JPH0119006B2 - - Google Patents
Info
- Publication number
- JPH0119006B2 JPH0119006B2 JP58006111A JP611183A JPH0119006B2 JP H0119006 B2 JPH0119006 B2 JP H0119006B2 JP 58006111 A JP58006111 A JP 58006111A JP 611183 A JP611183 A JP 611183A JP H0119006 B2 JPH0119006 B2 JP H0119006B2
- Authority
- JP
- Japan
- Prior art keywords
- container
- mortar
- basement
- anchor bolt
- resin
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000004570 mortar (masonry) Substances 0.000 claims description 33
- 239000011347 resin Substances 0.000 claims description 32
- 229920005989 resin Polymers 0.000 claims description 32
- 238000000034 method Methods 0.000 claims description 19
- 239000002689 soil Substances 0.000 claims description 3
- 239000003673 groundwater Substances 0.000 description 3
- 239000002184 metal Substances 0.000 description 3
- 241001070941 Castanea Species 0.000 description 2
- 235000014036 Castanea Nutrition 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000009415 formwork Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000012856 packing Methods 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 240000007643 Phytolacca americana Species 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000011799 hole material Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000123 paper Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/0007—Base structures; Cellars
- E04B1/0015—Cellars constructed from prefabricated units
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Residential Or Office Buildings (AREA)
Description
【発明の詳細な説明】
この発明は、地下室の築造方法に関するもので
ある。DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method of constructing a basement.
地下室は、今までコンクリートの現場打ちによ
つて築造されて来た。すなわち、まず築造すべき
現場の地面に穴を掘り、穴の中に型枠を組んで枠
内にコンクリートを流し、コンクリートの固化後
型枠を取除く、という方法によつて築造されて来
た。しかし、このような方法では、一品生産とな
り、従つて築造の特殊な技術と多大の労力とを要
し、安価に地下室を作ることができない。 Basements have traditionally been constructed using cast-in-place concrete. In other words, buildings were constructed by first digging a hole in the ground at the construction site, building a formwork inside the hole, pouring concrete into the frame, and removing the formwork after the concrete had hardened. . However, this method requires one-piece production, which requires special construction techniques and a great deal of labor, and it is not possible to build a basement at a low cost.
そこで、この発明者は、地下室を構成すべきも
のを予め別のところで作つておき、これを設置現
場に据えつけるだけで、地下室とすることを思い
着いた。その場合、地下室を構成するものとし
て、底と側壁とを持つた容器状のものとするの
が、便利であることに気付いた。しかし、容器状
のものを地下室とするには、地下室に適した固定
方法を採らなければならない。そうでなければ、
地下室が地下水のために浮き上り、地下室が破壊
されてしまうことになるからである。この発明
は、このような考え方に基づいて生れたものであ
る。 Therefore, the inventor came up with the idea of creating a basement by simply making something that would constitute a basement somewhere else and installing it at the installation site. In this case, it has been found convenient to construct the basement in the form of a container with a bottom and side walls. However, in order to use a container-like item in a basement, it is necessary to use a fixing method suitable for the basement. Otherwise,
This is because the basement would float up due to the groundwater and the basement would be destroyed. This invention was created based on this idea.
この発明は、底と側壁とを持つた容器の形に、
地下室となるべき材料を別のところで作つてお
き、容器底の外周に突片を付設し、突片をアンカ
ーボルトに固定することとし、アンカーボルトを
モルタル又は樹脂内に埋める、という工程を余分
に付加して、アンカーボルトが地下水により腐蝕
されるのを防止し、これによつて恒久使用に耐え
る地下室とすることを骨子とするものである。 This invention has a shape of a container having a bottom and a side wall.
The material for the basement was made elsewhere, a protruding piece was attached to the outer periphery of the bottom of the container, the protruding piece was fixed to the anchor bolt, and the process of burying the anchor bolt in mortar or resin was unnecessary. In addition, the main idea is to prevent anchor bolts from being corroded by groundwater, thereby creating a basement that can withstand permanent use.
すなわち、この発明は、地面に穴を掘り、穴の
底にコンクリートを打設して基礎を作り、穴内に
底と側壁とを持つた容器を入れて容器底を基礎上
に置き、容器底の外周に固定された突片を基礎上
のアンカーボルトに固定し、アンカーボルトの側
方に囲壁を付設し、囲壁内にモルタル又は樹脂を
流してアンカーボルトをモルタル又は樹脂内に埋
め、モルタル又は樹脂の硬化後にその上に土又は
コンクリートを投入して、容器の下部を地下に埋
め、地下室とすることを特徴とする、地下室の築
造方法に関するものである。 That is, in this invention, a hole is dug in the ground, concrete is poured at the bottom of the hole to create a foundation, a container with a bottom and side walls is placed in the hole, the bottom of the container is placed on the foundation, and the bottom of the container is placed on the foundation. The projecting piece fixed on the outer periphery is fixed to the anchor bolt on the foundation, a surrounding wall is attached to the side of the anchor bolt, mortar or resin is poured into the surrounding wall, the anchor bolt is buried in the mortar or resin, and the anchor bolt is buried in the mortar or resin. This invention relates to a method of constructing a basement, which is characterized in that after the container has hardened, soil or concrete is poured thereon, and the lower part of the container is buried underground to form a basement.
この発明方法を図面に基づいて説明すると、次
のとおりである。第1図及び第2図は、この発明
方法により築造された地下室の縦断面図である。
第3図ないし第6図は、この発明方法において、
アンカーボルトをモルタル又は樹脂で埋める工程
を示した地下室の一部切欠斜視図である。第7図
及び第8図は、第3図ないし第6図と同じ工程を
示した地下室の一部切欠縦断面図である。 The method of this invention will be explained as follows based on the drawings. 1 and 2 are vertical cross-sectional views of a basement constructed by the method of this invention.
3 to 6 show that in the method of this invention,
FIG. 2 is a partially cutaway perspective view of a basement showing the process of filling anchor bolts with mortar or resin. FIGS. 7 and 8 are partially cutaway vertical sectional views of the basement, showing the same steps as FIGS. 3 to 6.
第1図についてこの発明方法を説明すると、次
のとおりである。まず、地面1に穴2を掘る。穴
2は地下室の底となるべき面積よりも相当に広く
掘る。次いで、穴2の底全体に栗石3を並べ、そ
の上にコンクリートの層4を形成しさらにその上
にコンクリートを厚く打設して、これを基礎5と
する。基礎5は地下室の底面積の少なくとも1割
以上好ましくは2割以上大きな面積となつてい
る。基礎5内には、アンカーボルト12をその頭
が埋設され足が露出するように、付設しておく。
基礎5上に別のところで作つた容器6を置く。容
器6の周りには、ある幅を持つて基礎5が食み出
している。 The method of this invention will be explained with reference to FIG. 1 as follows. First, dig hole 2 in ground 1. Dig hole 2 much wider than the area that will be the bottom of the basement. Next, chestnut stones 3 are arranged on the entire bottom of the hole 2, a layer of concrete 4 is formed thereon, and a thick layer of concrete is poured on top of it to form a foundation 5. The area of the foundation 5 is at least 10% or more, preferably 20% or more larger than the bottom area of the basement. Anchor bolts 12 are installed in the foundation 5 so that their heads are buried and their legs are exposed.
A container 6 made elsewhere is placed on the foundation 5. Around the container 6, a foundation 5 protrudes with a certain width.
容器6は、底7と側壁8と天井9とを一体に形
成したものである。天井9には出入口10が設け
られている。また、底6の外周には金属製突片1
1が固定されている。突片11に孔をあけ、そこ
にアンカーボルト12を通して固定する。 The container 6 has a bottom 7, a side wall 8, and a ceiling 9 integrally formed. A doorway 10 is provided in the ceiling 9. In addition, a metal protrusion 1 is attached to the outer periphery of the bottom 6.
1 is fixed. A hole is made in the projecting piece 11, and an anchor bolt 12 is passed through the hole and fixed.
突片11及びアンカーボルト12の側方に囲壁
13を付設し、容器側壁8の下部と囲壁13とに
より、突片11及びアンカーボルト12を包囲
し、上方だけを開けておく。次いで、囲壁13内
にモルタル又は樹脂を流して、突片11及びアン
カーボルト12をモルタル又は樹脂14中に埋め
る。モルタル又は樹脂14の硬化後に囲壁13を
取除き、その上に土又はコンクリート15を投入
し、容器6の下部を地下に埋め地下室とする。こ
うして地下室を築造するのが、この発明方法であ
る。 A surrounding wall 13 is attached to the side of the projecting piece 11 and the anchor bolt 12, and the lower part of the container side wall 8 and the surrounding wall 13 surround the projecting piece 11 and the anchor bolt 12, leaving only the upper part open. Next, mortar or resin is poured into the surrounding wall 13, and the projecting piece 11 and the anchor bolt 12 are buried in the mortar or resin 14. After the mortar or resin 14 has hardened, the surrounding wall 13 is removed, earth or concrete 15 is poured thereon, and the lower part of the container 6 is buried underground to form a basement. The method of this invention is to construct a basement in this way.
第2図の地下室も第1図のものと同様に築造さ
れるが、第2図ではアンカーボルト12が、突片
11に吊された状態で埋め込まれる点が異なつて
いる。すなわち、基礎5にはアンカーボルト12
が打設されるべき付近に、スパイラルボード16
が埋設されて、孔が形成される。他方、容器の底
7に外周には突片11が付設され、突片11にア
ンカーボルト12が付設されて、突片11からア
ンカーボルト12が上記孔内に吊り下げられた恰
好にされる。こうして、突片11及びアンカーボ
ルト12の側方を囲壁13で包囲し、第1図の場
合と同様にモルタル又は樹脂を囲壁13内に流し
て、これを硬化させる。硬化後は、囲壁13をそ
のままにして、その上にコンクリート15を投入
し、地下室とする。 The basement shown in FIG. 2 is constructed in the same manner as that shown in FIG. 1, except that in FIG. That is, the anchor bolt 12 is attached to the foundation 5.
Spiral board 16 is placed near where the
is buried to form a hole. On the other hand, a projecting piece 11 is attached to the outer periphery of the bottom 7 of the container, and an anchor bolt 12 is attached to the projecting piece 11, so that the anchor bolt 12 is suspended from the projecting piece 11 into the hole. In this way, the sides of the projecting piece 11 and the anchor bolt 12 are surrounded by the surrounding wall 13, and as in the case of FIG. 1, mortar or resin is poured into the surrounding wall 13 and cured. After hardening, the surrounding wall 13 is left as it is and concrete 15 is poured on top of it to form a basement.
第3図では、突片11が互いに直交する3面又
は4面により構成されている。突片11は、容器
6とは別個に金属で作られ、あとで容器6に付設
され、底7の外周にボルト17により固定されて
いる。突片11にはアンカーボルト12が吊り下
げられている。突片11の側方に囲壁13が付設
される。囲壁13は断面はU又はコの字状を呈す
るもので作られ、アンカーボルト12の露出部及
び突片11を充分に覆い得る大きさのものであ
る。囲壁13内にモルタル又は樹脂を流し、ボル
ト17、突片11及びアンカーボルト12を完全
にモルタル又は樹脂で包み、この中に一体に埋め
込む。その後は、第1図又は第2図について説明
したのと同様にして地下室とする。 In FIG. 3, the projecting piece 11 is composed of three or four surfaces that are perpendicular to each other. The projecting piece 11 is made of metal separately from the container 6, is attached to the container 6 later, and is fixed to the outer periphery of the bottom 7 with a bolt 17. An anchor bolt 12 is suspended from the projecting piece 11. A surrounding wall 13 is attached to the side of the projecting piece 11. The surrounding wall 13 has a U- or U-shaped cross section, and is large enough to sufficiently cover the exposed portion of the anchor bolt 12 and the protruding piece 11. Mortar or resin is poured into the surrounding wall 13, and the bolts 17, protrusions 11, and anchor bolts 12 are completely covered with the mortar or resin, and are embedded integrally therein. Thereafter, the basement is constructed in the same manner as described with reference to FIG. 1 or 2.
第4図は、アンカーボルト12の下端が基礎5
中に埋設され、また容器の底7の外周が斜に面取
りされている場合の容器6の固定態様を示してい
る。詳しく説明すれば、アンカーボルト12は、
基礎5中に固定された鉄筋に連結され、初めから
固定されている。ボルト17は、板にボルトを固
定した形状のもので、板は容器の製造過程で底7
の外周に埋め込まれ、ボルト17の足だけが外周
に突出している。突片11は、第3図のものと同
様に、互いに直交する3面又は4面により構成さ
れた金属製のものである。 In Figure 4, the lower end of the anchor bolt 12 is connected to the foundation 5.
6 shows a manner in which the container 6 is fixed when the container 6 is embedded in the container and the outer periphery of the bottom 7 of the container is chamfered obliquely. To explain in detail, the anchor bolt 12 is
It is connected to reinforcing bars fixed in the foundation 5 and is fixed from the beginning. The bolt 17 is a bolt fixed to a plate, and the plate is attached to the bottom 7 during the manufacturing process of the container.
is embedded in the outer periphery of the bolt 17, with only the legs of the bolt 17 protruding from the outer periphery. The protruding piece 11 is made of metal and has three or four mutually perpendicular surfaces, similar to the one shown in FIG.
突片11には、ボルト17及びアンカーボルト
12の来るべき位置に孔をあけ、孔内にこれらの
ボルトを通し、突片11を容器6及びアンカーボ
ルト12に固定する。次いで、突片11の側方に
囲壁13を付設する。面取り部18と囲壁13と
の間には、三角形の孔19が開くことになるの
で、孔19を布又は紙片等で塞ぎ、囲壁13内に
モルタル又は樹脂を流して、突片11、アンカー
ボルト12、ボルト17をモルタル内に埋没させ
て一体にする。その後は、さきに述べたと同様に
して地下室とする。 Holes are made in the projecting piece 11 at the positions where the bolts 17 and anchor bolts 12 are to be placed, and these bolts are passed through the holes to fix the projecting piece 11 to the container 6 and the anchor bolts 12. Next, a surrounding wall 13 is attached to the side of the projecting piece 11. A triangular hole 19 will be opened between the chamfered portion 18 and the surrounding wall 13, so the hole 19 is covered with a piece of cloth or paper, mortar or resin is poured into the surrounding wall 13, and the projecting piece 11 and the anchor bolt are closed. 12. bury the bolt 17 in the mortar and integrate it. After that, use the same method as described above to create a basement.
第5図は、突片11が容器の底7の周りに長い
距離にわたつて付設されている場合を示してい
る。このような場合には、突片11の全体をアン
カーボルト12とともに埋めることはできない。
そこで、第5図では、突片11の一部だけを断面
がコの字状の囲壁13で包囲することとし、囲壁
13内にモルタル又は樹脂を流して、アンカーボ
ルト12をモルタル又は樹脂内に埋めることとす
る。アンカーボルトの埋め込みはこのようにして
もよい。 FIG. 5 shows the case where the projection 11 is attached over a long distance around the bottom 7 of the container. In such a case, the entire projecting piece 11 cannot be buried together with the anchor bolt 12.
Therefore, in FIG. 5, only a part of the projecting piece 11 is surrounded by a surrounding wall 13 having a U-shaped cross section, mortar or resin is poured into the surrounding wall 13, and the anchor bolt 12 is immersed in the mortar or resin. I will fill it in. The anchor bolt may be embedded in this manner.
第6図は、容器6の外周に小さな突片11の設
けられた場合を示している。この場合にも、アン
カーボルト12を突片11に通し、アンカーボル
ト12を囲壁13で囲つて、囲壁13内にモルタ
ル又は樹脂を流して、アンカーボルト12をモル
タル又は樹脂内に完全に埋める。また、必要なら
ば、囲壁13にパツキン20を付設したり、釘2
1により囲壁13を一時的に固定してもよい。 FIG. 6 shows a case in which a small protrusion 11 is provided on the outer periphery of the container 6. In this case as well, the anchor bolt 12 is passed through the projecting piece 11, the anchor bolt 12 is surrounded by the surrounding wall 13, mortar or resin is poured into the surrounding wall 13, and the anchor bolt 12 is completely buried in the mortar or resin. In addition, if necessary, a packing 20 may be attached to the surrounding wall 13, or nails 2 may be attached to the surrounding wall 13.
1 may temporarily fix the surrounding wall 13.
第7図は、容器の底7の外周に孔を掘り、その
孔内にボルト17の端を埋め込んで、容器にボル
ト17を固定し、これにより突片11を固定する
態様を示している。また、基礎5上に孔を設けて
おき、この孔内にアンカーボルト12の足を降下
させ、モルタル又は樹脂22を流してアンカーボ
ルト12を基礎5上に固定することとしている。
その後に、囲壁13を付設し、囲壁13内にモル
タル又は樹脂を線23の高さまで流して、アンカ
ーボルト12とボルト17とを一体にする。 FIG. 7 shows a mode in which a hole is dug in the outer periphery of the bottom 7 of the container and the end of the bolt 17 is embedded in the hole to fix the bolt 17 to the container, thereby fixing the projecting piece 11. Further, a hole is provided on the foundation 5, the foot of the anchor bolt 12 is lowered into the hole, and mortar or resin 22 is poured to fix the anchor bolt 12 on the foundation 5.
After that, a surrounding wall 13 is attached, and mortar or resin is poured into the surrounding wall 13 to the height of the line 23, so that the anchor bolt 12 and the bolt 17 are integrated.
第8図は、容器の底7の下面が突片11の下面
と同一平面上にない場合に、まずモルタル又は樹
脂22を流して、突片11の下面に接する部分を
作り、その後に囲壁13を付設して、線23の高
さまでモルタル又は樹脂を充填し、アンカーボル
ト12及び突片11をモルタル又は樹脂内に埋め
てもよいことを示している。 FIG. 8 shows that when the lower surface of the bottom 7 of the container is not on the same plane as the lower surface of the protruding piece 11, mortar or resin 22 is first poured to form a part that contacts the lower surface of the protruding piece 11, and then the surrounding wall 13 This indicates that the anchor bolt 12 and the protruding piece 11 may be buried in the mortar or resin by filling the mortar or resin up to the height of the line 23.
モルタル又は樹脂を流す場合には、モルタル又
は樹脂が隙間なく充填されるように棒で突き又は
振動を与えることが望ましい。 When pouring mortar or resin, it is desirable to poke or vibrate with a rod so that the mortar or resin is filled without any gaps.
この発明方法によれば、アンカーボルトの側方
に囲壁を設けて囲壁内にモルタル又は樹脂を流し
て、アンカーボルトをモルタル又は樹脂内に埋め
るので、アンカーボルトはモルタル又は樹脂によ
り保護されて腐蝕されなくなる。しかも、この場
合のアンカーボルトの埋没は、容器の外方に突出
した場所で行なわれ、しかも基礎上で局部的に行
なわれるので埋没を完全に行なうことができる。
このため、アンカーボルトは永い期間にわたつて
腐蝕を免れ、従つて容器は基礎上に永く強固に固
定されることになる。しかも、基礎はコンクリー
トから成り、容器の底7よりも広く拡がり重量の
大きいものであるから、地下室周囲に地下水が集
まつて地下室を押し上げようとしても、地下室は
浮き上ることを防止される。その上に、モルタル
又は樹脂の上には土又はコンクリートが投入さ
れ、基礎の上に位置しているから、地下室は一層
浮き上りにくくなつている。かくして、この発明
方法によれば、別のところで底と側壁とを持つた
容器の形に成形したものを用いて、簡単な操作に
より、永く使用できる地下室を築造することがで
きる。この点で実用上の効果が大きい。 According to the method of this invention, a surrounding wall is provided on the side of the anchor bolt, mortar or resin is poured into the surrounding wall, and the anchor bolt is buried in the mortar or resin, so that the anchor bolt is protected by the mortar or resin and does not corrode. It disappears. Moreover, in this case, the anchor bolt is buried in a location that projects outward from the container, and is localized on the foundation, so that it can be completely buried.
As a result, the anchor bolts are free from corrosion over a long period of time, and the container is therefore firmly fixed on the foundation for a long time. Moreover, since the foundation is made of concrete, spreads wider than the bottom 7 of the container, and is heavier, even if groundwater collects around the basement and tries to push the basement up, the basement is prevented from floating up. Moreover, the mortar or resin is filled with soil or concrete and is located on the foundation, making the basement even more difficult to lift. Thus, according to the method of the present invention, a cellar that can be used for a long time can be constructed by simple operations using a container formed elsewhere with a bottom and side walls. In this respect, the practical effect is great.
第1図及び第2図は、この発明方法により築造
された地下室の縦断面図である。第3図ないし第
6図は、この発明方法の一部の工程を示した地下
室の一部切欠斜視図である。第7図及び第8図
は、この発明方法の一部の工程を示した地下室の
一部切欠縦断面図である。
図において、1は地面、2は穴、3は栗石、4
はコンクリート層、5は基礎、6は容器、7は容
器の底、8は容器の側壁、9は容器の天井、10
は出入口、11は突片、12はアンカーボルト、
13は囲壁、14は樹脂又はモルタル、15は土
又はコンクリート、16はスパイラルボード、1
7はボルト、18は面取り部、19は孔、20は
パツキン、21は釘、22はモルタル又は樹脂で
ある。
1 and 2 are vertical cross-sectional views of a basement constructed by the method of this invention. 3 to 6 are partially cutaway perspective views of a basement illustrating some steps of the method of the present invention. FIGS. 7 and 8 are partially cutaway vertical sectional views of a basement showing some steps of the method of the invention. In the figure, 1 is the ground, 2 is the hole, 3 is chestnut stone, and 4
is the concrete layer, 5 is the foundation, 6 is the container, 7 is the bottom of the container, 8 is the side wall of the container, 9 is the ceiling of the container, 10
is an entrance/exit, 11 is a protrusion, 12 is an anchor bolt,
13 is a surrounding wall, 14 is resin or mortar, 15 is earth or concrete, 16 is a spiral board, 1
7 is a bolt, 18 is a chamfered portion, 19 is a hole, 20 is a packing, 21 is a nail, and 22 is mortar or resin.
Claims (1)
設して基礎を作り、穴内に底と側壁とを持つた容
器を入れて容器底を基礎上に置き、容器底の外周
に固定された突片を基礎上のアンカーボルトに固
定し、アンカーボルトの側方に囲壁を付設し、囲
壁内にモルタル又は樹脂を流して、アンカーボル
トをモルタル又は樹脂内に埋め、モルタル又は樹
脂の硬化後にその上に土又はコンクリートを投入
して、容器の下部を地下に埋め、地下室とするこ
とを特徴とする地下室の築造方法。1. Dig a hole in the ground, pour concrete into the bottom of the hole to create a foundation, place a container with a bottom and side walls in the hole, place the bottom of the container on the foundation, and secure the container to the outer periphery of the bottom. Fix the projecting piece to the anchor bolt on the foundation, attach a surrounding wall to the side of the anchor bolt, pour mortar or resin into the surrounding wall, bury the anchor bolt in the mortar or resin, and after the mortar or resin hardens, A method of constructing a basement, which is characterized by pouring soil or concrete on top and burying the lower part of the container underground to form a basement.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP58006111A JPS59130923A (en) | 1983-01-17 | 1983-01-17 | Construction of basement |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP58006111A JPS59130923A (en) | 1983-01-17 | 1983-01-17 | Construction of basement |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS59130923A JPS59130923A (en) | 1984-07-27 |
| JPH0119006B2 true JPH0119006B2 (en) | 1989-04-10 |
Family
ID=11629387
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP58006111A Granted JPS59130923A (en) | 1983-01-17 | 1983-01-17 | Construction of basement |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS59130923A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6022547U (en) * | 1983-07-25 | 1985-02-16 | ナショナル住宅産業株式会社 | Installation structure of underfloor storage |
-
1983
- 1983-01-17 JP JP58006111A patent/JPS59130923A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS59130923A (en) | 1984-07-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6578333B1 (en) | Integrated precast footings | |
| US7003918B2 (en) | Building foundation with unique slab and wall assembly, external sump, and void retention dam | |
| US20210017755A1 (en) | Composite wall and methods of constructing a composite wall | |
| JPH1113072A (en) | Basement structural body, and construction method thereof | |
| CN1118613A (en) | Improvements regarding termite control | |
| KR20080061580A (en) | Precast Concrete Slab Construction Method | |
| JP2927727B2 (en) | Construction method of underground structure | |
| JPH0119006B2 (en) | ||
| JP2515227B2 (en) | Installation method of cast-in-place concrete foundation and precast concrete wall slab | |
| JP4410572B2 (en) | Construction method of revetment for landfill | |
| JPS601458B2 (en) | Precast concrete basement construction method | |
| JPH0138929B2 (en) | ||
| JPH0796787B2 (en) | Prefabricated basement | |
| JPH08165671A (en) | Manhole lifting prevention construction | |
| JP3284009B2 (en) | Building with basement | |
| KR200348730Y1 (en) | Square vertical culvert tunnel using steel waterproof plate and concrete | |
| JPS621930A (en) | Foundation structure of underground structure | |
| JPH0119488B2 (en) | ||
| JP2002030680A (en) | Cellar structure | |
| KR200428941Y1 (en) | Reverse support structure of retaining wall for continuous construction of underground plywood | |
| JP2006219947A (en) | Ground excavation method | |
| JPS63300124A (en) | Wall panels for basements, etc. | |
| JPS633096B2 (en) | ||
| JPH11350500A (en) | Foundation structure of building and foundation work method | |
| JPH10280434A (en) | Construction method for basement under application of outside waterproofing |