JPH01106111A - Sequence monitoring method - Google Patents
Sequence monitoring methodInfo
- Publication number
- JPH01106111A JPH01106111A JP62263236A JP26323687A JPH01106111A JP H01106111 A JPH01106111 A JP H01106111A JP 62263236 A JP62263236 A JP 62263236A JP 26323687 A JP26323687 A JP 26323687A JP H01106111 A JPH01106111 A JP H01106111A
- Authority
- JP
- Japan
- Prior art keywords
- block
- work
- sequence
- web
- signal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Program-control systems
- G05B19/02—Program-control systems electric
- G05B19/04—Program control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/042—Program control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
- G05B19/0428—Safety, monitoring
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Program-control systems
- G05B19/02—Program-control systems electric
- G05B19/04—Program control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/042—Program control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
- G05B19/0421—Multiprocessor system
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/24—Pc safety
- G05B2219/24042—Signature analysis, compare recorded with current data, if error then alarm
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Treatment Of Fiber Materials (AREA)
- Programmable Controllers (AREA)
Abstract
Description
【発明の詳細な説明】
〔産業上の利用分野]
本発明は製造ライン設備等の稼働状況を監視するシーケ
ンス監視方法に関するものである。DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a sequence monitoring method for monitoring the operating status of manufacturing line equipment, etc.
自動化された製造設備等は、作業対象となっている製品
や半製品(ワーク)をベルトコンベア等で移送してゆき
、この移送の過程で種々の作業を順次加えてゆくライン
設備として構成されている。Automated manufacturing equipment is configured as a line equipment in which products and semi-finished products (workpieces) to be worked on are transported using belt conveyors, etc., and various operations are sequentially added during this transport process. There is.
このようなライン設備においては、ワークの移送とこの
移送過程で順次加えられる各種の作業とが所定のシーケ
ンスにしたがって処理されるようになっている。そして
、ライン設備のいずれかの個所に異常が生じた場合には
、ライン設備の作動を緊急停止させ、大きなトラブルに
なることを避けるようにしている。In such line equipment, the transfer of workpieces and the various operations sequentially added during the transfer process are processed in accordance with a predetermined sequence. If an abnormality occurs in any part of the line equipment, the operation of the line equipment is immediately stopped to avoid major trouble.
このため、例えば特開昭59−62912号公報に記載
されたように、ライン設備中の何個所かにリミットスイ
ッチ等の検出器を設け、これらの検出器から出力される
電気信号をシーケンス診断装置に入力して電気的な監視
を行うようにしている。シーケンス診断装置は、作業工
程が順次消化されてゆく過程を前記検出器から出力され
る電気信号の発生タイミングに基づいて評価し、異常が
検出されたときには非常停止信号等のトリガ信号を出力
する。こうしてトリガ信号が出力されると、ライン設備
の作動が中断されるとともに、故障解・析のために各部
の動作過程を2値化データとして逐次記憶しているメモ
リからデータを読み出し、これを所定フォーマットのデ
ータシートにプリントアウトするようにしている。For this reason, for example, as described in Japanese Patent Application Laid-Open No. 59-62912, detectors such as limit switches are installed at several locations in the line equipment, and the electrical signals output from these detectors are transmitted to a sequence diagnostic device. It is used for electrical monitoring. The sequence diagnosis device evaluates the process in which work steps are completed in sequence based on the generation timing of the electrical signal output from the detector, and outputs a trigger signal such as an emergency stop signal when an abnormality is detected. When the trigger signal is output in this way, the operation of the line equipment is interrupted, and data is read out from the memory that sequentially stores the operation process of each part as binary data for failure analysis and is converted to a predetermined value. I am trying to print it out on a formatted data sheet.
〔発明が解決しようとする問題点]
ところが、上述のようなこれまでのシーケンス監視方法
においては、ライン設備中のいずれかに異常が発生しシ
ーケンス動作がストップする状態にならないとトリガ信
号が出力されず、各部の動作が徐々に劣化してゆく過程
、すなわち故障が発生する前の動作異常を検出すること
ができない。[Problems to be Solved by the Invention] However, in the conventional sequence monitoring methods as described above, a trigger signal is not output unless an abnormality occurs in one of the line equipment and the sequence operation is stopped. First, it is impossible to detect a process in which the operation of each part gradually deteriorates, that is, an abnormal operation before a failure occurs.
また、動作異常の判定に用いられる基準データを、シー
ケンス診断装置に予め指定してやる必要があり、その基
準データの算出やインプット処理が極めて煩雑となる。Further, it is necessary to specify the reference data used for determining abnormality in operation to the sequence diagnosis device in advance, which makes calculation and input processing of the reference data extremely complicated.
そしてワ、−りの種類や寸法を変えたすして、シーケン
ス動作のタイミングが変更されるような場合には、前記
基準データの指定作業をやり直さなくてはならず、汎用
性に乏しいものとなっている。さらに、これまでのシー
ケンス診断装置では、故障後にアウトプットされるデー
タは、全ての作業部分からのデータを含んでいるため、
このアウトプットデータからどの個所にどのような異常
が発生したかを判別しにくいという欠点があった。Furthermore, if the timing of the sequence operation is changed due to a change in the type or size of the wire, the work of specifying the reference data must be redone, resulting in a lack of versatility. ing. Furthermore, with conventional sequence diagnostic equipment, the data output after a failure includes data from all working parts.
There was a drawback in that it was difficult to determine from this output data where and what kind of abnormality occurred.
本発明はこのような従来技術の欠点に鑑みてなされたも
ので、ライン設備が故障に達する前にも異常が起きつつ
ある状況を知ることができ、しかも汎用性に優れたシー
ケンス監視方法を提供することを目的とする。The present invention has been made in view of the shortcomings of the prior art, and provides a highly versatile sequence monitoring method that allows the user to know when an abnormality is occurring even before the line equipment reaches a failure. The purpose is to
本発明は上記目的を達成するために、作業内容が異なる
複数の作業ブロックが組み合わされ、これらがシーケン
スコントローラによって管制されるように構成された設
備ラインの作動を監視するにあたり、監視したい複数の
任意の作業工程を各々ブロック化し、ブロック化された
作業工程ごとにその作動シーケンスを監視するようにし
たものである。このため、前記作業ブロックの内で複数
の電気信号が時系列的に出力される任意の作業ブロック
について、その複数の電気信号をシーケンスコントロー
ラを介して取り出して記憶し、この記憶された電気信号
の順番1時間間隔に基づいて基準となるシーケンスパタ
ーンを設定し、この設定の後に前記作業ブロックによっ
て作業が行われるときには、作業時に出力される電気信
号を前記シーケンスパターンと比較することによって作
業経過の適否を判別するようにしたものである。In order to achieve the above object, the present invention combines a plurality of work blocks with different work contents, and when monitoring the operation of an equipment line configured such that these blocks are controlled by a sequence controller, a plurality of arbitrary blocks to be monitored are provided. Each of the work processes is divided into blocks, and the operation sequence of each block work process is monitored. For this reason, for any work block in which a plurality of electrical signals are output in time series among the work blocks, the plurality of electrical signals are extracted and stored via a sequence controller, and the stored electrical signals are A reference sequence pattern is set based on a one-hour interval, and when work is performed by the work block after this setting, the suitability of the work progress is determined by comparing the electrical signal output during work with the sequence pattern. It is designed to determine.
なお、ここで「任意」ということは、操作者が自由に信
号を何回でも登録できることを意味し、また「作業ブロ
ック」は、監視したい任意の数信号も含み、同じような
動作パターンとなるものの信号を集めたものも含まれる
。Note that "arbitrary" here means that the operator can freely register a signal any number of times, and a "work block" includes any number of signals that you want to monitor and has a similar operation pattern. It also includes a collection of signals from things.
上記の構成によれば、作業内容の異なる設定したプロ・
シフごとにシーケンス作動の標準パターンが自動的に作
成され、これに基づいて設定したブロックごとにシーケ
ンス作動が監視できるようになる。そして作業ブロック
ごとにシーケンス作動を監視することによって、ライン
設備の全体が非常停止に到る前でも、各々の作業ブロッ
クのシーケンス作動をそれぞれ適当な判定レベルにした
がって逐次監視することができるようになる。According to the above configuration, professional users with different work
A standard pattern of sequence operation is automatically created for each shift, and based on this, sequence operation can be monitored for each set block. By monitoring the sequence operations for each work block, it becomes possible to sequentially monitor the sequence operations of each work block according to the appropriate judgment level, even before the entire line equipment comes to an emergency stop. .
以下、図面にしたがって本発明の一実施例について説明
する。An embodiment of the present invention will be described below with reference to the drawings.
第1図は本発明方法を適用した作業ラインの一例を示す
もので、この作業ラインはウェブの表面に乳剤等の液を
塗布し、その塗布状態を検査しながら、塗布済みのウェ
ブを巻芯に一定巻厚で巻き取ってゆく作業を行う。この
作業ラインはウェブ供給ブロック2.塗布ブロック3.
検査ブロック4、ウェブ巻取リプロック5とから構成さ
れている。Figure 1 shows an example of a work line to which the method of the present invention is applied. In this work line, a liquid such as an emulsion is applied to the surface of a web, and the coated web is wound onto a core while inspecting the application state. The work is done by winding the material at a constant thickness. This work line consists of web supply block 2. Application block 3.
It consists of an inspection block 4 and a web winding replock 5.
ウェブ供給ブロック2は、ウェブ7が巻かれた供給リー
ル8.モータ9によって駆動される供給ローラー10と
を備え、シーケンスコントローラ12からの作動信号に
よってモータ9を定速で駆動することによってウェブ7
は供給リール8から引き出される。The web supply block 2 includes a supply reel 8.on which the web 7 is wound. A supply roller 10 driven by a motor 9 is provided, and the web 7 is supplied by driving the motor 9 at a constant speed in response to an operation signal from a sequence controller 12.
is pulled out from the supply reel 8.
塗布ブロック3は、ウェブ7の存否及びその横幅を光学
的に検出するラインセンサー11.塗布幅が可変である
とともに開閉自在な電磁弁等を備えたノズル機構13を
備えた塗布器14とからなる。The coating block 3 includes a line sensor 11 that optically detects the presence or absence of the web 7 and its width. It consists of an applicator 14 that has a nozzle mechanism 13 that has a variable application width and is equipped with a solenoid valve that can be opened and closed freely.
検査ブロック4は、投光ユニット15及びウェブ7の幅
方向に延長した受光ユニット16.パンチャー17、さ
らにモータ20で駆動される駆動ローラー22を備えて
いる。投光ユニット15は、ウェブ7に塗布された乳剤
に影響を与えることのない波長の細径のレーザービーム
を、一定速度で移送されるウェブ7の表面に幅方向に走
査しながら照射し、その反射光が受光ユニット16によ
って受光される。受光ユニット16は、ウェブ7からの
反射光強度から乳剤の塗布ムラの存在する領域を検出し
、これをシーケンスコントローラ12に出力する。そし
て、ウェブ7が一定の長さ移送されたときに、シーケン
スコントローラ12からの指令信号によってパンチャー
17が作動し、検出された塗布ムラ領域の始点及び終点
位置に穿孔を行う。こうして穿孔された部分は後処理工
程で不良部分としてカットされることになる。なお、こ
の検査ブロック4及び前述の塗布ブロック3では、共通
のモータ20で駆動される駆動ローラー21.22によ
りウェブ7が移送され、その移送速度は供給ローラー1
0によるウェブ7の移送速度と等しくなっている。The inspection block 4 includes a light projecting unit 15 and a light receiving unit 16 extending in the width direction of the web 7. It includes a puncher 17 and a drive roller 22 driven by a motor 20. The light projection unit 15 irradiates the surface of the web 7, which is being transported at a constant speed, with a narrow laser beam having a wavelength that does not affect the emulsion coated on the web 7 while scanning it in the width direction. The reflected light is received by the light receiving unit 16. The light receiving unit 16 detects an area where emulsion coating unevenness exists from the intensity of reflected light from the web 7, and outputs this to the sequence controller 12. Then, when the web 7 is transported a certain length, the puncher 17 is activated by a command signal from the sequence controller 12 to punch holes at the starting and ending positions of the detected uneven coating area. The thus perforated portions will be cut out as defective portions in the post-processing process. Note that in this inspection block 4 and the above-mentioned coating block 3, the web 7 is transported by drive rollers 21 and 22 driven by a common motor 20, and the transport speed is equal to that of the supply roller 1.
It is equal to the transport speed of the web 7 by 0.
ウェブ巻取りブロック5は、カッター24.モータ25
を含む巻芯交換機構26.モータ27によって駆動され
るローラー28.ニップロー’y −29を含む。前記
巻芯交換機構26は、巻芯30a、30bを回転自在に
支持する巻芯保持レバー31と巻厚検出器32とを備え
ている。巻厚検出器32は巻芯30aに巻き取られてい
るウェブ7の表面位置を光学的に検出し、一定の巻厚に
なったときに光電信号を出力する。ニップローラー29
を保持したレバー34は、例えばソレノイドを利用した
レバー制御ユニット35によって回動制御される。そし
て、図示した圧着位置においてはニップローラー29は
巻芯30aに向かつて付勢され、巻−き付けられたウェ
ブ7の表面に圧着してウェブ7とともに巻芯30aを巻
取り方向に回転させる。また、シーケンスコントローラ
12からの指令によってレバー制御ユニット35が作動
すると、レバー34が時計方向に回動し、ニップローラ
ー29はウェブ7の表面から離れた退避位置に移動する
。The web winding block 5 has a cutter 24. motor 25
Winding core exchange mechanism 26. Roller 28 driven by motor 27. Contains Niplow'y-29. The core exchange mechanism 26 includes a core holding lever 31 that rotatably supports the cores 30a and 30b, and a thickness detector 32. The winding thickness detector 32 optically detects the surface position of the web 7 wound around the winding core 30a, and outputs a photoelectric signal when a certain winding thickness is reached. Nip roller 29
The lever 34 holding the lever 34 is rotationally controlled by a lever control unit 35 using, for example, a solenoid. In the illustrated pressing position, the nip roller 29 is urged toward the winding core 30a, presses against the surface of the wound web 7, and rotates the winding core 30a together with the web 7 in the winding direction. Further, when the lever control unit 35 is actuated by a command from the sequence controller 12, the lever 34 rotates clockwise, and the nip roller 29 moves to a retracted position away from the surface of the web 7.
前述したウェブ供給ブロック2.塗布ブロック3、検査
ブロック4.ウェブ巻取りブロック5からの信号を受け
、さらにこれらの各ブロックに指令信号を供出するシー
ケンスコントローラ12には、アイソレータ37.イン
ターフェースユニット38を介してマイクロコンピュー
タ40が接続されている。アイソレータ37は、例えば
第2図に示したようにホトカプラを利用した信号伝達装
置として構成されている。そして、シーケンスコントロ
ーラ12(第1図)側の端子台41(第2図)とインタ
ーフェースユニット38(第1図)側の端子台42(第
2図)との間に接続され、シーケンスコントローラ12
を介して得られる各ブロックからの信号をマイクロコン
ピュータ40に伝達する作用を行う。The aforementioned web supply block 2. Application block 3, inspection block 4. The sequence controller 12, which receives signals from the web winding block 5 and also provides command signals to each of these blocks, includes an isolator 37. A microcomputer 40 is connected via an interface unit 38. The isolator 37 is configured as a signal transmission device using a photocoupler, for example, as shown in FIG. The terminal block 41 (FIG. 2) on the sequence controller 12 (FIG. 1) side and the terminal block 42 (FIG. 2) on the interface unit 38 (FIG. 1) side are connected to each other.
The function is to transmit signals from each block obtained through the microcomputer 40 to the microcomputer 40.
マイクロコンピュータ40には、出力装置としてCRT
45.プリンタ46が接続され、また補助記憶装置とし
てフロッピィドライブユニット47(以下、FD47と
いう)が接続されている。The microcomputer 40 has a CRT as an output device.
45. A printer 46 is connected, and a floppy drive unit 47 (hereinafter referred to as FD 47) is connected as an auxiliary storage device.
マイクロコンピュータ40は、インターフェースユニッ
ト38を通して入力される各ブロックからの信号の状態
を順次に繰り返してスキャンし、その出力変化を監視す
る。このスキャニング及び処理速度の高速化を図るため
には、例えばタイマーボードをマイクロコンピュータ4
0内に増設したり、マイクロコンピュータ40に使用す
るプログラムの内、高速処理が要求される部分について
はアセンブラ言語による記述を併用することで対処でき
る。The microcomputer 40 sequentially and repeatedly scans the states of the signals input from each block through the interface unit 38, and monitors changes in the output. In order to increase the scanning and processing speed, for example, the timer board can be connected to a microcomputer 4.
Parts of the program added to the microcomputer 40 or used in the microcomputer 40 that require high-speed processing can be handled by using description in assembler language.
第1図に示した作業ラインが起動されると、ウェブ7の
移送に寄与する各ブロックのモータ9゜20.27が駆
動される。これにより供給リール8からウェブ7は、塗
布ブロック3に移送されるようになる。ラインセンサー
11がウェブ7の先端及びその横幅を検出すると、この
検出信号がシーケンスコントローラ12に出力される。When the work line shown in FIG. 1 is started, the motors 9.20.27 of each block contributing to the transport of the web 7 are driven. As a result, the web 7 is transferred from the supply reel 8 to the application block 3. When the line sensor 11 detects the leading edge of the web 7 and its width, this detection signal is output to the sequence controller 12.
シーケンスコントローラ12は、こうして検出信号が入
力されるとノズル機構13に制御信号を与えこれをウェ
ブ7の幅に対応した塗布幅に設定するとともに、一定時
間後すなわちウェブ7の先端が塗布器14のノズルの真
下に達する時点で塗布器14のノズルを開く。これによ
り、ウェブ7の移送とともにウェブ7の表面には一定幅
、一定厚で乳剤が塗布されてゆくようになる。When the detection signal is input in this way, the sequence controller 12 gives a control signal to the nozzle mechanism 13 and sets it to a coating width corresponding to the width of the web 7, and after a certain period of time, that is, when the tip of the web 7 reaches the applicator 14. The nozzle of the applicator 14 is opened when the applicator reaches just below the nozzle. As a result, as the web 7 is transported, the emulsion is coated on the surface of the web 7 with a constant width and a constant thickness.
塗布済みのウェブ7が検査ブロック4に移送されてくる
と、投光ユニット15及び受光ユニット16により、乳
剤の塗布ムラが光電検出される。When the coated web 7 is transferred to the inspection block 4, the emulsion coating unevenness is photoelectrically detected by the light projecting unit 15 and the light receiving unit 16.
ウェブ7の表面に塗布ムラが存在していると、受光ユニ
ット16の出力が所定の闇値を越えて変動し、これを2
値化することによって第3図に示したような欠陥信号を
得ることができる。この欠陥信号の立ち上がりが塗布ム
ラの始点に対応し、立ち下がりがその終点に対応してい
る。このような欠陥信号が得られると、ウェブ7の移送
速度に基づいて予め設定された時間T0が経過した時点
でシーケンスコントローラ12はモータ20の駆動を停
止させる。これにより、検出された始点位置がパンチャ
ー17の真下にきたときにウェブ7の移送が停止する。If coating unevenness exists on the surface of the web 7, the output of the light receiving unit 16 will fluctuate beyond a predetermined darkness value, and this
By converting it into a value, a defect signal as shown in FIG. 3 can be obtained. The rising edge of this defect signal corresponds to the starting point of coating unevenness, and the falling edge corresponds to its ending point. When such a defect signal is obtained, the sequence controller 12 stops driving the motor 20 when a preset time T0 based on the transport speed of the web 7 has elapsed. As a result, the transport of the web 7 is stopped when the detected starting point position is directly below the puncher 17.
こうしてモータ20が停止しその停止が確認されると、
パンチャー17が作動して塗布ムラ領域の始点位置に穿
孔が行われる。When the motor 20 has stopped in this way and the stop has been confirmed,
The puncher 17 operates to punch a hole at the starting point of the uneven coating area.
パンチャー17の作動完了信号を受けて、シーケンスコ
ントローラ12は再びモータ20を駆動する。そして、
モータ20の駆動が再開された時点から、欠陥信号の幅
に対応する時間TIが経過すると再びモータ20の駆動
が停止する。モータ20の停止が確認されると、パンチ
ャー17が再び作動して塗布ムラ領域の終点位置に穿孔
が行われる。この終点位置の穿孔が完了すると、受光ユ
ニット16によって異常が検出された時点から開始され
た検査ブロック4の作動が完了し、モータ20の駆動が
開始されることになる。Upon receiving the operation completion signal of the puncher 17, the sequence controller 12 drives the motor 20 again. and,
When the time TI corresponding to the width of the defect signal has elapsed from the time when the driving of the motor 20 was restarted, the driving of the motor 20 is stopped again. When it is confirmed that the motor 20 has stopped, the puncher 17 is operated again to punch a hole at the end position of the uneven coating area. When the drilling at this end point position is completed, the operation of the inspection block 4 that started from the time when the abnormality was detected by the light receiving unit 16 is completed, and the driving of the motor 20 is started.
検査ブロック4を経たウェブ7はウェブ巻取りブロック
5に達する。ウェブ巻取りブロック5では、移送されて
くるウェブ7を巻芯30aに巻き取る。そして、巻芯3
0aに巻き取られたウェブ7の巻厚が、巻厚検出器32
によって一定値に達したことが検出されると、第4図に
示したように巻厚検出信号が得られ、これがシーケンス
コントローラ−ラ12に出力される。シーケンスコント
ローラ12は、この巻厚検出信号を受けてモータ27の
駆動を停止させる。モータ27が停止した後、カッター
24が作動してウェブ7を切断する。シーケンスコント
ローラ12はこのカッター24の作動完了信号を受ける
と、レバー制御ユニット35を作動させ、レバー34を
反時計方向に一定角度回動させてニップローラー29を
退避位置に保持する。The web 7 passing through the inspection block 4 reaches the web winding block 5. In the web winding block 5, the transported web 7 is wound around the winding core 30a. And core 3
The winding thickness of the web 7 wound around 0a is detected by the winding thickness detector 32.
When it is detected that a certain value has been reached, a winding thickness detection signal is obtained as shown in FIG. 4, and this is output to the sequence controller 12. The sequence controller 12 receives this winding thickness detection signal and stops driving the motor 27. After the motor 27 has stopped, the cutter 24 is activated to cut the web 7. When the sequence controller 12 receives the operation completion signal of the cutter 24, it operates the lever control unit 35, rotates the lever 34 counterclockwise by a certain angle, and holds the nip roller 29 at the retracted position.
レバー制御ユニット35の作動、すなわちニップローラ
ー29が退避位置に移動されたことが確認された後、シ
ーケンスコントローラ12は巻芯交換機構・26に作動
信号を出力する。これによりモータ25が一定回転量駆
動され、巻芯保持レバー31を丁度180°回転させる
。この結果、−定巻厚まで巻かれたウェブ7が巻芯30
aとともに巻取り位置から退避し、新たな巻芯30bが
巻取り位置にセットされる。After confirming that the lever control unit 35 is activated, that is, that the nip roller 29 has been moved to the retracted position, the sequence controller 12 outputs an activation signal to the core exchange mechanism 26. As a result, the motor 25 is driven by a certain amount of rotation, and the core holding lever 31 is rotated by exactly 180 degrees. As a result, the web 7 wound to a certain thickness is rolled onto the winding core 30.
The winding core 30b is retracted from the winding position together with the winding core 30b, and a new winding core 30b is set at the winding position.
こうして新たな巻芯301)がセットされると、レバー
制御ユニット35に作動終了信号が出力され、ニップロ
ーラー29は新たな巻芯30bに圧接される。そして、
モータ27の駆動が再開されると、ウェブ巻取りブロッ
ク5に移送されてくるウェブ7は巻芯30bに巻き取ら
れてゆくようになる。このウェブ巻取りブロック5の作
動は、巻厚検出器32から巻厚検出信号が得られた時点
がら、モータ27の駆動が再開されるまでの期間であり
、この間はウェブ巻取リブロック作動信号が出力される
。なお、一定巻厚にウェブ7を巻き取った巻芯30aは
、巻芯保持レバー31がら取り外され、さらに新たな巻
芯が代わりにセットされる。When a new core 301) is set in this way, an operation end signal is output to the lever control unit 35, and the nip roller 29 is pressed against the new core 30b. and,
When the drive of the motor 27 is resumed, the web 7 transferred to the web winding block 5 is wound around the winding core 30b. The operation of the web winding block 5 is from the time when the winding thickness detection signal is obtained from the winding thickness detector 32 until the driving of the motor 27 is restarted, and during this period, the web winding reblock activation signal is is output. Note that the core 30a on which the web 7 has been wound to a constant thickness is removed from the core holding lever 31, and a new core is set in its place.
ところで上述した作業ラインでは、例えば塗布ブロック
3と検査ブロック4やウェブ巻取りブロック5との間、
あるいは検査ブロック4とウェブ巻取リプロック5との
間には、互いに関連し合うシーケンス制御は存在しない
。このように、互いに連係のない作業ブロックを含む作
業ラインが正常に稼働しているか否かをチエツクするた
めに、シーケンスコントローラ12から各フロックに出
力される信号と、各ブロックからシーケンスコントロー
ラ12にフィードバックされる信号は、アイソレータ3
7及びインターフェースユニット38を介しマイクロコ
ンピュータ40にも供給される。そして、マイクロコン
ピュータ40はシーケンスコントローラ12と各ブロッ
クとの間で信号が授受されるタイミングを任意に設定し
た各ブロックごとに分離して監視し、これにより作業ラ
インの作動が正常であるか否かを判定する。By the way, in the above-mentioned work line, for example, between the coating block 3 and the inspection block 4 or the web winding block 5,
Alternatively, there is no mutually related sequence control between the inspection block 4 and the web winding replock 5. In this way, in order to check whether a work line including work blocks that are not linked to each other is operating normally, a signal is output from the sequence controller 12 to each block, and a signal is sent back from each block to the sequence controller 12. The signal to be output is the isolator 3
7 and an interface unit 38 to the microcomputer 40 as well. The microcomputer 40 then monitors the timing at which signals are exchanged between the sequence controller 12 and each block separately for each arbitrarily set block, thereby checking whether or not the operation of the work line is normal. Determine.
各ブロックのシーケンス作動が適正であるか否かの判定
を行うための基準データは、マイクロコンピュータ40
によって自動的にサンプリングされる。例えば検査ブロ
ック4について説明すると、検査ブロック作動信号(第
3図)が出力されている間に、インターフェースユニッ
ト38を介して得られる第3図の各信号の発生順序及び
時間間隔が、マイクロコンピュータ40に内蔵されたメ
モリに記憶される。The reference data for determining whether the sequential operation of each block is appropriate is provided by the microcomputer 40.
automatically sampled by For example, regarding the test block 4, while the test block activation signal (FIG. 3) is being output, the generation order and time interval of each signal shown in FIG. stored in the built-in memory.
この基準データのサンプリングは、マイクロコンピュー
タ40上のデータサンプリングプログラムにしたがって
遂行され、例えば検査ブロック4の作動シーケンスに係
る基準データは、検査ブロック4が作動するごとに10
回行われ、サンプリングされた基準データは各々のアド
レス領域に書き込まれる。この10回のデータサンプリ
ングが完了すると、得られた基準データに基づいて、欠
陥信号が得られた時点からモータ20が停止するまでの
時間、モータ20が停止してからパンチャー17が作動
するまでの時間、パンチャー17が作動してから再びモ
ータ20が起動されるまでの時間等、各信号の相互間の
時間間隔の平均が算出され、この平均時間が基準時間と
して記憶される。This sampling of the reference data is performed according to a data sampling program on the microcomputer 40. For example, the reference data related to the operation sequence of the test block 4 is sampled every time the test block 4 is operated.
The sampled reference data is written into each address area. When these 10 data samplings are completed, based on the obtained reference data, the time from when a defect signal is obtained until the motor 20 stops, and the time from when the motor 20 stops until the puncher 17 operates The average of the time intervals between each signal, such as the time from when the puncher 17 is activated until the motor 20 is activated again, is calculated, and this average time is stored as a reference time.
また、10回のサンプリングによって検出された時間間
隔の標準偏差から基準偏差が算出されメモリされる。な
お、10回のサンプリングを行う過程で、3回目以降は
前記基準時間及び基準偏差の算出のためにサンプリング
されるのと並行してシーケンス処理の監視も行われる。Further, a standard deviation is calculated from the standard deviation of the time intervals detected by sampling ten times and is stored in memory. In addition, in the process of sampling 10 times, from the third time onwards, the sequence processing is also monitored in parallel with sampling for calculating the reference time and reference deviation.
また、各信号の順番に関しては1回目のサンプリングで
決めるようにしてもよい。Further, the order of each signal may be determined at the first sampling.
このようにして、検査ブロック4におけるシーケンス作
動の順序、基準時間、基準偏差が判定基準として記憶さ
れた後は、それ以後に検査ブロック4が作動したときに
得られる基準データがこれらの判定基準と比較され、シ
ーケンス動作の適否が判定される。また、同様にしてウ
ヱブ巻取りブロック5の判定基準となる基準動作パター
ンもマイクロコンピュータ40によって自動的に作成さ
れる。In this way, after the sequence operation order, reference time, and reference deviation in the inspection block 4 are stored as judgment criteria, the reference data obtained when the inspection block 4 is operated thereafter will be used as these judgment criteria. The results are compared and the suitability of the sequence operation is determined. Similarly, the microcomputer 40 automatically creates a reference motion pattern that serves as a criterion for the web winding block 5.
こうして作成された平均的な基準動作パターンが第3図
に実線で示すものであり、例えばパンチャー作動のタイ
ミングに許容された基準偏差すなわちモータ20の停止
後、パンチャー17が作動するまでの時間間隔がT2で
あるときには、破線のタイミングでパンチャー17が作
動しても異常とは判定されることがない。しかし、パン
チャー17が作動した後、再びモータ20が駆動される
までの基準偏差時間がT3であるときには、パンチャー
17が終点位置の穿孔を行った後、モータ20が破線で
示したタイミングで再駆動した場合には異常と判定され
ることになる。なお、モータ20を停止させるタイミン
グは、ウェブ7の移送速度と欠陥信号の検出タイミング
に基づいて正確に決められる。The average standard operation pattern created in this way is shown by the solid line in FIG. At T2, even if the puncher 17 operates at the timing indicated by the broken line, it will not be determined to be abnormal. However, when the standard deviation time from when the puncher 17 operates until the motor 20 is driven again is T3, the motor 20 is re-driven at the timing shown by the broken line after the puncher 17 performs punching at the end position. If so, it will be determined as abnormal. Note that the timing for stopping the motor 20 is accurately determined based on the transport speed of the web 7 and the detection timing of the defect signal.
マイクロコンピュータ40によるシーケンス動作監視モ
ードには、非常時監視モード、順番監視モード、時間監
視モード、順番及び時間監視モード、動作印字モードの
5種類があり、作業ブロックごとに任意に設定すること
ができる。非常時監視モードにおいては、予定した機能
を達成することができないような異常、例えば上述した
検査ブロック4において欠陥信号が出力されていながら
モータ20が停止しなかったり、モータ20が停止する
前にパンチャー17が作動したりするような致命的な異
常状態を監視する。このような異常状態の判定基準は、
予め作業ブロックごとにマイクロコンピュータ40にメ
モリされており、こうした異常状態が発生したときには
、全ての作業ブロックの作動を停止させるとともに、こ
れらの作業ブロックからの全ての信号がタイムチャート
としてプリンタ46からプリントアウトされる。There are five types of sequence operation monitoring modes by the microcomputer 40: emergency monitoring mode, order monitoring mode, time monitoring mode, order and time monitoring mode, and operation printing mode, which can be arbitrarily set for each work block. . In the emergency monitoring mode, abnormalities that prevent the scheduled function from being achieved, such as failure of the motor 20 to stop even though a defect signal is output in the above-mentioned inspection block 4, or failure of the puncher to occur before the motor 20 stops, are detected. Monitor for fatal abnormal conditions such as 17 activation. The criteria for determining such abnormal conditions are:
Each work block is stored in memory in the microcomputer 40 in advance, and when such an abnormal condition occurs, the operation of all work blocks is stopped and all signals from these work blocks are printed out as a time chart from the printer 46. be outed.
順番監視モードでは、シーケンスコントローラ12から
時系列的に出力される信号の順番を監視する。例えば第
4図に基準動作パターンを示したウェブ巻取りブロック
5の作動を例にとると、巻厚検出信号、モータ27停止
、カッター作動、レバー制御ユニット作動等がこの順番
に行われたか否かを監視する。また時間監視モードでは
、例えばカッター24.レバー制御ユニット35の作動
が、モータ27の停止後それぞれ基準偏差T3゜T4の
時間内に作動したか否かを監視する。そして、これらの
作動タイミングが48a偏差の範囲を越えていたときに
異常を検出する。この監視モードにおいては、カッター
24の作動とレバー制御ブロック35の作動の前後はい
ずれでもよい。順番及び時間監視モードにおいては、前
記カッター24の作動とレバー制御ユニット35の作動
がこの順番でしかも基準偏差時間内に行われたか否かを
監視する。In the order monitoring mode, the order of signals output from the sequence controller 12 in time series is monitored. For example, if we take the operation of the web winding block 5 whose standard operation pattern is shown in FIG. to monitor. In the time monitoring mode, for example, the cutter 24. It is monitored whether the lever control unit 35 is activated within a time period of the respective reference deviations T3 and T4 after the motor 27 is stopped. Then, when these operating timings exceed the range of deviation 48a, an abnormality is detected. In this monitoring mode, the cutter 24 and the lever control block 35 may be operated before or after. In the order and time monitoring mode, it is monitored whether the operation of the cutter 24 and the lever control unit 35 are performed in this order and within a standard deviation time.
動作印字モードでは、マイクロコンピュータ40に入力
される種々の信号の変化時に、その信号変化の様子とそ
の時刻、及びその信号がどの作業ブロックからの何の信
号であるかの種別表示が、ブりン夕46からプリントア
ウトされる。したがって、作業ラインが正常に稼働して
いるときにこの動作印字モードに設定すると、正常稼働
時の電気信号の変化の様子を確認することができ、また
異常が生じつつある部分に関しては、その進行過程につ
いての知見を得ることも可能となる。In the operation print mode, when various signals input to the microcomputer 40 change, the state and time of the signal change, as well as the type of signal from which work block the signal is from, are displayed on the screen. Printed out from page 46. Therefore, if you set this operation print mode when the work line is operating normally, you can check how the electrical signal changes during normal operation, and you can also check the progress of the part where an abnormality is occurring. It also becomes possible to obtain knowledge about the process.
なお、上述した各監視モード下において異常が検出され
たときには、どの作業ブロック内の何の信号にどのよう
な異常(順番や作動時間)があったかをCRT45に表
示し、またプリンタ46でプリントアウトされる。さら
に、異常時においてはFD47が作動して、異常のおき
た前後のデータはフロッピィディスクに書き込まれ、後
日詳細な解析を行うときに役立てることができる。Furthermore, when an abnormality is detected under each of the above-mentioned monitoring modes, what kind of abnormality (order and operation time) occurred in which signal in which work block is displayed on the CRT 45 and printed out on the printer 46. Ru. Furthermore, in the event of an abnormality, the FD 47 is activated, and the data before and after the abnormality is written to a floppy disk, which can be used for detailed analysis at a later date.
以上のように、作業ラインのシーケンス動作を制場卸す
るシーケンスコントローラ12からさらに監視用の信号
を取り出し、これをマイクロコンピュータ40に入力し
てシーケンス動作を監視するようにしたから、作業ライ
ンが正常に動作しているときでも随時シーケンス動作を
確認することが 1でき、故障が発生する前の段階から
異常が進行してゆく過程も知見できるようになる。As described above, since a monitoring signal is further taken out from the sequence controller 12 that controls the sequence operation of the work line and inputted into the microcomputer 40 to monitor the sequence operation, the work line is maintained normally. It is possible to check the sequence operation at any time even when the system is operating normally, and it becomes possible to understand the progress of abnormalities from the stage before a failure occurs.
以上に説明してきたように、本発明のシーケンス監視方
法によれば、実際にライン設備を稼働させてその最初の
段階で監視したい、かつ毎サイクル同じパターンとなる
任意のブロックについて監視の基準となるシーケンスパ
ターンを設定し、それ以後は前述のようにして設定され
たシーケンスパターンをもとにしてブロックごとにシー
ケンス作動を監視するようにして−いる。したがって、
ライン設備に以上が発生したときには、どの作業ブロッ
クで異常が発生したかが簡単に判定できるようになる。As explained above, according to the sequence monitoring method of the present invention, any block that is desired to be monitored at the initial stage of actually operating the line equipment and that has the same pattern every cycle can be used as a monitoring standard. A sequence pattern is set, and thereafter the sequence operation is monitored for each block based on the sequence pattern set as described above. therefore,
When the above occurs in line equipment, it becomes possible to easily determine in which work block the abnormality has occurred.
また、ライン設備のシーケンス作動を管制するシーケン
スコントローラとは別にシーケンス動作の監視を行うか
ら、ライン設備を稼働させたまま随時監視を行うことが
でき、ライン設備が正常動作していることの確認もとる
ことができる。In addition, since the sequence operation is monitored separately from the sequence controller that controls the sequence operation of line equipment, it is possible to monitor the line equipment at any time while it is running, and it is also possible to confirm that the line equipment is operating normally. You can take it.
第1図は本発明方法を適用した作業ラインの概略説明図
である。
第2図はアイソレータの構成を示す回路図である。
第3図は検査ブロックが作動するときのタイムチャート
である。
第4図はウェブ巻取リブロックが作動するときのタイム
チャートである。
2・・・ウェブ供給ブロック
3・・・塗布ブロック
4・・・検査ブロック
5・・・ウェブ巻取りブロック
7・・・ウェブ
12・・シーケンスコントローラ
14・・塗布器
17・・パンチャー
26・・巻芯交換機構
29・ ・ニップローラー
32・・巻厚検出器
35・・レバー制御ユニット
40・・マイクロコンピュータ。
第2図
手続補正書
1.事件の表示
昭和62年 特許側 第263236号2、発明の名称
シーケンス監視方法
3、補正をする者
事件との関係 特許出願人
住所 神奈川県南足柄市中沼210番地名称 (520
)富士写真フィルム株式会社4、代理人
〒170 東京都豊島区北大塚2−25−1(1)明
細書の「特許請求の範囲」の欄。
6、補正の内容
(1)「特許請求の範囲」を別紙のとおり補正します。
(2)明細書第5頁第5〜6行の「シーケンスコントロ
ーラ」を、「シーケンスコントローラ等」と補正します
。
(3)明細書第15頁第7行の「・・存在しない。」の
後に以下を加入します。
「ただし、同一ブロック内で各信号の順番や時間が大き
く変わるときは、ブロック内で順番や時間がほとんど変
わらないもの同士でブロックをつくる。」
(4)明細書第19頁第1行〜同第9行の「例えば上述
した・・・・・とともに、」を、
「例えばシーケンスコントローラ12のCPUエラーが
発生したとき、ラインの非常停止信号が入ったとき等で
ある。このとき、」と補正する。
(5)明細書第19頁第10行〜同第11行の「全ての
信号がタイムチャートとして」を、
「全ての信号が、異常の前後の1分間分(変更可能)の
タイムチャートとして」と補正します。
(6)明細書第20頁第19行の「可能となる。」を、
[可能となる(日報モードを実行すると、順番監視モー
ド、順番及び時間監視モードでもモード実行直前の動作
時間、順番が確認できる)。」と補正します。
(7)明細書第22頁第4〜5行の「ライン設備に以上
が」を、
「ライン設備等に異常が」と補正します。
以上
加圧″の、云云求の「
(1)作業内容が異なる複数の作業ブロックを含み、こ
れらの作業ブロックの作動をシーケンスコントローラ等
で制御するようにしたライン設備等において、
前記作業ブロックの内で複数の電気信号が時系列的に出
力される任意の作業ブロックについて、これらの電気信
号の順番及び時間間隔を前記シーケンスコントローラ等
を介して、あるいは直接検出して記憶し、記憶された前
記電気信号の順番及び時間間隔に基づいて基準となるシ
ーケンスパターンを設定し、しかる後に前記作業ブロッ
クによって作業が行われるときには、作業時にシーケン
スコントローラ等から出力される電気信号を前記シーケ
ンスパターンと比較することによって作業経過の適否を
判定することを特徴とするシーケンス監視方法。FIG. 1 is a schematic explanatory diagram of a work line to which the method of the present invention is applied. FIG. 2 is a circuit diagram showing the configuration of the isolator. FIG. 3 is a time chart when the inspection block operates. FIG. 4 is a time chart when the web winding relock operates. 2... Web supply block 3... Coating block 4... Inspection block 5... Web winding block 7... Web 12... Sequence controller 14... Applicator 17... Puncher 26... Winding Core exchange mechanism 29, nip roller 32, winding thickness detector 35, lever control unit 40, microcomputer. Figure 2 Procedural Amendment 1. Display of the case 1986 Patent side No. 263236 2, Name of the invention Sequence monitoring method 3, Person making the amendment Relationship with the case Patent applicant address 210 Nakanuma, Minamiashigara City, Kanagawa Prefecture Name (520)
) Fuji Photo Film Co., Ltd. 4, Agent 2-25-1 Kita-Otsuka, Toshima-ku, Tokyo 170 (1) "Claims" column of the specification. 6. Contents of amendment (1) The "Scope of Claims" will be amended as shown in the attached sheet. (2) Correct "sequence controller" in lines 5-6 of page 5 of the specification to "sequence controller, etc." (3) Add the following after "...does not exist." on page 15, line 7 of the specification. "However, if the order or time of each signal changes significantly within the same block, create a block with signals whose order or time hardly differs within the block." (4) Specification, page 19, line 1 ~ In line 9, "For example, along with the above..." was corrected to "For example, when a CPU error occurs in the sequence controller 12, when a line emergency stop signal is received, etc. At this time," do. (5) "All signals are as time charts" on page 19, lines 10 to 11 of the specification, "All signals are as time charts for one minute before and after the abnormality (changeable)" I will correct it. (6) “It becomes possible” on page 20, line 19 of the specification,
[It becomes possible (if you execute the daily report mode, you can check the operating time and order immediately before the mode execution in the order monitoring mode and order and time monitoring mode). ” and correct it. (7) "There is an abnormality in the line equipment, etc." in lines 4 to 5 on page 22 of the specification will be corrected to "There is an abnormality in the line equipment, etc." (1) In line equipment, etc. that includes multiple work blocks with different work contents and whose operations are controlled by a sequence controller, etc., For any work block in which a plurality of electrical signals are output in time series, the order and time interval of these electrical signals are detected and stored via the sequence controller or the like, and the stored electrical signals are stored. A reference sequence pattern is set based on the order and time interval of the signals, and when the work block performs the work, the electrical signals output from the sequence controller etc. during the work are compared with the sequence pattern. A sequence monitoring method characterized by determining the suitability of work progress.
Claims (1)
れらの作業ブロックの作動をシーケンスコントローラで
制御するようにしたライン設備において、前記作業ブロ
ックの内で複数の電気信号が時系列的に出力される任意
の作業ブロックについて、これらの電気信号の順番及び
時間間隔を前記シーケンスコントローラを介して検出し
て記憶し、記憶された前記電気信号の順番及び時間間隔
に基づいて基準となるシーケンスパターンを設定し、し
かる後に前記作業ブロックによって作業が行われるとき
には、作業時にシーケンスコントローラから出力される
電気信号を前記シーケンスパターンと比較することによ
って作業経過の適否を判定することを特徴とするシーケ
ンス監視方法。(1) In line equipment that includes a plurality of work blocks with different work contents and whose operations are controlled by a sequence controller, a plurality of electrical signals are output in time series within the work blocks. Detect and store the order and time interval of these electrical signals for any work block that is stored through the sequence controller, and set a reference sequence pattern based on the stored order and time interval of the electrical signals. However, when work is subsequently performed by the work block, the suitability of the progress of the work is determined by comparing an electrical signal output from a sequence controller during the work with the sequence pattern.
Priority Applications (5)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP62263236A JPH01106111A (en) | 1987-10-19 | 1987-10-19 | Sequence monitoring method |
| DE3852923T DE3852923T2 (en) | 1987-10-19 | 1988-10-18 | Sequential control method and system. |
| EP88117342A EP0312991B1 (en) | 1987-10-19 | 1988-10-18 | Method of sequential monitoring and system thereof |
| US07/260,013 US4870176A (en) | 1986-02-25 | 1988-10-19 | 1-Substituted alkyl-1,2-dihydro-2-pyrazinone derivatives |
| US07/260,012 US5008842A (en) | 1987-10-19 | 1988-10-19 | Method of sequential monitoring and apparatus for practicing the same |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP62263236A JPH01106111A (en) | 1987-10-19 | 1987-10-19 | Sequence monitoring method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH01106111A true JPH01106111A (en) | 1989-04-24 |
Family
ID=17386667
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP62263236A Pending JPH01106111A (en) | 1986-02-25 | 1987-10-19 | Sequence monitoring method |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US5008842A (en) |
| EP (1) | EP0312991B1 (en) |
| JP (1) | JPH01106111A (en) |
| DE (1) | DE3852923T2 (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH03116304A (en) * | 1989-09-29 | 1991-05-17 | Mazda Motor Corp | Production line trouble restoring device |
| JPH03116303A (en) * | 1989-09-29 | 1991-05-17 | Mazda Motor Corp | Restoring method for production line trouble |
| JP2008137110A (en) * | 2006-12-01 | 2008-06-19 | Brother Ind Ltd | Main spindle device of machine tool |
Families Citing this family (23)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5231594A (en) * | 1989-04-11 | 1993-07-27 | Ernst Knibiehler | Maintenance monitoring system |
| US5134574A (en) * | 1990-02-27 | 1992-07-28 | The Foxboro Company | Performance control apparatus and method in a processing plant |
| US5351202A (en) * | 1992-02-27 | 1994-09-27 | International Business Machines Corporation | Evaluation and ranking of manufacturing line non-numeric information |
| JP3095881B2 (en) * | 1992-05-27 | 2000-10-10 | オークマ株式会社 | Tool life prediction device |
| US6208904B1 (en) | 1994-02-02 | 2001-03-27 | Mitsubishi Electric & Electronics Usa, Inc | General purpose data communications protocol converter |
| CA2195660C (en) * | 1994-07-22 | 2008-03-11 | Joseph J. Harding | Computer controlled cushioning conversion machine |
| US6524230B1 (en) | 1994-07-22 | 2003-02-25 | Ranpak Corp. | Packing material product and method and apparatus for making, monitoring and controlling the same |
| US5897478A (en) | 1994-07-22 | 1999-04-27 | Ranpak Corp. | Cushioning conversion machine and method using encoded stock material |
| DE4446966A1 (en) * | 1994-12-28 | 1996-07-04 | Itt Ind Gmbh Deutsche | Production control information system |
| EP0831993B1 (en) | 1995-06-07 | 2003-04-23 | Ranpak Corp. | Cushioning conversion system |
| IL119427A0 (en) * | 1995-10-16 | 1997-01-10 | Elf Antar France | Process for monitoring and control of the operation of an analyser and of a manufacturing unit to which it is linked |
| JP2978778B2 (en) * | 1996-08-29 | 1999-11-15 | 山形日本電気株式会社 | Production line management method |
| US5829231A (en) * | 1996-11-14 | 1998-11-03 | Ranpak Corporation | Automated cushioning producing and filling system |
| US5978751A (en) * | 1997-02-25 | 1999-11-02 | International Business Machines Corporation | Variegated manufacturing process test method and apparatus |
| ES2182381T3 (en) * | 1998-03-31 | 2003-03-01 | Siemens Ag | PROCEDURE AND PROVISION FOR NEURONAL MODELING OF A PAPER WINDING DEVICE. |
| EP0990964A1 (en) * | 1998-09-28 | 2000-04-05 | Siemens Aktiengesellschaft | Method for operating an automatic device |
| US7069185B1 (en) * | 1999-08-30 | 2006-06-27 | Wilson Diagnostic Systems, Llc | Computerized machine controller diagnostic system |
| US6954716B2 (en) * | 2000-07-07 | 2005-10-11 | Tokyo Electron Limited | Method of automatically resetting processing apparatus |
| JP2004341695A (en) * | 2003-05-14 | 2004-12-02 | Konica Minolta Photo Imaging Inc | Display system |
| US20050038541A1 (en) * | 2003-07-28 | 2005-02-17 | Clark Lawrence W. | Method and apparatus of manufacturing |
| WO2010016495A1 (en) * | 2008-08-05 | 2010-02-11 | 株式会社ブリヂストン | Belt support roller monitoring system |
| IT201800005091A1 (en) | 2018-05-04 | 2019-11-04 | "Procedure for monitoring the operating status of a processing station, its monitoring system and IT product" | |
| CN114167775B (en) * | 2021-11-30 | 2024-04-26 | 上海德衡数据科技有限公司 | Real-time external control method and system based on robot |
Family Cites Families (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| BE758981A (en) * | 1969-11-14 | 1971-05-17 | Westinghouse Electric Corp | OPERATING ERROR CONTROL SYSTEM OF AN INDUSTRIAL PROCESS |
| US4176396A (en) * | 1977-09-23 | 1979-11-27 | The Charles Stark Draper Laboratory, Inc. | Apparatus for directly measuring machine tool wear |
| EP0004907B2 (en) * | 1978-04-20 | 1987-03-25 | Ball Corporation | Override system for glass forming machinery |
| GB2067307A (en) * | 1979-12-21 | 1981-07-22 | Pcl Reprographic Eng Services | Improvements in Apparatus for a Method of Diagnostic Testing of Electrically Controlled Machinery |
| US4346446A (en) * | 1980-03-25 | 1982-08-24 | Harris Corporation | Management and analysis system for web machines and the like |
| JPS5895052A (en) * | 1981-11-30 | 1983-06-06 | Toshiba Corp | Jam detecting device |
| JPS58172928A (en) * | 1982-04-01 | 1983-10-11 | 株式会社大隈鐵工所 | Device for monitoring motor |
| AT376852B (en) * | 1982-07-29 | 1985-01-10 | Naimer H L | CIRCUIT ARRANGEMENT FOR A COMPUTER-BASED SWITCHGEAR |
| US4532599A (en) * | 1982-08-12 | 1985-07-30 | Eaton Corporation | Quality control method |
| JPS5962912A (en) * | 1982-10-01 | 1984-04-10 | Nissan Motor Co Ltd | Supervisory diagnostic device of sequence controller |
| EP0122582B1 (en) * | 1983-04-07 | 1988-08-24 | Aktiebolaget Iro | Yarn-feeding apparatus and method for controlling it |
| FR2544099A1 (en) * | 1983-04-07 | 1984-10-12 | Valenciennes Hainaut Cambresis | Monitoring and fault display for automated process |
| EP0211063A4 (en) * | 1985-01-22 | 1989-02-23 | Nat Can Corp | Redundant control system for automatic forming machine. |
| DE3515061A1 (en) * | 1985-04-26 | 1986-10-30 | Fried. Krupp Gmbh, 4300 Essen | METHOD AND DEVICE FOR MONITORING MACHINE PARTS |
| JPH0677216B2 (en) * | 1987-05-25 | 1994-09-28 | マツダ株式会社 | Monitor device for sequence program control system |
-
1987
- 1987-10-19 JP JP62263236A patent/JPH01106111A/en active Pending
-
1988
- 1988-10-18 DE DE3852923T patent/DE3852923T2/en not_active Expired - Fee Related
- 1988-10-18 EP EP88117342A patent/EP0312991B1/en not_active Expired - Lifetime
- 1988-10-19 US US07/260,012 patent/US5008842A/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH03116304A (en) * | 1989-09-29 | 1991-05-17 | Mazda Motor Corp | Production line trouble restoring device |
| JPH03116303A (en) * | 1989-09-29 | 1991-05-17 | Mazda Motor Corp | Restoring method for production line trouble |
| JP2008137110A (en) * | 2006-12-01 | 2008-06-19 | Brother Ind Ltd | Main spindle device of machine tool |
Also Published As
| Publication number | Publication date |
|---|---|
| US5008842A (en) | 1991-04-16 |
| DE3852923D1 (en) | 1995-03-16 |
| EP0312991A2 (en) | 1989-04-26 |
| DE3852923T2 (en) | 1995-05-24 |
| EP0312991A3 (en) | 1989-08-02 |
| EP0312991B1 (en) | 1995-02-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5008842A (en) | Method of sequential monitoring and apparatus for practicing the same | |
| DE69132319T2 (en) | Remote control method for photographic equipment | |
| JP5188380B2 (en) | Verification of tow cutting for automatic fiber placement | |
| IT9048336A1 (en) | MAINTENANCE SURVEILLANCE EQUIPMENT FOR AUTOMATIC WINDER. | |
| CN106879254A (en) | Method and system for welding | |
| WO2000040195A1 (en) | Method of controlling cross-direction alignment in manufacturing process | |
| US6038690A (en) | Remote automatic diagnostic analyzer for integrated mailing machines | |
| EP0537041B1 (en) | Method and device for monitoring sensors and for locating failures in an industrial process | |
| KR20170091266A (en) | Apparatus for inspection of label | |
| DE112021002584T5 (en) | mounting system | |
| JP6841554B2 (en) | Media supply unit | |
| CN109254009B (en) | Real-time detection processing system for embossing of nailing section | |
| US7870986B2 (en) | Method and device for clearance adjustment for lead-in roller clearance adjustment mechanism | |
| JP3132324B2 (en) | Turret splicing control method for roll material | |
| JP2006338165A (en) | Machine tool operating method and operating device | |
| JP2981028B2 (en) | Machine for removing defective processing parts of winding material | |
| JP2000270832A (en) | Stripper opening device | |
| JP2889603B2 (en) | Control device failure analysis device | |
| CN119387350B (en) | Intelligent control system for connector stamping and connector | |
| JP2010076209A (en) | Device and method for inspecting printing pattern | |
| JP3914879B2 (en) | Inspection device for film carrier tape for mounting electronic components and inspection method for film carrier tape for mounting electronic components | |
| JP2007058386A (en) | Label tape test device | |
| JP2000281014A (en) | Method and device for measuring length of carrier tape | |
| JP3246175B2 (en) | Failure analysis support device | |
| KR20250072766A (en) | Roll forming line control system interworking with vision system |