-12-05 | 2008-06-19 | Nippon Telegr & Teleph Corp <Ntt> | 太陽光発電システム評価装置、方法、およびプログラム |
| JP2013191719A (ja) * | 2012-03-14 | 2013-09-26 | Tokyo Electron Ltd | 太陽電池モジュールの効能監視システム及びその監視方法 |
| WO2013179655A1 (ja) * | 2012-05-29 | 2013-12-05 | 東京エレクトロン株式会社 | 太陽光発電監視方法及びその方法に用いられる太陽光発電監視システム |
| US20140188410A1 (en) * | 2012-12-28 | 2014-07-03 | Locus Energy, Llc | Methods for Photovoltaic Performance Disaggregation |
Non-Patent Citations (2)
| Title |
|---|
| TAKASHI OOZEKI ET AL.: ""An Evaluation Method for PV System to identify system losses by means of utilizing monitoring data"", PROCEEDINGS OF 2006 IEEE 4TH WORLD CONFERENCE ON PHOTOVOLTAIC ENERGY CONVERSION, JPN6019042636, 2006, pages 2319 - 2322, ISSN: 0004147550 * |
| 沈浩洋、日野英逸、村田昇、若尾真治: "「JITモデリングによる太陽光発電量予測とその信頼性評価」", 情報処理学会研究報告, vol. Vol.2011-MPS-86 No.14, JPN7019003531, 2011, pages 1 - 5, ISSN: 0004147551 * |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2020009325A (ja) * | 2018-07-11 | 2020-01-16 | 富士通株式会社 | 異常検知プログラム、異常検知方法及び異常検知装置 |
| JP7095443B2 (ja) | 2018-07-11 | 2022-07-05 | 富士通株式会社 | 異常検知プログラム、異常検知方法及び異常検知装置 |
| CN114729971A (zh) * | 2020-01-07 | 2022-07-08 | 株式会社Lg新能源 | 模拟系统和数据分布方法 |
| JP2023502622A (ja) * | 2020-01-07 | 2023-01-25 | エルジー エナジー ソリューション リミテッド | シミュレーションシステムおよびデータ分散方法 |
| JP7376189B2 (ja) | 2020-01-07 | 2023-11-08 | エルジー エナジー ソリューション リミテッド | シミュレーションシステムおよびデータ分散方法 |
| US12427890B2 (en) | 2020-01-07 | 2025-09-30 | Lg Energy Solution, Ltd. | Simulation system and data distribution method |
| JP2021144637A (ja) * | 2020-03-13 | 2021-09-24 | 株式会社東芝 | 情報処理装置、情報処理方法およびプログラム |
| JP7293156B2 (ja) | 2020-03-13 | 2023-06-19 | 株式会社東芝 | 情報処理装置、情報処理方法およびプログラム |
| KR102462909B1 (ko) * | 2022-06-07 | 2022-11-04 | 비케이엠 주식회사 | 태양광패널의 음영감지방법 및 시스템 |
| CN120354315A (zh) * | 2025-06-20 | 2025-07-22 | 深圳市德兰明海新能源股份有限公司 | 光伏发电异常检测方法、设备及存储介质 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP6634333B2 (ja) | 2020-01-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN118410445B (zh) | 分布式光伏异常数据检测方法、系统、电子设备及存储介质 | |
| JP6634333B2 (ja) | 分析装置、分析方法、およびプログラム | |
| JP7289995B2 (ja) | 太陽光発電ストリングの動作状態を認識する方法および装置ならびに記憶媒体 | |
| US20180100911A1 (en) | Systems and methods for system measurements integrity determination | |
| EP2653835B1 (en) | A method and system for optimizing a composite load disaggregation | |
| WO2015196133A2 (en) | Energy infrastructure sensor data rectification using regression models | |
| CN112886922B (zh) | 一种光伏电站损失电量的计算方法、装置及存储介质 | |
| US10998853B2 (en) | Internet of things-enabled solar photovoltaic health monitoring and advising related thereto | |
| US20210305937A1 (en) | Device and method for determining whether power generation system is abnormal | |
| Boretti | High‐frequency standard deviation of the capacity factor of renewable energy facilities—Part 2: Wind | |
| CN116540827A (zh) | 一种光伏发电最大功率点跟踪方法、装置及电子设备 | |
| JP6190438B2 (ja) | 発電データ収集システム及び太陽光発電装置 | |
| CN109543993B (zh) | 分析光伏电站的方法、计算机存储介质及计算机设备 | |
| Manasrah et al. | Shading anomaly detection framework for bi-facial photovoltaic modules | |
| Quest et al. | Intrinsic performance loss rate: Decoupling reversible and irreversible losses for an improved assessment of photovoltaic system performance | |
| KR20230038013A (ko) | 태양광 설비 발전량 예측 시스템 및 방법 | |
| CN115378364B (zh) | 光伏组串的故障诊断方法、装置、电子设备及存储介质 | |
| CN111894814A (zh) | 一种用于发电系统的故障处理系统及方法 | |
| Sowthily et al. | Detection and classification of faults in photovoltaic system using random forest algorithm | |
| JP5804905B2 (ja) | パターン分離装置及びパターン分離方法及びプログラム | |
| US20240393758A1 (en) | System and method for intelligent electronic safety response interface | |
| Ya'acob et al. | Modelling of photovoltaic array temperature in a tropical site using generalized extreme value distribution | |
| Schönau et al. | String outages in photovoltaic plants | |
| CN117314008A (zh) | 基于多源数据的碳成本确定方法、电子设备及存储介质 | |
| Bai et al. | Trace-based microservice anomaly detection through deep learning |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A80 | Written request to apply exceptions to lack of novelty of invention |
Free format text: JAPANESE INTERMEDIATE CODE: A80 Effective date: 20160513 |
|
| A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20181119 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20181204 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20181119 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20181217 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20191030 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20191108 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20191118 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20191210 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20191216 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6634333 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |