JP5642016B2 - 生産計画作成システム及び生産計画作成方法 - Google Patents
生産計画作成システム及び生産計画作成方法 Download PDFInfo
- Publication number
- JP5642016B2 JP5642016B2 JP2011108517A JP2011108517A JP5642016B2 JP 5642016 B2 JP5642016 B2 JP 5642016B2 JP 2011108517 A JP2011108517 A JP 2011108517A JP 2011108517 A JP2011108517 A JP 2011108517A JP 5642016 B2 JP5642016 B2 JP 5642016B2
- Authority
- JP
- Japan
- Prior art keywords
- utility
- production line
- production
- petri net
- utility equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
(実施形態1)
図1は、実施形態1における生産計画作成システム101の構成図の例である。生産計画作成システム101は、ユーザ106が入力した生産ライン110の情報に基づき生産ライン110のペトリネットモデルを作成する生産ラインペトリネットモデル作成部102と、ユーザ106が入力した用役設備109の情報に基づき用役設備109の各種情報を設定する用役設備情報設定部103と、費用やCO2(温室効果ガス排出量)などの最小化したいコストを設定する目的関数設定部104と、生産ラインペトリネットモデル作成部102のペトリネットモデルと用役設備情報設定部103の用役設備情報と目的関数設定部104で設定された目的関数に基づいて、コストを最小化するように生産ライン110における各工程開始時間を含む用役設備109の運転計画を決定する制約設定・最適計算部105(計算部)を含んで構成される。なお、制約設定・最適計算部105で決定された工程開始時間は、現場作業者107及び生産ライン制御装置108に送信される。
以後、各フローの詳細を生産設備と用役設備の場合で説明する。
ペトリネットは、時間ペトリネットと呼ばれるもので、プレースのトークン個数の推移を数式化すると以下の式で表される。適宜図7を参照する。
実施形態2では、用役設備の運転状態を制御可能な場合に、その運転計画も合わせて立案できることについて説明する。図12とともに適宜図1を参照して説明する。生産計画作成システム101の全体構成は、図1と同じであるので説明を省略する。また、生産計画作成の処理フローも図6と同様である。
グラフ1301を、ae(i)×x+be(i)とおき、
グラフ1302を、ah(i)×x+bh(i)とおく。
なお、iは区間を表す。
af(i)×x+bf(i)とする。
cbuy=c1(0<ebuy<e1)、c2(e1>ebuy)
fa×xboil+fb
と表せる。なお、近似できない場合でも個別の機器ごとに式を立てれば対応可能である。
102 生産ラインペトリネットモデル作成部
103 用役設備情報設定部
104 目的関数設定部
105 制約設定・最適計算部(計算部)
106 ユーザ
107 現場作業者
108 生産ライン制御装置
109 用役設備
110 生産ライン
701,703 プレース
704,706 トランジション
701T,703T,704T 表
707 アーク
1201 コジェネレーションシステム
1202 貫流ボイラ
1203 廃熱ボイラ
1204 空調
1205 買電
Claims (8)
- ユーザが入力した生産ライン情報に基づき生産ラインのペトリネットモデルを、工程開始時間を求めたい箇所を設定するとともに、用役使用量を前記ユーザが設定可能であるように作成する生産ラインペトリネットモデル作成部と、
前記生産ラインに用役を供給する用役設備モデルの用役設備情報を設定する用役設備情報設定部と、
前記用役設備で最小化したい物理量を目的関数として設定する目的関数設定部と、
前記ペトリネットモデルと前記用役設備情報と前記目的関数とに基づいて、前記生産ラインにおいて満たすべき条件と前記用役設備の運転に必要な条件とを制約条件として、数理計画法を用いて、製品の納期内で前記用役設備の物理量を最小化する計算をし、該計算に基づいて前記生産ラインにおける前記工程開始時間を決定する計算部とを有する
ことを特徴とする生産計画作成システム。 - 前記作成されたペトリネットモデルの要素の内、前記工程開始時間を求めたい箇所はトランジションによって定められ、前記用役使用量はプレースにその用役使用量が指定される
ことを特徴とする請求項1に記載の生産計画作成システム。 - 前記物理量として、前記用役設備の運転費用、前記用役設備の温室効果ガス排出量のうち少なくともいずれかを含む
ことを特徴とする請求項1に記載の生産計画作成システム。 - 前記用役設備情報設定部は、前記用役設備の負荷率に対するエネルギー消費特性を設定し、
前記目的関数設定部は、前記物理量として前記用役設備の運転に必要なエネルギー消費量を設定し、
前記計算部は、前記負荷率を変数として前記生産ラインの製品の流れとともに計算し、前記運転に必要なエネルギー消費量を最小化する生産計画を作成する
ことを特徴とする請求項1に記載の生産計画作成システム。 - 用役を供給する用役設備を有する生産ラインの生産計画作成方法であって、
生産ラインペトリネットモデル作成部は、ユーザが入力した生産ライン情報に基づき前記生産ラインのペトリネットモデルを、工程開始時間を求めたい箇所を設定するとともに、用役使用量を前記ユーザが設定可能であるように作成し、
用役設備情報設定部は、前記生産ラインに用役を供給する用役設備モデルの用役設備情報を設定し、
目的関数設定部は、前記用役設備で最小化したい物理量を目的関数として設定し、
計算部は、前記ペトリネットモデルと前記用役設備情報と前記目的関数とに基づいて、前記生産ラインにおいて満たすべき条件と前記用役設備の運転に必要な条件とを制約条件として、数理計画法を用いて、製品の納期内で前記用役設備の物理量を最小化する計算をし、該計算に基づいて前記生産ラインにおける前記工程開始時間を決定する
ことを特徴とする生産計画作成方法。 - 前記作成されたペトリネットモデルの要素の内、前記工程開始時間を求めたい箇所はトランジションよって定められ、前記用役使用量はプレースにその用役使用量が指定される
ことを特徴とする請求項5に記載の生産計画作成方法。 - 前記物理量として、前記用役設備の運転費用、前記用役設備の温室効果ガス排出量のうち少なくともいずれかを含む
ことを特徴とする請求項5に記載の生産計画作成方法。 - 前記用役設備情報設定部は、前記用役設備の負荷率に対するエネルギー消費特性を設定し、
前記目的関数設定部は、前記物理量として前記用役設備の運転に必要なエネルギー消費量を設定し、
前記計算部は、前記負荷率を変数として前記生産ラインの製品の流れとともに計算し、前記運転に必要なエネルギー消費量を最小化する生産計画を作成する
ことを特徴とする請求項5に記載の生産計画作成方法。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2011108517A JP5642016B2 (ja) | 2011-05-13 | 2011-05-13 | 生産計画作成システム及び生産計画作成方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2011108517A JP5642016B2 (ja) | 2011-05-13 | 2011-05-13 | 生産計画作成システム及び生産計画作成方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2012238284A JP2012238284A (ja) | 2012-12-06 |
| JP5642016B2 true JP5642016B2 (ja) | 2014-12-17 |
Family
ID=47461094
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2011108517A Expired - Fee Related JP5642016B2 (ja) | 2011-05-13 | 2011-05-13 | 生産計画作成システム及び生産計画作成方法 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP5642016B2 (ja) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2023107636A (ja) * | 2022-01-24 | 2023-08-03 | エヌ・ティ・ティ・コミュニケーションズ株式会社 | 生産支援装置、方法およびプログラム |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111241688B (zh) * | 2020-01-15 | 2023-08-25 | 北京百度网讯科技有限公司 | 复合生产工艺过程监控方法及装置 |
| CN113610313B (zh) * | 2021-08-16 | 2024-02-06 | 傲林科技有限公司 | 一种基于事件网的成本还原优化方法、系统及存储介质 |
| JP2023035965A (ja) * | 2021-08-30 | 2023-03-13 | 株式会社東芝 | 計画装置、および計画方法 |
| CN114511234B (zh) * | 2022-02-16 | 2023-05-30 | 陕西科技大学 | 一种生产线资源稳健配置方法、系统、设备及可读存储介质 |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4369189B2 (ja) * | 2003-09-22 | 2009-11-18 | 三菱電機株式会社 | スケジューリングシステムおよびスケジューリングをコンピュータに実行させるためのプログラム |
| JP2008117309A (ja) * | 2006-11-07 | 2008-05-22 | Nippon Steel Corp | 生産・物流スケジュール作成装置及び方法、生産・物流プロセス制御装置及び方法、コンピュータプログラム、並びにコンピュータ読み取り可能な記録媒体 |
| JP5033710B2 (ja) * | 2008-05-23 | 2012-09-26 | 株式会社日立製作所 | プラント運転計画立案装置およびそのプログラム |
-
2011
- 2011-05-13 JP JP2011108517A patent/JP5642016B2/ja not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2023107636A (ja) * | 2022-01-24 | 2023-08-03 | エヌ・ティ・ティ・コミュニケーションズ株式会社 | 生産支援装置、方法およびプログラム |
| JP7689088B2 (ja) | 2022-01-24 | 2025-06-05 | エヌ・ティ・ティ・コミュニケーションズ株式会社 | 生産支援装置、方法およびプログラム |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2012238284A (ja) | 2012-12-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN112700066B (zh) | 一种电-热综合能源系统调度最佳时间尺度配合方法 | |
| CN114662330B (zh) | 计及碳交易机制和需求响应的综合能源系统模型构建方法 | |
| Wu et al. | GENCO's risk-based maintenance outage scheduling | |
| JP5642016B2 (ja) | 生産計画作成システム及び生産計画作成方法 | |
| KR101654555B1 (ko) | 전력 관리 방법 및 시스템 | |
| US20180356780A1 (en) | Methods and systems for controlling generating units and power plants for improved performance | |
| WO2019130712A1 (ja) | 生産計画立案支援システム | |
| JP7178966B2 (ja) | 生産計画立案支援システム | |
| CN107918831A (zh) | 基于浏览器的bim进度计划管理方法及其系统 | |
| CN1661609A (zh) | 钢铁生产计划中合同与库存联合优化管理方法 | |
| CN104809545B (zh) | 一种虚拟电厂运行建模方法 | |
| Liu et al. | Robust pricing of energy and ancillary services in combined electricity and natural gas markets | |
| JP2017135976A (ja) | 需要側管理方法およびシステム | |
| CN110021932A (zh) | 双边参与的调峰辅助服务容量选取和经济模型构建方法 | |
| JP6427317B2 (ja) | 熱源設備制御システム、および熱源設備制御方法 | |
| JP4449276B2 (ja) | 生産計画の最適化方法及び生産計画の最適化プログラム | |
| CN108549256B (zh) | 一种需求响应数字物理混合仿真方法和系统 | |
| Sun et al. | Comparing dynamic risk-based scheduling methods with MRP via simulation | |
| JP2003113739A (ja) | エネルギ供給設備の運転計画システム | |
| JP3668018B2 (ja) | サプライチェーン評価システム | |
| JP2010250668A (ja) | サプライチェーン管理支援システム | |
| Wang et al. | Multi-objective integrated production planning model and simulation constrained doubly by resources and materials | |
| Kaldemeyer et al. | A generic formulation of compressed air energy storage as mixed integer linear program–unit commitment of specific technical concepts in arbitrary market environments | |
| JP7631249B2 (ja) | 電力取引支援装置、電力取引支援方法、および、プログラム | |
| JP2018025982A (ja) | エネルギープラント計画支援装置及びエネルギープラント計画支援システム |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20130731 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20140319 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20140408 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20140527 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20140930 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20141028 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 5642016 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| LAPS | Cancellation because of no payment of annual fees |