JPH011820A - Waterproof pile row wall construction method - Google Patents

Waterproof pile row wall construction method

Info

Publication number
JPH011820A
JPH011820A JP62-154754A JP15475487A JPH011820A JP H011820 A JPH011820 A JP H011820A JP 15475487 A JP15475487 A JP 15475487A JP H011820 A JPH011820 A JP H011820A
Authority
JP
Japan
Prior art keywords
pile
earth auger
construction method
piles
asphalt mastic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP62-154754A
Other languages
Japanese (ja)
Other versions
JPS641820A (en
Inventor
大根 義男
亘 湯川
弓井 信行
山本 康広
耕介 森田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Road Co Ltd
Shimizu Corp
Original Assignee
Nippon Road Co Ltd
Shimizu Corp
Filing date
Publication date
Application filed by Nippon Road Co Ltd, Shimizu Corp filed Critical Nippon Road Co Ltd
Priority to JP15475487A priority Critical patent/JPS641820A/en
Priority claimed from JP15475487A external-priority patent/JPS641820A/en
Publication of JPH011820A publication Critical patent/JPH011820A/en
Publication of JPS641820A publication Critical patent/JPS641820A/en
Pending legal-status Critical Current

Links

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明はアースオーガーにより掘削した地中の一連の
杭孔に芯材を充填して杭列による止水性の連続壁を造成
する工法に関するものである。
[Detailed Description of the Invention] [Industrial Application Field] This invention relates to a method of constructing a water-tight continuous wall using a row of piles by filling a series of underground pile holes excavated with an earth auger with core material. It is.

〔従来の技術〕[Conventional technology]

従来の止水性杭列壁工法は、アースオーガーにより一連
の杭孔を掘削し、それら杭孔にアースオーガーを介して
モルタルを充填し、そこに形成されたモルタル杭の列を
もって止水性を有する連続壁を地中に造成している。
The conventional water-stoppile row wall construction method involves excavating a series of pile holes with an earth auger, filling the pile holes with mortar through the earth auger, and forming a row of mortar piles to form a continuous wall with water-stop properties. The wall is being built underground.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

上記従来工法では、そこに造成される連続壁が、剛性を
有するモルタル杭列によるため、周囲地盤の剛性に追従
することがなく、長期的には破壊されて止水性が失われ
る虞れがあった。
In the above conventional construction method, the continuous wall constructed there is made of a row of rigid mortar piles, so it does not follow the rigidity of the surrounding ground, and there is a risk that it will be destroyed in the long term and lose its water-stopping properties. Ta.

この発明はこのような従来工法の問題点を解決するため
に考えられたものであって、その目的は地盤の剛性に追
従して永く止水性を保持することができ、また比較的浅
い所からの汚水漏出防止にも役立て得る杭列による連続
壁を造成する工法を提供することにある。
This invention was devised to solve the problems of conventional construction methods, and its purpose is to maintain water-tightness for a long time by following the rigidity of the ground, and also to be able to maintain water-tightness for a long time from relatively shallow places. An object of the present invention is to provide a construction method for constructing a continuous wall using rows of piles, which can also be used to prevent leakage of sewage.

〔問題点を解決するための手段〕[Means for solving problems]

上記目的によるこの発明は、アースオーガーにより地中
に一連の杭孔を掘削と、各杭孔にアースオーガーからア
スファルトマスチックを充填して、互に接続されたアス
ファルトマスチック杭による止水性の連続壁を地中に造
成し、これにより従来の問題点を解決してなる。
This invention for the above purpose involves excavating a series of pile holes in the ground with an earth auger, filling each pile hole with asphalt mastic from the earth auger, and creating a watertight continuous wall with interconnected asphalt mastic piles. It will be built underground, thereby solving the problems of the conventional method.

〔作 用〕[For production]

上記工法による止水性杭ダノ壁では、互に接続されたア
スファルトマスデック杭より構成されているため、モル
タル杭はどの剛性がなく、周囲地盤の剛性に追従するこ
とから、長期間にわたり地盤中にあっても止水性を失う
ことがない。
The water-stop pile wall made by the above construction method is composed of interconnected asphalt mass deck piles, so the mortar pile has no rigidity and follows the rigidity of the surrounding ground, so it remains in the ground for a long period of time. Even if there is water, it will not lose its waterproof properties.

〔実施例〕〔Example〕

クローラクレーン1に中空のアースオーガー2を取付け
、またアースオーガー2の上端部に耐圧、耐熱用のメタ
ルホース3を、アースオーガー2の回転に支障を来たさ
ぬように取付けて、アースオーが−2の内部とマスチッ
クポンプ4とを接続する。
A hollow earth auger 2 is attached to the crawler crane 1, and a pressure-resistant and heat-resistant metal hose 3 is attached to the upper end of the earth auger 2 so as not to interfere with the rotation of the earth auger 2. 2 and the mastic pump 4 are connected.

次にアースオーガー2を回転して地盤5に杭孔6を掘削
する。オーガ先端が所定の深さまで達したことを確認し
たのち、アースオーガー2の回転を停止し、待機してい
た運搬車から上記マスチックポンプ4にアスファルトマ
スチックを移す。そしてアスファルトマスチックをメタ
ルホース4を経てアースオーガー2の内部に送出する。
Next, the earth auger 2 is rotated to drill a pile hole 6 in the ground 5. After confirming that the auger tip has reached a predetermined depth, the rotation of the earth auger 2 is stopped, and the asphalt mastic is transferred from the waiting transport vehicle to the mastic pump 4. The asphalt mastic is then delivered to the inside of the earth auger 2 via the metal hose 4.

上記アスファルトマスデックはアースオーガー2の上部
からA−刃先端、即ち図に示すように杭孔6の底部に圧
送される。このような状態にJ3いて、アースオーガー
2を緩速にて引上げ、その引上げを行いながらアスファ
ルトマスチックaを杭孔6に圧入して、アースオーガー
周囲の掘削土をアスファルトマスチックに置換して行く
The asphalt mass deck is pumped from the top of the earth auger 2 to the tip of the A-blade, ie, to the bottom of the pile hole 6 as shown in the figure. With J3 in this state, the earth auger 2 is pulled up at a slow speed, and asphalt mastic a is press-fitted into the pile hole 6 while being pulled up, and the excavated soil around the earth auger is replaced with asphalt mastic.

杭孔6の上部の所定の位冒までアスファルトマスチック
aの圧入が完了し、所要高さのアスファルトマスデック
柱7が完成したならば、マスチックポンプ4を停止して
アースオーガー2を地盤5より引上げ、次の掘削位置に
移動する。
When the press-fitting of the asphalt mastic a to the predetermined height at the top of the pile hole 6 is completed and the asphalt mastic column 7 of the required height is completed, the mastic pump 4 is stopped and the earth auger 2 is pulled up from the ground 5. , move to the next drilling position.

上記アスファルトマスチック杭7の形成は、先行杭Aと
後行杭Bの2つに分けて行われ、1つ置きに先行杭Aを
形成したのち、それら先行杭Aの間に後行杭Bを形成し
て、一連のにアスファルトマスデック杭7.7による連
続!I!8となず。また止水効果を高めるため後行杭B
の杭孔は、先行杭Aの側部を削り込みながら掘削され、
後行杭Bを形成するアスファルトマスチックは先行杭A
のアスファルトマスチックと一体化して、そこに継目の
ない杭列による連続壁8を形成している。
The above asphalt mastic piles 7 are formed in two parts, leading piles A and trailing piles B. After forming the leading piles A every other time, trailing piles B are formed between the leading piles A. Formed into a series of asphalt mass deck piles 7.7 in succession! I! 8 and Nazu. In addition, trailing pile B is installed to increase the water-stopping effect.
The pile hole is excavated by cutting down the side of the preceding pile A,
The asphalt mastic forming trailing pile B is the leading pile A.
It is integrated with the asphalt mastic to form a continuous wall 8 made of seamless rows of piles.

〔発明の効果〕〔Effect of the invention〕

この発明は上述のように、アースオーガーを用いてアス
ファルトマスチックによる杭列壁を造成してなることか
ら、地質によっては脱水処理を必要とされるモルタル杭
の場合と異なって、地盤の地質に左右されず止水性に優
れた杭列壁を造成することができる。またアスファルト
マスチックは加熱あるいは常温での流し込みが容易であ
り、低温で便化するので、杭孔に充填しただけでよ(、
骨材などの配合を変えて剛性を任意に変更できるため、
周囲地盤の剛性に適合させることができ、これにより地
盤による破壊が防止されて、永く止水性が保持されるな
どの特長を有する。
As mentioned above, this invention uses an earth auger to create pile row walls made of asphalt mastic, so unlike the case of mortar piles, which require dewatering depending on the geology, it depends on the geology of the ground. It is possible to create a row of pile walls with excellent water-stopping properties. In addition, asphalt mastic is easy to heat or pour at room temperature, and it dissolves at low temperatures, so it can be simply filled into pile holes.
The rigidity can be changed arbitrarily by changing the mix of aggregate etc.
It has features such as being able to adapt to the rigidity of the surrounding ground, preventing destruction by the ground, and maintaining water-tightness for a long time.

【図面の簡単な説明】[Brief explanation of drawings]

図面はこの発明に係る止水性杭列壁工法の1実施例を示
すもので、第1図及び第2図は工程説明図、第3図は杭
列壁の平面図、第4図はその正面図である。 1・・・りO−ラフレーン 2・・・アースオーガー 3・・・メタルホース 4・・・マスチックポンプ   5・・・地 盤6・・
・杭 孔 7・・・アスファルトマスチック杭 8・・・連続壁 9・・・アスファルトマスチック 特許出願人     清水建設株式会社外2名 外−する 第3図
The drawings show one embodiment of the water-stop pile row wall construction method according to the present invention, and FIGS. 1 and 2 are process explanatory diagrams, FIG. 3 is a plan view of the pile row wall, and FIG. 4 is its front view. It is a diagram. 1...Rough lane 2...Earth auger 3...Metal hose 4...Mastic pump 5...Ground 6...
・Pile hole 7... Asphalt mastic pile 8... Continuous wall 9... Asphalt mastic patent applicant Shimizu Corporation and two others - Figure 3

Claims (1)

【特許請求の範囲】[Claims]  アースオーガーにより地中に一連の杭孔を掘削し、各
杭孔にアースオーガーからアスフアルトマスチツクを充
填して、互に接続されたアスフアルトマスチツク杭によ
る止水性の連続壁を地中に造成してなることを特徴とす
る止水性杭列壁工法。
A series of pile holes are excavated underground using an earth auger, each pile hole is filled with asphalt mastic from the earth auger, and a watertight continuous wall made of interconnected asphalt mastic piles is created underground. A waterproof pile row wall construction method that is characterized by the ability to
JP15475487A 1987-06-22 1987-06-22 Cut-off wall constituted of a series of piles Pending JPS641820A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP15475487A JPS641820A (en) 1987-06-22 1987-06-22 Cut-off wall constituted of a series of piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP15475487A JPS641820A (en) 1987-06-22 1987-06-22 Cut-off wall constituted of a series of piles

Publications (2)

Publication Number Publication Date
JPH011820A true JPH011820A (en) 1989-01-06
JPS641820A JPS641820A (en) 1989-01-06

Family

ID=15591174

Family Applications (1)

Application Number Title Priority Date Filing Date
JP15475487A Pending JPS641820A (en) 1987-06-22 1987-06-22 Cut-off wall constituted of a series of piles

Country Status (1)

Country Link
JP (1) JPS641820A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2557562B2 (en) * 1990-10-19 1996-11-27 株式会社クボタ How to lay a gutter pipe for dikes
JPH0628346A (en) * 1992-11-04 1994-02-04 Casio Comput Co Ltd Ruled line processing device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51125912A (en) * 1975-04-17 1976-11-02 Seiko Kogyo Kk Sheathing wall construction method
JPS58767B2 (en) * 1977-12-15 1983-01-07 宮下 崇 Construction method of underground continuous water-stop wall

Similar Documents

Publication Publication Date Title
US3410095A (en) Method of making water-sealing pile barrier around an excavation cutoff area
JPS58189414A (en) Construction of sheathing wall
JPS5936058B2 (en) How to construct a structure using underground continuous walls
JP4295880B2 (en) Construction method of impermeable walls
JP2005146756A (en) Earth retaining wall construction method and earth retaining wall formed thereby
JP2526333B2 (en) How to build a vertical shaft
JPH02266015A (en) Constructing underground continuous wall
JPS6255397A (en) Construction of large depth pit
JPS601451B2 (en) Water stop mountain stop wall construction method using Benoto pile excavator
JPH08151652A (en) Pile foundation and its construction method
JP2695319B2 (en) Tunnel construction method
JPS62117911A (en) Setting of pipe for well
JPS6160921A (en) How to build a water-shielding wall
JP2791664B2 (en) Simple underground continuous wall method
JPH0776844A (en) How to lay open caisson
JPH0433326B2 (en)
JP2024086373A (en) How to build a water barrier
JPS57140421A (en) Construction of large-diameter in-situ cast pile
JPH0442493B2 (en)
JPS6347435A (en) Construction method of shaft for tunnel boring machine
JPH0259889B2 (en)
JPH0377349B2 (en)
JPH0510084A (en) Construction method of deep human hole
JPS63151795A (en) Tunnel construction method
JP2000234331A (en) Method of forming the water penetration part of the underground impermeable wall