JP3145538B2 - Load control device - Google Patents

Load control device

Info

Publication number
JP3145538B2
JP3145538B2 JP16076893A JP16076893A JP3145538B2 JP 3145538 B2 JP3145538 B2 JP 3145538B2 JP 16076893 A JP16076893 A JP 16076893A JP 16076893 A JP16076893 A JP 16076893A JP 3145538 B2 JP3145538 B2 JP 3145538B2
Authority
JP
Japan
Prior art keywords
unit
master unit
communication
load
communication line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP16076893A
Other languages
Japanese (ja)
Other versions
JPH0723469A (en
Inventor
一成 森田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Electric Works Co Ltd
Original Assignee
Matsushita Electric Works Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Works Ltd filed Critical Matsushita Electric Works Ltd
Priority to JP16076893A priority Critical patent/JP3145538B2/en
Publication of JPH0723469A publication Critical patent/JPH0723469A/en
Application granted granted Critical
Publication of JP3145538B2 publication Critical patent/JP3145538B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Selective Calling Equipment (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、操作スイッチの操作等
により親機が子機へ負荷制御信号を送信して子機が負荷
を制御する負荷制御装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a load control device in which a base unit transmits a load control signal to a slave unit by operating an operation switch or the like and the slave unit controls a load.

【0002】[0002]

【従来の技術】この種の負荷制御装置としては、操作ス
イッチの操作により負荷制御信号を送信する親機と、そ
の負荷制御信号を通信線を介して受信するとともに負荷
を制御する子機と、を備えたものが知られているが、こ
のような負荷制御装置に新規に制御機能を付加したいと
きには、親機そのものを、新規機能を有する親機と取り
替える必要があった。
2. Description of the Related Art As a load control device of this kind, a master unit for transmitting a load control signal by operating an operation switch, a slave unit for receiving the load control signal via a communication line and controlling the load, However, when it is desired to add a new control function to such a load control device, it is necessary to replace the master unit itself with a master unit having a new function.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、親機
が、大規模で高価なものである場合は、容易に取り替え
ることができず、取り替えることによって生じる負担も
大きいという問題点があった。また、親機が故障したと
きには、新しい親機に交換する必要があったが、容易に
取り替えることができないために、負荷の制御が長期間
不可能となってしまうという問題があった。
However, when the master unit is large and expensive, it cannot be easily replaced, and there is a problem that the burden caused by the replacement is large. Further, when the master unit has failed, it has been necessary to replace the master unit with a new master unit. However, since the master unit cannot be easily replaced, there has been a problem that load control becomes impossible for a long time.

【0004】本発明は、かかる事由に鑑みてなしたもの
で、その目的とするところは、新規の制御機能を容易に
付加することができ、また、親機が故障しても円滑に負
荷制御を行うことができる負荷制御装置を提供するにあ
る。
The present invention has been made in view of the above-mentioned circumstances, and an object of the present invention is to easily add a new control function, and to smoothly perform load control even if a master unit fails. The present invention is to provide a load control device capable of performing the above.

【0005】[0005]

【課題を解決するための手段】かかる問題を解決するた
めに、本発明の負荷制御装置は、操作スイッチの操作に
より発生し負荷群(5)を遠隔制御する旨の負荷制御信
号を送信する機能と、サイクリックに負荷制御信号や負
荷監視信号を発信する機能とを有する親機(2)と、親
機からの負荷制御信号を通信線を介して受信するととも
にともに負荷を制御する子機すなわち端末機(4)と、
を備える負荷制御装置(1)において、親機と通信する
ための親機側通信手段(6b)と、端末機と通信するた
めの端末機側通信手段(6c)と、前記親機側通信手段
が受信した親機からの信号に基づき親機と端末機とを結
ぶ通信線(3a、3b)を接続または切断する通信線切
換手段(6d)と、親機から制御信号を受信し、受信し
た制御信号が、親機の有する子機制御機能に比して新規
であり自機にのみ備えられた子機制御機能を実行依頼す
る旨の信号であれば、中央処理装置(6a)により前記
通信線切換手段を動作させることにより、親機と子機と
の間の通信経路である前記通信線(3a、3b)を自機
と子機との間の通信経路に切換え、親機から制御信号を
受信し、受信した制御信号が、親機と子機との間の通信
を実行依頼する旨の信号であれば、中央処理装置により
前記通信線切換手段を動作させることにより、自機と子
機との間の通信経路を親機と子機との間の通信経路に切
換える端末機部(6e)と、親機からサイクリックに送
信されてくる負荷制御信号や負荷監視信号の送信停止が
あれば、該送信停止から現在までの経過時間を計時する
タイマ(6f)と、前記タイマで計時した前記経過時間
が所定時間を超えると親機の通信系機能の故障とみなし
て、親機と子機との間の通信経路である前記通信線(3
a、3b)を自機と子機との間の通信経路に切換えるこ
とにより親機を通信系から切り離し、親機の代行処置を
行なう中央処理装置(6a)と、備え前記親機と同じ
機能及び/または新規の機能を有する疑似親機(6)
を、親機と子機との間に接続した構成としている。
[MEANS FOR SOLVING THE PROBLEMS]
The load control device of the present invention
ThanOccurredloadTo remotely control group (5)Load control signal
Ability to send issuesAnd cyclically load control signals and negative
Function to send load monitoring signalParent machine with(2)And the parent
Receiving the load control signal from the
Unit that controls the load togetherThat is, the terminal (4)When,
Load control device provided with(1)To communicate with the parent machine
Communication means for master unit(6b)To communicate with the terminal
Terminal side communication means(6c)When,The main unit communication means
Signal received from master unitConnection between the base unit and the terminal
Communication line(3a, 3b)To disconnect or connect
Exchange means(6d)When,Receives control signals from the
Control signal is newer than the slave unit control function of the master unit.
And execute the slave unit control function provided only for the own unit.
Signal to the effect that the central processing unit (6a)
By operating the communication line switching means, the master unit and the slave unit
The communication line (3a, 3b) which is a communication path between
Switch to the communication path between the
The received control signal is transmitted between the master unit and the slave unit.
If it is a signal to request
By operating the communication line switching means, the own device and the child
The communication path between the main unit and the slave unit.
Cyclic transmission from terminal unit (6e) to be replaced and master unit
The transmission of the received load control signal and load monitoring signal
If so, measure the elapsed time from the stop of transmission to the present
A timer (6f) and the elapsed time measured by the timer
If the time exceeds the specified time, it is regarded as a malfunction of the communication function of the master unit.
The communication line (3), which is a communication path between the master unit and the slave unit.
a, 3b) to the communication path between the own device and the slave device.
With this, the master unit is disconnected from the communication system,
A central processing unit (6a) for performing;ToPreparationSame as the parent machine
Function and / orNewPseudo master unit with functions(6)
Is connected between the parent device and the child device.

【0006】[0006]

【作用】この構成によれば、親機の代替機能や新規機能
を有する擬似親機を、親機と子機の間に挿入接続するの
で、親機を取り替える必要がなくなる。
According to this structure, a pseudo master unit having a substitute function or a new function of the master unit is inserted and connected between the master unit and the slave unit, so that it is not necessary to replace the master unit.

【0007】[0007]

【実施例】以下、本発明の一実施例を図1及び図2に基
づいて説明する。この負荷制御装置1 は、操作スイッチ
の操作により負荷制御信号を送信する機能を有する親機
2と、親機2 からの負荷制御信号を通信線を介して受信
するとともに負荷5 を制御する端末機4 と、親機2 の代
替機能や新規機能を有し前記通信線に接続される擬似親
機6 とを備える。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below with reference to FIGS. This load control device 1 has a master unit having a function of transmitting a load control signal by operating an operation switch.
2, a terminal 4 that receives a load control signal from the base unit 2 via a communication line and controls a load 5, and a pseudo terminal connected to the communication line having an alternative function or a new function of the base unit 2. A master unit 6 is provided.

【0008】親機2 と擬似親機6 の間及び擬似親機6 と
端末機4 の間では、それぞれ親機側通信線3a、端末機側
通信線3bを介し、時分割多重伝送によりサイクリックに
制御信号や監視信号の送受信が行われる。
[0008] Between the base unit 2 and the pseudo base unit 6, and between the pseudo base unit 6 and the terminal unit 4, cyclic communication is performed by time division multiplex transmission via the base unit communication line 3a and the terminal unit communication line 3b, respectively. The transmission and reception of the control signal and the monitoring signal are carried out.

【0009】擬似親機6 は、図2に示すように、命令処
理を行う中央処理装置6a、親機2 と通信するための親機
側通信手段6b、端末機4 と通信するための端末機側通信
手段6c、親機側通信線3aと端末機側通信線3bを接続また
は切断する通信線切換手段6d、親機2 からの制御信号を
受信する端末機部6e、親機2 の通信の停止時間を測定す
るタイマ6fなどから構成される。
As shown in FIG. 2, the pseudo master unit 6 includes a central processing unit 6a for processing instructions, a master side communication means 6b for communicating with the master unit 2, and a terminal unit for communicating with the terminal unit 4. Side communication means 6c, communication line switching means 6d for connecting / disconnecting the main unit side communication line 3a and the terminal side communication line 3b, the terminal unit 6e receiving the control signal from the main unit 2, and the communication between the main unit 2 It comprises a timer 6f for measuring the stop time.

【0010】通信線切換手段6dは、装置の起動時、親機
側通信線3aと端末機側通信線3bを接続する。そして、端
末機部6eが親機2 から動作信号を受信すれば、前記両通
信線を切断し、停止信号を受信すれば、前記両通信線を
再び接続する。
The communication line switching means 6d connects the master communication line 3a and the terminal communication line 3b when the apparatus is started. When the terminal unit 6e receives the operation signal from the master unit 2, the two communication lines are disconnected, and when the terminal unit 6e receives the stop signal, the two communication lines are connected again.

【0011】この負荷制御装置1 の動作を説明すると、
まず、起動時、親機側通信線3aと端末機側通信線3bが接
続されているので、親機2 が負荷制御信号を送信すれば
直接端末機4 で受信される。これにより、端末機4 が自
己に接続された負荷5 を制御する。そして、親機2 が負
荷監視信号を送信すれば、その負荷監視信号を直接受信
した端末機4 が自己に接続された負荷5 を監視し、負荷
状態信号を親機2 へ直接送信する。このようにして、親
機2 による負荷5 の制御や監視が行われる。
The operation of the load control device 1 will be described.
First, at the time of startup, since the base unit side communication line 3a and the terminal side communication line 3b are connected, if the base unit 2 transmits a load control signal, it is directly received by the terminal unit 4. Thus, the terminal 4 controls the load 5 connected to itself. Then, when the base unit 2 transmits the load monitoring signal, the terminal 4 that directly receives the load monitoring signal monitors the load 5 connected to itself, and transmits the load state signal directly to the base unit 2. In this way, control and monitoring of the load 5 by the master unit 2 are performed.

【0012】また、擬似親機6 が有する新規の制御機能
を行うときは、親機2 から擬似親機6 の端末機部6eへ動
作信号が送信される。これにより、通信線切換手段6dが
親機側通信線3aと端末機側通信線3bを切断する。その後
は、擬似親機6 により、新規の制御機能や、親機2 と同
様の負荷5 の制御や監視が行われる。そして、新規の制
御機能が必要なくなれば、親機2 から擬似親機6 の端末
機部6eへ停止信号が送信され、通信線切換手段6dが親機
側通信線3aと端末機側通信線3bを接続する。その後は、
再び親機2 により、負荷5 の制御や監視が行われる。こ
のような構成により、親機2 を取り替えることなく、新
規の制御機能を行うことができる。
When performing a new control function of the pseudo base unit 6, an operation signal is transmitted from the base unit 2 to the terminal unit 6e of the pseudo base unit 6. As a result, the communication line switching means 6d disconnects the master communication line 3a and the terminal communication line 3b. After that, the pseudo master unit 6 performs a new control function and controls and monitors the load 5 similar to the master unit 2. Then, when the new control function becomes unnecessary, a stop signal is transmitted from the base unit 2 to the terminal unit 6e of the pseudo base unit 6, and the communication line switching means 6d sets the base unit side communication line 3a and the terminal side communication line 3b. Connect. After that,
The master unit 2 controls and monitors the load 5 again. With such a configuration, a new control function can be performed without replacing the master unit 2.

【0013】さらに、擬似親機6 は、親機2 が作動して
いるときサイクリックに送受信される負荷制御信号や負
荷監視信号を、親機側通信手段6bにて確認しており、送
受信が停止すれば、タイマ6fにより停止時間を測定す
る。そして、停止時間が所定時間を超えれば、親機2 が
故障したと判断し、通信線切換手段6dにより親機側通信
線3aと端末機側通信線3bを切断する。その後、擬似親機
6 は、親機2 に代わって負荷5 の制御や監視、もしくは
新規の制御機能を行う。このような構成により、制御が
不可能な状態になることを防ぎ、親機2 が故障しても円
滑に制御を行うことができる。
Further, the pseudo master unit 6 checks the load control signal and the load monitoring signal cyclically transmitted and received when the master unit 2 is operating by the master unit side communication means 6b. If stopped, the stop time is measured by the timer 6f. If the stop time exceeds the predetermined time, it is determined that the master unit 2 has failed, and the communication line switching unit 6d disconnects the master unit communication line 3a and the terminal unit communication line 3b. Then, the pseudo master unit
6 performs control and monitoring of the load 5 in place of the master unit 2 or performs a new control function. With such a configuration, it is possible to prevent a state in which control cannot be performed, and to smoothly perform control even if the base unit 2 fails.

【0014】[0014]

【発明の効果】本発明の負荷制御装置は、親機の代替機
能や新規機能を有する擬似親機を、親機と子機の間に挿
入接続するので、親機を取り替える必要がなく、容易に
新規機能を付加することができる。また、親機が故障し
ても擬似親機がその代替機能を果たすことにより、円滑
に負荷を制御することができる。
According to the load control device of the present invention, a pseudo master unit having a substitute function of the master unit and a new function is inserted and connected between the master unit and the slave unit, so that there is no need to replace the master unit and it is easy. To add new functions. Further, even if the master unit fails, the pseudo master unit performs its substitute function, so that the load can be smoothly controlled.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例を示す構成図である。FIG. 1 is a configuration diagram showing one embodiment of the present invention.

【図2】その擬似親機の構成を示すブロック図である。FIG. 2 is a block diagram showing a configuration of the pseudo master unit.

【符号の説明】[Explanation of symbols]

1 負荷制御装置 2 親機 4 端末機 5 負荷 6 擬似親機 1 Load control device 2 Master 4 Terminal 5 Load 6 Pseudo master

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 操作スイッチの操作により発生し負荷
(5)を遠隔制御する旨の負荷制御信号を送信する機能
と、サイクリックに負荷制御信号や負荷監視信号を発信
する機能とを有する親機(2)と、 親機からの負荷制御信号を通信線を介して受信するとと
もにともに負荷を制御する子機すなわち端末機(4)
と、を備える負荷制御装置(1)において、 親機と通信するための親機側通信手段(6b)と、 端末機と通信するための端末機側通信手段(6c)と、前記親機側通信手段が受信した親機からの信号 に基づき
親機と端末機とを結ぶ通信線(3a、3b)を接続また
は切断する通信線切換手段(6d)と、親機から制御信号を受信し、受信した制御信号が、親機
の有する子機制御機能に比して新規であり自機にのみ備
えられた子機制御機能を実行依頼する旨の信号であれ
ば、中央処理装置(6a)により前記通信線切換手段を
動作させることにより、親機と子機との間の通信経路で
ある前記通信線(3a、3b)を自機と子機との間の通
信経路に切換え、親機から制御信号を受信し、受信した
制御信号が、親機と子機との間の通信を実行依頼する旨
の信号であれば、中央処理装置により前記通信線切換手
段を動作させることにより、自機と子機との間の通信経
路を親機と子機との間の通信経路に切換える端末機部
(6e)と、 親機からサイクリックに送信されてくる負荷制御信号や
負荷監視信号の送信停止があれば、該送信停止から現在
までの経過時間を計時するタイマ(6f)と、 前記タイマで計時した前記経過時間が所定時間を超える
と親機の通信系機能の故障とみなして、親機と子機との
間の通信経路である前記通信線(3a、3b)を自機と
子機との間の通信経路に切換えることにより親機を通信
系から切り離し、親機の代行処置を行なう中央処理装置
(6a)と、備え前記親機と同じ機能及び/または新規の機能を有
する疑似親機(6)を、親機と子機との間に接続したこ
とを特徴とする負荷制御装置。
1. The operation of an operation switchOccurredloadgroup
(5) remote controlFunction to send load control signal
And cyclically sends load control and load monitoring signals
Function andParent machine with(2)And receive a load control signal from the master unit via a communication line.
Slave unit that controls load togetherThat is, the terminal (4)
And a load control device comprising:(1), The main unit communication means for communicating with the main unit(6b)And a terminal-side communication means for communicating with the terminal(6c)When,A signal from the master unit received by the master unit communication means Based on
Communication line connecting the master unit and the terminal(3a, 3b)Connect also
Is a communication line switching means for disconnecting(6d)When,A control signal is received from the master unit, and the received control signal is transmitted to the master unit.
It is newer than the slave unit control function of the
If the signal is a request to execute the slave unit control function
For example, the communication line switching means is controlled by the central processing unit (6a).
By operating, the communication path between the master unit and slave unit
A certain communication line (3a, 3b) is connected between the own device and the slave device.
Switch to the communication path, receive the control signal from the master unit,
A control signal requesting communication between the parent device and the child device
, The central processing unit switches the communication line.
By operating the stage, the communication between the
Terminal that switches the route to the communication path between the parent device and the child device
(6e), Load control signals cyclically transmitted from the base unit
If there is a load monitoring signal transmission stop, the transmission stop
A timer (6f) for measuring the elapsed time until: The elapsed time measured by the timer exceeds a predetermined time
And the failure of the communication function of the base unit,
The communication line (3a, 3b), which is a communication path between
Communicate with the master unit by switching to the communication path with the slave unit
Central processing unit that disconnects from the system and acts as a substitute for the parent machine
(6a), ToPreparationSame functions and / orNewHas function
Pseudo master(6)Connected between the master unit and slave unit.
And a load control device.
JP16076893A 1993-06-30 1993-06-30 Load control device Expired - Lifetime JP3145538B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16076893A JP3145538B2 (en) 1993-06-30 1993-06-30 Load control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16076893A JP3145538B2 (en) 1993-06-30 1993-06-30 Load control device

Publications (2)

Publication Number Publication Date
JPH0723469A JPH0723469A (en) 1995-01-24
JP3145538B2 true JP3145538B2 (en) 2001-03-12

Family

ID=15722043

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16076893A Expired - Lifetime JP3145538B2 (en) 1993-06-30 1993-06-30 Load control device

Country Status (1)

Country Link
JP (1) JP3145538B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008116164A (en) * 2006-11-07 2008-05-22 Sharp Corp Heat pump water heater
JP5234491B2 (en) * 2007-12-19 2013-07-10 Toto株式会社 Toilet unit

Also Published As

Publication number Publication date
JPH0723469A (en) 1995-01-24

Similar Documents

Publication Publication Date Title
JP3145538B2 (en) Load control device
JP3465663B2 (en) Digital wireless communication monitoring system
JP3294256B2 (en) Data communication method and device
JP2800018B2 (en) Baseband network system
JP2666849B2 (en) Remote monitoring device
JP2737761B2 (en) Digital transmission equipment
JPS58141057A (en) Loop network transmitter
JP2602821Y2 (en) Remote control device
JP2002217834A (en) Line-switching system for optical communication
JPH01202046A (en) Transmitter
JPH0389696A (en) Remote monitor control system
JPS644705B2 (en)
JP2925483B2 (en) Communication device for two-wire transmitter
JP2601188B2 (en) Communication device of flag synchronous line
JP2002019611A (en) Train traffic control system and interlocking device
JPH01265694A (en) Remote supervisory and control system
JPH10285163A (en) Digital transmission system
JPS6367842A (en) Load controlling system
JPH01111248A (en) Constitution changing system for data processing system
JPH0456436A (en) Control system for backup device utilizing isdn network
JPH0267853A (en) Transmission controller for remote supervisory and control device
JPS63144691A (en) Switch driving device
JPS6335020A (en) Multiplex transmission system
JPS60112337A (en) Duplex ring type transmission system
JPH03207125A (en) Line switching system

Legal Events

Date Code Title Description
A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 19990622

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080105

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090105

Year of fee payment: 8

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090105

Year of fee payment: 8

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100105

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100105

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110105

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120105

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120105

Year of fee payment: 11

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130105

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130105

Year of fee payment: 12

EXPY Cancellation because of completion of term