JPH01312106A - Cable stayed bridge - Google Patents

Cable stayed bridge

Info

Publication number
JPH01312106A
JPH01312106A JP14326688A JP14326688A JPH01312106A JP H01312106 A JPH01312106 A JP H01312106A JP 14326688 A JP14326688 A JP 14326688A JP 14326688 A JP14326688 A JP 14326688A JP H01312106 A JPH01312106 A JP H01312106A
Authority
JP
Japan
Prior art keywords
main
main girder
girder
tower
diagonal members
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP14326688A
Other languages
Japanese (ja)
Other versions
JPH0413486B2 (en
Inventor
Kazuhito Fujita
藤田 和仁
Tetsuo Takeda
竹田 哲夫
Masamichi Yasunaga
正道 安永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP14326688A priority Critical patent/JPH01312106A/en
Publication of JPH01312106A publication Critical patent/JPH01312106A/en
Publication of JPH0413486B2 publication Critical patent/JPH0413486B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE:To reduce a compressive force working on a main girder and reduce the number of diagonal members by a method wherein the upper end section of the main tower of a cable stayed bridge is projected in the longitudinal direction of the main girder, and wherein the diagonal members overhang from the upper end section, and wherein angles crossed between the diagonal members and the main girder are made small. CONSTITUTION:A cable stayed bridge is basically composed of a main tower 1, a main girder 2, diagonal members 4 overhung slantwise between the main tower 1 and the main girder 2, and a connecting member 3. The main tower 1 is formed with an upper section opened in the shape of V, and both the upper end sections are arranged in the overhanging direction and in the longitudinal direction of the main girder 2. Besides, both the end sections of the main tower 1 are connected to each other with the connecting member 3. For the connecting member 3, PC steel wires may be used, or a normal girder member may be used, or a member resisting tension should be used. As a result, a compressive force working on the main girder is reduced, and a suspending force can be made greater, and the number of the skew members can be decreased.

Description

【発明の詳細な説明】 〔産業上の利用分野] この発明は斜張橋に関するものである。[Detailed description of the invention] [Industrial application field] This invention relates to a cable-stayed bridge.

〔従来技術] 斜張橋は立設した主塔aから斜めに張出した斜材すによ
って主桁Cを吊上げるものである。
[Prior Art] A cable-stayed bridge is a bridge in which a main girder C is lifted by diagonal members extending diagonally from an erected main tower a.

従来の斜張橋としては第4図及び第5図に示すものが開
発されている。
As conventional cable-stayed bridges, those shown in FIGS. 4 and 5 have been developed.

すなわち主塔aは下方から上端まで垂直に起立するもの
であって、この主塔aの垂直な上部から斜めに斜材を張
出すものである。
That is, the main tower a stands vertically from the bottom to the top, and diagonal members are diagonally extended from the vertical top of the main tower a.

〔この発明が解決すべき課題〕[Problems to be solved by this invention]

上記したような斜張橋は、主桁Cから主塔a上端までの
高さhに対し、主塔aから斜材すの最到達点までの長さ
lは約2倍(2h)となっている。従って主桁Cの吊り
上げ力は、斜材すに張力Tを導入したとしても、この張
力Tの約172シか得ることができない。
In a cable-stayed bridge as described above, the height h from the main girder C to the top of the main tower a is approximately twice (2h) the length l from the main tower a to the highest point of the stay beam. ing. Therefore, even if the tension T is introduced into the diagonal members, the lifting force for the main girder C can only be obtained by about 172 of this tension T.

従って主桁Cを吊上げるためには多くの斜材すが必要と
なって、施工の手間が増えるとともにコストが高くなっ
てしまう。
Therefore, in order to lift the main girder C, many diagonal members are required, which increases the labor and cost of construction.

また斜材すの張力Tの多くは主桁Cを主塔a方向へ引張
る力(水平分力)となり、主桁Cの主塔a近傍部分に大
きな圧縮力が左右から作用することになる。従って主桁
Cの主塔a近傍部分を、この過大な圧縮応力に耐える構
造としなければならず、主桁Cを高強度にするため、施
工が大がかりとなってコストが高くなってしまう。
In addition, most of the tension T in the diagonal members becomes a force (horizontal force) that pulls the main girder C toward the main tower a, and a large compressive force acts on the portion of the main girder C near the main tower a from the left and right. Therefore, the portion of the main girder C near the main tower a must have a structure that can withstand this excessive compressive stress, and in order to make the main girder C high in strength, construction becomes extensive and costs increase.

この発明は以上のような課題を解決するためになされた
もので、斜材の数を少なくし、主桁の構造を簡単なもの
として施工が容易であって施工コストの低い斜張橋を提
供することを目的とする。
This invention was made to solve the above-mentioned problems, and provides a cable-stayed bridge that is easy to construct and has a low construction cost by reducing the number of diagonal members and simplifying the structure of the main girder. The purpose is to

〔課題を解決するための手段〕[Means to solve the problem]

この発明にかかる斜張橋は、主塔の少なくとも上端部を
主桁の長手方向に沿って突出させ、この主塔から張出し
た斜材によって主桁を吊上げるものである。
In the cable-stayed bridge according to the present invention, at least the upper end of the main tower projects along the longitudinal direction of the main girder, and the main girder is lifted by diagonal members extending from the main tower.

〔作 用〕[For production]

斜材の主塔の張出部から主桁への連結部までの長さρが
短くなり、斜材の主桁に対する交差角度が大きくなる。
The length ρ of the diagonal member from the overhang of the main tower to the connecting portion to the main girder becomes shorter, and the crossing angle of the diagonal member with respect to the main girder becomes larger.

従って斜材の引張力の水平分力が小さく、吊り上げ力が
大きくなる。
Therefore, the horizontal component of the tensile force of the diagonal member is small, and the lifting force is large.

よって斜材の本数を少なくできるとともに、主桁の強度
を余り大きくしなくともよくなる。
Therefore, the number of diagonal members can be reduced, and the strength of the main girder does not need to be increased too much.

〔実 施 例〕〔Example〕

以下、図に示す一実施例に基づきこの発明の詳細な説明
する。
Hereinafter, the present invention will be described in detail based on an embodiment shown in the drawings.

第1図において1は主塔であって、主桁2よりも上方と
なる上部がV字形に形成されている。
In FIG. 1, 1 is a main tower, and the upper part above the main girder 2 is formed into a V shape.

この主塔1の上部は上端部が主桁2の長手方向に沿って
張出す方向に延びている。
The upper end of the main tower 1 extends in a direction in which the upper end extends along the longitudinal direction of the main girder 2.

■字状の主塔1の上部には、主桁2の長手方向と平行で
水平なPC鋼材3が掛は渡されて、左右の斜材4,4の
引張力を受けている。
A horizontal PC steel material 3 parallel to the longitudinal direction of the main girder 2 is stretched over the top of the character-shaped main tower 1, and receives the tensile force of the left and right diagonal members 4, 4.

主塔1の上端部からは前述したように斜材4.4が斜め
に張出されている。このように主塔1上部はV字形とな
って主桁2の長手方向に張出しており、この張出した長
さi′分、主塔1の斜材4張出し部から主桁2の斜材4
到達部までの長さ乏が短くなる。従って斜材4の主桁2
に対する角度が大きくなって、斜材4に生じる引張力の
水平分力が小さくなる。また、この引張力の垂直分力で
ある吊上げ力は大きくなる。
As described above, diagonal members 4.4 are diagonally extended from the upper end of the main tower 1. In this way, the upper part of the main tower 1 has a V shape and overhangs in the longitudinal direction of the main girder 2, and the diagonal member 4 of the main girder 2
The length to the reaching part becomes shorter. Therefore, the main girder 2 of the diagonal member 4
The horizontal component of the tensile force generated in the diagonal member 4 becomes smaller. Moreover, the lifting force, which is the vertical component of this tensile force, increases.

このように吊上げ力が大きくなれば、斜材4の本数が少
なくとも、所要の吊上げ力が得られ、また主桁2の主塔
1近傍部分に作用する圧縮ツノが小さくなり、主桁2の
強度を大きくする必要がない。
If the lifting force increases in this way, the required lifting force can be obtained even if the number of diagonal members 4 is at least, and the compression horns acting on the main girder 2 near the main tower 1 become smaller, increasing the strength of the main girder 2. There is no need to make it larger.

この発明は、その他前記■字形の主塔1に、PC鋼材3
の代わりに、第2図に示すようにプレストレストコンク
リート梁5を設けてもよい。
In addition, this invention also provides a PC steel material 3 in the ■-shaped main tower 1.
Instead, a prestressed concrete beam 5 may be provided as shown in FIG.

また第3図に示すように、主塔1は上方部分を二股状に
分割し、その各々をV字形とし、この二本の平行な■字
形部6,6から斜材4を張出し、主桁2を二面吊りして
もよい。
As shown in Fig. 3, the upper part of the main tower 1 is divided into two parts, each of which is V-shaped, and the diagonal members 4 are extended from these two parallel ■-shaped parts 6, 6. 2 may be hung on two sides.

更に以上の実施例では主塔1の上端部のみを主桁2の長
手方向に突出したが、下方から上方まで等しい巾で形成
してもよい。
Further, in the above embodiment, only the upper end of the main tower 1 protrudes in the longitudinal direction of the main girder 2, but it may be formed with the same width from the bottom to the top.

〔発明の効果〕〔Effect of the invention〕

この発明は以上のような構成を有し、主塔の少なくとも
上端部を主桁の長手方向に沿って突出したため、この上
端部から張出した斜材と主桁との交差角度が従来のもの
より大きくなり、斜材の引張力の水平分力が小さく、主
桁に作用する圧縮応力が小さくなって且つ吊上げ力が大
きくなる。従って斜材の本数を少なくすることができる
とともに、主桁の強度を余り大きくする必要がなく、施
工が容易となり、施工コストを低くすることができる。
This invention has the above configuration, and since at least the upper end of the main tower protrudes along the longitudinal direction of the main girder, the intersection angle between the diagonal members protruding from the upper end and the main girder is greater than that of the conventional one. The horizontal component of the tensile force of the diagonal member becomes small, the compressive stress acting on the main girder becomes small, and the lifting force becomes large. Therefore, the number of diagonals can be reduced, and there is no need to increase the strength of the main girder, making construction easier and reducing construction costs.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの発明にかかる斜張橋の一実施例の斜視図、
第2図及び第3図は他の実施例の主塔部分の斜視図、第
4図は従来の斜張橋の斜視図、第5図はその側面図であ
る。 1・・主塔、・・主桁、3・・PC鋼材、4・・斜材。
FIG. 1 is a perspective view of an embodiment of a cable-stayed bridge according to the present invention;
2 and 3 are perspective views of the main tower portion of another embodiment, FIG. 4 is a perspective view of a conventional cable-stayed bridge, and FIG. 5 is a side view thereof. 1. Main tower, main girder, 3. PC steel, 4. Diagonal members.

Claims (1)

【特許請求の範囲】[Claims] (1)主塔から張出す斜材によって主桁を吊上げる斜張
橋において 主塔の少なくとも上端部を主桁の長手方向に沿って突出
させ、この主塔から張出した斜材によって主桁を吊り上
げたことを特徴とする斜張橋。
(1) In a cable-stayed bridge where the main girder is suspended by diagonal members extending from the main tower, at least the upper end of the main tower protrudes along the longitudinal direction of the main girder, and the main girder is suspended by the diagonal members extending from the main tower. A cable-stayed bridge characterized by being suspended.
JP14326688A 1988-06-10 1988-06-10 Cable stayed bridge Granted JPH01312106A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14326688A JPH01312106A (en) 1988-06-10 1988-06-10 Cable stayed bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14326688A JPH01312106A (en) 1988-06-10 1988-06-10 Cable stayed bridge

Publications (2)

Publication Number Publication Date
JPH01312106A true JPH01312106A (en) 1989-12-15
JPH0413486B2 JPH0413486B2 (en) 1992-03-09

Family

ID=15334749

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14326688A Granted JPH01312106A (en) 1988-06-10 1988-06-10 Cable stayed bridge

Country Status (1)

Country Link
JP (1) JPH01312106A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100614455B1 (en) * 2004-08-30 2006-08-21 주식회사 진화기술공사 Extra-dose bridge and its construction method
JP2010261154A (en) * 2009-04-30 2010-11-18 Kunio Honma Pressing connection method for bridge through through-crossbeam
CN105603858A (en) * 2016-03-14 2016-05-25 广西大学 Batter post bridge

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
CABLE SUPPORTED BRIDGES CONCEPT AND DESIGN lÞibýggÐcÞÐc-ibfhn±lib-=1990 *
CABLE SUPPORTED BRIDGES CONCEPT AND DESIGN=1983 *
CONSTRUCTION AND DESIGN OF CABLE-STAYED BRIDGES=1986 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100614455B1 (en) * 2004-08-30 2006-08-21 주식회사 진화기술공사 Extra-dose bridge and its construction method
JP2010261154A (en) * 2009-04-30 2010-11-18 Kunio Honma Pressing connection method for bridge through through-crossbeam
CN105603858A (en) * 2016-03-14 2016-05-25 广西大学 Batter post bridge
CN105603858B (en) * 2016-03-14 2017-11-03 广西大学 Batter post bridge

Also Published As

Publication number Publication date
JPH0413486B2 (en) 1992-03-09

Similar Documents

Publication Publication Date Title
US20070094960A1 (en) Composite structural member with longitudinal structural haunch
JPH04228707A (en) Bridge equipped with deck and two or more towers, and constructing method therefor
CN107354946A (en) A kind of supporting construction of encorbelmenting for foundation pit steel support
CN105463979B (en) Space Trident Tension Beam Pedestrian Bridge
CN100491639C (en) Prestressed Concrete Variable Section Box Girder Bridge with Box Floor and Its Construction Method
CN112048986A (en) Inclined arch tower cable-stayed bridge
CN103233419B (en) A kind of prestress concrete variable cross-section box bridge and construction method thereof
CN210140764U (en) Double-fold-line-shaped bridge span assembly stiffened through inhaul cable
JPH0413486B2 (en)
JPH093823A (en) Pc reinforcing temporary bridge
CN218667155U (en) Supporting platform structure
US4023318A (en) Concrete structures
CN210420839U (en) A kind of ramp bridge steel structure
CN203222728U (en) Bridge with a variable cross-section case and made by pre-stressed concrete
JPH0682110U (en) Cable-stayed bridge
US1584691A (en) Tower
CN221939877U (en) An adjustable lifting device
JP3259236B2 (en) Non-thrust large span frame construction method
CN219450450U (en) A cantilever pouring support device for the initial segment of the lower chord in the triangular area
KR102695874B1 (en) Spliced girder and method of manufacturing same
JPH01312107A (en) Cable stayed bridge
JPH041128B2 (en)
CN214301268U (en) Two-limb inclined bridge tower
CN109868724B (en) Double-fold-line bridge span assembly for cable stiffening
JPH01250544A (en) Tension introduction in tensed beam structure