JP6720562B2 - 制御装置、制御システム、制御プログラム、及び制御方法 - Google Patents
制御装置、制御システム、制御プログラム、及び制御方法 Download PDFInfo
- Publication number
- JP6720562B2 JP6720562B2 JP2016023938A JP2016023938A JP6720562B2 JP 6720562 B2 JP6720562 B2 JP 6720562B2 JP 2016023938 A JP2016023938 A JP 2016023938A JP 2016023938 A JP2016023938 A JP 2016023938A JP 6720562 B2 JP6720562 B2 JP 6720562B2
- Authority
- JP
- Japan
- Prior art keywords
- supply
- resource
- relational expression
- facilities
- amount
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Operations Research (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Game Theory and Decision Science (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Feedback Control In General (AREA)
Description
<システム構成>
まず、本実施形態に係る制御システム100のシステム構成について、図1を参照しながら説明する。図1は、第一の実施形態に係る制御システムの一例の構成を示す図である。
次に、本実施形態に係る制御装置10のハードウェア構成について、図2を参照しながら説明する。図2は、第一の実施形態に係る制御装置の一例のハードウェア構成を示す図である。
次に、本実施形態に係る制御装置10の機能構成について、図3を参照しながら説明する。図3は、第一の実施形態に係る制御装置の一例の機能構成を示す図である。
次に、本実施形態に係る制御装置10において実行される最適配分の決定処理の詳細について、図8を参照しながら説明する。図8は、第一の実施形態に係る最適配分の決定処理の一例のフローチャートである。なお、以降では、需給系統30は、図4に示す需給系統モデルMにより表されるものとして説明する。したがって、需給系統30には、資源供給設備1〜3が含まれる。
次に、第二の実施形態について説明する。第二の実施形態の説明では、第一の実施形態との相違点について説明し、第一の実施形態と実質的に同様の機能構成を有する箇所及び実質的に同様の処理を実行する箇所には第一の実施形態の説明で用いた符号と同様の符号を付与し、その説明を省略する。
まず、本実施形態に係る制御システム100のシステム構成について、図13を参照しながら説明する。図13は、第二の実施形態に係る制御システムの一例の構成を示す図である。
次に、本実施形態に係る制御装置10の機能構成について、図14を参照しながら説明する。図14は、第二の実施形態に係る制御装置の一例の機能構成を示す図である。
次に、本実施形態に係る制御装置10において実行される最適配分の決定処理の詳細について、図19を参照しながら説明する。図19は、第二の実施形態に係る最適配分の決定処理の一例のフローチャートである。
20 入出力装置
30 需給系統
100 制御システム
110 最適配分処理部
111 最小総コスト算出部
112 供給量算出部
120 制御処理部
1000 第1の関係式
2000 第2の関係式群
Claims (8)
- 資源を供給する複数の資源供給設備と、該複数の資源供給設備から供給される資源を需要する1以上の資源需要家設備とを含む需給系統を制御する制御装置であって、
前記制御装置とは異なる装置で予め作成された第1の関係式情報及び第2の関係式群情報を記憶する記憶手段と、
前記1以上の資源需要家設備において需要する資源の総需要量が入力されると、前記第1の関係式情報と前記複数の資源供給設備が資源を供給する際に必要なコストと前記総需要量とに基づいて、前記総需要量の資源を前記複数の資源供給設備が供給するために必要な最小コストを算出する最小コスト算出手段と、
前記最小コスト算出手段により最小コストが算出されると、前記第2の関係式群情報と、該最小コストと、前記総需要量と、前記複数の資源供給設備のうちの1以上の資源供給設備から供給される資源の供給量とに基づいて、前記資源供給設備それぞれの最適な供給量を算出する供給量算出手段と、
を有し、
前記第1の関係式情報は、前記総需要量と、前記複数の資源供給設備が資源を供給する際に必要な総コストとの関係を表す関係式を示す情報であり、
前記第2の関係式群情報は、前記総コストと、前記総需要量と、前記複数の資源供給設備の各々から供給される資源の供給量との関係をそれぞれ示す複数の関係式群を示す情報である、制御装置。 - 前記制御装置はハードウェア資源に制約がある機器又は装置であり、
前記第1の関係式情報及び前記複数の第2の関係式群情報は、前記需給系統を表すモデル及び前記複数の資源供給設備の資源のそれぞれの供給能力を示す情報に基づいて、前記制御装置と比較してハードウェア資源に制約の少ない前記異なる装置で作成される、請求項1に記載の制御装置。 - 前記最小コスト算出手段は、
前記1以上の資源需要家設備において需要する資源の総需要量と前記需給系統における外部条件とが入力されると、前記第1の関係式情報と、該外部条件と、前記複数の資源供給設備が資源を供給する際に必要なコストと、前記総需要量とに基づいて、前記総需要量の資源を前記複数の資源供給設備が供給するために必要な最小コストを算出し、
前記供給量算出手段は、
前記最小コスト算出手段により最小コストが算出されると、前記第2の関係式群情報と、前記外部条件と、前記最小コストと、前記総需要量と、前記複数の資源供給設備のうちの1以上の資源供給設備から供給される資源の供給量とに基づいて、前記資源供給設備の最適な供給量を算出する、請求項1又は2に記載の制御装置。 - 前記第1の関係式情報は、前記総需要量と、前記総コストと、前記外部条件との関係を表す関係式を示す情報であり、
前記第2の関係式群情報は、前記総コストと、前記総需要量と、前記複数の資源供給設備の各々から供給される資源の供給量と、前記外部条件との関係をそれぞれ示す複数の関係式群を示す情報である、請求項3に記載の制御装置。 - 資源を供給する複数の資源供給設備と、該複数の資源供給設備から供給される資源を需要する1以上の資源需要家設備とを含む需給系統を制御する制御装置と、前記1以上の資源需要家設備において需要する資源の総需要量を入力する入出力装置とを有する制御システムであって、
前記制御装置とは異なる装置で予め作成された第1の関係式情報及び第2の関係式群情報を記憶する記憶手段と、
前記総需要量が入力されると、前記第1の関係式情報と前記複数の資源供給設備が資源を供給する際に必要なコストと前記総需要量とに基づいて、前記総需要量の資源を前記複数の資源供給設備が供給するために必要な最小コストを算出する最小コスト算出手段と、
前記最小コスト算出手段により最小コストが算出されると、前記第2の関係式群情報と、該最小コストと、前記総需要量と、前記複数の資源供給設備のうちの1以上の資源供給設備から供給される資源の供給量とに基づいて、前記資源供給設備それぞれの最適な供給量を算出する供給量算出手段と、
を有し、
前記第1の関係式情報は、前記総需要量と、前記複数の資源供給設備が資源を供給する際に必要な総コストとの関係を表す関係式を示す情報であり、
前記第2の関係式群情報は、前記総コストと、前記総需要量と、前記複数の資源供給設備の各々から供給される資源の供給量との関係をそれぞれ示す複数の関係式群を示す情報である、制御システム。 - 資源を供給する複数の資源供給設備と、該複数の資源供給設備から供給される資源を需要する1以上の資源需要家設備とを含む需給系統を制御する制御装置と、前記1以上の資源需要家設備において需要する資源の総需要量を入力する入出力装置と、前記需給系統における外部条件を計測する計測装置とを有する制御システムであって、
前記制御装置とは異なる装置で予め作成された第1の関係式情報及び第2の関係式群情報を記憶する記憶手段と、
前記総需要量の入力と、前記外部条件の計測とがなされると、前記外部条件と、前記第1の関係式情報と、前記複数の資源供給設備が資源を供給する際に必要なコストと、前記総需要量とに基づいて、前記総需要量の資源を前記複数の資源供給設備が供給するために必要な最小コストを算出する最小コスト算出手段と、
前記最小コスト算出手段により最小コストが算出されると、前記外部条件と、前記第2の関係式群情報と、該最小コストと、前記総需要量と、前記複数の資源供給設備のうちの1以上の資源供給設備から供給される資源の供給量とに基づいて、前記資源供給設備それぞれの最適な供給量を算出する供給量算出手段と、
を有し、
前記第1の関係式情報は、前記総需要量と、前記複数の資源供給設備が資源を供給する際に必要な総コストとの関係を表す関係式を示す情報であり、
前記第2の関係式群情報は、前記総コストと、前記総需要量と、前記複数の資源供給設備の各々から供給される資源の供給量との関係をそれぞれ示す複数の関係式群を示す情報である、制御システム。 - 資源を供給する複数の資源供給設備と、該複数の資源供給設備から供給される資源を需要する1以上の資源需要家設備とを含む需給系統を制御する制御装置であって、前記制御装置とは異なる装置で予め作成された第1の関係式情報及び第2の関係式群情報を記憶する記憶手段を有する制御装置を、
前記1以上の資源需要家設備において需要する資源の総需要量が入力されると、前記第1の関係式情報と前記複数の資源供給設備が資源を供給する際に必要なコストと前記総需要量とに基づいて、前記総需要量の資源を前記複数の資源供給設備が供給するために必要な最小コストを算出する最小コスト算出手段、
前記最小コスト算出手段により最小コストが算出されると、前記第2の関係式群情報と、該最小コストと、前記総需要量と、前記複数の資源供給設備のうちの1以上の資源供給設備から供給される資源の供給量とに基づいて、前記資源供給設備それぞれの最適な供給量を算出する供給量算出手段、
として機能させ、
前記第1の関係式情報は、前記総需要量と、前記複数の資源供給設備が資源を供給する際に必要な総コストとの関係を表す関係式を示す情報であり、
前記第2の関係式群情報は、前記総コストと、前記総需要量と、前記複数の資源供給設備の各々から供給される資源の供給量との関係をそれぞれ示す複数の関係式群を示す情報である、制御プログラム。 - 資源を供給する複数の資源供給設備と、該複数の資源供給設備から供給される資源を需要する1以上の資源需要家設備とを含む需給系統を制御する制御装置であって、前記制御装置とは異なる装置で予め作成された第1の関係式情報及び第2の関係式群情報を記憶する記憶手段を有する制御装置に用いられる制御方法であって、
前記1以上の資源需要家設備において需要する資源の総需要量が入力されると、前記第1の関係式情報と前記複数の資源供給設備が資源を供給する際に必要なコストと前記総需要量とに基づいて、前記総需要量の資源を前記複数の資源供給設備が供給するために必要な最小コストを算出する最小コスト算出手順と、
前記最小コスト算出手順により最小コストが算出されると、前記第2の関係式群情報と、該最小コストと、前記総需要量と、前記複数の資源供給設備のうちの1以上の資源供給設備から供給される資源の供給量とに基づいて、前記資源供給設備それぞれの最適な供給量を算出する供給量算出手順と、
を有し、
前記第1の関係式情報は、前記総需要量と、前記複数の資源供給設備が資源を供給する際に必要な総コストとの関係を表す関係式を示す情報であり、
前記第2の関係式群情報は、前記総コストと、前記総需要量と、前記複数の資源供給設備の各々から供給される資源の供給量との関係をそれぞれ示す複数の関係式群を示す情報である、制御方法。
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016023938A JP6720562B2 (ja) | 2016-02-10 | 2016-02-10 | 制御装置、制御システム、制御プログラム、及び制御方法 |
| US15/412,196 US20170228678A1 (en) | 2016-02-10 | 2017-01-23 | Control apparatus, control system, computer-readable recording medium, and control method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2016023938A JP6720562B2 (ja) | 2016-02-10 | 2016-02-10 | 制御装置、制御システム、制御プログラム、及び制御方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2017142674A JP2017142674A (ja) | 2017-08-17 |
| JP6720562B2 true JP6720562B2 (ja) | 2020-07-08 |
Family
ID=59497755
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2016023938A Active JP6720562B2 (ja) | 2016-02-10 | 2016-02-10 | 制御装置、制御システム、制御プログラム、及び制御方法 |
Country Status (2)
| Country | Link |
|---|---|
| US (1) | US20170228678A1 (ja) |
| JP (1) | JP6720562B2 (ja) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6735219B2 (ja) * | 2016-12-05 | 2020-08-05 | 株式会社日立製作所 | 予測システム及び予測方法 |
| JP7822302B2 (ja) * | 2022-10-28 | 2026-03-02 | 三菱重工業株式会社 | 配分装置、配分方法、およびプログラム |
Family Cites Families (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5278772A (en) * | 1992-05-06 | 1994-01-11 | Honeywell Inc. | Real-time economic load allocation |
| EP0731397B1 (en) * | 1994-09-26 | 2001-05-16 | Kabushiki Kaisha Toshiba | Method and system for optimizing plant utility |
| US6032123A (en) * | 1997-05-12 | 2000-02-29 | Jameson; Joel | Method and apparatus for allocating, costing, and pricing organizational resources |
| US7343311B2 (en) * | 2002-03-01 | 2008-03-11 | I2 Technologies Us, Inc. | Generating an optimized supplier allocation plan |
| US7424438B2 (en) * | 2002-03-19 | 2008-09-09 | Marc Vianello | Apparatus and methods for providing career and employment services |
| US7072723B2 (en) * | 2002-10-23 | 2006-07-04 | Clearsight Systems Inc. | Method and system for optimization of general problems |
| US8880202B2 (en) * | 2010-07-09 | 2014-11-04 | Emerson Process Management Power & Water Solutions, Inc. | Optimization system using an iteratively coupled expert engine |
| WO2012118067A1 (ja) * | 2011-02-28 | 2012-09-07 | 横河電機株式会社 | エネルギー管理方法およびそのシステム並びにgui方法 |
| WO2013095624A1 (en) * | 2011-12-23 | 2013-06-27 | Hewlett-Packard Development Company, L.P. | Generating a capacity schedule for a facility |
| JP6334177B2 (ja) * | 2014-01-16 | 2018-05-30 | 株式会社東芝 | 運転計画作成装置、制御装置、運転計画作成方法、およびプログラム |
-
2016
- 2016-02-10 JP JP2016023938A patent/JP6720562B2/ja active Active
-
2017
- 2017-01-23 US US15/412,196 patent/US20170228678A1/en not_active Abandoned
Also Published As
| Publication number | Publication date |
|---|---|
| US20170228678A1 (en) | 2017-08-10 |
| JP2017142674A (ja) | 2017-08-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11556484B2 (en) | Minimizing energy consumption by peripheral machines | |
| US9841773B2 (en) | Cooling system management | |
| US9015726B2 (en) | Scheduling jobs of a multi-node computer system based on environmental impact | |
| US20160342186A1 (en) | System and Method for Providing Multi-Dimensional Power Supply Efficiency Profiles | |
| US8355828B2 (en) | Determining optimal settings for resource actuators | |
| Marten et al. | Nonlinear lifting line theory applied to vertical axis wind turbines: Development of a practical design tool | |
| CN116191554A (zh) | 风电场的功率控制方法和装置 | |
| US20210241393A1 (en) | Production allocation determining apparatus and production allocation determining method | |
| Ghaffari et al. | Modeling, control, and stability analysis of heterogeneous thermostatically controlled load populations using partial differential equations | |
| CN102377190B (zh) | 电网频率变化率限制系统 | |
| CN113759708A (zh) | 系统的优化控制方法、装置和电子设备 | |
| US20160283844A1 (en) | Load predictor for a cooling system | |
| JP6720562B2 (ja) | 制御装置、制御システム、制御プログラム、及び制御方法 | |
| CN108595757A (zh) | 能源设备建模、能源站调度方法、装置以及设备 | |
| JP5949827B2 (ja) | エネルギー管理システム | |
| US8047712B1 (en) | Method and apparatus for predicting steady state temperature of solid state devices | |
| Pradelle et al. | Energy-centric dynamic fan control | |
| JP2022163293A (ja) | 運用支援装置、運用支援方法及びプログラム | |
| Mirzaei et al. | IGDT-based robust operation of integrated electricity and natural gas networks for managing the variability of wind power | |
| JP6292338B1 (ja) | 運用支援システム、運用支援装置、運用支援方法及びプログラム | |
| Mast et al. | A computational intelligence based approach for optimized operation scheduling of energy plants | |
| Zaourar et al. | Modeling of applications and hardware to explore task mapping and scheduling strategies on a heterogeneous micro-server system | |
| Yokoyama | Optimal operation of a gas turbine cogeneration plant in consideration of equipment minimum up and down times | |
| Yokoyama et al. | Robust optimal operation of a gas turbine cogeneration plant under uncertain energy demands | |
| US12613050B2 (en) | Machine teaching with method of moments for mechanical systems |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20190111 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20191018 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20191119 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20191224 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20200519 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20200601 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6720562 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
