JPH02186032A - How to fix the Ohiki end to the concrete foundation - Google Patents
How to fix the Ohiki end to the concrete foundationInfo
- Publication number
- JPH02186032A JPH02186032A JP28608189A JP28608189A JPH02186032A JP H02186032 A JPH02186032 A JP H02186032A JP 28608189 A JP28608189 A JP 28608189A JP 28608189 A JP28608189 A JP 28608189A JP H02186032 A JPH02186032 A JP H02186032A
- Authority
- JP
- Japan
- Prior art keywords
- concrete foundation
- plate
- concrete
- embedded box
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000002184 metal Substances 0.000 claims description 20
- 210000000078 claw Anatomy 0.000 claims description 4
- 238000005452 bending Methods 0.000 claims description 3
- 238000003780 insertion Methods 0.000 claims description 3
- 230000037431 insertion Effects 0.000 claims description 3
- 125000006850 spacer group Chemical group 0.000 claims 1
- 238000000034 method Methods 0.000 description 6
- 238000010276 construction Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
- Floor Finish (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
(産業上の利用分野)
本発明は、住宅の床を構成する大引端部のコンクリート
基礎に対する固定方法に関する。DETAILED DESCRIPTION OF THE INVENTION (Industrial Application Field) The present invention relates to a method for fixing an end part of a house floor to a concrete foundation.
(従来の技術と問題点)
従来の大引端部の固定方法は、第6図に示すように、コ
ンクリート基礎aの内側面の上端に設けられた大引掛用
の凹部すに大引Cの端部が嵌入されると共に、該端部近
傍が束dにより下方から支持され、根がらみe、fで固
定されていたため、作業が大変煩雑で、しかも束dも束
石gを初めとして多くの部材を要するためコスト高とな
っていた。また、凹部dの底面はコンクリート基礎aの
天端均しと同時にモルタルhによって均されるのである
が、凹部であるが故に完全に均すことは困難で、このこ
とが大引Cのガタつき及び施工精度の悪さの原因ともな
っていた。(Prior art and problems) As shown in Fig. 6, the conventional method for fixing the end of the main drawer is to attach the recess for the main hook C to the upper end of the inner surface of the concrete foundation a. As soon as the end was inserted, the vicinity of the end was supported from below by the bundle d and fixed by the roots e and f, which made the work very complicated.Moreover, the bundle d also had many stones including the bundle g. The cost was high because it required parts. In addition, the bottom surface of the recess d is leveled with mortar h at the same time as the top of the concrete foundation a, but since it is a recess, it is difficult to level it completely, and this causes the wobbling of the large pull C. It also caused poor construction accuracy.
(問題を解決するための目的)
本発明は、受金具を用いてコンクリート基礎の内側面に
大引の端部を直角に取付ける方法であり、受金具をコン
クリート基礎に固定する固定ボルトの埋込固着方法にも
特徴を有する。(Purpose of Solving the Problem) The present invention is a method of attaching the end of a large wire at right angles to the inner surface of a concrete foundation using a receiving metal fitting, in which a fixing bolt is embedded to fix the receiving metal fitting to the concrete foundation. Another feature is the fixing method.
(実施例)
以下、本発明の構成を実施例について図面を参照して説
明する。(Example) Hereinafter, the configuration of the present invention will be described with reference to the drawings.
第4図は本発明において用いられる受金具2を示す。こ
の受金具2は、一枚の金属板を折曲げて形成したもので
、大引】の端部を挟持する挟持板7.7を受板6の両側
縁に立上げて形成するとともに受板6の後端を垂下させ
て受金具2をコンクリート基礎4に取付ける取付板5と
なしたものである。取付板5には二個以上のボルト挿通
孔8が形成されている。また、挟持板7.7の内側面に
は斜め下方に向けた爪片9が突設されている。該爪片9
は挟持板7,7を部分的に切り起して内方に折曲げ形成
するとよい。受金具2の形状は」二連したものに限られ
ない。例えば第5図に示すように、受板6と取付板5と
の間に補強リブ板10が設けられていてもよく、また5
両挟持板7,7間の後端部を背板30で閉じていてもよ
い。FIG. 4 shows the receiving metal fitting 2 used in the present invention. This receiving metal fitting 2 is formed by bending a single metal plate, and is formed by raising up both side edges of the receiving plate 6, and holding plates 7.7 for holding the ends of the main drawer. The rear end of 6 is made to hang down to form a mounting plate 5 for attaching the receiving metal fitting 2 to the concrete foundation 4. Two or more bolt insertion holes 8 are formed in the mounting plate 5. Furthermore, a claw piece 9 is provided on the inner surface of the holding plate 7.7 and projects diagonally downward. The claw piece 9
It is preferable to partially cut and raise the holding plates 7, 7 and bend them inward. The shape of the receiving metal fitting 2 is not limited to a two-piece shape. For example, as shown in FIG. 5, a reinforcing rib plate 10 may be provided between the receiving plate 6 and the mounting plate 5;
The rear end portion between both the clamping plates 7, 7 may be closed by the back plate 30.
次に、このように構成した受金具2をコンクリート基礎
4に取付ける手段について説明する。Next, a description will be given of means for attaching the receiving metal fitting 2 configured in this way to the concrete foundation 4.
第3図に示すように、まず後端部がU字状に屈曲された
固定ボルト11.11をそれぞれスペーサー13.13
を介して皿状の埋込ボックス14の底板工5の取付孔1
6.16に挿通し、底板15の内側からナツト12.1
2をそれぞれ固定ボルト1.1.11のねじ部に螺着し
て固定ボルト1111を埋込ボックス14に取付ける。As shown in FIG.
Attachment hole 1 of bottom plate work 5 of dish-shaped embedded box 14 through
6.16 and tighten the nut 12.1 from the inside of the bottom plate 15.
The fixing bolts 1111 are attached to the embedded box 14 by screwing the fixing bolts 1, 1, and 2 into the threaded portions of the fixing bolts 1, 1, and 11, respectively.
固定ボルト11.11の後端部は底板15から外方へ突
出している。The rear end of the fixing bolt 11.11 projects outwardly from the base plate 15.
次に仮枠17を組み立てた後、固定ボルト1111を取
付た埋込ボックス14を、押込ボックス14の上端に設
けられている逆り字形の掛止杆18゜18を用いて仮枠
17の上端に引っ掛けて仮枠の内面に取イ」ける。その
際、掛止杆18,18に螺入されている位置調整ねし1
9.19を回して埋込ボックス14が所定位置に、換言
すれば固定ポル1−11.11が所定埋設位置にくるよ
う埋込ボックス14の取付高さを調整する。次に、コン
クリートを打設し、埋込ボックス14の掛止杆18゜1
8の立上り部に突設されているレベル調整板20゜20
を利用して天端均しを行ないコンクリ−)基礎4を構築
する。コンクリート硬化後、まず仮枠17を順次解体し
ていき、最後にナンド12.12を外して埋込ボックス
14をコンクリート基礎4から取り外し作業を完了する
。Next, after assembling the temporary frame 17, the embedded box 14 with the fixing bolts 1111 is attached to the upper end of the temporary frame 17 using the inverted-shaped retaining rod 18°18 provided at the upper end of the push-in box 14. Hook it onto the inside of the temporary frame. At that time, the position adjustment screws 1 screwed into the latching rods 18, 18
9. Adjust the installation height of the embedded box 14 by turning the knob 19 so that the embedded box 14 is in the predetermined position, in other words, the fixed pole 1-11.11 is in the predetermined buried position. Next, concrete is poured, and the retaining rods of the embedded box 14 are fixed at 18°1.
Level adjustment plate 20°20 protruding from the rising part of 8
Level the top using the concrete and construct foundation 4 (concrete). After the concrete has hardened, the temporary frame 17 is first dismantled one by one, and finally the Nandos 12 and 12 are removed and the embedded box 14 is removed from the concrete foundation 4 to complete the work.
コンクリート基礎4に後端部を埋設した固定ボルト11
.11に受金具2を取付けるには、第1図及び第2図に
示すように、受金具2の取付板5に設けられたボルト挿
通孔8,8を固定ボルト1111に嵌め、ワッシャ21
を介してナツト12゜12を固定ポルl−11,IIの
ねじ部に螺着する。Fixing bolt 11 whose rear end is buried in concrete foundation 4
.. 11, as shown in FIG. 1 and FIG.
Screw the nuts 12°12 onto the threaded portions of the fixed poles I-11 and II through the screws.
このようにして受金具2をコンクリート基礎4の内側面
に固定する。ナツト12.12は固定ボルト11.11
の埋設時に使用したものである。In this way, the receiving metal fitting 2 is fixed to the inner surface of the concrete foundation 4. Nut 12.12 is fixing bolt 11.11
It was used when burying.
コンクリート基礎4の固定ボルト11に締着された受金
具2に大引lの端部を固定するには、第1図及び第2図
に示すように、大引lの端部を受金具2の上方から両挟
持Fi、7.7の間に木槌等を使って強制嵌入し、大引
lの底面を受板6の上面に当接させる。このとき、両挟
持板7,7に突設された爪片9が大引1の端部の両側面
に食い込み、大引1の端部を両挾持板7,7によってし
っかりと固定される。大引の端部はコンクリート基礎4
の内側面に直角に固定される。この固定は、両挾持板9
.9に釘孔を穿設しておいて、大引1の端部を釘止めし
てもよい。To fix the end of the Ohiki l to the receiving metal fitting 2 which is fastened to the fixing bolt 11 of the concrete foundation 4, as shown in Figs. Using a mallet or the like, forcefully insert the screw into the space between the two clamps Fi, 7.7 from above, and bring the bottom surface of the large puller L into contact with the top surface of the receiving plate 6. At this time, the claw pieces 9 protruding from both the holding plates 7, 7 bite into both side surfaces of the end of the large pull 1, and the end of the large pull 1 is firmly fixed by both the holding plates 7, 7. The end of the Ohiki is a concrete foundation 4
fixed at right angles to the inner surface of the This fixation is done by holding the two clamping plates 9
.. A nail hole may be drilled in 9 and the end of the drawer 1 may be nailed.
(発明の効果)
本発明は、大引の端部を受板の上に載せ、大引の端部の
両側面を挟持する挟持板が設けられた受金具がコンクリ
ート基礎の内側面に取付けられ、この受金具を介して大
引の端部がコンクリート基礎に直角に固定されるもので
ある。したがって、大引の端部をコンクリート基礎にガ
タつきなく確実に固定することができるので、作業性、
経済性が大目】に向上する。また、大引の端部は受金具
に嵌入するだけで固定できるため、作業能率がよい。(Effects of the Invention) The present invention is characterized in that the end of the large pull is placed on a receiving plate, and a receiving metal fitting provided with a clamping plate for holding both sides of the end of the large pull is attached to the inner surface of a concrete foundation. , the end of the daihiki is fixed to the concrete foundation at right angles through this receiving metal fitting. Therefore, the end of the Ohiki can be securely fixed to the concrete foundation without wobbling, which improves work efficiency.
Economical efficiency will be greatly improved. In addition, the end of the drawer can be fixed simply by fitting it into the receiving metal fitting, which improves work efficiency.
さらに、大引の端部は受金具により支持、固定され、か
つ受金具はコンクリート基礎に埋込ボックスを用いて水
平状に固着された固定ボルトに締着されている。したが
って大引の取付位置が正確で施工精度が高くなる。さら
にまた、受金具は1枚の金属板が屈曲されて形成される
ものであるから、材料費の節減が図れ、このこともまた
経済性の向上に寄与するものである。Further, the end of the main drawer is supported and fixed by a receiving metal fitting, and the receiving metal fitting is fastened to a fixing bolt horizontally fixed to the concrete foundation using an embedded box. Therefore, the installation position of the Ohiki is accurate and the construction accuracy is high. Furthermore, since the receiving fitting is formed by bending a single metal plate, material costs can be reduced, which also contributes to improving economic efficiency.
第1図は本発明方法による大引端部の固定構造の一実施
例を示す正面図、第2図は第1図におけるX−X線断面
図、第3図は本発明に係る固定ボルトの埋設方法を示す
説明図、第4図は本発明において用いられる受金具の一
実施例を示す斜視図、第5図は受金具の他の実施例を示
す斜視図、第6図は従来の大引の端部の固定方法を示す
斜視図である。FIG. 1 is a front view showing an embodiment of a fixing structure for a large draw end according to the method of the present invention, FIG. 2 is a sectional view taken along the line X-X in FIG. 1, and FIG. An explanatory diagram showing the burying method, Fig. 4 is a perspective view showing one embodiment of the receiving metal fitting used in the present invention, Fig. 5 is a perspective view showing another embodiment of the receiving metal fitting, and Fig. 6 is a conventional large-sized one. FIG. 3 is a perspective view showing a method of fixing the end of the pull.
Claims (1)
それぞれスペーサーを介して皿状の埋込ボックスの底板
に形成した取付孔に挿通させ、この取付孔から埋込ボッ
クス内に突出したねじ部にナットをねじ入れることによ
り、固定ボルトを後端部が底板から外方へ突出するよう
に埋込ボックスに取付け、コンクリート基礎を構築する
仮枠の側面(コンクリート基礎の内側面を形成する面)
の適所に、固定ボルトの後端部が仮枠内に突入するよう
に埋込ボックスを伏せて取付け、このようになした仮枠
内にコンクリートを打設して基礎を構築した後、仮枠を
解体し、前記したナットを外して埋込ボックスをコンク
リート基礎から除くことにより固定ボルトをコンクリー
ト基礎の内側面に水平状に埋込み固着し、 一枚の金属板を折曲げて受板と取付板から なる断面L字形の受金具を形成し、この受金具は両側縁
が立上げられて挾持板となされ、この両挟持板の内側面
には斜め下方に向けた爪片が形成され、取付板には二個
以上のボルト挿通孔が設けられたものであり、 前記した固定ボルトのコンクリート基礎か ら突出したねじ部に前記取付板のボルト挿通孔を挿通さ
せ、取付板から突出したねじ部にナットを締込んで受金
具をコンクリート基礎に固定し、 この受金具の両挾持板内に大引の端部を嵌 入し、大引をコンクリート基礎の内側面に直角に固定す
ることを特徴とするコンクリート基礎に対する大引端部
の固定方法。[Claims] 1) Two or more fixing bolts whose rear ends are bent into a U-shape are inserted into mounting holes formed in the bottom plate of the dish-shaped embedded box through spacers, and Attach the fixing bolt to the embedded box with the rear end protruding outward from the bottom plate by screwing a nut into the threaded part that protrudes into the embedded box from the side of the temporary frame for constructing the concrete foundation ( surface forming the inner surface of the concrete foundation)
At the appropriate location, install the embedded box face down so that the rear end of the fixing bolt protrudes into the temporary frame. After constructing the foundation by pouring concrete into the temporary frame, remove the temporary frame. By dismantling the above-mentioned nuts and removing the embedded box from the concrete foundation, the fixing bolts were embedded and fixed horizontally into the inner surface of the concrete foundation, and a receiving plate and mounting plate were created by bending a single metal plate. A receiving fitting with an L-shaped cross section is formed, and both edges of this receiving fitting are raised up to form a clamping plate, and claw pieces facing diagonally downward are formed on the inner surfaces of both clamping plates, and a mounting plate is formed. is provided with two or more bolt insertion holes, the bolt insertion hole of the mounting plate is inserted through the threaded part of the fixing bolt protruding from the concrete foundation, and the nut is inserted into the threaded part protruding from the mounting plate. The concrete is characterized in that the receiving bracket is fixed to the concrete foundation by tightening the bracket, and the ends of the large pull are fitted into both clamping plates of the receiving metal, and the large pull is fixed at right angles to the inner surface of the concrete foundation. How to fix the end of the main draw to the foundation.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP28608189A JPH02186032A (en) | 1989-11-02 | 1989-11-02 | How to fix the Ohiki end to the concrete foundation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP28608189A JPH02186032A (en) | 1989-11-02 | 1989-11-02 | How to fix the Ohiki end to the concrete foundation |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH02186032A true JPH02186032A (en) | 1990-07-20 |
| JPH034702B2 JPH034702B2 (en) | 1991-01-23 |
Family
ID=17699698
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP28608189A Granted JPH02186032A (en) | 1989-11-02 | 1989-11-02 | How to fix the Ohiki end to the concrete foundation |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH02186032A (en) |
-
1989
- 1989-11-02 JP JP28608189A patent/JPH02186032A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPH034702B2 (en) | 1991-01-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH1144025A (en) | Concrete formwork panel, concrete formwork and method of constructing concrete formwork | |
| JPH034702B2 (en) | ||
| JP2002356853A (en) | Anchor bolt position setting jig | |
| JPH024195Y2 (en) | ||
| JPS6231553Y2 (en) | ||
| JPH034701B2 (en) | ||
| JP3528587B2 (en) | How to adjust the height of the ceiling mounting structure | |
| JP2883309B2 (en) | Floor panel mounting structure | |
| JP3321670B2 (en) | Mold setting equipment for ready-mixed concrete | |
| JPS61237754A (en) | Sleeper construction method | |
| JPH0327154Y2 (en) | ||
| JPH02118029U (en) | ||
| JPH10140828A (en) | Fixing metal fittings for concrete formwork and method for fixing concrete formwork using the same | |
| JPH0545712Y2 (en) | ||
| JPS6241675Y2 (en) | ||
| JPH0142600Y2 (en) | ||
| JPH0348970Y2 (en) | ||
| KR200161889Y1 (en) | Ceiling plate holder | |
| JPS5942445Y2 (en) | Step temporary structure in concrete formwork | |
| JPH0413296Y2 (en) | ||
| JP2603354Y2 (en) | Groove lid receiving frame material | |
| JP2559639B2 (en) | Box erection tool for concrete burial | |
| JP2581699Y2 (en) | Large support equipment | |
| JPH0626677Y2 (en) | Anchor bolt embedding type | |
| JPS60138136A (en) | Embedding of concrete embedding article in concrete wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| EXPY | Cancellation because of completion of term |