JP6549896B2 - 電力需要調整装置、電力需要調整方法及び電力需要調整プログラム - Google Patents
電力需要調整装置、電力需要調整方法及び電力需要調整プログラム Download PDFInfo
- Publication number
- JP6549896B2 JP6549896B2 JP2015102495A JP2015102495A JP6549896B2 JP 6549896 B2 JP6549896 B2 JP 6549896B2 JP 2015102495 A JP2015102495 A JP 2015102495A JP 2015102495 A JP2015102495 A JP 2015102495A JP 6549896 B2 JP6549896 B2 JP 6549896B2
- Authority
- JP
- Japan
- Prior art keywords
- power demand
- charge
- load factor
- information
- storage battery
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/14—Energy storage units
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
2 需要家
3 上位系
4 配電線
10 電力需要調整装置
11 負荷率算出部
12 DR情報作成部
13 通信制御部
14 DR情報抽出部
15 充放電計画作成部
20 需要家端末
21 充放電計画作成部
22 蓄電池
23 監視センサ
200 コミュニティ
Claims (8)
- 蓄電池の充放電に対するインセンティブの情報を含むデマンドレスポンス情報を用いない状態での、予め決められた複数の需要家が属するコミュニティにおける第1の翌日の電力需要予測を取得し、前記第1の翌日の電力需要予測及び前記コミュニティにおける翌日の蓄電池の充放電計画を基に第2の翌日の電力需要予測を求め、求めた前記第2の翌日の電力需要予測から前記コミュニティの翌日の負荷率を算出する処理を行う負荷率算出部と、
前記負荷率算出部により求められた最新の第2の翌日の電力需要予測を基に前記デマンドレスポンス情報を作成する情報作成部と、
前記情報作成部により作成された最新の前記デマンドレスポンス情報を基に作成された前記翌日の蓄電池の充放電計画を取得し前記負荷率算出部へ送信する取得部と、
前記負荷率算出部が前記処理を所定回数繰り返した後に、前記処理毎に前記情報作成部が作成した前記デマンドレスポンス情報の中からデマンドレスポンス情報を抽出し各前記需要家に通知する通知部と
を備えたことを特徴とする電力需要調整装置。 - 前記通知部は、前記負荷率算出部により算出された前記負荷率の中で最高の負荷率に対応する前記デマンドレスポンス情報を抽出することを特徴とする請求項1に記載の電力需要調整装置。
- 前記負荷率算出部は、1回目の処理では、前記第1の翌日の電力需要の推定値を基に、第2の翌日の電力需要予測を求め且つ前記負荷率を算出し、2回目以降の処理では、前記第1の翌日の電力需要の推定値に加えて、前記取得部が作成した前記翌日の蓄電池の充放電計画を基に第2の翌日の電力需要予測を求め且つ前記負荷率を算出することを特徴とする請求項1又は2に記載の電力需要調整装置。
- 前記取得部は、前記需要家毎の前記充放電計画を作成し、
前記負荷率算出部は、前記翌日の電力需要及び各前記需要家の前記充放電計画を基に、前記第2の翌日の電力需要予測を求め且つ前記負荷率を算出することを特徴とする請求項1〜3のいずれか一つに記載の電力需要調整装置。 - 予め決められた1又は複数の仮想的な需要家群に関する仮想充放電計画を作成する仮想計画作成部をさらに備え、
前記取得部は、前記仮想計画作成部から前記仮想充放電計画を取得して、取得した前記仮想充放電計画を前記充放電計画として前記負荷率算出部へ送信する
ことを特徴とする請求項1〜3のいずれか一つに記載の電力需要調整装置。 - 前記取得部は、前記需要家の平均である平均需要家、前記平均需要家よりも需要が大きい大需要家及び前記平均需要家よりも需要が小さい小需要家の前記充放電計画を作成することを特徴とする請求項5に記載の電力需要調整装置。
- 蓄電池の充放電に対するインセンティブの情報を含むデマンドレスポンス情報を用いない状態での、予め決められた複数の需要家が属するコミュニティにおける第1電力需要予測を取得する取得ステップと、
前記第1電力需要予測及び前記コミュニティにおける翌日の蓄電池の充放電計画を基に第2電力需要予測を求め、求めた前記第2電力需要予測から前記コミュニティの翌日の負荷率を算出する算出ステップと、
前記算出ステップにより算出された前記負荷率を基に、前記デマンドレスポンス情報を作成する情報作成ステップと、
前記情報作成ステップにより作成された前記デマンドレスポンス情報を基に作成された前記翌日の蓄電池の充放電計画を取得する計画取得ステップと、
前記算出ステップ、前記情報作成ステップ及び前記計画取得ステップを所定回数繰り返す繰返ステップと、
前記情報作成ステップにおいて作成された前記デマンドレスポンス情報の中からデマンドレスポンス情報を抽出し各前記需要家に通知する通知ステップと
を備えたことを特徴とする電力需要調整方法。 - 蓄電池の充放電に対するインセンティブの情報を含むデマンドレスポンス情報を用いない状態での、予め決められた複数の需要家が属するコミュニティにおける第1電力需要予測を取得する取得工程と、
前記第1電力需要予測及び前記コミュニティにおける翌日の蓄電池の充放電計画を基に第2電力需要予測を求め、求めた前記第2電力需要予測から前記コミュニティの翌日の負荷率を算出する算出工程と、
前記算出工程により算出された前記負荷率を基に、前記デマンドレスポンス情報を作成する情報作成工程と、
前記情報作成工程により作成された前記デマンドレスポンス情報を基に作成された前記翌日の蓄電池の充放電計画を取得する計画取得工程と、
前記算出工程、前記情報作成工程及び前記計画取得工程を所定回数繰り返す繰返工程と、
前記情報作成工程により作成された前記デマンドレスポンス情報の中からデマンドレスポンス情報を抽出し各前記需要家に通知する通知工程と
をコンピュータに実行させることを特徴とする電力需要調整プログラム。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2015102495A JP6549896B2 (ja) | 2015-05-20 | 2015-05-20 | 電力需要調整装置、電力需要調整方法及び電力需要調整プログラム |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2015102495A JP6549896B2 (ja) | 2015-05-20 | 2015-05-20 | 電力需要調整装置、電力需要調整方法及び電力需要調整プログラム |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2016220384A JP2016220384A (ja) | 2016-12-22 |
| JP6549896B2 true JP6549896B2 (ja) | 2019-07-24 |
Family
ID=57581776
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2015102495A Expired - Fee Related JP6549896B2 (ja) | 2015-05-20 | 2015-05-20 | 電力需要調整装置、電力需要調整方法及び電力需要調整プログラム |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6549896B2 (ja) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7092558B2 (ja) * | 2018-05-30 | 2022-06-28 | 一般財団法人電力中央研究所 | 電力需要調整装置、電力需要調整システム、電力需要調整方法及び電力需要調整プログラム |
| CN112513916A (zh) * | 2018-07-31 | 2021-03-16 | 本田技研工业株式会社 | 电力预测系统、电力预测装置、电力预测方法、程序及存储介质 |
| US10903652B2 (en) | 2019-02-13 | 2021-01-26 | Abb Power Grids Switzerland Ag | Control architectures for power distribution networks with distributed energy resource |
| JP7630299B2 (ja) * | 2021-02-26 | 2025-02-17 | 三菱電機株式会社 | 需給管理装置、取引支援装置、需給管理方法および需給管理プログラム |
| US20250016671A1 (en) * | 2021-11-09 | 2025-01-09 | Telefonaktiebolaget Lm Ericsson (Publ) | Management of delivery of power to a radio head |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2011254617A (ja) * | 2010-06-02 | 2011-12-15 | Tokyo Electric Power Co Inc:The | 充電制御システムおよび充電制御方法 |
| JP6097592B2 (ja) * | 2013-01-30 | 2017-03-15 | 積水化学工業株式会社 | 地域内電力需給制御システム |
-
2015
- 2015-05-20 JP JP2015102495A patent/JP6549896B2/ja not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2016220384A (ja) | 2016-12-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| DiOrio et al. | A model for evaluating the configuration and dispatch of PV plus battery power plants | |
| Liu et al. | Bidding strategy for microgrid in day-ahead market based on hybrid stochastic/robust optimization | |
| Liu et al. | Decision-making models for the participants in cloud energy storage | |
| Yao et al. | Residential demand side management under high penetration of rooftop photovoltaic units | |
| Moazeni et al. | Mean-conditional value-at-risk optimal energy storage operation in the presence of transaction costs | |
| Hossan et al. | Integrated CVR and demand response framework for advanced distribution management systems | |
| CN108875992B (zh) | 一种考虑需求响应的虚拟电厂日前优化调度方法 | |
| JP6042184B2 (ja) | エネルギー管理システム、エネルギー管理方法、プログラム、サーバ装置およびローカルサーバ | |
| CN112465208B (zh) | 计及区块链技术的虚拟电厂随机自适应鲁棒优化调度方法 | |
| JP6543145B2 (ja) | ピーク電力予測装置、電力管理システム及びピーク電力予測方法 | |
| CN111009895B (zh) | 一种微网优化调度方法、系统以及设备 | |
| CN105162113B (zh) | 一种基于灵敏度分析的微电网与配电网互动成本计算方法 | |
| JP6069738B2 (ja) | 充放電制御システム、充放電制御方法、および充放電制御プログラム | |
| Xu et al. | Multi-objective chance-constrained optimal day-ahead scheduling considering BESS degradation | |
| Hartmann et al. | Evaluation of business possibilities of energy storage at commercial and industrial consumers–A case study | |
| JP2020089087A (ja) | 電力管理方法および電力管理システム | |
| US20240280617A1 (en) | Aggregator System | |
| Sajid et al. | Multi-micro grid system reinforcement across deregulated markets, energy resources scheduling and demand side management using a multi-agent-based optimization in smart grid paradigm | |
| JP2016220384A (ja) | 電力需要調整装置、電力需要調整方法及び電力需要調整プログラム | |
| WO2019158575A1 (en) | System and method for operating a combination of heterogeneous energy resources for fast grid services | |
| JP2020039222A (ja) | 電力需給制御装置、電力需給制御システムおよび電力需給制御方法 | |
| JP6789020B2 (ja) | 蓄電池運用方法および蓄電池運用装置 | |
| CN112906961A (zh) | 储能控制方法、装置、非易失性存储介质及电子装置 | |
| JP7319838B2 (ja) | 電力管理装置および電力管理方法 | |
| CN105162173B (zh) | 一种接入风力发电的电力系统备用容量确定方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20180302 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20181214 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20190205 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20190329 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20190416 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20190613 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20190625 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20190628 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6549896 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |