JP5510019B2 - 電力制御方法、プログラム及び装置 - Google Patents
電力制御方法、プログラム及び装置 Download PDFInfo
- Publication number
- JP5510019B2 JP5510019B2 JP2010095154A JP2010095154A JP5510019B2 JP 5510019 B2 JP5510019 B2 JP 5510019B2 JP 2010095154 A JP2010095154 A JP 2010095154A JP 2010095154 A JP2010095154 A JP 2010095154A JP 5510019 B2 JP5510019 B2 JP 5510019B2
- Authority
- JP
- Japan
- Prior art keywords
- power
- data
- battery
- target value
- value
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/30—Means for acting in the event of power-supply failure or interruption, e.g. power-supply fluctuations
- G06F1/305—Means for acting in the event of power-supply failure or interruption, e.g. power-supply fluctuations in the event of power-supply fluctuations
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/263—Arrangements for using multiple switchable power supplies, e.g. battery and AC
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/28—Supervision thereof, e.g. detecting power-supply failure by out of limits supervision
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Description
図1に、本実施の形態に係るシステムの構成図を示す。例えば社内LAN(Local Area Network)であるネットワーク1には、電力管理サーバ3と、給電装置5と、計測装置7と、管理端末13とが接続されている。また、例えば受電設備である商用電源9は、給電装置5に電力を供給する。給電装置5は、例えばUPS(Uninterruptible Power Supply)であり、例えばパーソナルコンピュータやプリンタ、照明といった、電力を消費する機器である負荷11に電力を供給する。
次に、第2の実施の形態について説明する。上で説明した第1の実施の形態では、商用電源から供給する電力のピーク値が最小となるように平準化目標値を特定した。これに対し、第2の実施の形態では、商用電源から供給する電力のピーク値だけでなく、発電により排出される二酸化炭素の量を少なくすることができるような平準化目標値を特定する。
次に、第3の実施の形態について説明する。上で説明した第1の実施の形態では、実際の需要電力と予測の需要電力との乖離を監視し、乖離の度合いに応じて平準化目標値の補正を行った。これに対し、本実施の形態では、実際のバッテリー残量と予測のバッテリー残量との乖離を監視し、乖離の度合いに応じて平準化目標値を補正する。
電力データベースに格納されている、実際の需要電力の推移のデータと、予測データ格納部に格納されている、需要電力の予測データとを用いて、直近の単位期間における実際の需要電力と予測の需要電力との乖離度合いを算出するステップと、
算出された前記乖離度合いに応じ、商用電源から供給する最大電力の目標値である平準化目標値の補正量を算出するステップと、
前記商用電源から供給する電力を制御する給電装置を、前記補正量で補正された前記平準化目標値の電力を前記商用電源から供給するように制御するステップと、
を含む電力制御方法。
前記平準化目標値の複数の候補値の各々について、当該候補値と前記給電装置に含まれるバッテリーの性能に関するデータと前記需要電力の予測データとを用いて、特定の期間において前記商用電源から供給する電力の予測データを生成する生成ステップと、
前記複数の候補値のうち、前記特定の期間において前記商用電源から供給する電力のピーク値が最も小さくなる候補値を前記平準化目標値として特定するステップと、
をさらに含む付記1記載の電力制御方法。
前記平準化目標値の複数の候補値の各々について、当該候補値と前記給電装置に含まれるバッテリーの性能に関するデータと前記需要電力の予測データとを用いて、特定の期間において前記商用電源から供給する電力の予測データを生成する生成ステップと、
前記複数の候補値の各々について、当該候補値について生成された前記予測データと、単位電力量当たりの二酸化炭素排出量のデータとを用いて、前記特定の期間における二酸化炭素排出量を算出する排出量算出ステップと、
前記複数の候補値のうち、前記特定の期間において前記商用電源から供給する電力のピーク値と前記特定の期間における二酸化炭素排出量とに基づき算出される指標値が最も小さくなる候補値を、前記平準化目標値として特定するステップと、
をさらに含む付記1記載の電力制御方法。
前記生成ステップが、
前記複数の候補値の各々について、当該候補値と前記バッテリーの性能に関するデータと前記需要電力の予測データとを用いて、前記特定の期間における前記バッテリーの充放電量を算出し、当該バッテリーの充放電量に基づき、前記特定の期間におけるバッテリー残量の予測データを生成するステップと、
前記複数の候補値の各々について、当該候補値と前記需要電力の予測データと前記バッテリー残量の予測データとを用いて、前記特定の期間において前記商用電源から供給する電力の予測データを生成するステップと、
を含む付記2又は3記載の電力制御方法。
商用電源から供給する最大電力の目標値である平準化目標値と、バッテリーの性能に関するデータと、予測データ格納部に格納されている、需要電力の予測データとを用いて、バッテリー残量の予測データを生成するステップと、
バッテリー残量データベースに格納されている、前記バッテリーの実際の残量の推移のデータと、前記バッテリー残量の予測データとを用いて、直近の単位期間における前記バッテリーの実際の残量と予測の残量との乖離度合いを算出するステップと、
算出された前記乖離度合いに応じ、前記平準化目標値の補正量を算出するステップと、
前記バッテリーを含み且つ前記商用電源から供給する電力を制御する給電装置を、前記補正量で補正された前記平準化目標値の電力を前記商用電源から供給するように制御するステップと、
を含む電力制御方法。
電力データベースに格納されている、実際の需要電力の推移のデータと、予測データ格納部に格納されている、需要電力の予測データとを用いて、直近の単位期間における実際の需要電力と予測の需要電力との乖離度合いを算出するステップと、
算出された前記乖離度合いに応じ、商用電源から供給する最大電力の目標値である平準化目標値の補正量を算出するステップと、
前記商用電源から供給する電力を制御する給電装置を、前記補正量で補正された前記平準化目標値の電力を前記商用電源から供給するように制御するステップと、
を、コンピュータに実行させるための電力制御プログラム。
電力データベースに格納されている、実際の需要電力の推移のデータと、予測データ格納部に格納されている、需要電力の予測データとを用いて、直近の単位期間における実際の需要電力と予測の需要電力との乖離度合いを算出し、算出された前記乖離度合いに応じ、商用電源から供給する最大電力の目標値である平準化目標値の補正量を算出する手段と、
前記商用電源から供給する電力を制御する給電装置を、前記補正量で補正された前記平準化目標値の電力を前記商用電源から供給するように制御する手段と、
を有する電力制御装置。
商用電源から供給する最大電力の目標値である平準化目標値と、バッテリーの性能に関するデータと、予測データ格納部に格納されている、需要電力の予測データとを用いて、バッテリー残量の予測データを生成するステップと、
バッテリー残量データベースに格納されている、前記バッテリーの実際の残量の推移のデータと、前記バッテリー残量の予測データとを用いて、直近の単位期間における前記バッテリーの実際の残量と予測の残量との乖離度合いを算出するステップと、
算出された前記乖離度合いに応じ、前記平準化目標値の補正量を算出するステップと、
前記バッテリーを含み且つ前記商用電源から供給する電力を制御する給電装置を、前記補正量で補正された前記平準化目標値の電力を前記商用電源から供給するように制御するステップと、
を、コンピュータに実行させるための電力制御プログラム。
商用電源から供給する最大電力の目標値である平準化目標値と、バッテリーの性能に関するデータと、予測データ格納部に格納されている、需要電力の予測データとを用いて、バッテリー残量の予測データを生成し、バッテリー残量データベースに格納されている、前記バッテリーの実際の残量の推移のデータと、前記バッテリー残量の予測データとを用いて、直近の単位期間における前記バッテリーの実際の残量と予測の残量との乖離度合いを算出し、算出された前記乖離度合いに応じ、前記平準化目標値の補正量を算出する手段と、
前記バッテリーを含み且つ前記商用電源から供給する電力を制御する給電装置を、前記補正量で補正された前記平準化目標値の電力を前記商用電源から供給するように制御する手段と、
を有する電力制御装置。
5 給電装置 7 計測装置
9 商用電源 11 負荷
13 管理端末
301 最適制御部 3011 平準化シミュレータ
3013 最適値探索部
303 リアルタイム補正部 3031 補正量算出部
3033 平準化制御部
305 長期予測部 3051 予測データ生成部
3053 予測データ格納部 3055 予測データ検索部
307 短期傾向データ生成部 309 分析データ格納部
311 分析部 313 需要電力DB
315 バッテリーDB 317 通信部
319 制御データ格納部
Claims (9)
- 電力データベースに格納されている、実際の需要電力の推移のデータと、予測データ格納部に格納されている、需要電力の予測データとを用いて、直近の単位期間における実際の需要電力と予測の需要電力との乖離度合いを算出するステップと、
算出された前記乖離度合いに応じ、商用電源から供給する最大電力の目標値である平準化目標値の補正量を算出するステップと、
前記商用電源から供給する電力を制御する給電装置を、前記補正量で補正された前記平準化目標値の電力を前記商用電源から供給するように制御するステップと、
を含む電力制御方法。 - 前記平準化目標値の複数の候補値の各々について、当該候補値と前記給電装置に含まれるバッテリーの性能に関するデータと前記需要電力の予測データとを用いて、特定の期間において前記商用電源から供給する電力の予測データを生成する生成ステップと、
前記複数の候補値のうち、前記特定の期間において前記商用電源から供給する電力のピーク値が最も小さくなる候補値を前記平準化目標値として特定するステップと、
をさらに含む請求項1記載の電力制御方法。 - 前記平準化目標値の複数の候補値の各々について、当該候補値と前記給電装置に含まれるバッテリーの性能に関するデータと前記需要電力の予測データとを用いて、特定の期間において前記商用電源から供給する電力の予測データを生成する生成ステップと、
前記複数の候補値の各々について、当該候補値について生成された前記予測データと、単位電力量当たりの二酸化炭素排出量のデータとを用いて、前記特定の期間における二酸化炭素排出量を算出する排出量算出ステップと、
前記複数の候補値のうち、前記特定の期間において前記商用電源から供給する電力のピーク値と前記特定の期間における二酸化炭素排出量とに基づき算出される指標値が最も小さくなる候補値を、前記平準化目標値として特定するステップと、
をさらに含む請求項1記載の電力制御方法。 - 前記生成ステップが、
前記複数の候補値の各々について、当該候補値と前記バッテリーの性能に関するデータと前記需要電力の予測データとを用いて、前記特定の期間における前記バッテリーの充放電量を算出し、当該バッテリーの充放電量に基づき、前記特定の期間におけるバッテリー残量の予測データを生成するステップと、
前記複数の候補値の各々について、当該候補値と前記需要電力の予測データと前記バッテリー残量の予測データとを用いて、前記特定の期間において前記商用電源から供給する電力の予測データを生成するステップと、
を含む請求項2又は3記載の電力制御方法。 - 商用電源から供給する最大電力の目標値である平準化目標値と、バッテリーの性能に関するデータと、予測データ格納部に格納されている、需要電力の予測データとを用いて、バッテリー残量の予測データを生成するステップと、
バッテリー残量データベースに格納されている、前記バッテリーの実際の残量の推移のデータと、前記バッテリー残量の予測データとを用いて、直近の単位期間における前記バッテリーの実際の残量と予測の残量との乖離度合いを算出するステップと、
算出された前記乖離度合いに応じ、前記平準化目標値の補正量を算出するステップと、
前記バッテリーを含み且つ前記商用電源から供給する電力を制御する給電装置を、前記補正量で補正された前記平準化目標値の電力を前記商用電源から供給するように制御するステップと、
を含む電力制御方法。 - 電力データベースに格納されている、実際の需要電力の推移のデータと、予測データ格納部に格納されている、需要電力の予測データとを用いて、直近の単位期間における実際の需要電力と予測の需要電力との乖離度合いを算出するステップと、
算出された前記乖離度合いに応じ、商用電源から供給する最大電力の目標値である平準化目標値の補正量を算出するステップと、
前記商用電源から供給する電力を制御する給電装置を、前記補正量で補正された前記平準化目標値の電力を前記商用電源から供給するように制御するステップと、
を、コンピュータに実行させるための電力制御プログラム。 - 電力データベースに格納されている、実際の需要電力の推移のデータと、予測データ格納部に格納されている、需要電力の予測データとを用いて、直近の単位期間における実際の需要電力と予測の需要電力との乖離度合いを算出し、算出された前記乖離度合いに応じ、商用電源から供給する最大電力の目標値である平準化目標値の補正量を算出する手段と、
前記商用電源から供給する電力を制御する給電装置を、前記補正量で補正された前記平準化目標値の電力を前記商用電源から供給するように制御する手段と、
を有する電力制御装置。 - 商用電源から供給する最大電力の目標値である平準化目標値と、バッテリーの性能に関するデータと、予測データ格納部に格納されている、需要電力の予測データとを用いて、バッテリー残量の予測データを生成するステップと、
バッテリー残量データベースに格納されている、前記バッテリーの実際の残量の推移のデータと、前記バッテリー残量の予測データとを用いて、直近の単位期間における前記バッテリーの実際の残量と予測の残量との乖離度合いを算出するステップと、
算出された前記乖離度合いに応じ、前記平準化目標値の補正量を算出するステップと、
前記バッテリーを含み且つ前記商用電源から供給する電力を制御する給電装置を、前記補正量で補正された前記平準化目標値の電力を前記商用電源から供給するように制御するステップと、
を、コンピュータに実行させるための電力制御プログラム。 - 商用電源から供給する最大電力の目標値である平準化目標値と、バッテリーの性能に関するデータと、予測データ格納部に格納されている、需要電力の予測データとを用いて、バッテリー残量の予測データを生成し、バッテリー残量データベースに格納されている、前記バッテリーの実際の残量の推移のデータと、前記バッテリー残量の予測データとを用いて、直近の単位期間における前記バッテリーの実際の残量と予測の残量との乖離度合いを算出し、算出された前記乖離度合いに応じ、前記平準化目標値の補正量を算出する手段と、
前記バッテリーを含み且つ前記商用電源から供給する電力を制御する給電装置を、前記補正量で補正された前記平準化目標値の電力を前記商用電源から供給するように制御する手段と、
を有する電力制御装置。
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2010095154A JP5510019B2 (ja) | 2010-04-16 | 2010-04-16 | 電力制御方法、プログラム及び装置 |
| US13/072,886 US8694176B2 (en) | 2010-04-16 | 2011-03-28 | Power control method, and power control apparatus |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2010095154A JP5510019B2 (ja) | 2010-04-16 | 2010-04-16 | 電力制御方法、プログラム及び装置 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2011229238A JP2011229238A (ja) | 2011-11-10 |
| JP5510019B2 true JP5510019B2 (ja) | 2014-06-04 |
Family
ID=44788819
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2010095154A Expired - Fee Related JP5510019B2 (ja) | 2010-04-16 | 2010-04-16 | 電力制御方法、プログラム及び装置 |
Country Status (2)
| Country | Link |
|---|---|
| US (1) | US8694176B2 (ja) |
| JP (1) | JP5510019B2 (ja) |
Families Citing this family (23)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102011078045A1 (de) * | 2011-06-24 | 2012-12-27 | Siemens Aktiengesellschaft | Verfahren und Vorrichtungen zum Zuteilen von Energiemengen |
| JP5720004B2 (ja) * | 2011-09-22 | 2015-05-20 | パナソニックIpマネジメント株式会社 | 電力調整装置及び電力調整方法 |
| JP2013165448A (ja) * | 2012-02-13 | 2013-08-22 | Sony Corp | 機器管理装置及び機器管理方法 |
| WO2013121514A1 (ja) | 2012-02-14 | 2013-08-22 | 東芝三菱電機産業システム株式会社 | 電力平準化装置 |
| US9715261B2 (en) * | 2012-02-29 | 2017-07-25 | Thomas Wilkins | Continuous dynamic balancing of generation and loads |
| JP2013192413A (ja) * | 2012-03-15 | 2013-09-26 | Omron Corp | 蓄電デバイス制御方法、蓄電デバイス制御装置、蓄電デバイス制御システム |
| US9425727B2 (en) * | 2012-04-17 | 2016-08-23 | Kohler Co. | Charging an energy storage device with a variable speed generator |
| KR101979272B1 (ko) * | 2012-06-25 | 2019-05-16 | 엘지전자 주식회사 | 에너지 저장장치, 서버 및 그 동작방법 |
| JP5882156B2 (ja) * | 2012-07-23 | 2016-03-09 | 株式会社デンソー | 電力制御装置 |
| US20150286200A1 (en) * | 2012-07-31 | 2015-10-08 | Caterva Gmbh | Device for an Optimized Operation of a Local Storage System in an Electrical Energy Supply Grid with Distributed Generators, Distributed Storage Systems and Loads |
| US9002531B2 (en) * | 2012-09-28 | 2015-04-07 | Sharp Laboratories Of America, Inc. | System and method for predictive peak load management via integrated load management |
| JP5756566B2 (ja) * | 2012-12-14 | 2015-07-29 | パナソニック株式会社 | 充放電制御方法、充放電制御システムおよび充放電制御装置 |
| US9312698B2 (en) * | 2012-12-19 | 2016-04-12 | Robert Bosch Gmbh | System and method for energy distribution |
| JP5461717B1 (ja) * | 2013-01-11 | 2014-04-02 | 中国電力株式会社 | 電力予測装置 |
| JP2014147216A (ja) * | 2013-01-29 | 2014-08-14 | Omron Corp | システム制御装置、電力供給を制御する方法、電力供給システムによる制御内容を表示する方法、および、プログラム |
| US9511675B2 (en) * | 2013-09-13 | 2016-12-06 | Nissan North America, Inc. | Methods of decreasing peak energy consumption |
| JP6402924B2 (ja) * | 2014-03-07 | 2018-10-10 | 株式会社Gsユアサ | 電力管理システム及びこれと連携する蓄電池搭載機器並びに電力管理システムの制御方法 |
| US9779431B1 (en) * | 2014-03-26 | 2017-10-03 | Amazon Technologies, Inc. | Determining cost variations in a resource provider environment |
| JP6069738B2 (ja) * | 2015-03-11 | 2017-02-01 | 株式会社エプコ | 充放電制御システム、充放電制御方法、および充放電制御プログラム |
| JP2018007466A (ja) * | 2016-07-05 | 2018-01-11 | 富士通株式会社 | 電力管理装置、電力管理システムおよび電力管理方法 |
| JP2019114011A (ja) * | 2017-12-22 | 2019-07-11 | ルネサスエレクトロニクス株式会社 | 半導体装置及び半導体装置の制御方法 |
| JP6804072B1 (ja) * | 2020-02-28 | 2020-12-23 | 公立大学法人会津大学 | 仮想発電所制御システム |
| EP4258506A4 (en) * | 2020-12-04 | 2024-10-30 | Tsubakimoto Chain Co. | CHARGING AND DISCHARGING DEVICE, CHARGING/DISCHARGING CONTROL METHOD, AND COMPUTER PROGRAM |
Family Cites Families (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5237507A (en) * | 1990-12-21 | 1993-08-17 | Chasek Norman E | System for developing real time economic incentives to encourage efficient use of the resources of a regulated electric utility |
| JP3230640B2 (ja) | 1995-04-18 | 2001-11-19 | 東京電力株式会社 | 二次電池電力貯蔵システムの運転方法及びその装置 |
| JPH1141831A (ja) * | 1997-07-11 | 1999-02-12 | N T T Facilities:Kk | 電力貯蔵装置、及び電力貯蔵装置の運転方法 |
| JP2001008385A (ja) | 1999-06-22 | 2001-01-12 | Sekisui Chem Co Ltd | 電力貯蔵システム |
| JP2003244840A (ja) | 2001-12-14 | 2003-08-29 | Furukawa Electric Co Ltd:The | 負荷平準化装置 |
| US6832134B2 (en) * | 2002-11-12 | 2004-12-14 | Honeywell International Inc. | Coordination in multilayer process control and optimization schemes |
| JP4064334B2 (ja) * | 2003-11-06 | 2008-03-19 | 日本電信電話株式会社 | エネルギーシステムの制御装置および制御方法 |
| JP2005218193A (ja) | 2004-01-28 | 2005-08-11 | Osaka Gas Co Ltd | コージェネレーションシステム |
| JP2009284723A (ja) * | 2008-05-26 | 2009-12-03 | Toshiba Corp | 電力需給制御装置および電力需給制御方法 |
| JP5268458B2 (ja) * | 2008-07-09 | 2013-08-21 | 株式会社東芝 | 小規模電力系統の需給制御装置 |
| US8068938B2 (en) * | 2009-05-15 | 2011-11-29 | General Electric Company | Method and system for managing a load demand on an electrical grid |
| US8892264B2 (en) * | 2009-10-23 | 2014-11-18 | Viridity Energy, Inc. | Methods, apparatus and systems for managing energy assets |
| JP4866470B2 (ja) * | 2010-05-31 | 2012-02-01 | 株式会社エナリス | 電力需要管理装置および電力需要管理システム |
| JP5101675B2 (ja) * | 2010-09-09 | 2012-12-19 | 株式会社東芝 | 需給バランス制御装置 |
| JP5696877B2 (ja) * | 2010-10-01 | 2015-04-08 | 清水建設株式会社 | 運転管理装置、運転管理方法、および運転管理プログラム |
| WO2012138688A1 (en) * | 2011-04-04 | 2012-10-11 | The Catholic University Of America | Systems and methods for improving the accuracy of day-ahead load forecasts on an electric utility grid |
| JP2012252580A (ja) * | 2011-06-03 | 2012-12-20 | Sony Corp | 電力制御装置、電力管理装置および電力管理システム |
| US9158300B2 (en) * | 2011-06-30 | 2015-10-13 | Panasonic Corporation | Method for designing a control apparatus and control apparatus |
-
2010
- 2010-04-16 JP JP2010095154A patent/JP5510019B2/ja not_active Expired - Fee Related
-
2011
- 2011-03-28 US US13/072,886 patent/US8694176B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| US8694176B2 (en) | 2014-04-08 |
| JP2011229238A (ja) | 2011-11-10 |
| US20110257803A1 (en) | 2011-10-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5510019B2 (ja) | 電力制御方法、プログラム及び装置 | |
| US10193339B2 (en) | Grid integrated control apparatus, grid control system, grid control apparatus, program, and control method | |
| JP5639540B2 (ja) | 蓄電池需給計画作成装置および蓄電池需給計画作成方法 | |
| JP2017022975A (ja) | 風力発電所の運転制御装置、運転制御方法及び風力発電システム | |
| US9543775B2 (en) | Battery controller, management system, battery control method, battery control program, and storage medium | |
| JP6699719B2 (ja) | 制御装置、発電制御装置、制御方法、システム、及び、プログラム | |
| JP5541549B2 (ja) | 急速充電システム、制御装置、蓄電量の制御方法、及びプログラム | |
| JP7252906B2 (ja) | 資源同化及び最適化による電力分配制御 | |
| CN118229121A (zh) | 一种风光制氢一体化规划生产模拟方法、系统及存储介质 | |
| US20150244173A1 (en) | Method of managing electric power, power management device and program | |
| US20150229128A1 (en) | Method of managing electric power, power management device, and program | |
| JP6702408B2 (ja) | 電力制御装置、電力制御システム、電力制御方法、及び、プログラム | |
| JP6705319B2 (ja) | 統括制御装置、統括制御システム、統括制御方法および統括制御プログラム | |
| US12230960B2 (en) | Power management system and power management method | |
| JP6827220B2 (ja) | 蓄電制御システム、指示制御装置、蓄電制御装置、蓄電制御方法、及びプログラム | |
| US11545851B2 (en) | Systems, methods, and apparatuses for distributing backup electrical power | |
| JP6968431B2 (ja) | 制御装置、システム及びプログラム | |
| CN112542857B (zh) | 控制微网系统稳定输出的方法、装置及设备 | |
| Feng et al. | Learning-Augmented Online Control for Sustainable Data Centers and Edge Computing Systems: Fostering a Sustainable and Supportive Digital Infrastructure | |
| KR20240040305A (ko) | 화력발전원 유연성 증대를 위한 ess 협조제어 방법 | |
| EP4084276A1 (en) | Electric power management system, and electric power management method | |
| EP4084278A1 (en) | Power management system and power management method | |
| CN116742687A (zh) | 制氢系统控制方法、装置、存储介质及电子设备 | |
| US20250239851A1 (en) | Power sharing system, power system | |
| CN120450756B (zh) | 一种考虑独立储能参与电力市场的发电机组组合优化方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20130206 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20140124 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20140225 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20140310 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 5510019 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| LAPS | Cancellation because of no payment of annual fees |