JPH0213237A JP15924588A JP15924588A JPH0213237A JP H0213237 A JPH0213237 A JP H0213237A JP 15924588 A JP15924588 A JP 15924588A JP 15924588 A JP15924588 A JP 15924588A JP H0213237 A JPH0213237 A JP H0213237A
Authority
JP
Japan
Prior art keywords
control
command
monitoring device
monitoring
signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP15924588A
Other languages
Japanese (ja)
Other versions
JPH0832136B2 (en
Inventor
Ichiro Arinobu
有信 一郎
Hirohisa Mizuhara
博久 水原
Yasuhiro Ishii
康裕 石井
Masao Tomota
友田 雅雄
Keiji Nagamine
永峰 啓二
Masao Masuda
桝田 征男
Hiromitsu Takahashi
広光 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP63159245A priority Critical patent/JPH0832136B2/en
Publication of JPH0213237A publication Critical patent/JPH0213237A/en
Publication of JPH0832136B2 publication Critical patent/JPH0832136B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Selective Calling Equipment (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 [産業上の利用分近〕 この発明は、例えば漏電遮断器、ノーヒユーズ遮断器等
の保護機器、電磁開閏器、リモコン制御機器等の制御機
器、及びトランスジューサ、電力量計等の計装置!器な
どの広範囲にわたる各種の配電1fi ’t%の個々の
制御 監視情報をネットワークした配電R器制御監視シ
ステムを容易に構成できる配電機器制御監視装置に関す
るものである。
[Detailed Description of the Invention] [Industrial Applicability] The present invention is applicable to protection devices such as earth leakage circuit breakers and no-fuse circuit breakers, control devices such as electromagnetic switchgears, remote control control devices, transducers, and power consumption devices. Measuring devices such as meters! The present invention relates to a power distribution device control and monitoring device that can easily configure a power distribution device control and monitoring system in which individual control and monitoring information of various types of power distribution 1fi't% are networked over a wide range of devices.

特に、中央制御監視袋πを不要にした配電機器制御監視
装置に関するものである。
In particular, the present invention relates to a power distribution equipment control and monitoring device that eliminates the need for a central control monitoring bag π.

[従来の技術] 従来例の構成を第14図を参照しながら説明する。[Conventional technology] The configuration of a conventional example will be explained with reference to FIG. 14.

第14図は、例えば特公昭59−29998号公報に示
された従来の配電If!器制御監視′A萱を示すブロッ
ク図である。
FIG. 14 shows the conventional power distribution If! shown in, for example, Japanese Patent Publication No. 59-29998. FIG. 2 is a block diagram illustrating the device control and monitoring system;

第14図において、(1)は中央制御監視装置、く2)
はこの中央制御監視装置く1)に接続している2木の信
号伝送線、(31)、−・、(3n)はそれぞれ信号伝
送線(2)に接続された端末制御監視装置である。
In Figure 14, (1) is the central control and monitoring device;
are two signal transmission lines connected to this central control and monitoring device (1), and (31), . . . , (3n) are terminal control and monitoring devices connected to the signal transmission line (2), respectively.

また、(5)は商用電源、(6)はこの商用電源く5)
に接続している2本のt′a線、(71aン、(71b
)、・・・、(7na) 、(7nb)はそれぞれ一方
の電源線(6)に接続された制御接点、(4+a)、(
’Lb)、・・・、(4na)、(4nb)はそれぞれ
一方の入力端子が他方の電源線(6)に接続され、かつ
他方の入力端子が制御接点(71a)〜(7nb)に接
続された負荷である。
In addition, (5) is a commercial power supply, and (6) is this commercial power supply.
Two t'a wires, (71a and (71b)
), ..., (7na), (7nb) are control contacts connected to one power line (6), respectively, (4+a), (
'Lb), ..., (4na), (4nb) each have one input terminal connected to the other power line (6), and the other input terminal connected to the control contacts (71a) to (7nb) load.

つぎに、上述した従来例の動作を第15図(a)、(b
)及び(c)を参照しながら説明する。第15図(a)
〜(c)は、従来例の各部の信号波形を示すタイムチャ
ート図である。
Next, the operation of the conventional example described above will be explained in FIGS. 15(a) and 15(b).
) and (c). Figure 15(a)
-(c) are time charts showing signal waveforms of various parts in the conventional example.

第15図において、(a)は伝送信号を示し、Plは伝
送の開始を示す開始パルス、P2は端末制御監視装置(
3,)〜(3n)のアドレスを示す端末アドレスパルス
、P、は端末制御監視装置(3,)〜(3n)の制御を
示す制御パルスである。(b)はアドレス一致信号、(
c)はラッチ信号を示す。
In FIG. 15, (a) shows a transmission signal, Pl is a start pulse indicating the start of transmission, and P2 is a terminal control and monitoring device (
The terminal address pulse P indicating the addresses of terminals 3,) to (3n) is a control pulse indicating control of the terminal control and monitoring devices (3,) to (3n). (b) is the address match signal, (
c) shows a latch signal.

まず、制御接点(7,a)〜(7nb)を「○NJして
負荷(4,a)〜(4nl+)を動作させる場合、中央
制御監視装置(1)は、信号伝送線(2)を介して端末
制御監視装置(31)〜(3n)に、第15図(a)に
示すような、伝送信号を送る。
First, when operating the loads (4, a) to (4nl+) by switching the control contacts (7, a) to (7nb) to "○NJ", the central control and monitoring device (1) connects the signal transmission line (2). A transmission signal as shown in FIG. 15(a) is sent to the terminal control/monitoring devices (31) to (3n) via the terminal controller.

端末制御監視装置(31)〜(3n)は、伝送信号中の
端末アドレスと自己の端末アドレスとを比較し、両者が
一致したとき、第15図(b)に示すような、アドレス
一致信号を発生する。
The terminal control and monitoring devices (31) to (3n) compare the terminal address in the transmission signal with their own terminal address, and when the two match, send an address matching signal as shown in FIG. 15(b). Occur.

同時に、第15図(c)に示すような、ラッチ信号を制
御接点(La)〜(7nb)に出力してそれらの制御接
点(71a)〜(7nb)を「ON」させ、負荷(’t
ea)〜(4nb)を動作させる。
At the same time, a latch signal as shown in FIG.
Operate ea) to (4nb).

こうして、中央制御監視装置(1)は、制御指令に基づ
いて制御動作を行なう端末制御監視装置(3,)〜(3
n)を介して、配電機器の1つである制御接点(71a
>〜(7nb)をrON、+していろ。
In this way, the central control and monitoring device (1) performs control operations based on control commands, and the terminal control and monitoring devices (3,) to (3)
n), a control contact (71a
>~(7nb) + rON.

また、中央制御監視装置(1)は、監視指令に基づいて
監視動作を行なう端末制御監視装置(31)〜(3n)
を介して、図示しない配電機器を監視することができる
。
The central control monitoring device (1) also includes terminal control monitoring devices (31) to (3n) that perform monitoring operations based on monitoring commands.
Power distribution equipment (not shown) can be monitored via the .

[発明が解決しようとする課題] 」二連したような従来の配電機器制御監視装置では、以
下に述べるような問題点があった。
[Problems to be Solved by the Invention] Conventional dual power distribution equipment control and monitoring devices have the following problems.

(ア)、小さいシステムを構築する場合でも中央制御監
視装置が必要なので、システム全体として高価で取付ス
ペースが大きかった。
(a) Even when building a small system, a central control and monitoring device was required, making the system as a whole expensive and requiring a large amount of installation space.

(イ)、中央制御監視装置の制御・監視手順を準備する
ときに、接続されている全ての配電機器の動作に関する
、膨大かつ煩雑な、動作手順や禁止事項を熟知しなけれ
ばならなかった。
(b) When preparing control and monitoring procedures for the central control and monitoring equipment, it was necessary to thoroughly understand the vast and complicated operating procedures and prohibitions regarding the operation of all connected power distribution equipment.

(つ)、制御・監視の最小単位が接点入力やリレー接点
出力等よりなる為に、中央制御監視装置が、ネットワー
クされた各々の配電11固有の制御監視手順に従ったア
ルゴリズムにより制御・監視指令を出力する必要があり
、従って中央制御監視装面内の制御・監視手順が膨大と
なるので、1つの制御・監視指令を完了するまでの処理
時間が長くなり、信号伝送線の使用効率が非常に悪かっ
た。
(1) Since the minimum unit of control/monitoring consists of contact inputs, relay contact outputs, etc., the central control/monitoring device issues control/monitoring commands using an algorithm that follows the control/monitoring procedures specific to each networked power distribution unit 11. Therefore, the number of control and monitoring procedures within the central control and monitoring system becomes enormous, which increases the processing time to complete one control and monitoring command, making the use of signal transmission lines extremely inefficient. It was bad.

(1)、自己アドレス及び相手アドレスが固定されてい
たので、端末制御監視装置の増設等による配電機器制御
監視システムの拡張や変更について柔軟に対応すること
ができなかった。
(1) Since the self-address and the other party's address were fixed, it was not possible to flexibly respond to expansions and changes in the power distribution equipment control and monitoring system due to the addition of terminal control and monitoring devices.

(オ)、1種類の端末制御監視装置により各種の配電機
器を制御・監視することができなかった。
(E) It was not possible to control and monitor various power distribution equipment using one type of terminal control and monitoring device.

(力)、接続されている配電機器等の動作状態を確認す
ることができなかった。
(power), it was not possible to check the operating status of connected power distribution equipment, etc.

この発明は、上述した間圧点を解決するためになされた
もので、中央制御監視装置を不要とし、各種の配′:r
、機2利の制御や監視等の動作手j1n及び県北事項を
熟知することなく、かつ簡潔でより高速な制御・監視等
ができる配電機器制御監視装置を得ることを目自勺とす
る。
This invention was made in order to solve the above-mentioned pressure point, and eliminates the need for a central control and monitoring device, and
The objective is to obtain a power distribution equipment control and monitoring device that can perform simpler and faster control and monitoring without having to be familiar with operating methods such as control and monitoring of power supplies and other prefectural matters.

さらに、この発明は、配電機器制御監視システムの拡張
等について柔軟に対応することができ、各種の配電機器
を制御・監視することができ、かつ接続されている配電
機器等の動fヤ状態を確認できる配′:ri機器制m監
視装置を得ることを目的とする。
Furthermore, the present invention can flexibly deal with the expansion of the power distribution equipment control and monitoring system, can control and monitor various power distribution equipment, and can monitor the dynamic status of connected power distribution equipment, etc. The purpose of the present invention is to obtain an RI equipment control monitoring device that can be confirmed.

[課題を解決するための手段] この発明に係る配電機器制御監視装置は、以下に述べる
ような構成を備えたものである。
[Means for Solving the Problems] A power distribution equipment control and monitoring device according to the present invention has the configuration described below.

(I)、つぎの構成からなる第1の端末制御監視装置。(I) A first terminal control and monitoring device having the following configuration.

送信系として、 (i)5接続している配電機器の動作状態を検知し検知
信号を生成する入力部。
As a transmission system, (i) 5 an input unit that detects the operating status of the connected power distribution equipment and generates a detection signal;

(ii)、上記検知信号に基づいて監視情報又は応答指
令を生成する監視情報生成部。
(ii) A monitoring information generation unit that generates monitoring information or a response command based on the detection signal.

(iii)、−h記監視情報に基づいて制御指令を生成
する制御指令生成部。
(iii) A control command generation unit that generates a control command based on the monitoring information listed in -h.

<iv)、上記制御指令又は応答指令を符号変換する符
号生成部。
<iv) A code generation unit that converts the code of the control command or response command.

(V)、外部から自己アドレスを設定できる自己アドレ
ス設定部。
(V) A self-address setting section that can set the self-address from the outside.

(vi)、上記自己アドレスと上記符号変換した制御指
令又は応答指令とを含む伝送信号を送信する送信部。
(vi) a transmitter that transmits a transmission signal including the self-address and the code-converted control command or response command;

受信系機して、 (vii)、上記伝送信号を受信する受信部。As a receiving system, (vii) A receiving unit that receives the transmission signal.

(v、i)、上記伝送信号から上記制御指令又は応答指
令の符号であると解読する符号解読部。
(v, i) a code decoding unit that decodes the transmitted signal as the code of the control command or response command;

(ix)、上記制御指令又は応答指令に基づいて上記配
電機器を勤1ヤする動作手順を示す制御信号を生成する
制御信号生成部。
(ix) A control signal generation unit that generates a control signal indicating an operation procedure for operating the power distribution equipment based on the control command or response command.

(×)、上記制御信号に基づいて上記配電Il!l:得
を駆動する駆動信号を出力する駆動出力部。
(x), the power distribution Il! based on the control signal! l: A drive output section that outputs a drive signal that drives the output.

(■)、上記第1の端末制御監視装置と同一の構成を有
する第2の端末制御監視装置。
(■), a second terminal control and monitoring device having the same configuration as the first terminal control and monitoring device;

また、この発明に係る配電機器制御監視装置は、以下に
述べるような構成を備えたものである。
Further, the power distribution equipment control and monitoring device according to the present invention has the configuration described below.

(I)、つぎの構成からなる第1の端末制御監視装置。(I) A first terminal control and monitoring device having the following configuration.

送信系として、 (i)、接続している配電機器の動作状層を検知し検知
信号を生成する入力部。
As a transmission system, (i) an input unit that detects the operating status layer of the connected power distribution equipment and generates a detection signal;

(ii)、上記検知信号に基づいて監視情報又は応答指
令を生成する監視情報生成部。
(ii) A monitoring information generation unit that generates monitoring information or a response command based on the detection signal.

(iii)、上記監視情報に基づいて制御指令を生成す
る制御指令生成部。
(iii) A control command generation unit that generates a control command based on the monitoring information.

(iv)、上記制御指令又は応答指令を符号変換する符
号生成部。
(iv) a code generation unit that converts the code of the control command or response command;

(V)、外部から相手アドレスを設定できる相手アドレ
ス設定部。
(V) A partner address setting section that allows setting the partner address from the outside.

(vi)、上記相手アドレスと上記符号変換した制御指
令又は応答指令とを含む伝送信号を送信する送信部。
(vi) A transmitting unit that transmits a transmission signal including the partner address and the code-converted control command or response command.

受信系として、 (vii)、上記伝送信号を受信する受信部。As a receiving system, (vii) A receiving unit that receives the transmission signal.

く婦)、上記伝送信号から上記vI御借令又は応答指令
の符号であると解読する符号解読部。
a code decoding unit that decodes the transmitted signal as the code of the vI borrowing order or response command;

<ix)、上記制御指令又は応答指令に基づいて上記配
8!機器を動作する動作手順を示す制御信号を生成する
制御信号生成部。
<ix), the above arrangement 8! based on the above control command or response command. A control signal generation unit that generates a control signal indicating an operation procedure for operating the device.

(×)上記制御信号に基づいて上記配電機器を駆動する
駆動信号を出力するi駆動出力部。
(x) An i-drive output unit that outputs a drive signal for driving the power distribution equipment based on the control signal.

(11)上記第1の端末制f2′II監視装置と同一の
構成を存する第2の端末制御監視装置。
(11) A second terminal control monitoring device having the same configuration as the first terminal-based f2'II monitoring device.

さらに、この発明に係る配電機器制御監視装置は、以下
に述べるような構成を備えたものである。
Furthermore, the power distribution equipment control and monitoring device according to the present invention has the following configuration.

(1)、つぎの構成からなる第1の端末制御監視装置。(1) A first terminal control and monitoring device having the following configuration.

送信系として、 に)接続している配電機器の動作状態を検知し検知信号
を生成する入力部。
An input section that detects the operating status of power distribution equipment connected to (as a transmission system) and generates a detection signal.

(ii)、上記検知で3号に基づいて監視情報又は応答
指令を生成する監視vt報生成部。
(ii) A monitoring VT report generation unit that generates monitoring information or response commands based on No. 3 upon the above detection.

(iii ) 、上記監視fr1報に基づいて制御指令
を生成する制御指令生成部。
(iii) A control command generation unit that generates a control command based on the monitoring fr1 report.

(iy)、上記制御指令又は応答指令を符号変換する符
号生成部、 (V)、上記符号変換した制御指令又は応答指令を含む
伝送信号を送信する送信部。
(iy) a code generation unit that converts the code of the control command or response command; (V) a transmission unit that transmits a transmission signal including the code-converted control command or response command.

受信系として、 (vi)、上記伝送信号を受信する受信部。As a receiving system, (vi) a receiving unit that receives the transmission signal;

(vii)、上記伝送信号から−1−記制御指令又は応
答指令の符号であると解読する符号解読部。
(vii) A code decoding unit that decodes the transmitted signal to be the code of the -1- control command or response command.

(vii)、外部から上記配電機3ユの沢器識別番号を
設定できる+fi器ID、No、設定部。
(vii) A +fi device ID, No., and setting section that allows setting device identification numbers of the three power distribution devices from the outside.

(ix)、J−記tR器識別番号と上記制御指令又は応
答指令とに基づいて上記配電機21を動作する動中手順
を示す制御信号を生成する制御fス号生成部。
(ix) A control signal generation unit that generates a control signal indicating an operating procedure for operating the power distribution machine 21 based on the J-recorded tR device identification number and the control command or response command.

(X)、上記制御信号に基づいて上記配電V%器を駆動
する駆動信号を出力する駆動出力部。
(X) A drive output unit that outputs a drive signal for driving the power distribution V% device based on the control signal.

(■)、上記第1の端末制御監視装置と同一の構成を有
する第2の端末制御監視装置。
(■), a second terminal control and monitoring device having the same configuration as the first terminal control and monitoring device;

さらに、この発明に係る配電機器制御監視装置は、以下
に述べるような構成を備えたものである。
Furthermore, the power distribution equipment control and monitoring device according to the present invention has the following configuration.

(I)、つぎの構成からなる第1の端末制御監視装置。(I) A first terminal control and monitoring device having the following configuration.

送信系として、 (1)、接続している配電機器の動作状態を検知し検知
信号を生成する入力部。
As a transmission system, (1) an input unit that detects the operating status of connected power distribution equipment and generates a detection signal;

(ii)、上記検知信号に基づいて監視情報又は応答指
令を生成する監視情報生成部。
(ii) A monitoring information generation unit that generates monitoring information or a response command based on the detection signal.

(iii)、上記監視情報に基づいて1制御指令を生成
する制御指令生成部。
(iii) A control command generation unit that generates one control command based on the monitoring information.

(iv)、上記制御指令又は応答指令を符号変換する符
号生成部。
(iv) a code generation unit that converts the code of the control command or response command;

(V)、上記符号変換した制御指令又は応答指令を含む
伝送信号を送信する送信部。
(V) A transmitter that transmits a transmission signal including the code-converted control command or response command.

受信系として、 hi)、上記伝送信号を受信する受信部。As a receiving system, hi), a receiving unit that receives the transmission signal;

(vIii)、上記伝送信号から上記制御指令又は応答
指令の符号であると解読する符号解読部。
(vIii) a code decoding unit that decodes the transmitted signal as the code of the control command or response command;

(捕)、上記制御指令又は応答指令に基づいて上記配電
機器を動作する動作手順を示す制御信号を生成する制御
:n信号生成部。
(capture) a control:n signal generation unit that generates a control signal indicating an operation procedure for operating the power distribution equipment based on the control command or response command;

(ix)、上記制御信号に基づいて上記配tn器を駆動
する駆動信号を出力する駆動出力部。
(ix) a drive output unit that outputs a drive signal for driving the tunable switch based on the control signal;

共通系として (X)、上記監視情報又は制置信号に基づいて情報を出
力する情報出力部。
As a common system (X), an information output unit that outputs information based on the monitoring information or control signal.

(■)、上記第1の端末制御監視装置と同一の構成を有
する第2の端末I11御監視装置。
(■), a second terminal I11 control and monitoring device having the same configuration as the first terminal control and monitoring device;

[作用] この発明においては、各端末制御監視装置は、自局の異
常を含む状態変化などの情報に基づいて、自局自身で制
御指令等を生成して、所定の他の端末制御監視装置に送
信し、その指令に対する応答指令が返ってくるまでの間
(あるいはその指令が完了するまでの間)は、自局が中
央側0++監視装置としての役目をはたす。
[Operation] In the present invention, each terminal control and monitoring device generates control commands, etc. by itself based on information such as state changes including abnormalities of its own station, and transmits control commands to predetermined other terminal control and monitoring devices. Until a response command is returned to the command (or until the command is completed), the local station serves as the central 0++ monitoring device.

また、各端末制御監視装置は、所定の他の端末制御監視
装置からの制御指令等を受信した場合は、送信側の他の
端末制御監視装置を中央制御監視装置とみなし、自局は
その端末制御監視袋!としての役目をはたす。
In addition, when each terminal control and monitoring device receives a control command etc. from a predetermined other terminal control and monitoring device, it regards the other terminal control and monitoring device on the transmitting side as the central control and monitoring device, and the own terminal Control monitoring bag! fulfill the role of

[実施例] 実施例の構成を第1図を参照しながら説明する。[Example] The configuration of the embodiment will be explained with reference to FIG.

第1図は、この発明の一実施例を示すブロック図であり
、(2)は上記従来装置のものと全く同一である。
FIG. 1 is a block diagram showing an embodiment of the present invention, and (2) is completely the same as that of the conventional device described above.

第1図において、(30)は第1の端末制御監視装置で
あって、この実施例では(30a)、(30b)、(3
0c)、(30d)、(30e)、(30f)、(30
g>、(30h)、(30i)、(30j)、<30k
>、(30+)、(30m)及び(30n)から構成さ
れた端末ホl +卸監呪装置である。
In FIG. 1, (30) is a first terminal control and monitoring device, and in this embodiment, (30a), (30b), (3
0c), (30d), (30e), (30f), (30
g>, (30h), (30i), (30j), <30k
>, (30+), (30m), and (30n).

また、(3^)は第2の端末制御監視袋πであって、こ
の実施例では(3a)、(3b)、(3C)、(3d)
、(3e)、(3f)、(3g)、(31+)、〈31
)、(3j)、(3k)、(31)、<3m)及び(3
n)から構成された端末制御監視装置である。
Also, (3^) is the second terminal control monitoring bag π, and in this embodiment, (3a), (3b), (3C), (3d)
, (3e), (3f), (3g), (31+), <31
), (3j), (3k), (31), <3m) and (3
This is a terminal control and monitoring device consisting of: (n).

(30a)は送信部かつ受信部、(30h)は制御指令
生成部かつ監視指令生成部、(30+a)及び(30n
)は情報出力部であって、この実施例では、(3k)は
信号伝送線(2)に接続された送・受信部、(30b)
はこの送・受信部(30a)に接続された符号解読部、
(3Qe)はこの符号解読部(3Qb)に接続された制
御信号生成部、(30d)はこの!til+御信号生成
部(30e)に接続された駆動出力部、(30e)はこ
の駆動出力部(30d)に接続された入力部、(30f
)は符号解読部(30b)及び入力部(30e)に接続
された監視情報生成部、(30g)はこの監視情報生成
部(30f)に接続された通報指令生成部、(30h)
は監視情報生成部(30f)に接続された制御・監視指
令生成部、(30i)は入力側が監視情報生成部(30
f)、通報指令生成部(30g>及び制御、・監視指令
生成部(301+>に接続されかつ出力側が送・受信部
(30a)に接続された符号生成部、(30j)は送・
受信部(loa)に接続された自己アドレス設定部、(
30k)は送・受信部<30a)に接続された相手アド
レス設定部、(301)は制御1言号生戊部(30c)
及び監視情報生成部(30f)に接続された機フルID
、NO1設定部、(30m)は制tMfv号生成部(3
0c)及び監視情報生成部(30r)に接続された情報
処理部、(3On)はこの情報処理部(30m)に接続
された表示部である。なお、制御信号生成部(30c)
は監視情報生成部(3Of)にも接続されている。
(30a) is a transmitter and a receiver, (30h) is a control command generator and a monitoring command generator, (30+a) and (30n)
) is an information output section, in this embodiment, (3k) is a transmitting/receiving section connected to the signal transmission line (2), and (30b) is an information output section.
is a code decoding unit connected to this transmitting/receiving unit (30a),
(3Qe) is a control signal generation unit connected to this code decoding unit (3Qb), and (30d) is this! The drive output section (30e) is connected to the til+ control signal generation section (30e), and the input section (30f) is connected to the drive output section (30d).
) is a monitoring information generating section connected to the code decoding section (30b) and the input section (30e), (30g) is a reporting command generating section connected to this monitoring information generating section (30f), (30h)
(30i) is a control/monitoring command generating unit connected to the monitoring information generating unit (30f), and (30i) is connected to the monitoring information generating unit (30i) on the input side.
f), reporting command generation unit (30g> and control, code generation unit connected to the monitoring command generation unit (301+) and whose output side is connected to the transmission/reception unit (30a); (30j) is the transmission/reception unit (30j);
A self-address setting unit connected to the receiving unit (LOA), (
30k) is the destination address setting section connected to the sending/receiving section <30a), and (301) is the control 1 word generation section (30c).
and machine full ID connected to the monitoring information generation unit (30f)
, NO1 setting section, (30m) is control tMfv signal generation section (3
(3On) is a display unit connected to this information processing unit (30m). In addition, the control signal generation section (30c)
is also connected to the monitoring information generation section (3Of).

端末制御監視装置(3^)は、上述した端末制御監視′
A置(30)の構成と同一であり、各符号(3a)〜(
3n)は、各符号(30a)〜(3On>に対応してい
る。なお、駆動出力部(30cl)は出力端子(30d
l>、(30d2)、(3od、)及び(30d、)を
有し、入力部(30e)は入力端子(30e1)及び(
30e2)を有し、駆動出力部(3d)は出力端子(3
c1.)及び(3d、)を有し、かつ入力部(3e)は
入力端子(3e、)、(3e2)及び(3e1)を有す
る。
The terminal control monitoring device (3^) is the terminal control monitoring device described above.
It is the same as the configuration of A position (30), and each code (3a) to (
3n) corresponds to each code (30a) to (3On>.The drive output section (30cl) corresponds to the output terminal (30d
l>, (30d2), (3od,) and (30d,), and the input section (30e) has input terminals (30e1) and (30d,).
30e2), and the drive output section (3d) has an output terminal (30e2).
c1. ) and (3d, ), and the input section (3e) has input terminals (3e, ), (3e2), and (3e1).

つぎに、配電機器の構成を第2図及び第3図を参照しな
がら説明する。第2図はこの発明の一実施例に接続され
た配電機器を示すブロック図、第3図は第2図の一部を
示す回路図であり、(5)及び(6)は上記従来装置の
ものと全く同一である。
Next, the configuration of the power distribution equipment will be explained with reference to FIGS. 2 and 3. FIG. 2 is a block diagram showing power distribution equipment connected to an embodiment of the present invention, FIG. 3 is a circuit diagram showing a part of FIG. It is exactly the same as the one.

第2図において、(40)は端末制御監視装置(30)
に接続された制御・監視用電気機械器具であり、端末制
御監視装置(30)の出力端子(30d、)、(30d
2)、(30d3)及び(30d4)並びに入力端子(
30e+)及び(30e2)に接続された0N10FF
表示灯(40a)、過電流・短絡トリップ表示灯(40
b)、漏電トリップ表示灯(40c)、異常表示灯<4
0d)、ON操作用スイッチ(40e)及びOFF操作
用スイッチ(40r>が設けられている。
In Figure 2, (40) is the terminal control and monitoring device (30)
It is an electrical mechanical device for control and monitoring connected to the output terminals (30d, ), (30d) of the terminal control and monitoring device (30).
2), (30d3) and (30d4) and input terminal (
0N10FF connected to (30e+) and (30e2)
Indicator light (40a), overcurrent/short circuit trip indicator light (40a)
b), Earth leakage trip indicator light (40c), abnormality indicator light <4
0d), an ON operation switch (40e), and an OFF operation switch (40r>).

(4^)は負荷、(7^)は商用電源(5)と負荷(4
^)との間に接続された漏電3を断器であり、電源線(
6)を介して商用電J(5)に接続された電源端子(7
a) 。
(4^) is the load, (7^) is the commercial power supply (5) and the load (4
It is a disconnector for the earth leakage 3 connected between the power line (
Power terminal (7) connected to commercial power J (5) via
a).

電源線(6)を介して負荷(4八)に接続された負荷端
子(7c)、電源端子(7a)と負荷端子(7c)との
間に接続された主回路(7g)、この主回路(7g)に
挿入された開閉装置(7b)、主回路(7g)に接続さ
れた過電流用外し装置(7d)、主回路(7g)に接続
されたZCT(7e)、このZCT(7e)に接続され
た漏電用外し装置(7r)、過電流用外し装置(7d)
内に設けられかつ端末制御監視装置(3^)の入力端子
(3e 、 )に接続された警報接点AL、漏電用外し
装7f、(7r)内に設けられかつ端末制御監視装置(
3A)の入力端子(3e2)に接続された漏電警報接点
E A L、及び開閉装置(7b)に連動しかつ端末制
御監視装置(3八)の入力端子(:1e*)に接続され
た補助接点AXが設けられている。
A load terminal (7c) connected to a load (48) via a power supply line (6), a main circuit (7g) connected between the power supply terminal (7a) and the load terminal (7c), and this main circuit. Switching device (7b) inserted in (7g), overcurrent disconnection device (7d) connected to main circuit (7g), ZCT (7e) connected to main circuit (7g), this ZCT (7e) Earth leakage disconnection device (7r) and overcurrent disconnection device (7d) connected to
Alarm contacts AL provided inside and connected to the input terminals (3e, ) of the terminal control monitoring device (3^), earth leakage enclosures 7f, (7r) provided inside the terminal control monitoring device (
An earth leakage alarm contact E A L connected to the input terminal (3e2) of 3A), and an auxiliary contact connected to the input terminal (:1e*) of the terminal control and monitoring device (38) in conjunction with the switchgear (7b) A contact AX is provided.

(8)はfll電断断器7^)に結合されかつ端末制御
監視装置(3^)に接続された電気操作装置である。
(8) is an electrical operating device coupled to the FLL circuit breaker 7^) and connected to the terminal control and monitoring device (3^).

第3図において、電気操作装置(8)には、サージ吸収
用バリスタを含むダイオードブリッジ回路(8a)及び
(8c)、ダイオードブリッジ回路(8a)に接続され
たON用操作コイル(8b)、ダイオードブリッジ回路
(8c)に接続されたOFF用操作コイル(8d)、端
子(8e、)、(8e 、 )、(8e3)及び(8e
、)が設けられた操代用接続端子(8c)、端子(8e
、)を介してダイオ−fブリッジ回路(8a)及び(8
c)の一端に接続された操作用電源端子(8h)、端子
(823)を介してダイオードブリッジ回路(8&)の
他端に接続されたON操作スイッチ(8r)、端子(8
e、)を介してダイオードブリッジ回路(8c)の他端
に接続されたO F F ii作スイッチ(8g)、並
びにON操作スイッチ(8r)及び○FF操乍操作ッチ
(8g)に接続された操作用型J端子(81)が設けら
れている。なお、端子(8e、)は接地されている。
In FIG. 3, the electrical operation device (8) includes diode bridge circuits (8a) and (8c) including a surge absorption varistor, an ON operation coil (8b) connected to the diode bridge circuit (8a), and a diode OFF operation coil (8d) connected to the bridge circuit (8c), terminals (8e, ), (8e, ), (8e3) and (8e
), terminal (8e)
, ) to diode-f bridge circuits (8a) and (8
c) An operating power supply terminal (8h) connected to one end, an ON operation switch (8r) connected to the other end of the diode bridge circuit (8&) via the terminal (823), and a terminal (8
e,) is connected to the other end of the diode bridge circuit (8c), as well as the ON operation switch (8r) and the FF operation switch (8g). An operating type J terminal (81) is provided. Note that the terminal (8e,) is grounded.

さらに、配′c111器制御監視システムの構成を第4
図及び第5図を参照しながら説明する。第4図はこの発
明の一実施例をネットワークした配電代器fi制御監視
システムを示す概略ブロック図、第5図は池の配電vl
器制御監視システムを示す概略ブロック図である。
Furthermore, the configuration of the controller control and monitoring system was changed to the fourth
This will be explained with reference to the drawings and FIG. FIG. 4 is a schematic block diagram showing a networked power distribution meter fi control and monitoring system according to an embodiment of the present invention, and FIG.
1 is a schematic block diagram showing a device control and monitoring system.

第4図において、負荷(4^)、(4^1)、・・・、
(4八n)はそれぞれ漏電遮断器(7^)、配電機器(
7酷)、(7^n)に接続され、漏電3I!断器(7A
)、制御・監視用電気機械器具(40)、配電機器(7
A+>、制御・監視用電気機械器具(40,)、・・・
、・・・、配電機器(7A n )、及び制御・監視用
電気機械器具(4Qn)はそれぞれ端末1lIN御監視
装置(3A)、(30)、(3^1)、(30,)、・
・・・・・、(3^n)及び(30n)に接続され、こ
れら端末1llI御監視装置(3八)〜(30n)どう
しは信号伝送線(2)により接続されている。なお、負
荷(4^1)、配電代)W(7A1)、制御・監視用電
気機FIi器具(40,)、端末制御監視装置(3^l
)及び(30,)は図示していない。
In Figure 4, loads (4^), (4^1),...
(48n) are earth leakage circuit breakers (7^) and power distribution equipment (
7) is connected to (7^n), causing electrical leakage 3I! Disconnector (7A
), control/monitoring electrical equipment (40), power distribution equipment (7)
A+>, control/monitoring electrical equipment (40,),...
,..., power distribution equipment (7A n) and control/monitoring electrical equipment (4Qn) are terminal 1IN control and monitoring devices (3A), (30), (3^1), (30,), respectively.
..., (3^n) and (30n), and these terminals 1llI control and monitoring devices (38) to (30n) are connected to each other by a signal transmission line (2). In addition, load (4^1), power distribution fee) W (7A1), control/monitoring electric machine FIi equipment (40,), terminal control and monitoring device (3^l)
) and (30,) are not shown.

第5図において、負荷(4A、)、(4Δ2)、・・・
、(4^m)はそれぞれ配電1i′!器(7八l)、(
7八2)、・・・、(7^1)に接続され、これら配電
機器(7八、)〜(7八噛)はそれぞれ端末側fff[
it装置?ff1(3A、)、(3A、)、・・・、(
3^m)4:接続され、これら端末制御監視装置(3^
1)〜(3Δl11)どうしは信号伝送線(2)により
接続されている。
In Fig. 5, loads (4A, ), (4Δ2),...
, (4^m) are the power distribution 1i′! Vessel (78 l), (
782), ..., (7^1), and these power distribution devices (78,) to (782) are connected to the terminal side fff[
IT equipment? ff1(3A,),(3A,),...,(
3^m) 4: Connected to these terminal control and monitoring devices (3^m)
1) to (3Δl11) are connected to each other by a signal transmission line (2).

また、端末制御監視装置の外観を第6図を参照しながら
説明する。第6図は漏電遮断器用の端末制御監視装置(
311)を示す斜視図である。
Further, the appearance of the terminal control and monitoring device will be explained with reference to FIG. Figure 6 shows terminal control and monitoring equipment for earth leakage circuit breakers (
311).

第6図において、(3dl>、(3d2)、(3d)>
及び(3d、)は出力端子、(3c 、 )、(3e2
)、 (3e−)及び(3e−)は入力端子、(31k
l)は自己アドレス・相手アドレス・機器ID、NO,
設定スイッチ、(3n+)は伝送状態表示LED、(3
n2)は0N10FF状態表示LED、(3n、)は過
電流・短絡トリップ状態表示LED、(3n4)は漏電
トリップ状態表示LED、(3z)はボディーである。
In FIG. 6, (3dl>, (3d2), (3d)>
and (3d,) are output terminals, (3c, ), (3e2
), (3e-) and (3e-) are input terminals, (31k
l) is the self address, partner address, device ID, NO,
Setting switch, (3n+) is transmission status display LED, (3
n2) is an 0N10FF status display LED, (3n,) is an overcurrent/short circuit trip status display LED, (3n4) is an earth leakage trip status display LED, and (3z) is a body.

ここで、伝送信号の構成を第7図を参照しながら説明す
る。第7図は伝送信号のフレーム構成を示す構成図であ
る。
Here, the structure of the transmission signal will be explained with reference to FIG. FIG. 7 is a block diagram showing the frame structure of a transmission signal.

第7図において、伝送信号の1フレームは、自己アドレ
スSA、相手アドレスDA、コマンドワードCW、デー
タ数BC、データDT及びフレームチエツクコードFC
Cから構成されている。
In FIG. 7, one frame of a transmission signal includes a self address SA, a destination address DA, a command word CW, a data count BC, data DT, and a frame check code FC.
It is composed of C.

自己アドレスSAは送信元の端末制御監視装置自身のア
ドレス、相手アドレスDAは、送信先の池の端末制御監
視装置のアドレス、コマンド・ワードCWは例えば制御
指令であるrONコマンド」や「OFFコマンド」、監
視指令である「監視コマンド」等、通報指令である「通
報コマンド」等、応答指令である「応答コマンド」等の
コマンドの種類、データ数BCはデータDTのブロック
数、データDTはコマンド・ワードCWに付随するデー
タ、フレームチエツクコードFCCはフレーム全体の整
合性を表わすコードを示す。
The self-address SA is the address of the terminal control and monitoring device that is the source, the destination address DA is the address of the terminal control and monitoring device that is the destination, and the command word CW is a control command such as "rON command" or "OFF command". , types of commands such as "monitoring command" which is a monitoring command, "report command" which is a reporting command, "response command" which is a response command, the number of data BC is the number of blocks of data DT, and the data DT is the command. Data accompanying word CW, frame check code FCC, indicates a code representing the consistency of the entire frame.

つづいて、上述した実施例の動1ヤを代表的な制御指令
、監視指令及び通報指令について順に説明する。
Next, typical control commands, monitoring commands, and notification commands for the operations of the above-described embodiment will be explained in order.

システム立ちあげ時又は必要に応じてシステム稼動時、
端末制御監視装置(30)及び(3八)は、自己アドレ
ス設定部(30j)及び(3j)、相手アドレス設定部
(30k>及び(3k)並びに機器ID、NO,設定部
(301)及び(3I)により、自己アドレス、相手ア
ドレス及び機器ID、NO,(II器識別番号)が設定
される0例えば、端末制御監視袋W(3^)は、自己ア
ドレスとして適当な自局のアドレス、相手アドレスとし
て端末制御監視装置<30)のアドレス及び機器ID、
No、として接続されている漏電遮断器(7^)の機器
ID、No、が設定される。
When starting up the system or when operating the system as necessary,
The terminal control and monitoring devices (30) and (38) have self-address setting units (30j) and (3j), other party address setting units (30k> and (3k), and device ID, NO, setting units (301) and ( 3I), the self-address, the other party's address, and the device ID, NO, (II device identification number) are set. The address and device ID of the terminal control monitoring device <30) as the address,
As No., the device ID and No. of the connected earth leakage breaker (7^) are set.

第1番目に、漏電遮断器(7^)をrONJさせる制御
、つまり制御指令の勤1ヤを説明する。
First, the control to turn on the earth leakage breaker (7^), that is, the function of the control command will be explained.

最初に、端末制御監視装置(30)側のrONコマンド
」の送信動作及び「応答コマンド」の受信動作を第8図
を9照1−ながら説明する。第8図は「ONコマンド1
及び「応答コマンド」の動作の流れを示す概略動作フロ
ーチャート図である。
First, the transmission operation of the "rON command" and the reception operation of the "response command" on the terminal control and monitoring device (30) side will be explained with reference to FIG. 8. Figure 8 shows "ON command 1"
FIG. 3 is a schematic operational flowchart showing the operational flow of the response command and “response command.”

ステップ(50)において、端末制御監視装置W(30
)は動作を開始する。
In step (50), the terminal control monitoring device W (30
) starts working.

ステップ(51)において、端末側f3iI監視装置(
30)は、rONコマンド」を生成して、端末制御監視
装置く3^)に送信する。
In step (51), the terminal side f3iI monitoring device (
30) generates an "rON command" and sends it to the terminal control and monitoring device 3^).

すなわち、入力部(30e)は、入力端子(30e1)
を介して、帽り監視用電気機械器具(40)のON操作
用スイッチ(40e)の「ON」操作を検知し、検知信
号を生成して監視情報生成部(:1Of)に出力する。
That is, the input section (30e) has an input terminal (30e1)
, it detects the "ON" operation of the ON operation switch (40e) of the cap monitoring electric machine device (40), generates a detection signal, and outputs it to the monitoring information generation section (:1Of).

監視情報生成部(30f)は、検知信号に基づいて「O
Nコマンド」を表わすコマンド・ワードCWを生成して
制御・監視指令生成部(30b)に渡す。
The monitoring information generation unit (30f) generates “O” based on the detection signal.
A command word CW representing "N command" is generated and passed to the control/monitoring command generation section (30b).

制御・監視指令生成部(30h)は、コマンド・ワード
CWに基づいて付随するデータDT及びそのデータ数B
Cを生成し、コマンド・ワードCWとともに符号生成部
(30i )に渡す。
The control/monitoring command generation unit (30h) generates accompanying data DT and the number of data B based on the command word CW.
C is generated and passed along with the command word CW to the code generator (30i).

符号生成部(30i )は、コマンド・ワードCW、デ
ータ数BC及びデータDTを符号2換し送 受信部(3
0a)に渡す。
The code generation unit (30i) converts the command word CW, the number of data BC and the data DT into two codes, and sends them to the transmitter/receiver unit (30i).
Pass it to 0a).

送・受信部(30a)は、自己アドレス設定部(30j
)で設定された自局の自己アドレスSA、相手アFレス
設定部(30k)で設定された端末制御監視装置(3A
)のアドレスである相手アドレスDA及びフレームチエ
ツクコードFCCを追加して伝送信号のフレームを構成
する。そして、その伝送信号を信号伝送線(2)に載せ
る。
The transmitting/receiving unit (30a) has a self-address setting unit (30j
), and the terminal control and monitoring device (3A) set in the remote address setting section (30k).
) and a frame check code FCC are added to form a transmission signal frame. Then, the transmission signal is placed on the signal transmission line (2).

また、監視情報生成部(3or)は、上述した検知信号
に基づいた情報等を情報処理部(30m)に渡し、この
情報処理部(30m)を動作させる。
Further, the monitoring information generation section (3or) passes information based on the above-mentioned detection signal to the information processing section (30m), and operates the information processing section (30m).

情報処理部(30m)は、上述した情報等に基づいて表
示部(30n)を駆動し、端末制DI!監視装fi(3
0)の動作状態及び制御・監視用電気機械器具(40)
の動(%状態等を例えばLEDで表示する。
The information processing section (30m) drives the display section (30n) based on the above-mentioned information, etc., and displays the terminal-based DI! Surveillance equipment fi (3
0) Electrical mechanical equipment for controlling and monitoring the operating status (40)
The movement (% status, etc.) is displayed using, for example, an LED.

ステップ(52)において、端末制御監視装置(30)
は、「応答コマンド」を端末制御監視装置(3^)から
受信する。
In step (52), the terminal control monitoring device (30)
receives a "response command" from the terminal control and monitoring device (3^).

すなわち、送 受信部(30a)は、信号伝送線(2)
上の伝送信号を受取り、そのフレームチエツクコードF
CCをチエツクし正常であれば、その相手アドレスDA
が自己アドレス設定部(30j)に設定された自局のア
ドレスかどうかを判別する。相手アドレスDAが自局の
アドレスの場合、コマンドワードCW、データ数BC及
びデータDTを符号解読部(30b)に渡す。
That is, the transmitting/receiving section (30a) is connected to the signal transmission line (2).
Receives the above transmission signal and checks its frame check code F.
Check the CC and if it is normal, the other party's address DA
It is determined whether or not it is the address of the own station set in the own address setting section (30j). When the other party's address DA is the own address, the command word CW, data count BC and data DT are passed to the code decoder (30b).

符号解読部(30b)は、コマンド・ワードCWが「応
答コマンドJであるかどうがを判別する。「応答コマン
ド」の場合、コマンド・ワードCW、データ数BC及び
データDTを制御信号生成部(30c)に渡して、この
制御信号生成部(30c)を動作させる。
The code decoder (30b) determines whether the command word CW is a "response command J."If it is a "response command," the command word CW, the number of data BC, and the data DT are sent to the control signal generator (30b). 30c) to operate this control signal generating section (30c).

111郡信号生成部(30c)は、1M]ID、NO0
設定部(:1O1)に設定された制御・監視用電気機械
器具(40)の8!l器識別番号、コマンド・ワードC
W、データRBC及びデータDTに基づいて、制御監視
用電気機械器具(40)を動作させる応答手順を示す制
御信号を生成し、駆動出力部(30cl)に出力する。
The 111 group signal generation unit (30c) is 1M] ID, NO0
8! of the control/monitoring electrical equipment (40) set in the setting section (:1O1)! Instrument identification number, command word C
Based on W, data RBC, and data DT, a control signal indicating a response procedure for operating the control/monitoring electric mechanical device (40) is generated and output to the drive output section (30cl).

例えば、漏電1[t[?5(7八)が、正常に[ON;
した場合には制御・監視電気i!!鍼器具(40)の0
N10FF表示灯(40a)を点灯させろ応答手順を生
成する。
For example, earth leakage 1[t[? 5 (78) is normally [ON;
If so, control/monitor electricity i! ! Acupuncture device (40) 0
A response procedure is generated to turn on the N10FF indicator light (40a).

駆動出力部(30cl)は、出力端子(30dl)を介
して、上述した制御信号により制御・監視用電気11!
鍼器具(40〉の0N10FF表示灯(40a)を点灯
する。
The drive output section (30cl) outputs the control/monitoring electricity 11! via the output terminal (30dl) using the above-mentioned control signal.
Turn on the 0N10FF indicator light (40a) of the acupuncture device (40>).

また、制御信号生成部(30c)は、上述したコマンド
・ワードC界等を情報処理部(30m)に渡し、この情
報処理部(30m)を動作させる。
Further, the control signal generation section (30c) passes the above-mentioned command word C field, etc. to the information processing section (30m), and operates the information processing section (30m).

情報処理部(30m)は、上述したコマンド・ワードC
界等に基づいて表示部(30n)を駆動し、端末制御監
視装置(30)の動作状態等を例えばLEDで表示する
。
The information processing section (30m) uses the above-mentioned command word C.
The display unit (30n) is driven based on the field, etc., and the operating status of the terminal control/monitoring device (30) is displayed using, for example, an LED.

ステップ(53〉において、端末側(31!監視装置(
30)は動作を終了する。
In step (53>), the terminal side (31! Monitoring device (
30) ends the operation.

つぎに、端末制御監視装置(3^)側のrONコマンド
」の受信動作及び「応答コマンド」の送信動作を説明す
る。
Next, the operation of receiving the "rON command" and the transmission operation of the "response command" on the terminal control and monitoring device (3^) side will be explained.

ステップ(60)において、端末制御監視装置(3^)
は動作を開始する。
In step (60), the terminal control monitoring device (3^)
starts working.

ステップ(61)において、端末制御監視装置(3A)
は、「ONコマンド」を端末制御監視袋71(30)か
ら受信する。
In step (61), the terminal control monitoring device (3A)
receives the "ON command" from the terminal control monitoring bag 71 (30).

すなわち、送・受信部(3a〉は、信号伝送線(2)上
の伝送信号を受取り、そのフレームチエツクコードFC
Cをチエツクし正常であれば、その相手アドレスDAが
自己アドレス設定部(3j)に設定された自局のアドレ
スかどうかを判別する。相手アドレスD Aが自局のア
ドレスの場合、コマンド・ワードCW、データIBc及
びデータDTを符号解読部(3b)に渡す。
That is, the transmitting/receiving section (3a) receives the transmission signal on the signal transmission line (2), and checks the frame check code FC.
C is checked, and if it is normal, it is determined whether the other party's address DA is the address of the own station set in the own address setting section (3j). If the destination address DA is the address of the own station, the command word CW, data IBc and data DT are passed to the code decoder (3b).

符号解読部(3b)は、コマンド・ワードCWが「ON
コマンド」であるかどうかを判別する。rONコマンド
Jの場合、コマンド・ワードCW、データ数BC及びデ
ータDTを制御信号生成部(3c)に渡して、この制御
信号生成部(3c)を動作させる。
The code decoder (3b) detects that the command word CW is “ON”.
command". In the case of rON command J, the command word CW, data count BC, and data DT are passed to the control signal generation section (3c) to operate the control signal generation section (3c).

ステップ(62)において、端末制御監視袋71(3^
)はrONコマンl’ Iを実行する。
In step (62), the terminal control monitoring bag 71 (3^
) executes the rON command l'I.

すなわち、制御信号生成部(3c)は、機器ID。That is, the control signal generation unit (3c) generates the device ID.

NO1設定部(31)に設定された′a電電断断器7^
)の機器識別番号、コマンド ワードCW、データ数B
C及びデータDTに基づいて、:m TL遮断器(7へ
)を「ON」させる制御手順をを示す制御信号を生成し
、駆動出力部(3d)に出力する。
'a electric disconnector 7^ set in NO1 setting section (31)
) device identification number, command word CW, data number B
Based on C and data DT, a control signal indicating a control procedure for turning on the :m TL circuit breaker (to 7) is generated and output to the drive output section (3d).

駆動出力部(3d)は、出力端子(3d、)を介して、
上述した制御信号により電気操作装置(8)のON1作
スイッチ(8「)を閏じる。
The drive output section (3d), via the output terminal (3d,),
The ON1 operation switch (8'') of the electric operating device (8) is operated by the above-mentioned control signal.

こうして、ON操(ヤスイッチ(8f)が閉じることに
よりON用操11ミコイル(8b)が励磁され、開17
1装置(7b)が閏じる。つまりa主遮断器(7八)が
「ON」することになる。
In this way, when the ON switch (8f) is closed, the ON switch 11 (8b) is energized, and the switch 17 is opened.
1 device (7b) snaps. In other words, the a main circuit breaker (78) is turned on.

また、制御信号生成部(3c)は、上述したコマンド・
ワードC界等を情報処理部(3随)に渡し、この情報処
理部(3+a)を動作させる。
The control signal generation unit (3c) also includes the above-mentioned command/
The word C field etc. are passed to the information processing section (3), and this information processing section (3+a) is operated.

情報処理部(3m)は、上述したコマンド・ワードC界
等に基づいて表示部(3n)を駆動し、端末制御監視装
置(3八)の動作状R等を例えばLEDで表示する。
The information processing section (3m) drives the display section (3n) based on the above-mentioned command/word C field, etc., and displays the operating status R of the terminal control/monitoring device (38) using, for example, an LED.

ステップ(63)において、端末制御監視装置(3^)
は、「応答コマンド」を生成して、端末側の監視装置(
30)に送信する。
In step (63), the terminal control monitoring device (3^)
generates a "response command" and sends it to the terminal monitoring device (
30).

すなわち、監視情報生成部(3f)は、入力部(3e)
が検知した検知信号に基づいて、漏電遮断器(7^)が
正常にrON」したかを判別する。また、検知信号に基
づいて「応答コマンド]を表わすコマンド・ワードCW
を生成し、その判別結果であるデータDT及びそのデー
タ数BCを生成してコマンド・ワードCWとともに符号
生成部(31)に渡す。
That is, the monitoring information generation unit (3f) is the input unit (3e)
Based on the detection signal detected by the controller, it is determined whether the earth leakage breaker (7^) has been normally turned on. Also, a command word CW representing a “response command” is generated based on the detection signal.
is generated, and the data DT and the number of data BC which are the discrimination results are generated and passed to the code generation unit (31) together with the command word CW.

符−号生成部(31)は、コマンド・ワードCW、デー
タ数BC及びデータDTを符号変換し送・受信部(3a
)に渡す。
The code generation unit (31) converts the code of the command word CW, the number of data BC and the data DT, and sends the code to the transmission/reception unit (3a).
).

送・受信部(3a)は、自己アドレス設定部(33)に
設定された自局の1〕己アドレスSA、相手アドレス設
定部(3k)に設定された端末制御監視装置(30)の
アドレスである相手アドレスDA及びフレームチエツク
コードFCCを追加して伝送信号のフレームを構成する
。そして、その伝送信号を信号伝送!!(2)に載せる
。
The transmitting/receiving unit (3a) uses the own address SA of the own station set in the own address setting unit (33) and the address of the terminal control and monitoring device (30) set in the other party address setting unit (3k). A destination address DA and a frame check code FCC are added to form a transmission signal frame. Then, transmit that transmission signal! ! Put it in (2).

また、監視情報生成部(3r)は、上述した検知信号に
基づいた情報等を情報処理部(3輪)に渡し、この情報
処理部(3II)を動作させる。
Further, the monitoring information generation section (3r) passes information based on the above-mentioned detection signal to the information processing section (three wheels), and operates this information processing section (3II).

情報処理部(3ffl>は、上述した情報等に基づいて
表示部(3n〉を駆動し、端末制御監視装置(3^)の
動作状態及び漏電遮断器り7八)の0N10FF状態、
過電流・短絡トリップ状態、漏電トリップ状態等を例え
ばLEDで表示する。
The information processing unit (3ffl> drives the display unit (3n) based on the above-mentioned information, etc., and displays the operating state of the terminal control and monitoring device (3^) and the 0N10FF state of the earth leakage circuit breaker 78),
Overcurrent/short circuit trip status, earth leakage trip status, etc. are displayed using, for example, an LED.

ステップ(64)において、端末制御監視装置(3Δ)
は動作を終了する。
In step (64), the terminal control monitoring device (3Δ)
ends the operation.

ここで、上述した漏電遮断器<7八)をrONJさせる
制御手順を第9図を参照しながら説明する。第9図はn
電断断器(7^)をrON、させる制御手順を示すフロ
ーチャート図である。
Here, a control procedure for turning on the earth leakage breaker <78) described above will be explained with reference to FIG. 9. Figure 9 is n
It is a flowchart figure which shows the control procedure which turns on a power interrupter (7^).

ステップ〈70)において、制御信号生成部(3c)は
、コマンド・ワー1< CWがrONコマンド」の場合
、符号解読部(3b)により動作が開始され、つぎのス
テップ(71)に進む。
In step <70), if the command word 1 < CW is rON command, the control signal generation unit (3c) is started to operate by the code decoding unit (3b), and proceeds to the next step (71).

ステップ(71)において、制御信号生成部(3c)は
、入力部(3e)及び監視情報生成部(3f)を介して
検知された漏TL遮断2;(7^)の警報接点ALの開
閉状態に基づいて、過電流、短絡又は漏電によって漏電
遮断器(7Δ)がトリップしているかどうかを判別する
。トリップしていない”% 会(NO)はつぎのステッ
プ(72)に進む。また、トリップしている場合(YE
S)はステップ(75)へ進む。
In step (71), the control signal generation unit (3c) detects the open/closed state of the alarm contact AL of the leakage TL cutoff 2 (7^) detected via the input unit (3e) and the monitoring information generation unit (3f). Based on this, it is determined whether the earth leakage breaker (7Δ) is tripped due to overcurrent, short circuit, or leakage. If it is not tripped (NO), proceed to the next step (72).If it is tripped (YE), proceed to the next step (72).
S) proceeds to step (75).

ステップ(72)において、制御信号生成部(3c)は
、駆動出力部<3d)を介して電気操作装置(8)のO
N操作スイッチ(8r)を所定時間開じた後、つぎのス
テップ(73)に進む。
In step (72), the control signal generation section (3c) outputs the output voltage of the electric operating device (8) via the drive output section<3d).
After opening the N operation switch (8r) for a predetermined period of time, proceed to the next step (73).

ステップ(73)において、制御信号生成部(3C)は
。
In step (73), the control signal generation section (3C).

入力部<3e)及び監視情報生成部(3「)を介して検
知された漏電遮断器(7八)の補助接点AXの開閉状態
に基づいて、漏電遮断器(7^〉がrONJしているか
どうかを判別する。rON、l、ている場合(YES)
はつぎのステップ(74)へ進む、また、rONJして
いないQ # (NO>はステップ(77)へ進む。
Based on the open/closed state of the auxiliary contact AX of the earth leakage breaker (78) detected via the input unit <3e) and the monitoring information generation unit (3''), it is determined whether the earth leakage breaker (7^>) is rONJ. Determine whether it is rON, l, if it is (YES)
If Q # (NO>) does not perform rONJ, the process proceeds to the next step (74).

ステップ(74)において、制御信号生成部(3c)は
動作を終了する。
In step (74), the control signal generation section (3c) ends its operation.

ステップ(75)において、制御信号生成部(3c)は
、漏電遮断器(7^)のトリップ状態を解除するために
、警報接点ALをリセット(OFF)して、つぎのステ
・ツブ(76)に進む。
In step (75), the control signal generation unit (3c) resets (OFF) the alarm contact AL in order to release the trip state of the earth leakage breaker (7^), and the next step (76) Proceed to.

ステップ(76)において、制御信号生成部(3c)は
1.11電遮断器(7^)の警報接点ALがリセットし
ているかどうかを判別する。リセッ1〜している場合(
YES)はステップ(72)へ戻る。また、リセツトし
ていない場合(NO)はつぎのステップ(77)に進む
。
In step (76), the control signal generator (3c) determines whether the alarm contact AL of the 1.11 electric circuit breaker (7^) has been reset. If you have reset 1 or more (
YES) returns to step (72). If the reset has not been performed (NO), the process proceeds to the next step (77).

ステップ(77)において、過電流 短絡トリップ等の
エラー処理をして、ステップ(74)へ戻る。
In step (77), errors such as overcurrent and short circuit trip are handled, and the process returns to step (74).

第2番目に、漏電遮断器(7^)をrOFFjさせる1
1制御、つまり他の制御指令の動作を説明する。なお、
「○Nコマンド」の動作と対応しているので詳開な説明
は省略する。
Second, turn off the earth leakage breaker (7^)1
1 control, that is, the operation of other control commands will be explained. In addition,
Since this corresponds to the operation of the "○N command", a detailed explanation will be omitted.

まず、端末制御監視装置(30)は、制御・監視用電気
機械器具(、io)のOFF操作泪スイッチ(40f)
が押されると、「○FFコマンド」を生成して、端末制
御監視装置(3^)に送信する。
First, the terminal control and monitoring device (30) operates the OFF operation switch (40f) of the control/monitoring electrical equipment (,io).
When is pressed, a "○FF command" is generated and sent to the terminal control and monitoring device (3^).

一方、端末制御監視装置(3^)は、rOFFコマンド
」を受信して、実行する。
On the other hand, the terminal control and monitoring device (3^) receives and executes the rOFF command.

すなわち、制御信号生成部(3c)は、機≧KIDNO
9設定部(31)に設定された漏電遮断器(7八)の機
3;識別番号、コマンド・ワードCW、データ数BC及
びデータDTに基づいて、漏電遮yfr器く7^)をr
OFFJさせる制御手順を示す制御信号を生成し、駆動
出力部(3d)に出力する。
That is, the control signal generation unit (3c)
Based on the device 3 of the earth leakage breaker (78) set in the 9 setting section (31); the identification number, command word CW, data number BC, and data DT, set the earth leakage breaker
A control signal indicating a control procedure for OFFJ is generated and output to the drive output section (3d).

駆動出力部(3d)は、出力端子(3d2)を介して、
上述した制御信号により電気操作装置(8)のOFF操
乍スイッチ(8g)を蘭じる。
The drive output section (3d), via the output terminal (3d2),
The OFF operation switch (8g) of the electric operation device (8) is activated by the above-mentioned control signal.

こうして、0FFti作スイッチ(8g)が閏じること
によりOFF用操作コイル(8d)が励磁され、開閉装
置(7b)が開く、つまり漏電遮断器(7^)が「OF
F、することになる。
In this way, when the 0FFti operation switch (8g) is engaged, the OFF operation coil (8d) is excited, and the switchgear (7b) is opened, that is, the earth leakage breaker (7^) is turned OFF.
F. I will do it.

その後、端末器gg監視装T1.(3^)は、「応答コ
マンド」を生成して、端末制御監視装置(30)に送信
する。
Thereafter, the terminal gg monitoring device T1. (3^) generates a "response command" and sends it to the terminal control and monitoring device (30).

そして、端末制御監視装置(30)は、「応答コマンド
Jを受信して、動作を終了する。
Then, the terminal control and monitoring device (30) receives the response command J and ends its operation.

ここで、上述した漏電遮断器(7A)をroaF、、さ
せる制御手順を第10口を参照しながら説明する。
Here, a control procedure for causing the earth leakage breaker (7A) described above to roaF will be explained with reference to the 10th port.

第10図は漏電遮断器(7局と「OFF、させる制御手
順を示すフローチャート図である。
FIG. 10 is a flowchart showing a control procedure for turning off the earth leakage circuit breaker (7 stations).

ステップ(80)において、制御信号生成部(3c)は
。
In step (80), the control signal generation section (3c).

コマンド・ワードCWがrOFFコマンド」の場合、符
号解読部(3b)により動作が開始され、つぎのステッ
プ(81)に進む。
If the command word CW is "rOFF command", the decoder (3b) starts the operation and proceeds to the next step (81).

ステップ(81)において、制御信号生成部(3c〉は
、入力部(3c)及び監視情報生成部(3「)を介して
検知された漏電遮断器(7八)のW接点点ALの開閉状
官に基づいて、過電流、回路又は漏電によって漏τ;遮
[1787^)がトリップしているがどうかを判別する
。トリップしていない場合(No)はつぎのステップ(
82)に進む、また、トリップしている場合(YES)
はステップ(85)へ進む。
In step (81), the control signal generation unit (3c>) generates an open/close status of the W contact AL of the earth leakage breaker (78) detected via the input unit (3c) and the monitoring information generation unit (3''). Based on the official data, it is determined whether the leakage τ; interrupter [1787^) is tripped due to overcurrent, circuit, or earth leakage.If not tripped (No), proceed to the next step (
Proceed to 82), or if tripped (YES)
The process proceeds to step (85).

ステップ(82)において、制御信号生成部(3c)は
、駆動出力部<3t1)を介して電気操作装置(8)の
OFF操作スイッチ(8g)を所定時間開じた後、つぎ
のステ・/グ(S3)に進む。
In step (82), the control signal generation unit (3c) opens the OFF operation switch (8g) of the electric operation device (8) for a predetermined period of time via the drive output unit (<3t1), and then operates the next step// Go to step (S3).

ステップ(83)において、制御信号生成部(3c)は
、入力部(3e)及び監視情報生成部(3丁)を介して
検知された漏T、遮断器(7^)の補助接点AXの開田
状態に基づいて、漏電遮断器(7^)がro F F 
+しているかどうかを判別する。’OF F +してい
ろ場合(YES)はつぎのステップ(84〉八、進む、
また、’0FF4!。
In step (83), the control signal generation unit (3c) generates the leakage T detected via the input unit (3e) and the monitoring information generation unit (3), and the open field of the auxiliary contact AX of the circuit breaker (7^). Based on the condition, the earth leakage circuit breaker (7^) is ro F F
Determine whether it is + or not. 'OF F + If yes, proceed to the next step (84〉8, proceed.
Also, '0FF4! .

ていない場= (NO)はステラ7 (87>へ進む。If not = (NO), proceed to Stella 7 (87>).

ステップ(84)において、制御信号生成部(3c)は
動作を終了する。
In step (84), the control signal generation section (3c) ends its operation.

ステップ(85)において、制御信号生成部(3c)は
、漏′:r、遮断器(7^)のトリップ状態を解除する
ために、7報接媒ALをリセット(OFFAして、つぎ
のステップ(86)に進む。
In step (85), the control signal generation unit (3c) resets (OFFA) the 7-signal contact AL in order to release the leakage r and the tripped state of the circuit breaker (7^), and then proceeds to the next step. Proceed to (86).

ステップ(86)において、制御信号生成部(3c)は
。
In step (86), the control signal generation section (3c).

漏電遮断器(7八)の警報接点ALがリセットしている
かどうかを判別する。リセットシている場合(YES)
はステップ(82)へ戻る。また、リセットしていない
場合(NO)はつぎのステップ(87〉に進む。
It is determined whether the alarm contact AL of the earth leakage breaker (78) has been reset. If it has been reset (YES)
returns to step (82). If the reset has not been performed (NO), the process proceeds to the next step (87>).

ステップ(87)において、過電流・短絡I・リップ等
のエラー処理をして、ステップ(84)へ戻る。
In step (87), errors such as overcurrent, short circuit I, lip, etc. are handled, and the process returns to step (84).

第3番目に、漏電遮断器(7^)の動fヤ状態の監視、
つまり監視指令の動作を説明する。なお、制御指令の動
作と同一のところは詳細な説明を省略する。
Thirdly, monitoring the operating status of the earth leakage breaker (7^),
In other words, the operation of the monitoring command will be explained. Note that detailed explanations of the same operations as those of the control commands will be omitted.

最初に、端末制御監視装置(30)tnlの「監視コマ
ンド」の送信動作及び「応答コマンド」の受信動作を第
11図を′9照しなか・−説明する。第11図はげ2視
コマンドJ及び「応答コマンドjの動作の流れを示す概
略動作フローチャー1・図である。
First, the transmission operation of the "monitoring command" and the reception operation of the "response command" of the terminal control and monitoring device (30) tnl will be explained with reference to FIG. FIG. 11 is a schematic operation flowchart 1 showing the operation flow of the bald two-vision command J and the response command j.

ステップ(90)において、端末1liII陣監視装置
(30)は動作を開始する。
In step (90), the terminal 1liII team monitoring device (30) starts operating.

ステップ(91)において、端末制御監視装置(30)
は、rONコマンドlの場合と同一の手順で「c睨コマ
ンドJを生成して、端末制御監視装置送信する6 すなわち、入力部(30e)は、制御・監視用電気機械
器具(40)の図示しない監視スイッチの操作を検知す
る。
In step (91), the terminal control monitoring device (30)
Generates the ``c glare command J'' and transmits it to the terminal control and monitoring device using the same procedure as the rON command 1. In other words, the input unit (30e) generates the Detects monitoring switch operations that are not performed.

ステップ(92)において、端末制御監視袋W (30
)は、「応答コマンド」を端末制御監視袋T!(3^)
から受信し、そのF応答コマンド」に基づいて制御・監
視用電気機械器具(40)を駆動する。
In step (92), terminal control monitoring bag W (30
) is the "response command" terminal control monitoring bag T! (3^)
and drives the control/monitoring electric mechanical device (40) based on the F response command.

すなわち、端末側fffII監視装f (30)は、「
応答コマンドJに基づいて制御・監視用電気機械器具(
40)の○N/○FF表示灯(4Qa)、過電流 短絡
トリップ表示灯(40b)、漏電1−リップ表示灯(4
0c)又は異常表示灯(40d)を点灯又は点滅する。
In other words, the terminal side fffII monitoring device f (30)
Based on the response command J, control/monitoring electrical equipment (
○N/○FF indicator light (4Qa), overcurrent short circuit trip indicator light (40b), earth leakage 1-lip indicator light (40)
0c) or the abnormality indicator light (40d) is turned on or blinks.

例えば、漏電31!断器(7八)が過電流・短絡トリッ
プ動作状態であると応答された場合は、制御・監視用電
気機械\ 器具(40〉の過電流・短絡トリップ表示灯(40b)
を点滅させる。
For example, electric leakage 31! If the disconnector (78) responds that it is in an overcurrent/short-circuit trip state, the overcurrent/short-circuit trip indicator light (40b) of the control/monitoring electrical machine/equipment (40>)
flash.

ステップ(93)において、端末制御監視装置(30)
は動作を終了する。
In step (93), the terminal control monitoring device (30)
ends the operation.

つぎに、端末制御監視装置(3^)側の「監視コマンド
」の受信動作及び「応答コマンドjの送信動作を第11
図及び第12図を参照しながら説明する。第12図は漏
電31!Itlr器(7A)の監視情報を示す説明図で
ある。
Next, the receiving operation of the "monitoring command" and the transmitting operation of the "response command j" on the terminal control and monitoring device (3^) side are performed in the 11th
This will be explained with reference to the drawings and FIG. 12. Figure 12 shows leakage 31! It is an explanatory diagram showing monitoring information of the Itlr device (7A).

ステップ(100)において、端末制御監視装置(3^
)は動作を開始する。
In step (100), the terminal control monitoring device (3^
) starts working.

ステップ(101)において、端末制御監視装置く3^
)は、「監視コマンド」を端末制御監視装置(30)か
ら受信する。
In step (101), the terminal control and monitoring device 3^
) receives a "monitoring command" from the terminal control and monitoring device (30).

すなわち、送・受信部(3a)は、信号伝送線(2)上
の伝送信号を受取り、そのフレームチエツクコードFC
Cをチエツクし正常であれば、その相手アドレスDAが
自己アドレス設定部(3j)に設定された自局のアドレ
スかどうかを判別する。相手アドレスDAが自局のアド
レスの場合、コマンド・ワードCW、データ数BC及び
データDTを符号解読部(3b)に渡す。
That is, the transmitter/receiver (3a) receives the transmission signal on the signal transmission line (2), and checks the frame check code FC.
C is checked, and if it is normal, it is determined whether the other party's address DA is the address of the own station set in the own address setting section (3j). If the other party's address DA is the address of the local station, the command word CW, data count BC and data DT are passed to the code decoder (3b).

符号解読部(31+)は、コマンド・ワードCWが[監
視コマンド」であるかどうかを判別する。「監視コマン
ドJの場合、コマンド・ワードCW、データ数BC及び
データDTを監視情報生成部(3r〉に渡して、この監
視情報生成部(3f)を動作させる。
The code decoder (31+) determines whether the command word CW is a "monitoring command". “In the case of the monitoring command J, the command word CW, the number of data BC, and the data DT are passed to the monitoring information generation unit (3r), and the monitoring information generation unit (3f) is operated.

ステップ(102)において、端末側fIl監視装置(
3^)は、監視情報を生成する。
In step (102), the terminal side fIl monitoring device (
3^) generates monitoring information.

すなわち、監視情報生成部(3C)は、fiHID。That is, the monitoring information generation unit (3C) uses fiHID.

NO1設定部(31)に設定された漏電4断器(7^)
の機器識別番号、コマンド・ワードCW、データ数BC
及びデータDTに基づいて、入力部(3c)を介して検
知した、漏電遮断器(7八)の補助接点AX、警報接点
AL及び漏?を警報接点EALの開閉データを入力し、
これらに基づいて例えば第12図に示すような7種類の
監視情報を生成する。
Earth leakage 4 disconnector (7^) set in NO1 setting section (31)
equipment identification number, command word CW, data count BC
And based on the data DT, the auxiliary contact AX, alarm contact AL and leakage? of the earth leakage breaker (78) detected via the input section (3c). Input the opening/closing data of the alarm contact EAL,
Based on these, for example, seven types of monitoring information as shown in FIG. 12 are generated.

正常動作モードとして、補助接点AX、警報接点AL及
び漏電警報接点EALが全て「開」の場合ハriam遮
断H(7A)ノOF’ F状態」、「閉」、「間」及び
[開1の場合は「fi電電断断器7八)のON状態」、
「開J、「閏j及び「開」の場合はr過電流 短絡トリ
ップ動作状態」、「開」、「閉」及び「VA」の場合は
「漏電1−リップ動作状態」の監視情報を生成する。
As normal operation mode, when auxiliary contact AX, alarm contact AL and earth leakage alarm contact EAL are all "open", Hariam cutoff H (7A) is in "F state", "closed", "between" and [open 1]. In this case, "fi electric disconnector 78) is ON",
Generates monitoring information of "R overcurrent short circuit trip operation status if open J, leap j and 'open', and 'earth leakage 1-rip operation status' if 'open', 'closed' and 'VA'. do.

また、異常動作モードとして、補助接点AX、警報接点
へり及びa雷警報接点EALが「閉」、「閉」及び「開
Jの場合は「過電流・短絡l・リップ動作異常」、「閉
」、「開1(又は「閏」)及び「閏」の場合は「漏電1
〜リップ動作異常J、補助接点AX、Q報接点AI−及
び漏電警報接点EALの開閉データが上記以外の組合せ
の場合は「その他の異常」の監視情報を生成する。
In addition, as the abnormal operation mode, if the auxiliary contact AX, alarm contact edge, and lightning alarm contact EAL are "closed", "closed", and "open J", "overcurrent/short circuit l/lip operation abnormality", "closed" , "Open 1 (or "leap")" and "Leakage 1" in the case of "leap"
- If the opening/closing data of lip operation abnormality J, auxiliary contact AX, Q signal contact AI-, and earth leakage alarm contact EAL are combinations other than those described above, "other abnormality" monitoring information is generated.

ステップ(103)において、端末制御監視装置く3Δ
)は、「応答コマンド」を生成して、端末制御監視袋T
!(30)へ送信する。
In step (103), the terminal control and monitoring device
) generates a "response command" and sends it to the terminal control monitoring bag T.
! Send to (30).

すなわち、監視情報生成部(3f)は、「応答コマンド
」を表わすコマンド・ワードCWを生成し、上述した監
視情報であるデータDT及びそのデータ数BCを生成し
てコマンド・ワードCWとともに符号生成部(31〉に
渡す。
That is, the monitoring information generation section (3f) generates a command word CW representing a "response command", generates the data DT which is the above-mentioned monitoring information, and the number of data BC, and sends the data together with the command word CW to the code generation section. (Give it to 31〉.

符号生成部(31)は、コマンド・ワードCW、データ
数BC及びデータDTを符号変換し送・受信部(3a)
に渡す。
The code generation unit (31) converts the code of the command word CW, the number of data BC and the data DT, and sends the code to the transmission/reception unit (3a).
give it to

送・受信部(3a)は、自己アドレス設定部(3j)に
設定された自局の自己アドレスSA、相手アドレス設定
部(3k)に設定された端末制御監視装置(30)のア
ドレスである相手アドレスDA及びフレームチエツクコ
ードFCCを追加して伝送信号のフレームを構成する。
The transmitting/receiving unit (3a) sets the own address SA of the own station set in the own address setting unit (3j) and the address of the terminal control and monitoring device (30) set in the other party address setting unit (3k). Address DA and frame check code FCC are added to configure the frame of the transmission signal.

そして、その伝送信号を信号伝送1(2)に載せる。Then, the transmission signal is placed on signal transmission 1 (2).

また、監視情報生成部(3r)は、上述した監視情報等
を情報処理部(31)に渡し、この情報処理部(3m)
を動作させる。
Further, the monitoring information generation unit (3r) passes the above-mentioned monitoring information etc. to the information processing unit (31), and the information processing unit (3m)
make it work.

情報処理部(3m)は、上述した監視情報等に基づいて
表示部(3n)を駆動し、端末制御監視装置(3^)の
動作状層及びa電断断器(7^)の○N10 F F状
態、過電流・短絡トリップ伏皿、漏電トリップ状態等を
例えばLEDで表示する。
The information processing unit (3m) drives the display unit (3n) based on the above-mentioned monitoring information, etc., and displays the operating state layer of the terminal control and monitoring device (3^) and the ○N10F of the a-disconnector (7^). F status, overcurrent/short circuit trip status, earth leakage trip status, etc. are displayed using, for example, an LED.

ステップ(104)において、端末制御監視装置(3^
)は動1ヤを終了する。
In step (104), the terminal control monitoring device (3^
) ends the first move.

第4番目に、漏電遮断器(7^)の異常及び状態変化に
基づいた動作、つまり通報指令の動作並びに第3の端末
制御監視装置への制御指令及び監視指令の動作を説明す
る。なお、l’ONコマンド」の動作と同一のところは
詳細な説明を省略する。
Fourth, operations based on abnormalities and state changes of the earth leakage circuit breaker (7^), that is, operations of notification commands and operations of control commands and monitoring commands to the third terminal control and monitoring device will be explained. Note that a detailed explanation of the operations that are the same as those of the "l'ON command" will be omitted.

最初に、端末制御監視装置(3^)側の[通報コマンド
」並びに「制御コマンド」及び「監視コマンド」の送信
動作を第13図を参照しながら説明する。第13図は「
通報コマンド」並びに漏電遮断器(7^)の異常及び状
磨変化に基づいた「制御コマンド」及び「監視コマンド
jの動作の流れを示す概略動作フローチャー1〜図であ
る。
First, the transmission operation of the "report command", "control command" and "monitoring command" on the terminal control and monitoring device (3^) side will be explained with reference to FIG. Figure 13 shows “
FIG. 1 is a schematic operation flowchart 1 showing the flow of operations of a "report command" and a "control command" and a "monitoring command j" based on an abnormality and a change in condition of the earth leakage circuit breaker (7^).

ステップ(110)において、端末制御監視装置(3^
)は動作を開始する。
In step (110), the terminal control and monitoring device (3^
) starts working.

ステップ(111)において、端末制御監視装置(3^
)は、漏電遮断器(7八)の開閉データを入力する。
In step (111), the terminal control monitoring device (3^
) inputs the opening/closing data of the earth leakage breaker (78).

すなわち、入力部(3c)は、入力端子(3e、)、(
3e2)及び(3e、)を介して、漏′:r、遮断器く
7^)の警報接点AL、ita電警報接点EAL及び補
助接点AXの開m状態を検知し、検知信号(開閉データ
)を生成して監視情報生成部(3f)に出力する。
That is, the input unit (3c) has input terminals (3e, ), (
3e2) and (3e,), the open state of the alarm contact AL, ita electric alarm contact EAL, and auxiliary contact AX of the circuit breaker 7^) is detected, and the detection signal (opening/closing data) is detected. is generated and output to the monitoring information generating section (3f).

ステップ(112)において、端末制御監視装U (3
A)は、漏′:f1遮断器(7^)の動作状層が変化し
たかどうかを判別する。動作状態が変化した場合(YE
S)はつぎのステップ(113)に進む。動作状層が変
化しない場合(NO)は最終のステップ(116)へ進
む。
In step (112), terminal control monitoring device U (3
A) determines whether the operating state of the leakage f1 circuit breaker (7^) has changed. If the operating status changes (YE
S) proceeds to the next step (113). If the active layer does not change (NO), proceed to the final step (116).

すなわち、監視情報生成部(3f)は、警報接点AL、
漏電警報接点EAL及び補助接点AXの開閉データが変
化したかどうかを判別する。
That is, the monitoring information generation unit (3f) generates the alarm contact AL,
It is determined whether the opening/closing data of the earth leakage alarm contact EAL and the auxiliary contact AX has changed.

ステップ(113)において、端末制御監視装置(3^
)は、開閉データに基づいて監視情報を生成する。
In step (113), the terminal control monitoring device (3^
) generates monitoring information based on opening/closing data.

すなわち、監視情報生成部(3−f)は、警報接点AL
、漏電警報接点EAL及び補助接点AXの開閉データに
基づいて、「監視コマンド」の動作で説明した監視情報
を生成する。
That is, the monitoring information generation unit (3-f)
, the monitoring information explained in the operation of the "monitoring command" is generated based on the opening/closing data of the earth leakage alarm contact EAL and the auxiliary contact AX.

また、監視情報生成部(3f)は、上述した監視情報等
を情報処理部(3端)に渡し、この情報処理部(3II
+)を動作させる。
Further, the monitoring information generation unit (3f) passes the above-mentioned monitoring information etc. to the information processing unit (3rd end), and this information processing unit (3II
+) to operate.

情報処理部(3m)は、上述した監視情報等に基づいて
表示部(3n)を駆動し、端末制御監視装置(3^)の
動作状層及び漏電遮断3(7^)のON10 F F状
態、過’1流・短絡トリップ状層、漏電トリップ状態等
を例えばLEDで表示する。
The information processing section (3m) drives the display section (3n) based on the above-mentioned monitoring information, etc., and displays the operating status layer of the terminal control monitoring device (3^) and the ON10 F F state of the earth leakage cutoff 3 (7^). , excessive current/short circuit trip state, earth leakage trip state, etc. are displayed using, for example, an LED.

ステップ<114>において、端末制御監視装置(3^
)は、監視情報に基づいて通報するかどうかを判別する
0通報する場合(YES)はステップ(117)へ進む
。
In step <114>, the terminal control monitoring device (3^
) determines whether or not to report based on the monitoring information.0 If the notification is to be made (YES), the process proceeds to step (117).

また、通報しない場合(NO)はつぎのステップ(11
5)に進む。
Also, if you do not want to report (NO), proceed to the next step (11).
Proceed to 5).

すなわち、監視情報生成部(3f)は、監視情報に基づ
いて通報するかどうかを判別する0通報する場合(YE
S)は、「通報コマンド」を表わすコマンドワードCW
を生成して、監視情報とともに通報指令生成部(3g)
に渡す。
That is, the monitoring information generation unit (3f) determines whether to report based on the monitoring information.
S) is a command word CW representing "report command"
The notification command generation unit (3g) generates the information and sends it along with the monitoring information
give it to

ステップ(115/)において、端末制御監視装置(3
八)は、監視+fItHに基づいて「制御コマンド」又
は「監視コマンドJを出すかどうかを判別する。「制御
コマンド」又は「監視コマンド」を出す場合(YES)
はステップ(11,8)へ進む。「制御コマンド」又は
「監視コマンド」を出さない場合(NO)はつぎの最終
ステップ(116)に進む。
In step (115/), the terminal control monitoring device (3
8) determines whether to issue a "control command" or "monitoring command J" based on monitoring + fItH. When issuing a "control command" or "monitoring command" (YES)
Proceeds to step (11,8). If the "control command" or "monitoring command" is not issued (NO), the process proceeds to the next final step (116).

すなわち、監視情報生成部(3r)は、監視十青報に基
づいて「制御コマンド」又は「監視コマンド」を出すか
どうかを判別する。「制御コマンド」又は「監視コマン
ド」を出す場合(YES)は、「制御コマンド1又は「
監視コマンド」を表わすコマンド・ワードCWを生成し
て、監視情報とともに制御・監視指令生成部(3h)に
渡す。
That is, the monitoring information generation unit (3r) determines whether to issue a "control command" or a "monitoring command" based on the monitoring report. When issuing a "control command" or "monitoring command" (YES), select "control command 1" or "monitoring command".
A command word CW representing a "monitoring command" is generated and passed along with the monitoring information to the control/monitoring command generation section (3h).

ステラ・ブ(11B)において、端末制御監視装置(3
^)は動作を終了する。
At Stella Bu (11B), the terminal control and monitoring device (3
^) ends the operation.

ステップ(117)において、端末制御監視装置(3Δ
)は、「通報コマンド」を生成して、端末制御監視装置
(30)へ送信する。その後、ステップ(115)に進
む。
In step (117), the terminal control monitoring device (3Δ
) generates a "report command" and sends it to the terminal control and monitoring device (30). Thereafter, the process proceeds to step (115).

すなわち、通報指令生成部(3g)は、監視情報及びコ
マンド・ワードCWに基づいて付随するデータDT及び
そのデータ数BCを生成し、コマンド・ワードCWとと
もに符号生成部(31)に渡す。
That is, the reporting command generation section (3g) generates the accompanying data DT and the number of data BC based on the monitoring information and the command word CW, and passes the generated data together with the command word CW to the code generation section (31).

符号生成部(31)は、コマンド・ワードCW、データ
数BC及びデータDTを符号変換し送・受信部(3a)
に渡す。
The code generation unit (31) converts the code of the command word CW, the number of data BC and the data DT, and sends the code to the transmission/reception unit (3a).
give it to

送・受信部(3a)は、自己アドレス設定部(3j)に
設定された自局の自己アドレスSA、相手アドレス設定
部(3にンに設定された端末制御監視装置(30)のア
ドレスである相手アドレスDA及びフレームチエツクコ
ードFCCを追加して伝送信号のフレームを構成する。
The transmitting/receiving unit (3a) has the own address SA of its own station set in the own address setting unit (3j), and the address of the terminal control and monitoring device (30) set in the other party address setting unit (3). A destination address DA and a frame check code FCC are added to form a transmission signal frame.

そして、その伝送信号を信号伝送線(2)に載せて、端
末制御監視装置(30)へ割込をかける。
Then, the transmission signal is placed on the signal transmission line (2) and interrupts the terminal control and monitoring device (30).

ステップ(118)において、端末制御監視装置(3^
)は、「制御コマンドj又は[監視コマンドJを生成し
て、第3の端末制御監視装置に送信する。その後、最終
ステップ(116)に進む。
In step (118), the terminal control monitoring device (3^
) generates a control command j or a monitoring command J and transmits it to the third terminal control and monitoring device. Thereafter, the process proceeds to the final step (116).

すなわち、制御・監視指令生成部(31+)は、監視情
報及びコマンド・ワードCWに基づいて1;[随するデ
ータDT及びそのデータ数BCを生成し、コマンド・ワ
ードCWとともに符号生成部(31〉に渡す。
That is, the control/monitoring command generation unit (31+) generates the accompanying data DT and the number of data BC based on the monitoring information and the command word CW, and generates the code generation unit (31) along with the command word CW. give it to

符号生成部(31)は、コマンド・ワードCW、データ
数BC及びデータDTを符号変換し送 受信部(3a)
に渡す。
The code generation unit (31) converts the code of the command word CW, the number of data BC, and the data DT, and transmits and receives the code to the transmitting/receiving unit (3a).
give it to

送・受信部(3a)は、自己アドレス設定部(3j)に
設定された自局の自己アドレスSA、相手アドレス設定
部(3k)に設定された第3の端末制御監視装置のアド
レスである相手アドレスDA及びフレームチエツクコー
ドFCCを追加して伝送信号のフレームを構成する。そ
して、その伝送信号を信号伝送線(2)に載せる。
The transmitting/receiving unit (3a) sets the own address SA of the own station set in the own address setting unit (3j), and the other party which is the address of the third terminal control and monitoring device set in the other party address setting unit (3k). Address DA and frame check code FCC are added to configure the frame of the transmission signal. Then, the transmission signal is placed on the signal transmission line (2).

つぎに、端末制御監視装置(30)側の「通報コマンド
」の受信動作を第13図を参照しながら・説明する。
Next, the operation of receiving the "report command" on the terminal control and monitoring device (30) side will be explained with reference to FIG.

ステラフ責120)において、端末制御監視装置 (3
0)は動作を開始する。
In Stellaf Responsibility 120), the terminal control monitoring device (3
0) starts the operation.

ステップ(121)において、端末制御監視装置(30
)は、「通報コマンドjを端末制御監視装置(3^)か
ら受信したかどうかを判別する。受信した場合(YES
)はつぎのステップ(122)に進む、受信しない場合
(NO)はステップ(124)へ進む。
In step (121), the terminal control monitoring device (30
) determines whether the notification command j has been received from the terminal control monitoring device (3^).If received (YES
), proceed to the next step (122); if not received (NO), proceed to step (124).

すなわち、送・受信部(30a)は、割込があった場合
は信号伝送線(2)上の伝送信号を受取り、そのフレー
ムチエツクコードFCCをチエツクし正常であれば、そ
の相手アドレスDAが自己アドレス設定部(30j)に
設定された自局のアドレスかどうかを判別する。相手ア
ドレスDAが自局のアドレスの場合、コマンド・ワード
CW、データ数BC及びデータDTを符号解読部(30
b)に渡す。
That is, the transmitting/receiving section (30a) receives the transmission signal on the signal transmission line (2) when there is an interrupt, checks the frame check code FCC, and if it is normal, the destination address DA is the self-transmission signal. It is determined whether the address of the own station is set in the address setting section (30j). When the other party's address DA is the own address, the command word CW, data number BC and data DT are sent to the code decoder (30
b).

符号解読部(301+)は、コマンド・ワードCWが「
通報コマンド」であるかどうかを判別する。「通報コマ
ンドノの場合、コマンド・ワードCW、データ数BC及
びデータDTを監視情報生成部(30f)に渡して、こ
の監視情報生成部(30f)を動作させる。
The code decoder (301+) determines that the command word CW is “
It is determined whether the command is a "report command" or not. In the case of a report command, the command word CW, the number of data BC, and the data DT are passed to the monitoring information generating section (30f) to operate the monitoring information generating section (30f).

ステップ(122)において、端末制御監視袋J(30
)は、「通報コマンド」を解読し、つぎのステップ(1
23)に進む。
In step (122), terminal control monitoring bag J (30
) decodes the “report command” and executes the next step (1
Proceed to 23).

すなわち、監視情報生成部<3Or)は、コマンド・ワ
ードCW、データ数BC及びデータDTを解読する。
That is, the monitoring information generation unit <3Or) decodes the command word CW, the number of data BC, and the data DT.

ステップ(123)において、端末制御監視装置(30
)は、「通報コマンド1に基づく処理をして、ステップ
(124)に進む。
In step (123), the terminal control monitoring device (30
) performs processing based on report command 1 and proceeds to step (124).

すなわち、監視情報生成部(30f>は、コマンド・ワ
ードCW、データ数BC及びデータDT基づいて、必要
がある場合は第3の端末制御監視装置への新たな「通報
コマンド」、「制御コマンド」又は「監視コマンド」を
表わすコマンド・ワードCWを生成して、通報指令生成
!(30g>又は制御・監視指令生成部(30h)に渡
す。
That is, the monitoring information generation unit (30f> generates a new "report command" and "control command" to the third terminal control and monitoring device, if necessary, based on the command word CW, data count BC, and data DT). Alternatively, a command word CW representing a "monitoring command" is generated and passed to the reporting command generation! (30g) or control/monitoring command generation section (30h).

通報指令生成部(30g>又は制御・監視指令生成部(
30h)は、コマンド・ワードCW等に基づいて付随す
るデータDT及びデータ数BCを生成し、コマンド・ワ
ードCWとともに符号生成部(30i)に渡す。
Notification command generation unit (30g>) or control/monitoring command generation unit (
30h) generates accompanying data DT and data count BC based on the command word CW, etc., and passes it to the code generation unit (30i) together with the command word CW.

符号生成部(30i)は、コマンド・ワードCW、デー
タ数BC及びデータDTを符号変換して送・受信部(3
0a)に渡す。
The code generation unit (30i) converts the code of the command word CW, the number of data BC and the data DT, and sends the code to the transmission/reception unit (30i).
Pass it to 0a).

送・受信部(30a)は、自己アドレス設定部(30j
)に設定された自局の自己アドレスSA、相手アドレス
設定部(30k)に設定された第3の端末制御監視装置
のアドレスである相手アドレスDA及びフレームチエツ
クコードFCCを追加して伝送信号のフレームを構成す
る。そして、その伝送信号を信号伝送線(2)に載せる
。
The transmitting/receiving unit (30a) has a self-address setting unit (30j
), the other party address DA which is the address of the third terminal control and monitoring device set in the other party address setting section (30k), and the frame check code FCC are added to create a frame of the transmission signal. Configure. Then, the transmission signal is placed on the signal transmission line (2).

また、監視情報生成部<3Of>は、上述したコマンド
・ワードCW等を情報処理部(30m)に渡し、この情
報処理部(30m>を動作させる。
Further, the monitoring information generating section <3Of> passes the above-mentioned command word CW, etc. to the information processing section (30m), and operates this information processing section (30m).

情報処理部(3m)は、上述したコマンド・ワードCW
等に基づいて表示部(3n)を駆動し、端末制御監視装
ff (30)の動作状態等をLEDで表示する。
The information processing section (3m) uses the above-mentioned command word CW.
The display section (3n) is driven based on the above information, and the operating status of the terminal control/monitoring device ff (30) is displayed on the LED.

ステップ(124)において、端末制御監視装置(3o
)は動作を終了する。
In step (124), the terminal control monitoring device (3o
) ends the operation.

なお、この発明は、特に伝送方式にこだわる必要はなく
、各制御コマンド、監視コマンド等に対応する接点入力
等を相手の端末制御監視装置に送信してもよく、専用信
号線を用いたり、電力tsm送を用いたり、あるいは各
種多重伝送技術を応用した伝送方式でも実現できる。
Note that this invention does not need to be particular about the transmission method, and contact inputs corresponding to each control command, monitoring command, etc. may be transmitted to the terminal control and monitoring device of the other party, and a dedicated signal line or power This can be realized by using TSM transmission or by a transmission system applying various multiplex transmission techniques.

ところで、上記実施例では相手アドレス設定部で設定で
きるアドレスが1個であるが、複数個(2〜N)として
も同様の動作を期待でき、この場きは複数の端末制御監
視装置に制御指令等を送信することができる。
By the way, in the above embodiment, the number of addresses that can be set in the destination address setting section is one, but the same operation can be expected even if there are multiple addresses (2 to N), and in this case, control commands are sent to multiple terminal control and monitoring devices. etc. can be sent.

また、上記実施例では自己アドレス設定部、相手アドレ
ス設定部及び機器ID、No、設定部を個別に設けたが
、第6図に示したように切り換えスイッチを設けた1個
の設定部で兼用しても同様の動1ヤを期待できる。
Furthermore, in the above embodiment, the self-address setting section, the other party address setting section, and the device ID, No., setting section were provided separately, but as shown in Fig. 6, a single setting section provided with a changeover switch is used. We can expect a similar movement even if we do.

さらに、上記実施例では表示部としてLEDを設けて接
続された配電機器等の動作状態を目視できるようにした
が、他の表示手段でもよく例えば液晶を用いれば詳細な
情報を表示することができる。すなわち、設定されてい
る自己アドレス、相手アドレス及び機器識別番号等も表
示することができる。
Further, in the above embodiment, an LED was provided as a display unit so that the operating status of the connected power distribution equipment etc. could be visually checked, but other display means may be used, and detailed information can be displayed by using a liquid crystal, for example. . That is, the set self address, partner address, device identification number, etc. can also be displayed.

またさらに、上記実施例では情報の出力手段として表示
部を設けたが、音声による出力部を設けてもよい。
Furthermore, in the above embodiments, a display section is provided as an information output means, but an audio output section may also be provided.

[発明の効果] この発明は、以上説明したように構成されているので、
以下に記載されるような効果を奏する。
[Effect of the invention] Since this invention is configured as explained above,
This produces the effects described below.

システムを構築する場合、中央制御監視装置が不要なの
で、システム全体として安価で取付スペースが節約でき
る。
When constructing the system, there is no need for a central control and monitoring device, so the overall system is inexpensive and saves installation space.

また、接続されている全ての配電機器の動作に関する、
膨大かつ煩雑な、動作手順や禁出事項を熟知する必要が
ない。
In addition, regarding the operation of all connected power distribution equipment,
There is no need to be familiar with vast and complicated operating procedures and prohibitions.

さらに、帽ト監視の最小単位がマクロ的な制御指令や監
視指令なので、1つの制御・監視指令を完了するまでの
処理時間が短くなり、信号伝送線の使用効率が非常に良
くなった。
Furthermore, since the minimum unit of monitoring is a macroscopic control command or monitoring command, the processing time required to complete one control/monitoring command is shortened, and the efficiency of use of signal transmission lines is greatly improved.

またさらに、自己アドレス及び相手アドレスが自由に設
定できるので、端末制御監視装置の増設等による配電a
器制御監視システムの拡張や変更について柔軟に対応す
ることができる。
Furthermore, since the self-address and the other party's address can be freely set, power distribution a
It is possible to flexibly respond to expansions and changes to the equipment control and monitoring system.

またさらに、接続される配電機器の種類を設定(例えば
、機器識別番号を漏電遮断器は01、配電用遮断器は0
2、電磁開閉器は03、等)できるので、1押圧の端末
制御監視装置により各種の配電機器を制御・監視するこ
とができる。
Furthermore, set the type of power distribution equipment to be connected (for example, set the equipment identification number to 01 for earth leakage circuit breakers and 0 for power distribution circuit breakers).
2. Since the electromagnetic switch can be operated (03, etc.), various power distribution equipment can be controlled and monitored by a one-press terminal control and monitoring device.

またさらに、情報出力部を設けたので、接続された配電
機器等の動作状態を目視等で確認することができる。
Furthermore, since the information output unit is provided, the operating status of the connected power distribution equipment, etc. can be visually confirmed.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの発明の一実施例を示すブロック図、第21
7Iはこの発明の一実施例に接続された配′:rL機器
を示すブロック図、第3図は第2図の一部を示す回路図
、第4図はこの発明の一実施例をネットワークした配電
機器制御監視システム示す概略ブロック図、第5図は他
の配電機器制御監視システム示す概略ブロック図、第6
図はB主遮断器用の端末制御監視装置を示す斜視図、第
7図は伝送信号のフレーム構成を示す構成図、第8図は
rONコマンド」及び「応答コマンド1の動作の流れを
示す概略動作フローチャート図、第9図は漏を遮断器を
rON」させる制御手順を示すフローチャート図、第1
0図は漏電遮断器を「OFF」させる制御手順を示すフ
ローチャート図、第11図は「ONコマンド」及び「応
答コマンド」の動作の流れを示す概略動(ヤフローチャ
ート図、第12図は漏電遮断器の監視情報を示す説明図
、第13図は「通報コマンド」並びに漏電31!断器の
異常及び状態変化に基づいた「制御コマンド」及び「監
視コマンド」の動作の流れを示すi略動作フローチャー
ト図、第14図は従来の配電81器制御監視装置を示す
ブロック図、第15図(a)〜(c)は従来例の各部の
信号波形を示すタイムチャート図である。 図において、 (3^)、(30)  ・・一端末制御監視装置、(3
a)、 (3b)、 (3c)、 (3d  、 <3e  、 (3「 、 (3g  、 (3h)、 (3i  、 <33  、 (3k)、 (31、 (3端 、 (3n)、 (7^) ある。 なお、 (30b) (30c) (30d) (30e) (30f) (30g> (30h) (30i) (30j) (30k) (30+a) (30n) 送 受信部、 符号解読部、 制御信号生成部、 駆動出力部、 入力部、 監視情報生成部、 通報指令生成部、 制御・監視指令生成部、 符号生成部、 自己アドレス設定部、 相手アドレス設定部、 機器ID、NO6設定部、 情報処理部、 表示部、 漏電遮FIT器、 制御・監視用電気ll!l械器具で 各図中同一符号は同一または相当部分を昂3図 悠8図 4木製#監攬表置(3A) 過木智1岬監刀1さ!(30) 扇11図 煽末%’J卿監硯に置(3A) 棉末哨hリネ把p覧イ1−−噂ζ計置(3o)昂15図 (c)う、テ傅号
FIG. 1 is a block diagram showing one embodiment of the present invention, and FIG.
7I is a block diagram showing the wiring:rL equipment connected to an embodiment of this invention, FIG. 3 is a circuit diagram showing a part of FIG. 2, and FIG. 4 is a network diagram of an embodiment of this invention. A schematic block diagram showing a power distribution equipment control and monitoring system; FIG. 5 is a schematic block diagram showing another power distribution equipment control and monitoring system;
The figure is a perspective view showing the terminal control and monitoring device for the B main circuit breaker, FIG. 7 is a configuration diagram showing the frame structure of the transmission signal, and FIG. 8 is a schematic operation flow showing the operation flow of "rON command" and "response command 1. Flowchart diagram, Figure 9 is a flowchart diagram showing the control procedure for turning on the circuit breaker to prevent leakage, 1st
Figure 0 is a flowchart showing the control procedure for turning off the earth leakage breaker, Figure 11 is a flowchart showing the flow of the ON command and response command, and Figure 12 is a flowchart showing the flow of the ON command and response command. Fig. 13 is an explanatory diagram showing the monitoring information of the device, and Fig. 13 is a schematic operation flowchart showing the flow of the “report command” and the “control command” and “monitoring command” based on the abnormality and status change of the electric leakage 31! 14 is a block diagram showing a conventional power distribution 81 control and monitoring device, and FIGS. 15(a) to 15(c) are time charts showing signal waveforms of each part of the conventional example. ^), (30) ...One terminal control and monitoring device, (3
a), (3b), (3c), (3d, <3e, (3'', (3g, (3h), (3i, <33, (3k), (31, (3end), (3n), ( 7^) Yes. In addition, (30b) (30c) (30d) (30e) (30f) (30g> (30h) (30i) (30j) (30k) (30+a) (30n) Transmitting/receiving section, code decoding section , control signal generation section, drive output section, input section, monitoring information generation section, notification command generation section, control/monitoring command generation section, code generation section, self address setting section, other party address setting section, device ID, NO6 setting section , information processing section, display section, earth leakage shielding FIT device, control/monitoring electrical equipment, etc. In each figure, the same reference numerals refer to the same or corresponding parts. ) Satoshi Ogi 1 Misaki Kanto 1 Sa! (30) Ougi 11 Figure 11 Instigation End % ' Placed in Lord J's Inkstone (3A) 棉 sue shu h line grasp p view ii 1 -- rumor ζ measurement (3o) 昂Figure 15 (c) U, Tefu No.

Claims (4)

【特許請求の範囲】[Claims] (1)接続している配電機器の動作状態を検知し検知信
号を生成する入力部、上記検知信号に基づいて監視情報
又は応答指令を生成する監視情報生成部、上記監視情報
に基づいて制御指令を生成する制御指令生成部、上記制
御指令又は応答指令を符号変換する符号生成部、外部か
ら自己アドレスを設定できる自己アドレス設定部、及び
上記自己アドレスと上記符号変換した制御指令又は応答
指令とを含む伝送信号を送信する送信部から送信系を構
成し、かつ上記伝送信号を受信する受信部、上記伝送信
号から上記制御指令又は応答指令の符号であると解読す
る符号解読部、上記制御指令又は応答指令に基づいて上
記配電機器を動作する動作手順を示す制御信号を生成す
る制御信号生成部、及び上記制御信号に基づいて上記配
電機器を駆動する駆動信号を出力する駆動出力部から受
信系を構成する第1の端末制御監視装置、並びにこの第
1の端末制御監視装置と同一の構成を有する第2の端末
制御監視装置を備え、上記第1の端末制御監視装置又は
第2の端末制御監視装置が上記制御指令を送信するとき
は上記第2の端末制御監視装置又は第1の端末制御監視
装置が上記応答指令を送信することを特徴とする配電機
器制御監視装置。
(1) An input unit that detects the operating state of connected power distribution equipment and generates a detection signal, a monitoring information generation unit that generates monitoring information or response commands based on the detection signal, and a control command based on the monitoring information. a control command generation unit that generates the control command or the response command, a code generation unit that converts the code of the control command or response command, a self-address setting unit that can set the self-address from the outside, and a self-address setting unit that converts the self-address and the code-converted control command or response command. A transmission system is constituted by a transmitter that transmits a transmission signal containing the transmission signal, and a receiver that receives the transmission signal, a code decoder that decodes the transmission signal as the code of the control command or response command, and a code decoder that decodes the transmission signal as the code of the control command or response command. A receiving system includes a control signal generation unit that generates a control signal indicating an operation procedure for operating the power distribution equipment based on a response command, and a drive output unit that outputs a drive signal that drives the power distribution equipment based on the control signal. a first terminal control and monitoring device, and a second terminal control and monitoring device having the same configuration as the first terminal control and monitoring device; A power distribution equipment control and monitoring device characterized in that when the device transmits the control command, the second terminal control and monitoring device or the first terminal control and monitoring device transmits the response command.
(2)接続している配電機器の動作状態を検知し検知信
号を生成する入力部、上記検知信号に基づいて監視情報
又は応答指令を生成する監視情報生成部、上記監視情報
に基づいて制御指令を生成する制御指令生成部、上記制
御指令又は応答指令を符号変換する符号生成部、外部か
ら相手アドレスを設定できる相手アドレス設定部、及び
上記相手アドレスと上記符号変換した制御指令又は応答
指令とを含む伝送信号を送信する送信部から送信系を構
成し、かつ上記伝送信号を受信する受信部、上記伝送信
号から上記制御指令又は応答指令の符号であると解読す
る符号解読部、上記制御指令又は応答指令に基づいて上
記配電機器を動作する動作手順を示す制御信号を生成す
る制御信号生成部、及び上記制御信号に基づいて上記配
電機器を駆動する駆動信号を出力する駆動出力部から受
信系を構成する第1の端末制御監視装置、並びにこの第
1の端末制御監視装置と同一の構成を有する第2の端末
制御監視装置を備え、上記第1の端末制御監視装置又は
第2の端末制御監視装置が上記制御指令を送信するとき
は上記第2の端末制御監視装置又は第1の端末制御監視
装置が上記応答指令を送信することを特徴とする配電機
器制御監視装置。
(2) An input unit that detects the operating state of connected power distribution equipment and generates a detection signal, a monitoring information generation unit that generates monitoring information or response commands based on the detection signal, and a control command based on the monitoring information. a control command generation unit that generates the control command or the response command, a code generation unit that converts the code of the control command or the response command, a partner address setting unit that can set the partner address from the outside, and a control command generation unit that converts the code of the control command or the response command. A transmission system is constituted by a transmitter that transmits a transmission signal containing the transmission signal, and a receiver that receives the transmission signal, a code decoder that decodes the transmission signal as the code of the control command or response command, and a code decoder that decodes the transmission signal as the code of the control command or response command. A receiving system includes a control signal generation unit that generates a control signal indicating an operation procedure for operating the power distribution equipment based on a response command, and a drive output unit that outputs a drive signal that drives the power distribution equipment based on the control signal. a first terminal control and monitoring device, and a second terminal control and monitoring device having the same configuration as the first terminal control and monitoring device; A power distribution equipment control and monitoring device characterized in that when the device transmits the control command, the second terminal control and monitoring device or the first terminal control and monitoring device transmits the response command.
(3)接続している配電機器の動作状態を検知し検知信
号を生成する入力部、上記検知信号に基づいて監視情報
又は応答指令を生成する監視情報生成部、上記監視情報
に基づいて制御指令を生成する制御指令生成部、上記制
御指令又は応答指令を符号変換する符号生成部、及び上
記符号変換した制御指令又は応答指令を含む伝送信号を
送信する送信部から送信系を構成し、かつ上記伝送信号
を受信する受信部、上記伝送信号から上記制御指令又は
応答指令の符号であると解読する符号解読部、外部から
上記配電機器の機器識別番号を設定できる機器ID.N
O.設定部、上記機器識別番号と上記制御指令又は応答
指令とに基づいて上記配電機器を動作する動作手順を示
す制御信号を生成する制御信号生成部、及び上記制御信
号に基づいて上記配電機器を駆動する駆動信号を出力す
る駆動出力部から受信系を構成する第1の端末制御監視
装置、並びにこの第1の端末制御監視装置と同一の構成
を有する第2の端末制御監視装置を備え、上記第1の端
末制御監視装置又は第2の端末制御監視装置が上記制御
指令を送信するときは上記第2の端末制御監視装置又は
第1の端末制御監視装置が上記応答指令を送信すること
を特徴とする配電機器制御監視装置。
(3) An input unit that detects the operating state of connected power distribution equipment and generates a detection signal, a monitoring information generation unit that generates monitoring information or response commands based on the detection signal, and a control command based on the monitoring information. A transmission system includes a control command generation unit that generates a control command, a code generation unit that converts the code of the control command or response command, and a transmission unit that transmits a transmission signal including the code-converted control command or response command, and A receiving section that receives a transmission signal, a code decoding section that decodes the transmission signal as the code of the control command or response command, and an equipment ID that allows setting the equipment identification number of the power distribution equipment from the outside. N
O. a setting unit, a control signal generation unit that generates a control signal indicating an operation procedure for operating the power distribution equipment based on the equipment identification number and the control command or response command, and a control signal generation unit that drives the power distribution equipment based on the control signal. a first terminal control and monitoring device that constitutes a reception system from a drive output section that outputs a drive signal to output a drive signal; and a second terminal control and monitoring device that has the same configuration as the first terminal control and monitoring device; When the first terminal control monitoring device or the second terminal control monitoring device transmits the control command, the second terminal control monitoring device or the first terminal control monitoring device transmits the response command. Power distribution equipment control and monitoring equipment.
(4)接続している配電機器の動作状態を検知し検知信
号を生成する入力部、上記検知信号に基づいて監視情報
又は応答指令を生成する監視情報生成部、上記監視情報
に基づいて制御指令を生成する制御指令生成部、上記制
御指令又は応答指令を符号変換する符号生成部、及び上
記符号変換した制御指令又は応答指令を含む伝送信号を
送信する送信部から送信系を構成し、上記伝送信号を受
信する受信部、上記伝送信号から上記制御指令又は応答
指令の符号であると解読する符号解読部、上記制御指令
又は応答指令に基づいて上記配電機器を動作する動作手
順を示す制御信号を生成する制御信号生成部、及び上記
制御信号に基づいて上記配電機器を駆動する駆動信号を
出力する駆動出力部から受信系を構成し、かつ上記監視
情報又は制御信号に基づいて情報を出力する情報出力部
を有する第1の端末制御監視装置、並びにこの第1の端
末制御監視装置と同一の構成を有する第2の端末制御監
視装置を備え、上記第1の端末制御監視装置又は第2の
端末制御監視装置が上記制御指令を送信するときは上記
第2の端末制御監視装置又は第1の端末制御監視装置が
上記応答指令を送信することを特徴とする配電機器制御
監視装置。
(4) An input unit that detects the operating state of connected power distribution equipment and generates a detection signal, a monitoring information generation unit that generates monitoring information or response commands based on the detection signal, and a control command based on the monitoring information. A transmission system includes a control command generation unit that generates a control command, a code generation unit that converts the code of the control command or response command, and a transmission unit that transmits a transmission signal including the code-converted control command or response command, and A receiving unit that receives a signal, a code decoding unit that decodes the transmitted signal as a code of the control command or response command, and a control signal that indicates an operation procedure for operating the power distribution equipment based on the control command or response command. A receiving system is configured from a control signal generation section that generates a control signal, and a drive output section that outputs a drive signal that drives the power distribution equipment based on the control signal, and information that outputs information based on the monitoring information or control signal. A first terminal control and monitoring device having an output section, and a second terminal control and monitoring device having the same configuration as the first terminal control and monitoring device, the first terminal control and monitoring device or the second terminal A power distribution equipment control and monitoring device characterized in that when the control and monitoring device transmits the control command, the second terminal control and monitoring device or the first terminal control and monitoring device transmits the response command.
JP63159245A 1988-06-29 1988-06-29 Distribution equipment control and monitoring device Expired - Lifetime JPH0832136B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63159245A JPH0832136B2 (en) 1988-06-29 1988-06-29 Distribution equipment control and monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63159245A JPH0832136B2 (en) 1988-06-29 1988-06-29 Distribution equipment control and monitoring device

Publications (2)

Publication Number Publication Date
JPH0213237A true JPH0213237A (en) 1990-01-17
JPH0832136B2 JPH0832136B2 (en) 1996-03-27

Family

ID=15689522

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63159245A Expired - Lifetime JPH0832136B2 (en) 1988-06-29 1988-06-29 Distribution equipment control and monitoring device

Country Status (1)

Country Link
JP (1) JPH0832136B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7366950B2 (en) 1992-01-08 2008-04-29 Hitachi, Ltd. Information processing apparatus with resume function and information processing system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5815391A (en) * 1981-07-21 1983-01-28 Fuji Electric Co Ltd Remote control system
JPS59181929A (en) * 1983-03-30 1984-10-16 株式会社東芝 Controller for electric device
JPS6070940A (en) * 1983-09-26 1985-04-22 松下電工株式会社 Indoor wiring system
JPS6197244U (en) * 1984-11-30 1986-06-21
JPS61274526A (en) * 1985-05-30 1986-12-04 Matsushita Electric Ind Co Ltd transmission control device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5815391A (en) * 1981-07-21 1983-01-28 Fuji Electric Co Ltd Remote control system
JPS59181929A (en) * 1983-03-30 1984-10-16 株式会社東芝 Controller for electric device
JPS6070940A (en) * 1983-09-26 1985-04-22 松下電工株式会社 Indoor wiring system
JPS6197244U (en) * 1984-11-30 1986-06-21
JPS61274526A (en) * 1985-05-30 1986-12-04 Matsushita Electric Ind Co Ltd transmission control device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7366950B2 (en) 1992-01-08 2008-04-29 Hitachi, Ltd. Information processing apparatus with resume function and information processing system
US7661029B2 (en) 1992-01-08 2010-02-09 Hitachi, Ltd. Information processing apparatus with resume function and information processing system
US7908517B2 (en) 1992-01-08 2011-03-15 Hitachi, Ltd. Information processing apparatus with resume function and information processing system

Also Published As

Publication number Publication date
JPH0832136B2 (en) 1996-03-27

Similar Documents

Publication Publication Date Title
KR20150140907A (en) Incoming and distribution panel circuit breaker monitoring and control system using the integrated display and intelligent controller
JPS6239478B2 (en)
KR100783503B1 (en) Digital Miniature Miniature Switchgear for Substation Operation Monitoring
US2709249A (en) Instrument units for process alarm systems
JPH0213236A (en) Controller/monitor for distribution machinery
JPH0213239A (en) Controller/monitor for distribution machinery
JPH0213235A (en) Controller/monitor for distribution machinery
CN213782862U (en) Split type motor comprehensive protection controller
KR100885036B1 (en) Simulating device and simulating system of digital miniature switchgear
JPH0213238A (en) Controller/monitor for distribution machinery
CN114079265B (en) Intelligent motor protection control device and control system
JPH0213241A (en) Controller/monitor for distribution machinery
CN106469943A (en) Based on the intelligent system connecting distribution loop using communication through cross-connecting box of operation post
JPH0213240A (en) Controller/monitor for distribution machinery
CN214837046U (en) 10kV high pressure fire pump is controlling means on spot
CN209267268U (en) A kind of intelligent alarm DC switchgear
CN210626585U (en) Logic function test system and device of fast switching device
CN222282863U (en) An intelligent power distribution cabinet system
JPS63209412A (en) Preventive maintenance system of gas insulated switchgear
JPH0217794A (en) Controller and supervisory equipment used for terminal supervisory and controlling equipment
CN220543017U (en) Multi-path electromagnetic valve loop voltage monitoring device applied to gas fire extinguishing system
JP2560290B2 (en) Equipment for controlled locations of remote monitoring and control equipment
JPH01274630A (en) Controller/monitor for distribution machinery
JPH0832136B2 (en) Distribution equipment control and monitoring device
JPS6052193A (en) Remote controller