JPH01210536A - Construction of reinforced concrete structure body - Google Patents
Construction of reinforced concrete structure bodyInfo
- Publication number
- JPH01210536A JPH01210536A JP3406688A JP3406688A JPH01210536A JP H01210536 A JPH01210536 A JP H01210536A JP 3406688 A JP3406688 A JP 3406688A JP 3406688 A JP3406688 A JP 3406688A JP H01210536 A JPH01210536 A JP H01210536A
- Authority
- JP
- Japan
- Prior art keywords
- precast concrete
- concrete member
- reinforcing bar
- reinforcement
- reinforcements
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000011150 reinforced concrete Substances 0.000 title claims description 15
- 238000010276 construction Methods 0.000 title description 7
- 230000002787 reinforcement Effects 0.000 claims abstract description 59
- 239000011178 precast concrete Substances 0.000 claims abstract description 50
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 47
- 239000004567 concrete Substances 0.000 claims abstract description 9
- 238000000034 method Methods 0.000 claims description 13
- 238000004519 manufacturing process Methods 0.000 abstract description 4
- 238000009415 formwork Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 3
- 210000003205 muscle Anatomy 0.000 description 3
- 230000000694 effects Effects 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
Description
【発明の詳細な説明】
(産業上の利用分野)
本発明は、鉄筋コンクリート構造物の構築方法−に関し
、特に、構築された鉄筋コンクリート構造物における梁
の下端主鉄筋か複数段に配置されている鉄筋コンクリー
ト構造物の構築方法に関する。Detailed Description of the Invention (Industrial Field of Application) The present invention relates to a method for constructing a reinforced concrete structure, and in particular, the present invention relates to a method for constructing a reinforced concrete structure, and in particular, to a method for constructing a reinforced concrete structure in which the main reinforcing bars at the lower end of a beam or the reinforced concrete arranged in multiple stages are used. Concerning methods of constructing structures.
(従来の技術)
構築すべき鉄筋コンクリート構造物が高層の場合、前記
構造物における梁のスパンが長い場合等、梁に発生する
応力が大きいときは、梁の下端主鉄筋が複数段に配筋さ
れる。(Prior art) When the stress generated in the beam is large, such as when the reinforced concrete structure to be constructed is high-rise or the span of the beam in the structure is long, the main reinforcing bars at the lower end of the beam are arranged in multiple stages. Ru.
このような梁を備える鉄筋コンクリート構造物の施工法
の一つとして、下端主鉄筋を複数段に配置した鉄筋籠な
地組みにより形成し、こわを所定の位置に配置した後、
梁型枠を配置し、該型枠により規定される空間にコンク
リートを打設するものがある。この方法に使用される前
記鉄筋籠は、平面的に見て二方向すなわち十字、T字ま
たはL字状に組み立てられる。しかし、前記方法は、全
ての梁が現場打ちコンクリートにより形成されるため、
施工の省力化、高品質化を図る上で問題がある。One of the construction methods for reinforced concrete structures equipped with such beams is to form a reinforced concrete structure in which the main reinforcing bars at the lower end are arranged in multiple stages, and after placing the stiffness in the predetermined position,
Some methods involve placing beam formwork and pouring concrete into the space defined by the formwork. The reinforcing bar cage used in this method is assembled in two directions, that is, in a cross, T-shape, or L-shape when viewed from above. However, in the above method, all the beams are formed of cast-in-place concrete, so
There are problems in trying to save labor and improve quality in construction.
上記問題を解決するために、柱梁交差部いわゆるパネル
ゾーンを含む梁の一部をプレキャスト部材とした方法が
ある(特開昭62−6034号公報)。この方法は、梁
の一部を含み、鉄筋が錯綜するパネルゾーンをプレキャ
ストコンクリート部材としたことにより、施工の省力化
、高品質化に寄与するが、プレキャストコンクリート部
材が平面的に見て二方向への広がりを有するため、プレ
キャストコンクリート部材の製造および運搬作業が困難
となる。梁上鉄筋の接続位置は、接続数の低減および渠
内に発生する応力の見地から、スパン中央位置が望まし
い。しかし、前記プレキャストコンクリート部材の梁上
鉄筋をスパン中央まで延長させると、運搬がますます困
難になり、また、重量が大きくなることから、プレキャ
ストコンクリート部材の揚重に大型の機械設備が必要と
なり、不経済である。In order to solve the above problem, there is a method in which a part of the beam including the column-beam intersection, so-called panel zone, is made of a precast member (Japanese Patent Laid-Open No. 62-6034). This method contributes to labor-saving and high quality construction by making the panel zone, which includes a part of the beam and has intertwined reinforcing bars, into a precast concrete member. This makes manufacturing and transportation of precast concrete members difficult. The connection position of the reinforcing bars on the beam is preferably at the center of the span from the viewpoint of reducing the number of connections and stress generated in the culvert. However, if the reinforcing bars on the beams of the precast concrete members are extended to the center of the span, transportation becomes increasingly difficult and the weight increases, so large mechanical equipment is required to lift the precast concrete members. It is uneconomical.
(発明が解決しようとする課題)
本発明は、製造、運搬および取扱作業が容易なプレキャ
ストコンクリート部材を使用してプレハブ化を促進する
と共に、相互に交差する下端主鉄筋を合理的に複数段に
配置することができる、鉄筋コンクリート構造物の構築
方法を提供することを目的とする。(Problems to be Solved by the Invention) The present invention promotes prefabrication by using precast concrete members that are easy to manufacture, transport, and handle, and also rationally arranges lower end main reinforcing bars that intersect with each other in multiple stages. The purpose of the present invention is to provide a method for constructing a reinforced concrete structure that can be placed.
(課題を解決するための手段)
本発明の鉄筋コンクリート構造物の構築方法は、端面が
互いに対向するように互いに間隔をおかわた−・対のコ
ンクリート製梁主体部と、両梁主体部を相互に連結する
ようにna記梁主体部の下部にあって該梁主体部の高さ
方向に隔てられた部位を貫通して伸びる少なくとも二つ
の下端筋と、前記梁主体部の上方へ突出する上端部を有
する複数のスタラップ筋とを含むプレキャストコンクリ
ート部材を萌記梁主体部の間が構造物の柱主体部の上部
となるように配置し、nf記プレキャストコンクリート
部材と交差する方向へ伸びる梁用の、少なくとも一つの
下端筋を有する鉄筋籠を前記柱主体部の上部で前記プレ
キャストコンクリート部材と交差するように配置し、航
記鉄筋籠の前記下端筋の下方にあって前記プレキャスト
コンクリート部材の餌記下端筋の間を通るように曲記鉄
筋籠に他の下端筋を通し、この後またはこれに先立って
前記プレキャストコンクリート部材に梁用の上端筋を前
記プレキャストコンクリート部材の前記下端筋と平行に
伸びるように配置して前記プレキャストコンクリート部
材の鉄筋と航記鉄筋籠の鉄筋とを交差させることを含む
。(Means for Solving the Problems) The method for constructing a reinforced concrete structure of the present invention is such that a pair of concrete beam main bodies are spaced apart from each other so that their end faces face each other, and both beam main bodies are connected to each other. At least two lower end reinforcements located at the lower part of the beam main body and extending through portions separated in the height direction of the beam main body so as to be connected, and an upper end portion protruding upward from the beam main body. A precast concrete member including a plurality of stirrup bars having , a reinforcing bar cage having at least one bottom end reinforcement is disposed above the column main body so as to intersect with the precast concrete member; Pass another lower end reinforcement through the curved reinforcing bar cage so as to pass between the lower end reinforcements, and then or before this, extend an upper end reinforcement for a beam in the precast concrete member in parallel with the lower end reinforcement of the precast concrete member. The method includes arranging the reinforcing bars of the precast concrete member and the reinforcing bars of the rebar cage so that they intersect with each other.
(発明の作用効果)
本発明で用いるプレキャストコンクリート部材は、端面
が互いに対向するように下端筋により間隔をおかれて連
結された一対の鉄筋コンクリート製梁主体部を含む1字
状のすなわち一方向へのみ広がりを有する構造であるか
ら、二方向への広がりを有する従来のプレキャストコン
クリート部材に比べて、製造作業および運搬作業か容易
である。(Operation and Effect of the Invention) The precast concrete member used in the present invention has a one-character shape, that is, one direction, including a pair of reinforced concrete beam main parts connected at intervals by lower end reinforcements so that the end faces face each other. Since it has a structure that extends only in one direction, it is easier to manufacture and transport than a conventional precast concrete member that extends in two directions.
プレキャストコンクリート部材と交差する梁の形成に用
いられる鉄筋は、鉄筋籠として所定の位置に配置される
。このため、プレキャストコンクリート部材の下端筋の
間をこれと交差する方向へ伸びる下端筋を配置するのみ
で、交差する複数段の下端筋を有する梁を形成すること
ができる。The reinforcing bars used to form the beams intersecting the precast concrete members are placed in predetermined positions as reinforcing bar cages. Therefore, a beam having multiple levels of intersecting lower end reinforcements can be formed by simply arranging lower end reinforcements that extend between the lower end reinforcements of the precast concrete members in a direction that intersects with the lower end reinforcements.
(実施例) 以下、図面に示す本発明の実施例について説明する。(Example) Embodiments of the present invention shown in the drawings will be described below.
第1図には、本発明のプレキャストコンクリート部材1
0が示されている。プレキャストコンクリート部材10
は、鉄筋コンクリート構造物において梁として作用する
鉄筋コンクリート製の一対の梁主体部12を含む。FIG. 1 shows a precast concrete member 1 of the present invention.
0 is shown. Precast concrete member 10
includes a pair of beam main parts 12 made of reinforced concrete that act as beams in a reinforced concrete structure.
梁主体部12は、その端面が互いに対向するように、間
隔をおかれて配置され、また、梁用の複数の下端筋14
.16により相互に連結されている。各下端筋14.1
6は、業主体部12の下部にあって該業主体部の幅方向
に隔てられた部位を貫通して伸びる。下端筋14は、下
端筋16より下方に配置されている。The beam main body parts 12 are arranged at intervals so that their end surfaces face each other, and a plurality of lower end reinforcements 14 for the beam are arranged.
.. They are interconnected by 16. Each lower end reinforcement 14.1
6 extends through parts located at the lower part of the business body part 12 and separated from each other in the width direction of the business body part 12. The lower end reinforcement 14 is arranged below the lower end reinforcement 16.
業主体部12には、梁用の鉄筋を相互に連結する複数の
スタラップ筋18が設けられている。各スタラップ筋1
8の上端部は、業主体部12のコンクリート部分から上
方へ突出されている。The main body part 12 is provided with a plurality of stirrup bars 18 that interconnect reinforcing bars for beams. Each stirrup muscle 1
The upper end portion of 8 projects upward from the concrete portion of the business body portion 12.
第2図には、鉄筋コンクリート構造物の構築時にプレキ
ャストコンクリート部材10とともに用いられる梁用の
鉄筋1120が示されている。鉄筋籠20は、構築され
た構造物の梁として形成されたとき、該梁の上部にあっ
て該梁の幅方向に隔てられた部位を平行に伸びる複数の
上端筋22゜24と、前記梁の下端部にあって該梁の幅
方向に隔てられた部位を平行に伸びる複数の下端筋26
と、上端筋22.24および下端筋26を相互に連結す
る複数のスタラップ筋28とを含む。スタラップ筋28
の寸法は、プレキャストコンクリート部材10のスタラ
ップ筋18のそれとほぼ同じである。なお、鉄筋籠20
の上端筋22または24は設けなくてもよい。FIG. 2 shows a beam reinforcing bar 1120 used with the precast concrete member 10 during construction of a reinforced concrete structure. When the reinforcing bar cage 20 is formed as a beam of a constructed structure, the reinforcing bar cage 20 includes a plurality of upper end reinforcements 22 and 24 extending in parallel at parts separated in the width direction of the beam at the upper part of the beam. A plurality of lower end reinforcements 26 extending in parallel at the lower end of the beam and separated in the width direction of the beam.
and a plurality of stirrup muscles 28 that interconnect the upper end reinforcements 22, 24 and the lower end reinforcements 26. stirrup muscle 28
The dimensions are approximately the same as those of the stirrup bars 18 of the precast concrete member 10. In addition, reinforcing bar cage 20
The upper end reinforcement 22 or 24 may not be provided.
次に、第3図を参照して本゛発明の構築方法を説明する
。Next, the construction method of the present invention will be explained with reference to FIG.
第3図(A)に示すように、下層階の床上面30には、
複数の柱32が所定の間隔をおかれて建て込まわる。柱
32には、上下方向へ伸びる複数の柱主筋34と、該柱
主筋を相互に連結する複数のフープ筋(図示せず)とか
配置されている。社主筋34の上端部は、これの上端の
高さ位置が梁の高さ位置より上方となるように、柱32
から突出されている。As shown in FIG. 3(A), on the floor top surface 30 of the lower floor,
A plurality of pillars 32 are erected at predetermined intervals. The column 32 is provided with a plurality of column main reinforcements 34 extending in the vertical direction and a plurality of hoop reinforcements (not shown) that interconnect the column main reinforcements. The upper end of the company main reinforcement 34 is attached to the pillar 32 so that the height position of the upper end is above the height position of the beam.
It is protruded from.
プレキャストコンクリート部材10は、第3図(A)に
示すように、業主体部12の間が柱30の上部となり、
また、業主体部12の対向する端面の側の端部が柱30
に載置されるように、クレーン等の手段により配置され
る。プレキャストコンクリート部材10が柱32上に配
置された状態において、柱32の柱主筋34は、業主体
部12間を上方へ伸びる。業主体部12と柱32との間
には、両者の間に間隙を形成する複数のスペーサ36が
予め配置される。In the precast concrete member 10, as shown in FIG.
Further, the end of the opposite end surface of the business body part 12 is connected to the pillar 30.
It is placed by means such as a crane so that it is placed on the When the precast concrete member 10 is placed on the column 32, the main column reinforcement 34 of the column 32 extends upward between the main body parts 12. A plurality of spacers 36 are arranged in advance between the business body part 12 and the pillar 32 to form a gap therebetween.
次いで、第3図(B)に示すように、鉄筋籠20が柱3
0の上方にあって業主体部12間をプレキャストコンク
リート部材10と交差する方向へ伸びかつ下端筋26が
プレキャストコンクリート部材10の下端筋16に当接
するように、クレーン等の手段により配置される。この
とき、後述する下端筋38も第3図(B)に示すように
鉄筋fi20のスタラップ筋28の下部に仮止めし、鉄
筋H,20と同時に所定の位置へ揚重することが望まし
い。Next, as shown in FIG. 3(B), the reinforcing bar cage 20 is attached to the pillar 3.
0, extending between the business body parts 12 in a direction intersecting the precast concrete member 10, and arranged by means such as a crane so that the lower end reinforcement 26 contacts the lower end reinforcement 16 of the precast concrete member 10. At this time, it is desirable that the lower end reinforcing bars 38, which will be described later, be temporarily fixed to the lower part of the stirrup bars 28 of the reinforcing bars fi20, as shown in FIG. 3(B), and lifted to a predetermined position at the same time as the reinforcing bars H and 20.
鉄筋1i20が第3図(B)に示すように配置された状
態において、鉄筋籠20はプレキャストコンクリート部
材10の下端筋16に支持され、また、社主筋34は鉄
筋M、20から上方へ突出している。In the state where the reinforcing bars 1i20 are arranged as shown in FIG. 3(B), the reinforcing bar cage 20 is supported by the lower end reinforcement 16 of the precast concrete member 10, and the main reinforcement 34 projects upward from the reinforcing bars M, 20. There is.
次いで、第3図(B)に示すように、鉄筋籠20の下端
筋38がスタラップ筋28の下端部と下端筋26との間
にあってプレキャストコンクリート部材10の下端筋1
4.16間に挿入される。Next, as shown in FIG. 3(B), the lower end reinforcement 38 of the reinforcing bar cage 20 is located between the lower end of the stirrup reinforcement 28 and the lower end reinforcement 26, and the lower end reinforcement 1 of the precast concrete member 10 is placed between the lower end of the stirrup reinforcement 28 and the lower end reinforcement 26.
It is inserted between 4.16 and 4.16.
次に、第3図(C)に示すように、プレキャストコンク
リート部材10の上端筋40がフープ筋の上部にあって
鉄筋M、20の上端筋22.24間に挿入されるととも
に、上端筋42が上端筋40および鉄筋籠20の上端筋
24の下方に挿入される。これにより、プレキャストコ
ンクリート部材10と鉄筋醸20とが第3図(D)に示
すように結合される。Next, as shown in FIG. 3(C), the upper end reinforcement 40 of the precast concrete member 10 is placed above the hoop reinforcement and inserted between the upper end reinforcements 22 and 24 of the reinforcing bars M and 20, and the upper end reinforcement 40 is inserted below the upper end reinforcement 40 and the upper end reinforcement 24 of the reinforcing bar cage 20. As a result, the precast concrete member 10 and the reinforcing bars 20 are combined as shown in FIG. 3(D).
なお、プレキャストコンクリート部材10の上端筋40
は、鉄筋籠20の下端筋38を配置する前に配置しても
よい。In addition, the upper end reinforcement 40 of the precast concrete member 10
may be placed before placing the lower end reinforcing bars 38 of the reinforcing bar cage 20.
次いで、床スラブ用の空間を規定する型枠、業主体部1
2と柱32との間の空間を規定する型枠、隣り合うプレ
キャストコンクリート部材10を相互に連結する空間を
規定する型枠、プレキャストコンクリート部材10の露
出している鉄筋を埋め込む空間を規定する型枠、および
、プレキャストコンクリート部材10と交差する方向へ
伸びる梁用の空間を規定する型枠が配置された後、こわ
らの型枠により規定される空間内にコンクリートが打設
される。Next, the formwork defining the space for the floor slab, the main body part 1
2 and the column 32, a formwork that defines the space that interconnects adjacent precast concrete members 10, and a mold that defines the space in which the exposed reinforcing bars of the precast concrete members 10 are embedded. After the frame and the formwork defining the space for the beam extending in the direction intersecting the precast concrete member 10 are placed, concrete is poured into the space defined by the stiff formwork.
これにより、十字状に伸びる梁、柱32および床スラブ
が一体的に形成される。この後、次の両川の柱が新設の
床上に建て込まれる。上記の工程は、構築すべき構造物
の階の数だけ繰り返される。As a result, the cross-shaped beams, columns 32, and floor slab are integrally formed. After this, the next Ryokawa Pillar will be built on top of the newly constructed floor. The above steps are repeated as many times as there are floors of the structure to be built.
第1図は本発明に使用されるプレキャストコンクリート
部材の一実施例を示す斜視図、第2図は第1図のプレキ
ャストコンクリート部材とともに用いる梁用鉄筋籠の一
実施例を示す斜視図、第3図は本発明の構築方法の説明
図であって第3図(A)はプレキャストコンクリート部
材を下層階の柱の上に配置した状態を示す図、第3図(
B)は鉄筋籠を柱上に配置した状態を示す図、第3図(
C)はプレキャストコンクリート部材用の上端筋を配置
する状態を示す図、第3図(D)は梁用の全ての鉄筋の
配置が終了した状態を示す平面図である。
10:プレキャストコンクリート部材、12:梁主体部
、
14.16:プレキャストコンクリート部材の下端筋、
18.28ニスタラツプ筋、
20:梁用の鉄筋籠、
22.24:鉄筋籠の上端筋、
26.38:鉄筋籠の下端筋、
32:柱、
40.42:プレキャストコンクリート部材の上端筋。
代理人 弁理士 松 永 宣 行
第3図(A)
第3図(B)
第3図(C)FIG. 1 is a perspective view showing an embodiment of a precast concrete member used in the present invention, FIG. 2 is a perspective view showing an embodiment of a reinforcing bar cage for a beam used together with the precast concrete member shown in FIG. The figures are explanatory diagrams of the construction method of the present invention, and FIG.
B) is a diagram showing the state in which reinforcing bar cages are placed on columns, and Figure 3 (
C) is a diagram showing a state in which upper end reinforcements for a precast concrete member are placed, and FIG. 3(D) is a plan view showing a state in which all reinforcing bars for a beam have been placed. 10: Precast concrete member, 12: Main body of beam, 14.16: Lower end reinforcement of precast concrete member, 18.28 Nistarap reinforcement, 20: Rebar cage for beam, 22.24: Upper end reinforcement of reinforcing bar cage, 26.38 : Lower end reinforcement of reinforcing bar cage, 32: Column, 40.42: Upper end reinforcement of precast concrete member. Agent Patent Attorney Nobuyuki Matsunaga Figure 3 (A) Figure 3 (B) Figure 3 (C)
Claims (1)
た一対のコンクリート製梁主体部と、両梁主体部を相互
に連結するように前記梁主体部の下部にあって該梁主体
部の高さ方向に隔てられた部位を貫通して伸びる少なく
とも二つの下端筋と、前記梁主体部の上方へ突出する上
端部を有する複数のスタラップ筋とを含むプレキャスト
コンクリート部材を前記梁主体部の間が構造物の柱主体
部の上部となるように配置し、前記プレキャストコンク
リート部材と交差する方向へ伸びる梁用の、少なくとも
一つの下端筋を有する鉄筋籠を前記柱主体部の上部で前
記プレキャストコンクリート部材と交差するように配置
し、前記鉄筋籠の前記下端筋の下方にあって前記プレキ
ャストコンクリート部材の前記下端筋の間を通るように
前記鉄筋籠に他の下端筋を通し、この後またはこれに先
立って前記プレキャストコンクリート部材に梁用の上端
筋を前記プレキャストコンクリート部材の前記下端筋と
平行に伸びるように配置して前記プレキャストコンクリ
ート部材の鉄筋と前記鉄筋籠の鉄筋とを交差させること
を含む、鉄筋コンクリート構造物の構築方法。(1) A pair of concrete beam main bodies spaced apart so that their end faces face each other; A precast concrete member including at least two lower end reinforcements extending through portions separated in the height direction and a plurality of stirrup reinforcements having upper end portions projecting upwardly from the beam main body is placed between the beam main body. is arranged so as to be the upper part of the column main part of the structure, and a reinforcing bar cage having at least one lower end reinforcement for a beam extending in a direction intersecting with the precast concrete member is placed in the precast concrete above the column main part. pass another lower end reinforcement through the reinforcing bar cage so as to intersect with the member, and pass another lower end reinforcement under the lower end reinforcement of the reinforcing bar cage and between the lower end reinforcements of the precast concrete member; Prior to this step, the upper end reinforcement for a beam is arranged in the precast concrete member so as to extend parallel to the lower end reinforcement of the precast concrete member, and the reinforcing bars of the precast concrete member intersect with the reinforcing bars of the reinforcing bar cage. , methods of constructing reinforced concrete structures.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3406688A JPH0699956B2 (en) | 1988-02-18 | 1988-02-18 | Construction method of reinforced concrete structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP3406688A JPH0699956B2 (en) | 1988-02-18 | 1988-02-18 | Construction method of reinforced concrete structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH01210536A true JPH01210536A (en) | 1989-08-24 |
| JPH0699956B2 JPH0699956B2 (en) | 1994-12-12 |
Family
ID=12403887
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP3406688A Expired - Lifetime JPH0699956B2 (en) | 1988-02-18 | 1988-02-18 | Construction method of reinforced concrete structure |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0699956B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110984449A (en) * | 2019-11-25 | 2020-04-10 | 清华大学 | Precast concrete floor and construction method thereof |
-
1988
- 1988-02-18 JP JP3406688A patent/JPH0699956B2/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110984449A (en) * | 2019-11-25 | 2020-04-10 | 清华大学 | Precast concrete floor and construction method thereof |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0699956B2 (en) | 1994-12-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN118481286B (en) | Beam-slab integrated prefabricated wafer slab structure and construction method thereof | |
| JP7411749B2 (en) | How to construct a concrete building | |
| JPH042725B2 (en) | ||
| JPH06264412A (en) | Prefabrication method of bridge pier and bridge pier concrete block | |
| JP3069753B2 (en) | Construction method of framed reinforced concrete structure | |
| JPH069170Y2 (en) | Beam structure | |
| JP6636345B2 (en) | RC building and construction method of RC building | |
| JPH0699956B2 (en) | Construction method of reinforced concrete structure | |
| JPH0728269Y2 (en) | Precast beams | |
| JPH0693675A (en) | Pca earthquake resisting wall and connecting method of the same pca earthquake resisting wall and cast-in-place post or pca post | |
| JPH0415855B2 (en) | ||
| CN112942679B (en) | A prefabricated concrete frame beam capable of realizing standardization and its construction method | |
| JPH0197744A (en) | Shear reinforcement structure of shear head part in flat plate structure building | |
| JP2922731B2 (en) | How to connect slabs and concrete columns | |
| JPH08193422A (en) | How to build a building | |
| JPH05141025A (en) | Constructing method for reinforced concrete wall | |
| JPH0238740B2 (en) | ||
| JPH06264414A (en) | Prefabrication method of bridge pier and bridge pier concrete block | |
| KR102175474B1 (en) | Rebar assembly | |
| JP3108828B2 (en) | Beam-to-column reinforced body and method of arranging beam-to-column reinforcement | |
| JPH081083B2 (en) | Reinforced concrete beams | |
| KR0140095Y1 (en) | A half-finished sectional concrete composite beam | |
| JPH0781315B2 (en) | Construction method of composite structure with precast reinforced concrete columns and steel beams | |
| JPH05171682A (en) | Column-beam joint structure of RC structure | |
| JPH02282538A (en) | Construction method of reinforced concrete-made building frame |