JPH0130971B2 - - Google Patents

Info

Publication number
JPH0130971B2
JPH0130971B2 JP14780481A JP14780481A JPH0130971B2 JP H0130971 B2 JPH0130971 B2 JP H0130971B2 JP 14780481 A JP14780481 A JP 14780481A JP 14780481 A JP14780481 A JP 14780481A JP H0130971 B2 JPH0130971 B2 JP H0130971B2
Authority
JP
Japan
Prior art keywords
curtain wall
concrete
steel
hole
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP14780481A
Other languages
Japanese (ja)
Other versions
JPS5850205A (en
Inventor
Shinobu Yamaguchi
Hideaki Mutsuro
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Penta Ocean Construction Co Ltd
Original Assignee
Penta Ocean Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Penta Ocean Construction Co Ltd filed Critical Penta Ocean Construction Co Ltd
Priority to JP14780481A priority Critical patent/JPS5850205A/en
Publication of JPS5850205A publication Critical patent/JPS5850205A/en
Publication of JPH0130971B2 publication Critical patent/JPH0130971B2/ja
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Description

【発明の詳細な説明】 本発明はカーテンウオール式防波堤の製造方
法、特にその構造を強固とし、且つその築造を容
易ならしめたカーテンウオール式防波堤の製造方
法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to a method for manufacturing a curtain wall type breakwater, and particularly to a method for manufacturing a curtain wall type breakwater that has a strong structure and is easy to construct.

本発明のカーテンウオール式防波堤の製造方法
は複数の鋼杭を海底に2列に互いに離間して打設
する工程と、この鋼杭の頭部を緊結材によつて互
いに結合する工程と、この鋼杭の頭部に貫通孔を
有する下部コンクリートを打設する工程と、前記
鋼杭の列間に位置されるよう前記下部コンクリー
トの貫通孔に垂下するカーテンウオールの頭部を
挿入して固定する工程と、前記下部コンクリート
の上部に上部コンクリートを打設する工程とより
成ることを特徴とする。
The method for manufacturing a curtain wall type breakwater of the present invention includes the steps of driving a plurality of steel piles in two rows at a distance from each other on the seabed, joining the heads of the steel piles to each other with a binding material, and A step of pouring a lower concrete having a through hole in the head of the steel pile, and inserting and fixing the head of a curtain wall hanging down into the through hole of the lower concrete so as to be located between the rows of the steel pile. and a step of pouring upper concrete on top of the lower concrete.

以下図面によつて従来及び本発明の実施例を説
明する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Conventional embodiments and embodiments of the present invention will be described below with reference to the drawings.

カーテンウオール式防波堤は、通常は比較的設
計波の小さい内海にて採用されている組杭構造物
であり、この構造物ではこれに用いる鋼杭を支持
層まで打設するため、上層に軟弱地盤が介在して
も、軟弱地盤を改良する必要がないこと、カーテ
ン下部は海水の出入が自由な透過式であり、付近
の水産資源への影響が従来の重力式防波堤に比べ
非常に小さいことなどから近年は浅海漁場開発で
注目されている。
A curtain wall type breakwater is a pile structure that is usually used in inland seas where the design waves are relatively small.In this structure, the steel piles used for this structure are driven up to the supporting layer, so the upper layer is covered with soft ground. There is no need to improve the soft ground even if there is a breakwater, and the lower part of the curtain is a permeable type that allows seawater to freely enter and exit, so the impact on nearby marine resources is much smaller than that of conventional gravity-type breakwaters. In recent years, it has been attracting attention for the development of shallow sea fishing grounds.

即ち従来のカーテンウオール式防波堤は第1図
に示すように複数の鋼杭1を2列に所定間隔離し
て海底支持層2に軟弱地盤3を介して打設し、第
2図、第3図に示すようにその一方の列の鋼杭1
に板状のカーテンウオール4をはめ込み、このカ
ーテンウオール4の穴5と鋼杭1の外周間の隙間
に中詰モルタルコンクリート6を流し込み、その
後第4図に示すように各列同志の対向する鋼杭1
の頭部を緊結鋼材7によつて結合し、次いで第5
図のようにその頂部に上部コンクリート8を打設
して構成している。
That is, in the conventional curtain wall type breakwater, as shown in Fig. 1, a plurality of steel piles 1 are separated by a predetermined distance in two rows and are driven into the seabed support layer 2 through soft ground 3, and as shown in Figs. One row of steel piles 1 as shown in
A plate-shaped curtain wall 4 is fitted into the curtain wall 4, and filling mortar concrete 6 is poured into the gap between the hole 5 of the curtain wall 4 and the outer periphery of the steel pile 1. Then, as shown in FIG. Pile 1
The head of
As shown in the figure, an upper concrete 8 is placed on top of the structure.

しかしながらこのような構造のものでは組杭と
して頭部が結合されるまでは、単杭としての強度
しか無いので、カーテンウオール4の取付後、上
部コンクリート8を打設するまでは、波力の作用
を、極力避けなければならず、波浪の静穏の時期
をねらつて作業を進める必要がある。
However, this type of structure only has the strength of a single pile until the heads are joined together as a set of piles, so after installing the curtain wall 4 and until the upper concrete 8 is placed, it is not affected by the action of wave force. It is necessary to avoid this as much as possible, and it is necessary to proceed with the work by aiming for a period when the waves are calm.

又カーテンウオール4は鋼杭1の一方に取り付
けるがその長さは鋼杭1の水中にある長さ全体で
はなく、その下部hに相当する部分には設けられ
ていない。従つてこの鋼杭1には剛度の大きい上
方部分と剛度の小さい下方部分が存在することに
なりこの剛度の小さいh部分の鋼杭1に応力集中
が生じ構造的に弱くなる欠点がある。
Further, although the curtain wall 4 is attached to one side of the steel pile 1, its length is not the entire length of the steel pile 1 underwater, and is not provided in a portion corresponding to the lower part h. Therefore, this steel pile 1 has an upper part with high rigidity and a lower part with low rigidity, and there is a drawback that stress concentration occurs in the steel pile 1 in the h part with low rigidity, making it structurally weak.

本発明においてはこのような欠点を除くため第
6図、第7図に示すように先ず鋼杭1の打設を行
つた後カーテンウオールを取り付けることなくそ
の頭部を緊結鋼材7によつて結合し、次いでこの
頂部に下部コンクリート9を打設する。
In the present invention, in order to eliminate such drawbacks, as shown in FIGS. 6 and 7, the steel piles 1 are first driven, and then their heads are joined by a fastening steel member 7 without attaching a curtain wall. Then, lower concrete 9 is placed on top of this.

この下部コンクリート9には鉛直方向の貫通孔
10を設け、この貫通孔10を介して下部コンク
リート9の下側からカーテンウオール11の頭部
を挿入し、このカーテンウオール11の中間部に
形成したフランジ部12とカーテンウオール11
の頂部にその下端を埋め込んだボルトとこのボル
トに対しナツトにより固定した前記下部コンクリ
ート9の上面に係合する板状体とより成る係止機
構13とによつて前記下部コンクリート9をその
上下から挾持し、下部コンクリート9にカーテン
ウオール11を固定せしめる。
This lower concrete 9 is provided with a vertical through hole 10, and the head of the curtain wall 11 is inserted from below the lower concrete 9 through this through hole 10, and the flange formed in the middle part of this curtain wall 11 is inserted. Section 12 and curtain wall 11
The lower concrete 9 is fixed from above and below by a locking mechanism 13 consisting of a bolt whose lower end is embedded in the top of the bolt and a plate-shaped body that engages with the upper surface of the lower concrete 9 fixed to the bolt by a nut. The curtain wall 11 is fixed to the lower concrete 9 by clamping.

又貫通孔10とカーテンウオール11との隙間
にモルタルを詰める。
Also, the gap between the through hole 10 and the curtain wall 11 is filled with mortar.

次いで前記下部コンクリート9の上部に上部コ
ンクリート14を打設してカーテンウオール式防
波堤を構成せしめる。
Next, an upper concrete 14 is placed on top of the lower concrete 9 to form a curtain wall type breakwater.

本発明カーテンウオール式防波堤の製造方法は
上記の通りであるから下記のような大きな利点が
ある。
Since the method for manufacturing the curtain wall type breakwater of the present invention is as described above, it has the following great advantages.

カーテンウオール11の取り付けが複数の鋼
杭を互いに結合した後であり、組杭施工時に波
力の影響を受けることが少ない。そのため組杭
の施工にあたり稼動日数が増加する。
The curtain wall 11 is installed after a plurality of steel piles are connected to each other, so that it is less affected by wave force during construction of pile sets. Therefore, the number of working days will increase when constructing pile piles.

カーテンウオール11の取付工事が、完成し
た下部コンクリート9上にて行えるため、安全
に、かつ敏速に、緻密な作業が可能となる。
Since the installation work of the curtain wall 11 can be carried out on the completed lower concrete 9, the work can be carried out safely, quickly and precisely.

カーテンウオール11の取り付けと略同時に
堤体完成となるので、天候の急変悪化に対し
て、施工途中の被害率が小さくなる。
Since the embankment body is completed almost at the same time as the installation of the curtain wall 11, the damage rate during construction is reduced in case of sudden changes in weather.

鋼杭1には応力集中の生ずる部分がなく機械
的強度が大きい。
The steel pile 1 has no parts where stress concentration occurs and has high mechanical strength.

【図面の簡単な説明】[Brief explanation of drawings]

第1図、第2図、第4図,第5図はそれぞれ従
来の防波堤の築造工程説明図、第3図はそのカー
テンウオールの平面図、第6図は本発明防波堤の
正面図、第7図はその斜視図、第8図はカーテン
ウオールの斜視図である。 1……鋼杭、2……海底支持層、3……軟弱地
盤、4……カーテンウオール、5……穴、6……
中詰モルタルコンクリート、7……緊結鋼材、8
……上部コンクリート、9……下部コンクリー
ト、10……貫通孔、11……カーテンウオー
ル、12……フランジ部、13……係止機構、1
4……上部コンクリート。
1, 2, 4, and 5 are explanatory diagrams of the construction process of a conventional breakwater, FIG. 3 is a plan view of the curtain wall, FIG. 6 is a front view of the breakwater of the present invention, and FIG. The figure is a perspective view thereof, and FIG. 8 is a perspective view of the curtain wall. 1... Steel pile, 2... Seabed support layer, 3... Soft ground, 4... Curtain wall, 5... Hole, 6...
Filled mortar concrete, 7... Bonded steel material, 8
... Upper concrete, 9 ... Lower concrete, 10 ... Through hole, 11 ... Curtain wall, 12 ... Flange part, 13 ... Locking mechanism, 1
4...Top concrete.

Claims (1)

【特許請求の範囲】[Claims] 1 複数の鋼杭を海底に2列に互いに離間して打
設する工程と、この鋼杭の頭部を緊結材によつて
互いに結合する工程と、この鋼杭の頭部に貫通孔
を有する下部コンクリートを打設する工程と、前
記鋼杭の列間に位置されるよう前記下部コンクリ
ートの貫通孔に垂下するカーテンウオールの頭部
を挿入して固定する工程と、前記下部コンクリー
トの上部に上部コンクリートを打設する工程とよ
り成ることを特徴とするカーテンウオール式防波
堤の製造方法。
1. A process of driving a plurality of steel piles in two rows at a distance from each other on the seabed, a process of connecting the heads of the steel piles to each other with a binding material, and having a through hole in the head of the steel piles. a step of placing a lower concrete; a step of inserting and fixing the head of a curtain wall hanging down into a through hole of the lower concrete so as to be positioned between the rows of the steel piles; A method for manufacturing a curtain wall type breakwater, characterized by comprising a step of pouring concrete.
JP14780481A 1981-09-21 1981-09-21 Curtain wall type brakewater Granted JPS5850205A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14780481A JPS5850205A (en) 1981-09-21 1981-09-21 Curtain wall type brakewater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14780481A JPS5850205A (en) 1981-09-21 1981-09-21 Curtain wall type brakewater

Publications (2)

Publication Number Publication Date
JPS5850205A JPS5850205A (en) 1983-03-24
JPH0130971B2 true JPH0130971B2 (en) 1989-06-22

Family

ID=15438583

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14780481A Granted JPS5850205A (en) 1981-09-21 1981-09-21 Curtain wall type brakewater

Country Status (1)

Country Link
JP (1) JPS5850205A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5024489B1 (en) * 2012-02-08 2012-09-12 Jfeエンジニアリング株式会社 Embankment
JP5024490B1 (en) * 2012-02-08 2012-09-12 Jfeエンジニアリング株式会社 Levee body and method of raising the dam body

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5024489B1 (en) * 2012-02-08 2012-09-12 Jfeエンジニアリング株式会社 Embankment
JP5024490B1 (en) * 2012-02-08 2012-09-12 Jfeエンジニアリング株式会社 Levee body and method of raising the dam body

Also Published As

Publication number Publication date
JPS5850205A (en) 1983-03-24

Similar Documents

Publication Publication Date Title
US4643617A (en) Method of creating offshore seabed mound
JPH0756140B2 (en) Retaining wall structure construction method and retaining wall structure
US4793739A (en) Offshore structure
JPH0799010B2 (en) Pile standing structure and its construction method
JP3713263B2 (en) Breakwater structure using pile foundation
JPS6119764B2 (en)
JPS5850205A (en) Curtain wall type brakewater
JP2503854Y2 (en) Wave control structure using columnar members
JPH11200337A (en) Breakwater structure and construction method
JP2001311166A (en) Construction method for underwater foundation structure
JPS5853122B2 (en) wave-dissipating dyke
JPS63181804A (en) Breakwater and its construction and concrete caisson therefor
JPH0742180A (en) Anchor
JPH06971B2 (en) Breakwater and its construction method
JP2556380B2 (en) Construction method of revetment structure
JPS6027324B2 (en) Quay construction method
JP2840045B2 (en) Freestanding foundation method on soft ground
JP2953823B2 (en) Construction method of offshore substructure
JPS60246910A (en) Method of building underwater concrete block-coupled wall body
JPH1046596A (en) Underwater caisson construction formwork, underwater caisson and method of constructing the same
JPH0579022A (en) Construction method for marine structure
JPH0213098B2 (en)
JPH02252807A (en) Execution process of transmission type breakwater for deep depth
JPS5947767B2 (en) Anti-icing/breakwater structure and its installation method
JPH08311841A (en) Construction method of revetment structure