Construction method of hollow bottom expansion cast-in-place ready-made concrete pileInfo
- Publication number
- JPH02225714A JPH02225714A JP4448289A JP4448289A JPH02225714A JP H02225714 A JPH02225714 A JP H02225714A JP 4448289 A JP4448289 A JP 4448289A JP 4448289 A JP4448289 A JP 4448289A JP H02225714 A JPH02225714 A JP H02225714A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- expanded
- bottomed
- concrete
- flexible tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
Description
【発明の詳細な説明】
(産業上の利用分野)
本発明は中空拡底場所打既製品コンクリート抗工法の改
良に関し、杭先端の支持力向上とならびに施工後におけ
るネガティブフリクシジンの減衰と打設コンクリートの
強度低下防ローと、支持力の増大につながる構築杭体の
中空化、そして抗工事における施工の簡便性と信頼性の
向」−をはかることを目的とする。Detailed Description of the Invention (Industrial Field of Application) The present invention relates to an improvement in the method of pouring ready-made concrete in hollow-bottomed areas, improving the bearing capacity of the tip of the pile, attenuating negative frixigins after construction, and improving the method of pouring concrete. The purpose of this project is to prevent the strength of concrete piles from decreasing in strength, to make the construction pile hollow, which increases the bearing capacity, and to improve the ease and reliability of construction in pile construction.
(従来の技術)
いわゆる拡底場所打コンクリート杭の打設工法にはこれ
までに種々のものが開発され、実用化されているか拡底
場所打コンクリート杭の打設にあたり、ポーリングをお
こなう手段として以下に代表的なものをあげると、
第一番目に拡底リバース工法といわれるものであり、水
を利用し静水圧0.2Kg/Cm’で孔壁を保持し、ノ
ーケーシングにより掘削するらので、ロータリーテーブ
ルを回転し、先端に取り付けたドリルビットにより掘削
された土砂を渦巻きポンプまたは水中ポンプで循環送泥
し、土砂と水を吸い上げ、これを孔外へ排出し水だil
を再度孔内へ循環させつつ掘削するものであり拡底部の
掘削は拡大ドリルビットにより前記の方法併用で行う6
のである。(Prior art) Various methods for driving so-called cast-in-place concrete piles with an expanded bottom have been developed and have they been put into practical use? The first is the bottom expansion reverse method, which uses water to hold the hole wall under a hydrostatic pressure of 0.2 Kg/Cm' and excavates without a casing, so it requires a rotary table. It rotates and circulates the earth excavated by a drill bit attached to the tip using a centrifugal pump or submersible pump, sucks up the earth and water, and discharges it out of the hole to create a water sump.
Drilling is carried out while circulating the water into the hole again, and the drilling of the expanded bottom part is carried out using the above method in combination with an expanded drill bit6.
It is.
第二番目に拡底アースドリル工法が知られる。The second well-known method is the expanded-bottom earth drill method.
ドリリングバケットで旧劇排土しながら杭穴を掘るが、
これは地下水がある場合に、ガイドケーシンクで地盤の
表層部を保護し、それより以深の部分は安定液を使って
掘削するものであり、また地下水が全くなく孔壁崩壊の
懸念のない粘性上の地盤〉素掘って掘削し、そして拡底
部は拡大ドリルビットにより掘削を行うらのである。I dig a pile hole while removing old soil with a drilling bucket,
If there is groundwater, the surface layer of the ground is protected with a guide casing, and the deeper part is excavated using a stabilizing liquid.Also, there is no groundwater and there is no risk of the hole wall collapsing. The upper ground was excavated by bare digging, and the expanded bottom part was excavated using an enlarged drill bit.
従来はL記に代表されるポーリング手段により掘削され
たポーリング孔内にコンクリートを打設して場所打コン
クリート杭の施工をおこなっていた。Conventionally, cast-in-place concrete piles have been constructed by pouring concrete into a poling hole excavated by a poling method such as L.
また既製品の杭体?こおいては、中空拡底杭の施工方法
と杭体の構造は今までに公知されていない。Or a ready-made pile body? In this case, the method of constructing the hollow expanded pile and the structure of the pile body have not been publicly known.
(発明の解決すべき問題点)
ところが上記した従来の工法による場合において孔内へ
のコンクリートの打設に際し多量の地下水による悪影響
をうけることになる。(Problems to be Solved by the Invention) However, in the case of using the above-mentioned conventional construction method, when concrete is poured into a hole, it is adversely affected by a large amount of groundwater.
とりわけ安定液か用いられる一般的な]二法においては
安定液の中でコンクリートの打ち込みを行うものである
ためCaイオン及びOHイオン双方の影響によって粘性
ゲルストレングス璧の形成及びpHに粁しい悪影響を与
える。また安定液中の塩分は打設コンクリート杭の中位
断面積へたりの強度を低下させるために、その分だけ余
分に杭の径を大きくする必要があるために不経済であり
、また品質劣化を免れない。また場所打杭の外周面に活
性度がある場合には杭先端を支持地盤に支持された状聾
でのネガティブフリクション作用で杭先端の崩壊をひき
おこす危険がある。そしてリバース工法やアースドリル
工法においては掘削杭穴の杭側壁の保持が完全ではなく
、支持地盤の掘削杭穴に鉄筋及びトレミー管を施工する
際に、杭穴の側壁部が崩壊し土砂が落下し支持地盤に堆
積し、杭先端の断面を昔しく減少かつ不等沈下の原因に
つながるものである。それからベノトエ法においてはケ
ーシングの引き抜き時又は、コンクリートの打設時にお
いて、鉄筋の兵士がり現象が発生し支持地盤での杭先端
の強度の低下につながるしのである。そして場所打コン
クリート杭は杭体の一本当たりの’yu Ulがとてら
重く長期支持力naから杭体の自重Wを、ひいて計算さ
れている。In particular, in the two most common methods in which a stabilizing solution is used, concrete is poured in a stabilizing solution, so the formation of a viscous gel strength barrier and the pH are severely affected by the influence of both Ca ions and OH ions. give. In addition, salt in the stabilizing solution reduces the strength of the medium cross-sectional area of the cast concrete pile, making it necessary to increase the diameter of the pile by that amount, which is uneconomical and also causes quality deterioration. I can't escape it. In addition, if there is activity on the outer surface of a cast-in-place pile, there is a risk that the pile tip will collapse due to negative friction in the state where the pile tip is supported by the supporting ground. In addition, in the reverse construction method and the earth drill method, the pile side wall of the excavated pile hole is not completely retained, and when installing reinforcing bars and tremie pipes in the excavated pile hole in the supporting ground, the side wall of the pile hole collapses and earth and sand fall. It accumulates on the supporting ground, reducing the cross section of the pile tip and causing uneven settlement. Furthermore, in the Benotoé method, when the casing is pulled out or concrete is placed, a phenomenon of stiffening of the reinforcing bars occurs, which leads to a decrease in the strength of the pile tip in the supporting ground. Cast-in-place concrete piles are calculated by subtracting the dead weight W of the pile from the long-term bearing capacity na because the weight per pile is very heavy.
(問題点を解決する為の手段)
本発明は上記した従来技術における問題点を解決し、高
強度で高支持力が得られしかも経済的であり、かつ施工
の簡便な中空拡底場所打既製品コンクリート杭の施工法
を開発に至ったものであり、具体的には、中空拡底場所
打既製品コンクリート杭を構築する場合において、拡底
掘削杭穴内にあらかじめ検尺によって確認した杭長以上
のa底フレキシブルチューブを内側に、無底フレキシブ
ルチューブを外側にした二重のフレキシブルチューブを
介して有底拡大部を掘削杭穴底部に向けて装入し有底拡
大部にコンクリートの打設をおこない杭体を接続しなが
らコンクリートを打設し、拡底杭穴の底部に有底拡大部
を到達させ、抗頭11<を打撃揺動させ、杭体の先端に
よってtr底底入大部中にあらかじめ取り付けられた機
構によりフレキシブルチューブの中においてベントナイ
ト液と分離された状聾で有底拡大部を拡大させる。杭体
内部のコンクリートを有底拡大部の杭体内部にあらかじ
め取り付けられたフロートバルブで杭体内部と外部を遮
断することができ、杭体の上下揺動で杭体内部から杭体
外部へと杭体の自重をflJ用し杭体内部のコンクリー
トを圧送する方法により中空拡底場所打既製品コンクリ
ート杭の構築を可能とした施工方法と杭構造である。(Means for Solving the Problems) The present invention solves the problems in the above-mentioned prior art, and provides a ready-made product with a hollow expanded bottom that provides high strength and high bearing capacity, is economical, and is easy to construct. This led to the development of a construction method for concrete piles. Specifically, when constructing hollow-bottomed, cast-in-place ready-made concrete piles, an A-bottom with an a-bottom of a length equal to or longer than the pile length confirmed in advance by measuring the size of the pile is installed in the expanded-bottomed excavated pile hole. A double flexible tube with a flexible tube on the inside and a bottomless flexible tube on the outside is inserted so that the bottomed expanded section faces the bottom of the excavated pile hole, and concrete is poured into the bottomed expanded section to form the pile body. Concrete is cast while connecting the bottomed expanded part to the bottom of the expanded pile hole, and the shaft head 11 is struck and swung, and the tip of the pile body is installed in advance in the bottom entry part of the tr bottom. The mechanism expands the bottomed expansion part in a flexible tube separated from the bentonite liquid. The concrete inside the pile body can be separated from the outside by a float valve installed in advance inside the pile body in the bottomed expansion part, and the vertical movement of the pile body allows concrete to flow from the inside of the pile body to the outside of the pile body. This is a construction method and pile structure that makes it possible to construct a hollow, expanded-bottom cast-in-place concrete pile by using the pile body's own weight as flJ and pumping the concrete inside the pile body.
(作 用)
無底と有底のフレキシブルチューブを二重にしたらのは
あらかじめ蛇腹状に折りたたまれており、これをポーリ
ング孔の開口部より孔底に向けて順次その袋状をした底
部を先頭に装入させる。装入するフレキシブルチューブ
内に中空拡底杭の拡大部となる有底拡大部内にコンクリ
ートを打設しながら杭本体となりうる杭体を孔内の底部
に向けて杭体の接続とコンクリートの打設を交互におこ
ない、杭穴底部の支持地盤において杭先端を拡大させ、
杭体のL上揺動によりフロートバルブの開閉をおこない
杭体内部のコンクリートを杭体外部に圧送充填し中空の
拡底杭体を構築4”る。(Function) The double flexible tubes, one without a bottom and the other with a bottom, are folded into a bellows shape in advance, and are sequentially folded from the opening of the polling hole toward the bottom of the hole, with the bag-shaped bottom at the top. Charge it to While pouring concrete into the bottomed expanded part of the hollow expanded pile inside the flexible tube to be charged, connect the pile body and place concrete so that the pile body, which can become the pile body, faces the bottom of the hole. This is done alternately to expand the tip of the pile in the supporting ground at the bottom of the pile hole.
The float valve is opened and closed by swinging the pile body over L, and the concrete inside the pile body is pumped and filled to the outside of the pile body to construct a hollow expanded-bottom pile body.
(実 施 例)
以下において本発明の具体的な内容を図面の実施例にら
とづいて説明すると、第1図は場所打コンクリート杭の
打設−[程順に(A)〜(11)まであられした掘削杭
穴の縦断面を表しだらのである。(Example) Below, the specific contents of the present invention will be explained based on the embodiments of the drawings. It shows a vertical cross-section of the excavated pile hole.
第2図は第1図の打設工程順の〔1〕)〜(II)まで
の掘削杭穴の任意の位置(b−b〜「−「)の横断面を
表したらのである。FIG. 2 shows a cross section at arbitrary positions (bb to ``-'') of the excavated pile holes from [1] to (II) in the order of the driving process in FIG. 1.
第3図は、第1図の打設工程順の(D)〜(F )まで
の杭体4と(i成鉱大5SWの明細な説明を図(d)〜
(g)に、そして杭体イの揺動I9.20によるフロー
トバルブY、シールt)とコンクリート12の明細な働
きを図(1)〜(4)に示している。Figure 3 shows a detailed explanation of the pile body 4 (D) to (F) in the order of the driving process in Figure 1 and the detailed description of the pile bodies 4 (i) to (D) to (F) in the order of the driving process in Figure 1.
(g), and detailed functions of the float valve Y, seal t) and concrete 12 due to the rocking I9.20 of the pile body A are shown in Figures (1) to (4).
また図(h)は杭の構築工程が終了しコンクリート12
が硬化し杭体が中空コンクリート抗となっている状態を
示す。Figure (h) shows concrete 12 after the pile construction process has been completed.
This shows the state in which the pile has hardened and the pile body has become a hollow concrete shaft.
第1図において図(A)は最も一般的な掘削り段として
安定液を供給しながら掘削゛4゛るアースドリル工法の
拡底掘削により掘削した杭穴I!の縦断面をあられしだ
らのであって、この状態においては安定液1が満たされ
ており、開[]縁部にはIJ≦地盤の崩壊を防ぐためト
ップケーシング8が、かん装されている。In Figure 1, diagram (A) shows the pile hole I which was excavated by the earth drilling method, which is the most common method of drilling, while supplying stabilizing liquid. The vertical cross section of the casing is shown as a raindrop, and in this state it is filled with a stabilizing liquid 1, and a top casing 8 is installed at the open edge to prevent IJ≦ground collapse.
図(r3)は該トップケーシング8内に、あらかごめγ
1°底のフレキシブルチューブ2を外周側面に蛇腹状に
たぐり込んだチューブケーンングバイブ9を装入し、−
り記フレキシブルヂューゾ2の底面が安定液上面にある
ことを示す。Figure (r3) shows that inside the top casing 8, there is an Arakagome γ
Insert the tube caning vibe 9 in which the flexible tube 2 with a bottom of 1° is recessed into the outer peripheral side in a bellows shape, and -
This shows that the bottom surface of the flexible duplexer 2 is on the top surface of the stabilizing liquid.
図(C)は有底拡大fi<Wをフレキシブルチューブ2
を介して抗底部に向ljて蛇腹状のフレキシブルチュー
ブを解きながら装入しモルタルコンクリート12を打設
している状態をしめず。又同時にポンプ10によってγ
f底底入大部同等の体積の安定液fを掘削杭穴If外へ
くみ出している状態をしめしている。第2図の(D)
b−bi、t(r成鉱大部Wに組み込まれている杭体4
にモルタルコンクリ−)12が充填されている状態を示
す。Figure (C) shows the bottomed enlarged fi < W of the flexible tube 2.
A bellows-shaped flexible tube is unraveled and charged toward the bottom of the trench through the mortar concrete 12, and the state in which mortar concrete 12 is being poured is not closed. At the same time, the pump 10
The figure shows a state in which a volume of stabilizing liquid f equivalent to the volume of the bottom part of f is pumped out of the excavated pile hole If. (D) in Figure 2
b-bi, t (r Pile body 4 incorporated in the main part W
12 is shown filled with mortar concrete 12.
図(D)は(−i成鉱大部Wに杭体4を抗接続部Rで接
続し杭穴i!底部の支持地盤までフレキシブルチューブ
2をほどきながら装入し同時に杭体4と同等の体積の安
定液1をポンプIOによって掘削杭穴I(外へくみだし
コンクリート12を杭体4に打設している状態を示して
いる。Diagram (D) shows (-i) Pile body 4 is connected to forming ore large part W by anti-connection part R, and the flexible tube 2 is unraveled and charged to the supporting ground at the bottom of the pile hole i! At the same time, it is equivalent to pile body 4. The figure shows a state in which a volume of stabilizer 1 is pumped out of the excavated pile hole I (outside) by a pump IO, and concrete 12 is poured into the pile body 4.
第2図の(D)c〜Cは有底拡大部Wの内部構造を示し
、そこにコンクリート12が充填されていて拡大面の状
態を示している。(D) c to C in FIG. 2 show the internal structure of the bottomed enlarged part W, which is filled with concrete 12 and shows the state of the enlarged surface.
図(E)は掘削杭長をあらかじめ計測した長さの杭を接
続し杭体4内部にP定数’dのコンクリート12を打設
しコンクリートとベントナイト液の混合防止のプランジ
ャー〇をコンクリートI2の]二に乗せ杭体4をクレー
ン等で吊り上げ後、徐々に杭穴底部1(に向けて吊り下
ろしa成鉱大部Wを拡大させコンクリート12をフレキ
シブルチューブ2内に排出さUる。ベントライト液lを
フレキシブルチューブ2を介して抗頭部へ押し上げポン
プ10で杭体内部から排出されたコンクリート12と同
値のベントナイト液を杭体内部のコンクリートを加圧す
べく杭体内部に送水している。この場合の加圧するらの
は清水または圧縮空気でら可能である。Figure (E) shows that the excavated pile length is connected to the piles whose length was measured in advance, concrete 12 with P constant 'd is poured inside the pile body 4, and the plunger 〇 to prevent mixing of the concrete and bentonite liquid is inserted into the concrete I2. ] After the pile body 4 is lifted by a crane or the like, it is gradually lowered toward the bottom 1 of the pile hole to enlarge the bulk part W of the a-forming ore and discharge the concrete 12 into the flexible tube 2. The liquid 1 is pushed up to the pile head via the flexible tube 2, and bentonite liquid having the same value as the concrete 12 discharged from the inside of the pile body is sent into the pile body by a pump 10 in order to pressurize the concrete inside the pile body. The pressurizer in this case can be fresh water or compressed air.
第2図(1シ)d−dは杭穴Hとフレキシブルチューブ
2の11旧こ安定液Iがq在し、また杭体イの内部にら
安定液!が充填されていることを示゛4゛。In Figure 2 (1) d-d, there is a stabilizing liquid I in the pile hole H and the flexible tube 2, and there is also a stabilizing liquid inside the pile body A! 4 indicates that it is filled.
第1図(e)は杭体4の内部に取り付けられた、フロー
トバルブYとソールPの働きは杭体4の揺動19によっ
てフロートバルブYが開き流動4゛るコンクリートI2
を圧力差によって杭体外部へ排出している状態を示し、
フ【1−トバルブYが開き、シールPがフンクリート1
2中で開き杭体4と共に揺動19の方向へコンクリート
を押し−Lげでいる伏@をしめしている。Fig. 1(e) shows the function of the float valve Y and sole P installed inside the pile body 4. The float valve Y opens due to the swing 19 of the pile body 4, and the concrete I2 flows 4.
is discharged to the outside of the pile body due to the pressure difference.
Foot [1] The foot valve Y opens, and the seal P
2, the concrete is pushed in the direction of the swing 19 together with the pile body 4, and the concrete is pushed downward.
図(F)はクレーン等によって杭体4を」−上揺動20
し杭体外部へのコンクリートI2の充填を促進し抗頭部
近くまでコンクリート12が充填された状態をしめして
いる。Figure (F) shows the pile body 4 being moved upward by a crane, etc.
The figure shows a state in which the filling of the concrete I2 to the outside of the pile body is promoted and the concrete 12 is filled up to the vicinity of the pile head.
第1図(「)は杭体4の内部に取り付けられたフロート
バルブYと7−ルl)の働きは杭体4のに上揺動20に
よってフロートバルブYが閉じて揺動19によって杭体
4の外部に排出されたコンクリートI2を杭体4の重I
i1と、杭体内部のコンクリート12の4i blそし
て、ベントナイト液1の爪!J1のPnIこよりて揺動
19と揺動20を繰り返すことでコンクリート12を抗
頭部まで押し上げることができ、杭体−「aの和によっ
てコンクリート12かシールr〕を上方へ押し曲げた状
態を示しスムーズにコンクリート!2が]ニガに圧送さ
れている状@を示している。Figure 1 () shows the function of the float valve Y and the float valve Y installed inside the pile body 4. When the pile body 4 moves upward, the float valve Y closes due to the upward swing 20, and when the pile body The concrete I2 discharged to the outside of pile body 4 is
i1, 4i bl of concrete 12 inside the pile body, and nail of bentonite liquid 1! By repeating rocking 19 and rocking 20 from the PnI of J1, the concrete 12 can be pushed up to the counter head, and the pile body - "concrete 12 or seal r depending on the sum of a" is pressed upward and bent. It shows that the concrete!2 is being pumped smoothly into the concrete.
図(G)はフレキシブルチューブ2のに4開1−1部に
接合させていたヂューブケーシングバイプ9を取り除き
、杭先端を50ernらしくはイj底拡大1亙(Wの抗
i条の長さ以し+支F¥地盤に1′j人させるべく、抗
頭部を打撃しリバウンドを計測し支持力を確認したあと
、フレキシブルチューブ2と杭体4とを仕口の位置で切
断する。In Figure (G), the tubular casing pipe 9 that had been joined to the 4-opening 1-1 part of the flexible tube 2 has been removed, and the tip of the pile has been expanded to 1.5 mm (the length of the resistance line of W). Then, after hitting the counter head and measuring the rebound to confirm the supporting capacity, the flexible tube 2 and the pile body 4 are cut at the joint position in order to make the support F\ 1'j people on the ground.
図(11)は杭体4の外ffsに打ち込まれたコンクリ
ート■2が硬化コンクリートI4となった後、内部の安
定液1をポンプIOで杭体4の外へくみ出し、抗頭処理
をおこないケーシングバイブ8を引き抜いて中空拡底場
所打既製品コンクリート杭の構築を完了するiBをしめ
している。Figure (11) shows that after the concrete ■2 poured into the outside ffs of the pile body 4 becomes hardened concrete I4, the internal stabilizing liquid 1 is pumped out of the pile body 4 using a pump IO, and the head treatment is performed to form a casing. This shows iB pulling out Vibe 8 to complete the construction of a hollow-bottomed, cast-in-place concrete pile.
第2図(II) r −flirt°底拡大部W成鉱大
し充填されたコンクリート12が硬化コンクリート」4
となり、杭体4の内1くには硬化コンクリートが存在せ
ず中空拡底杭の状態を示している。Fig. 2 (II) r -flirt° Bottom expansion part W Concrete 12 filled with ore is hardened concrete.
Therefore, there is no hardened concrete in one of the pile bodies 4, indicating the condition of a hollow expanded-bottom pile.
第3図(11)は杭体4の先端にコンクリート12を充
填した存成鉱人11りWの外部を示し、フレキシブルチ
ューブ2を介して掘削杭底11のベントナイト液1の中
に装入された状@をしめす。FIG. 3 (11) shows the outside of the existing ore 11 W filled with concrete 12 at the tip of the pile body 4, which is charged into the bentonite liquid 1 in the excavated pile bottom 11 via the flexible tube 2. Shows the shape of @.
図(+)は(T成鉱大部Wの拡大機構の未拡大状四の内
部を示す。Figure (+) shows the inside of the unexpanded state 4 of the expansion mechanism of the large part W of the T-forming ore.
図(e)は杭体4の先端により有底拡大1wを開く初期
状態を示し短冊状の拡大機構の接合部からコンクリート
12が流れ出て(f底フレキシブルチューブ2の中で拡
底杭穴!1の底面からコンクリート12が充填され、比
重差によってベントナイト液Iを拡底杭穴11の上ff
i地上へ押し上げ始めている状態を示している。Figure (e) shows the initial state in which the bottomed expansion 1w is opened by the tip of the pile body 4, and the concrete 12 flows out from the joint of the rectangular expansion mechanism (f). Concrete 12 is filled from the bottom, and bentonite liquid I is poured into the bottom of the pile hole 11 due to the difference in specific gravity.
i This shows that it is starting to be pushed up to the ground.
図(2)は杭体4により白″成鉱大部Wの拡大機hl’
lK’を押し開き拡大機構に!らそれによって開き始め
た状態を示している。またイf成鉱大部Wの杭体4内部
に取り付けられたフロートバルブYが開いて杭体内部の
コンクリート12が矢印の方向へ排出されることをしめ
し、このときシールr)はフレキシブルチューブ2によ
って閉じている。Figure (2) shows an expanding machine hl' for large part of white ore W using pile body 4.
Push lK' open and use it as an enlargement mechanism! This shows the state in which it has begun to open. It also shows that the float valve Y attached to the inside of the pile body 4 of the main part W of the ore is opened and the concrete 12 inside the pile body is discharged in the direction of the arrow. Closed by.
図(r)は杭体4の先端によりf「成鉱大部Wが開いた
状態を示し、【f成鉱大1<wの底部を杭体4によって
支持地盤に打撃し共に貫入した状態を示し、引き続きコ
ンクリートI2が充填されベントナイト液を押し上げた
状態を示している。Figure (r) shows the state in which the large part of the ore W is opened by the tip of the pile body 4, and the state in which the bottom part of the part of the ore in which the part of the ore of f1<w is struck by the pile body 4 and penetrates together. This shows a state in which concrete I2 is subsequently filled and the bentonite liquid is pushed up.
図(3)は有底拡大部Wが完全に杭体4により開かれ拡
大が完rし、(4成鉱大部Wの底部と杭体4とが共に支
持地盤に打9:ri人した状態を示している。またこの
ときソール■)はコンクリート+2の中で開いている。Figure (3) shows that the bottomed expansion part W has been completely opened by the pile body 4 and the expansion has been completed (the bottom of the four-formed ore large part W and the pile body 4 have both been driven into the supporting ground for 9 hours). The state is shown. Also, at this time, the sole (■) is open in the concrete +2.
図(g)は支持地盤にl′j人した(T成鉱大、1wを
貫入した状態のままで杭体4を任αの高さまで引き上げ
た状態を示しているが、杭体4を任意の高さまで上下さ
けることにより杭体4とフレキシブルチューブ2との間
にコンクリート12の充填が円滑に促進される。Figure (g) shows the state in which the pile body 4 has been raised to the height of α with the support ground still penetrated by 1 w. By spacing the concrete 12 vertically to a height of , filling of the concrete 12 between the pile body 4 and the flexible tube 2 is promoted smoothly.
図(4)は支持地盤に1人した(j−底入大部Wを貝大
した状態のまま杭体4を任意の高さまで引き」二げイ1
゛成鉱大部Wが拡大されたままの状態を示していて、杭
体内部と杭体外部のFE力差で)a−トバルブYが開い
た状態になり、引き続きコンクリートI2が杭体4とフ
レキシブルチューブ2の間に充填される。またソール■
)がコンクリート12の中で開いてコンクリートの充填
を促進する。Figure (4) shows one person on the supporting ground (J-Pull the pile body 4 to an arbitrary height with the bottom part W kept in a shell-sized state).
This shows the state in which the large ore section W remains enlarged, and due to the FE force difference between the inside of the pile body and the outside of the pile body) the a-to valve Y is opened, and the concrete I2 continues to connect with the pile body 4. It is filled between the flexible tubes 2. Also sole
) open in the concrete 12 to facilitate filling of the concrete.
図(h)は杭体イが」−下したのらコンクリート■2が
a成鉱大部Wと杭体4の杭頭部外周の高さまで充填され
硬化後のコンクリート14となり、杭体4内部は中空を
示しており、杭体4の所定の位置に取り付けられた帯I
tは杭体4の打撃によって(j成鉱大部Wを上部から支
持地盤に固定する事を示し、(T成鉱大部Wが杭体4の
杭先端を閉塞している状態で中空拡底杭が構築されてい
る。杭体4の上部と下部の接続部Rはネジ込み式、もし
くは杭体の接続を電気溶接などでおこなうようにしてら
同様の結果が得られる。Figure (h) shows that after the pile body A has been lowered, the concrete ■2 is filled up to the height of the outer circumference of the pile head of the pile body W and the pile body 4, and hardened concrete 14 is formed inside the pile body 4. indicates a hollow area, and the belt I attached to a predetermined position of the pile body 4
t indicates that by the impact of the pile body 4 (J), the large ore body W is fixed from the upper part to the supporting ground; A pile is constructed.A similar result can be obtained by using a screw-in type connection R between the upper and lower parts of the pile body 4, or by electric welding or the like to connect the pile bodies.
さらに11を記実施例では杭の施工にあたり杭体4に鋼
管を用いたが、目的如何によっては杭体と成りうる物で
あれば必ずしもそれを限定しない。Furthermore, in the embodiment described in 11, a steel pipe was used for the pile body 4 when constructing the pile, but it is not necessarily limited to any material as long as it can be used as a pile body depending on the purpose.
(発明の効果)
本発明は」二足したように、拡底掘削杭穴内に有底のフ
レキシブルチューブと無底のフレキシブルチューブを介
して有底拡大部を取り付けた杭体を拡底掘削杭穴の底部
に向けて装入し、杭体の内部にコンクリートを打設しつ
つ杭体を拡底掘削された支持地盤において有底拡大部を
拡大させる中空拡底場所打既製品コンクリート抗を構築
する場合において、掘削杭穴内に(f底のフレキシブル
チュブを介して杭体の内部にコンクリートを打設するよ
うにしたために、掘削穴のポーリング時に用いた安定液
と打設コンクリートとが直接に接触することがなく、安
定液による。・ト影響をうけないため他の]二法による
水中コンクリート抗に比べて格段の強度の向」、がみら
れ、しかもその強度向」二分だけ杭を細くしてコンクリ
ート等の使用量を節減することができ、そのうえ杭体内
部に取り付けたフロートバルブを杭体揺動によって連動
して開閉させることにより、場所打杭でありながら中空
拡底杭が構築できるため同径の場所打杭と比較しても非
常に[!i’を化された杭となる。また使用するフレキ
シブルチューブを表面滑性に優れた材質のらのを二重に
して使用した場合には、開削地盤の帖第1図は本発明の
一実施例である中空拡底場所性土に発生するネガティブ
フリクシタンを8しく減衰さ什ることができ、フレキシ
ブルチューブの長さを調節4−ることによって摩損効果
も期涛できるので杭のESM支持力をコントa−ル出来
る。(Effects of the Invention) The present invention provides a pile body in which a bottomed flexible tube is attached to an expanded bottomed pile hole via a bottomed flexible tube and a bottomed expanded portion is attached to the bottom of an expanded bottomed pile hole. When constructing a hollow-bottomed, cast-in-place concrete shaft, the bottomed expansion part is expanded in the support ground where the pile body is expanded and the concrete is cast into the inside of the pile body. Because the concrete is placed inside the pile body through the flexible tube at the bottom of the pile hole, there is no direct contact between the stabilizing liquid used when polling the excavated hole and the poured concrete. Because it is not affected by the stabilizing liquid, it has a much higher strength than underwater concrete piles made by the other two methods, and it is possible to thin the pile by half and use concrete, etc. In addition, by opening and closing the float valve installed inside the pile body in conjunction with the rocking of the pile body, it is possible to construct a hollow expanded pile even though it is a cast-in-place pile, so it is possible to construct a hollow expanded pile with the same diameter. Even compared to the pile, it becomes a very smooth pile.Also, if the flexible tube used is double layered with lana, which is a material with excellent surface smoothness, Figure 1 shows an embodiment of the present invention, which can attenuate the negative flexibility generated in hollow-bottomed local soil by 80%, and also prevent abrasion effects by adjusting the length of the flexible tube. Since it can be undulated, the ESM bearing capacity of the pile can be controlled.
さらに施工中においてら地Fの被圧水による悪影響をう
けろことがないので十分な支持力が確保され、支持層に
構築された拡底部は機械的に拡大し、杭先端が有底拡大
部の底部によって閉塞され支持力確認のリバウンドが取
れ、また杭底のスライムの影響が甚だ少ないため場所打
杭でイjりながら設計通りの杭の支持力が確保され、不
等沈ドの防+1−に非常に役立つものである。Furthermore, during construction, sufficient bearing capacity is ensured as there will be no adverse effects from pressurized water in the ground F, and the expanded bottom section built on the support layer will be mechanically expanded, and the tip of the pile will become the bottomed expanded section. It is blocked by the bottom of the pile, allowing rebound to confirm the bearing capacity, and since the influence of slime at the bottom of the pile is extremely small, the bearing capacity of the pile as designed is ensured even though it is difficult to use cast-in-place piles, and uneven settlement is prevented by +1. - It is very useful.
打既製品コンクリート杭の施工方法を施工順に表した縦
断面図である。
第2図は第1図における各断面箇所を拡大して表した断
面図である。
第3図は第1図の有底拡大部とフレキシブルチューブ内
のコンクリートの動きを断面図で表したものである。
〜 拡底部111抗六 2 〜 安定液〜フレキ
シブルチューブ(二It)
〜 鉄筋 4〜 !4管
〜 トップケーンングバイプ
〜 デユープケーシングバイブ
〜 ポンプ
〜 コンクリート
硬化コンクリート
(f底入大部
ブランツヤ−
杭体の接続部
揺動方向上
)a−トバルブ
シール
有底拡大部の接続部
揺動方向下
発明と
佐藤
傅FIG. 2 is a vertical cross-sectional view showing the construction method of a cast concrete pile in the order of construction. FIG. 2 is an enlarged cross-sectional view of each section in FIG. 1. FIG. 3 is a cross-sectional view showing the movement of concrete in the expanded bottomed part and flexible tube in FIG. 1. ~ Expanded bottom part 111 anti-six 2 ~ Stabilizing liquid ~ Flexible tube (2 It) ~ Reinforcing bar 4 ~! 4 pipes ~ Top caning vipe ~ Duplex casing vibe ~ Pump ~ Concrete hardened concrete (F bottom-in large blunt shaft - Up in the swinging direction of the connection part of the pile body) Invention of motion direction and Fu Sato
Claims (12)
いて、拡底杭となる杭体の有底拡大部を掘削杭穴内に無
底のフレキシブルチューブと有底のフレキシブルチュー
ブを介して掘削杭底に向けて装入し、杭体の内部にコン
クリートを打設するようにした中空拡底場所打既製品コ
ンクリート杭の施工法。(1) When constructing a hollow expanded pile in an expanded bottom excavated pile hole, the expanded bottomed part of the pile body that will become the expanded bottom pile is inserted into the excavated pile hole via a bottomless flexible tube and a bottomed flexible tube. A construction method for hollow, expanded-bottom ready-cast concrete piles in which concrete is poured into the interior of the pile body.
いて、掘削杭穴内へ無底のフレキシブルチューブと有底
のフレキシブルチューブを二枚重ねにして装入後、その
有底フレキシブルチューブ内に拡底杭となる杭体の有底
拡大部と杭体を拡底掘削底部に向けて装入した後、コン
クリートを打設するようにした請求項(1)記載の中空
拡底場所打既製品コンクリート杭の施工法。(2) When constructing a hollow expanded pile in an expanded-bottomed excavated pile hole, after charging two layers of bottomless flexible tubes and bottomed flexible tubes into the excavated pile hole, insert the bottomed expanded pile into the bottomed flexible tube. The method for constructing a hollow, expanded-bottom, ready-cast concrete pile according to claim 1, wherein the concrete is poured after the bottomed expanded portion of the pile body and the pile body are charged toward the bottom of the expanded-bottomed excavation.
いて、掘削杭穴内にあらかじめ無底のフレキシブルチュ
ーブと有底フレキシブルチューブを二枚重ねし、有底の
フレキシブルチューブ内の拡底杭の有底拡大部と杭体へ
コンクリートを打設しつつ、そのフレキシブルチューブ
と杭体を一緒に順次掘削杭穴底部に向けて装入させるよ
うにした請求項(1)記載の中空拡底場所打既製品コン
クリート杭の施工法。(3) When constructing a hollow expanded pile in an expanded-bottomed excavated pile hole, a bottomless flexible tube and a bottomed flexible tube are stacked in advance in the excavated pile hole, and the bottomed expanded portion of the expanded-bottomed pile is inside the bottomed flexible tube. The hollow expanded-bottom ready-cast concrete pile according to claim (1), wherein the flexible tube and the pile body are sequentially charged toward the bottom of the excavated pile hole while pouring concrete into the pile body. Construction method.
いて、掘削杭穴内にあらかじめ無底のフレキシブルチュ
ーブと有底のフレキシブルチューブを二枚重ねにし、有
底のフレキシブルチューブを介して有底拡大部と杭体を
掘削杭底に向け装入させ、杭の有底拡大部と杭体の外周
頭部まで流動性の高いコンクリートを充填しやすくする
ため、杭体外周部の任意の場所に複数個の成型の自在シ
ールを取り付けることによって杭穴と杭体の間で杭体が
上下することでコンクリートを杭頭部まで押し上げる機
能を取り付け杭体外周部に円滑にコンクリートを打設す
るようにした請求項(1)記載の中空拡底場所打既製品
コンクリート杭の施工法。(4) When constructing a hollow expanded pile in an expanded-bottomed excavated pile hole, a bottomless flexible tube and a bottomed flexible tube are stacked in advance in the excavated pile hole, and the bottomed expanded portion is connected to the bottomed expanded portion through the bottomed flexible tube. In order to charge the pile body toward the bottom of the excavated pile, and to make it easier to fill the concrete with high fluidity up to the expanded bottomed part of the pile and the top of the outer periphery of the pile body, multiple A claim in which a moldable flexible seal is installed to allow the pile body to move up and down between the pile hole and the pile body, thereby pushing up concrete to the pile head, so that concrete can be poured smoothly around the outer periphery of the pile body. (1) Construction method for hollow expanded-spot ready-cast concrete piles.
いて、拡底杭となる杭体の有底拡大部を掘削杭穴内に無
底のフレキシブルチューブと有底のフレキシブルチュー
ブを介して装入後、有底拡大部と杭体にコンクリートを
打設し、拡底杭先端を杭体によって機械的に拡大すべく
有底拡大部の内部に拡大機構を取りつけ、杭先端の杭体
外周に向け全方向に広がり拡大機構その物が杭構造体に
なるようにした請求項(1)記載の中空拡底場所打既製
品コンクリート杭の施工法。(5) When constructing a hollow expanded pile in an expanded-bottomed excavated pile hole, after inserting the expanded bottomed part of the pile body that will become the expanded-bottomed pile into the excavated pile hole via a bottomless flexible tube and a bottomed flexible tube. , concrete is poured into the bottomed expansion part and the pile body, and an expansion mechanism is installed inside the bottomed expansion part to mechanically expand the bottomed expansion pile tip by the pile body, and the expansion mechanism is installed inside the bottomed expansion part, and the expansion mechanism is installed in all directions toward the outer periphery of the pile body at the pile tip. The method for constructing a hollow, bottom-expanding, cast-in-place ready-made concrete pile according to claim (1), wherein the expanding mechanism itself is a pile structure.
いて、拡底杭となる杭体の有底拡大部を掘削杭穴内に無
底のフレキシブルチューブと有底のフレキシブルチュー
ブを介して掘削杭底に向けて装入し、杭体内部にコンク
リートを打設し、杭先端の有底拡大部を杭体の揺動加圧
により有底フレキシブルチューブ内において拡大させ、
杭体内部に打設されたコンクリートは拡底掘削部におい
て有底拡大部の短冊状に作られた接合部が開き、その拡
大された接合部から流動性の高いコンクリートを排出さ
せ、コンクリート2.3とベントナイト液1.1の比重
差によってベントナイト液を押しあげコンクリートが掘
削杭底部から充填され、杭体内部のコンクリートを補充
することにより掘削杭穴の杭体の外周側面頭部までコン
クリートを充填させるようにした請求項(1)記載の中
空拡底場所打既製品コンクリート杭の施工法。(6) When constructing a hollow expanded pile in an expanded-bottomed excavated pile hole, the expanded bottomed part of the pile body that will become the expanded-bottomed pile is inserted into the excavated pile bottom through a bottomless flexible tube and a bottomed flexible tube. Concrete is placed inside the pile body, and the bottomed expanding part at the tip of the pile is expanded in the bottomed flexible tube by the swinging pressure of the pile body.
Concrete placed inside the pile body opens at the bottomed expanded section in the expanded bottom excavation section, where the strip-shaped joint is opened, and highly fluid concrete is discharged from the expanded joint, resulting in concrete 2.3. Due to the difference in specific gravity between the bentonite liquid and the bentonite liquid (1.1), the bentonite liquid is pushed up and concrete is filled from the bottom of the excavated pile, and by replenishing the concrete inside the pile body, the concrete is filled up to the top of the outer periphery of the pile body in the excavated pile hole. A method for constructing a hollow, expanded-bottom, cast-in-place concrete pile according to claim (1).
いて、拡底杭となる杭体の有底拡大部を掘削杭穴内に無
底のフレキシブルチューブと有底のフレキシブルチュー
ブを介して掘削杭穴底部に向けて装入し、杭体内部にあ
らかじめ打設されたコンクリートを拡大部から排出させ
掘削孔内に充填後、杭体の支持力を確認すべくリバウン
ドを取るために杭体を杭穴底部に向けて打撃する力を利
用して、杭穴底部に残ったスライムを有底拡大部の底部
で厚密処理をするようにした請求項(1)記載の中空拡
底場所打既製品コンクリート杭の施工法。(7) When constructing a hollow expanded pile in an expanded-bottomed excavated pile hole, the expanded bottomed part of the pile body that will become the expanded-bottomed pile is inserted into the excavated pile hole via a bottomless flexible tube and a bottomed flexible tube. After charging toward the bottom and discharging the concrete previously placed inside the pile body from the enlarged part and filling it into the excavated hole, the pile body is inserted into the pile hole in order to take rebound in order to check the bearing capacity of the pile body. The hollow expanded-bottom cast-in-place ready-made concrete pile according to claim (1), wherein the slime remaining at the bottom of the pile hole is thickened at the bottom of the bottomed expansion part by using the force of impact toward the bottom. construction method.
いて、拡底杭となる杭体の有底拡大部を掘削穴内に無底
のフレキシブルチューブと有底のフレキシブルチューブ
を介して掘削底部に向け装入しながらコンクリートを打
設し、拡底杭の有底拡大部を拡大させ流動性の高いコン
クリートを有底のフレキシブルチューブ内に排出させた
コンクリートとベントナイト液の比重の差により杭底部
からフレキシブルチューブを介して地上に向け押し上げ
るので、そのときコンクリートとベントナイト液が直接
に接しないようにした請求項(1)記載の中空拡底場所
打既製品コンクリート杭の施工法。(8) When constructing a hollow expanded pile in an expanded-bottomed excavated pile hole, direct the expanded bottomed part of the pile body that will become the expanded-bottomed pile toward the bottom of the excavation through the bottomless flexible tube and the bottomed flexible tube in the excavated hole. Concrete is placed during charging, the bottomed expansion part of the expanded bottom pile is expanded, and highly fluid concrete is discharged into the bottomed flexible tube.Due to the difference in specific gravity between the concrete and bentonite liquid, the flexible tube is released from the bottom of the pile. 2. The method for constructing a hollow, expanded-bottom, cast-in-place concrete pile according to claim 1, wherein the concrete and the bentonite liquid are not brought into direct contact with each other at that time.
いて、拡底杭となる杭体の有底拡大部を掘削穴内に無底
のフレキシブルチューブと有底のフレキシブルチューブ
を介して掘削穴底部に向け装入しながらコンクリートを
打設し杭穴底部で有底拡大部を杭体の加圧によって拡大
させ、有底拡大部の底と杭体先端の支持面とが拡底掘削
杭穴底部において一体となり、支持力確認のリバウンド
を行うとき、杭先端が閉塞されるようにした請求項(1
)記載の中空拡底場所打既製品コンクリート杭の施工法
。(9) When constructing a hollow expanded pile in an expanded-bottomed excavated pile hole, the expanded bottomed part of the pile body that will become the expanded-bottomed pile is inserted into the excavated hole via a bottomless flexible tube and a bottomed flexible tube to the bottom of the excavated hole. Concrete is cast while charging to the bottom of the pile hole, and the expanded bottomed part is expanded by the pressure of the pile body, and the bottom of the expanded bottomed part and the supporting surface of the tip of the pile body are integrated at the bottom of the expanded bottom excavated pile hole. Therefore, when performing rebound to confirm bearing capacity, the tip of the pile is closed (claim 1).
) Construction method for hollow-bottomed, cast-in-place concrete piles.
おいて、拡底杭となる杭体の有底拡大部を掘削杭穴内に
無底のフレキシブルチューブと有底のフレキシブルチュ
ーブを介して掘削杭穴底部に向け装入しながらコンクリ
ートを打設し、杭穴底部で杭体により有底拡大部を拡大
させた後、有底拡大部全体と杭体外周部のフレキシブル
チューブと杭体の間に円滑なコンクリートの充填が出来
るよう拡底杭の拡大部の中で任意の高さで杭体が上下す
るようにした請求項(1)記載の中空拡底場所打既製品
コンクリート杭の施工法。(10) When constructing a hollow expanded pile in an expanded-bottomed excavated pile hole, insert the expanded bottomed part of the pile body that will become the expanded-bottomed pile into the excavated pile hole via a bottomless flexible tube and a bottomed flexible tube. Concrete is placed while charging toward the bottom, and after expanding the bottomed expansion part with the pile body at the bottom of the pile hole, the concrete is poured smoothly between the entire bottomed expansion part, the flexible tube on the outer periphery of the pile body, and the pile body. 2. The method for constructing a hollow, expanded-bottom, cast-in-place concrete pile according to claim (1), wherein the pile body is moved up and down at an arbitrary height within the enlarged portion of the expanded-bottomed pile so that the concrete can be filled with concrete.
おいて、拡底杭となる杭体の有底拡大部を掘削杭穴内に
無底のフレキシブルチューブと有底フレキシブルチュー
ブを介して掘削杭穴底部に向けて装入しながらコンクリ
ートを打設し、有底フレキシブルチューブ内の杭穴底部
で杭体により有底拡大部を拡大させるが、計画施工長の
杭体部を任意の長さに、または二枚重ねを一枚にフレキ
シブルチューブを調節する事により杭体周辺の摩擦力を
期待する事もでき、杭の長期支持力の計算上拡底杭先端
は打ち込み杭としての支持力、杭体周辺は摩擦杭として
の支持力が期待できるようにした請求項(1)記載の中
空拡底場所打既製品コンクリート杭の施工法。(11) When constructing a hollow expanded pile in an expanded-bottomed excavated pile hole, the expanded bottomed part of the pile body that will become the expanded-bottomed pile is inserted into the excavated pile hole via a bottomless flexible tube and a bottomed flexible tube to the bottom of the excavated pile hole. Concrete is placed while charging toward By adjusting the flexible tube from two layers to one, it is possible to anticipate the frictional force around the pile body.In calculating the long-term bearing capacity of the pile, the tip of the expanded bottom pile has the bearing capacity as a driven pile, and the area around the pile body is a friction pile. The method for constructing a hollow, expanded-bottom, cast-in-place concrete pile according to claim (1), which can be expected to have a supporting capacity as high as possible.
おいて、掘削杭穴内へ無底のフレキシブルチューブと有
底のフレキシブルチューブを介して杭体を掘削杭底に向
けて装入後、フレキシブルチューブ内において有底拡大
部が拡大し、そこから排出されたコンクリートが杭体の
揺動により、あらかじめ有底拡大部の杭体内部に取り付
けられたフロートバルブによって遮断され、杭体内部に
打設されたコンクリートをフレキシブルチューブと杭体
の間にコンクリートとベントナイト液の比重差により充
填し、杭体の上下揺動によってフロートバルブを開閉し
掘削杭穴の地盤にフレキシブルチューブと杭体との間に
コンクリートを杭体全体の重量を利用して充填できるよ
うにし、杭体の内部が中空になり杭体の軽量化と共にコ
ンクリートの節約が計れ、フレキシブルチューブとコン
クリートが杭体外周を保護し杭体の腐食を防止するよう
にした請求項(1)記載の中空拡底場所打既製品コンク
リート杭の施工法。(12) When constructing a hollow expanded pile in an expanded-bottomed excavated pile hole, after inserting the pile body into the excavated pile hole through a bottomless flexible tube and a bottomed flexible tube toward the bottom of the excavated pile, the flexible tube The bottomed expansion part expands inside the pile, and the concrete ejected from it is blocked by the float valve installed inside the pile body in advance due to the rocking of the pile body, and is poured into the pile body. Fill the space between the flexible tube and the pile with concrete based on the difference in specific gravity between the concrete and bentonite liquid, and open and close the float valve by vertically swinging the pile to fill the concrete between the flexible tube and the pile in the ground of the excavated pile hole. The inside of the pile is hollow, which reduces the weight of the pile and saves on concrete.The flexible tube and concrete protect the outer periphery of the pile, preventing corrosion of the pile. The method for constructing a hollow, expanded-bottom cast-in-place ready-made concrete pile according to claim (1), which prevents.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP4448289A JPH02225714A (en) | 1989-02-23 | 1989-02-23 | Construction method of hollow bottom expansion cast-in-place ready-made concrete pile |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP4448289A JPH02225714A (en) | 1989-02-23 | 1989-02-23 | Construction method of hollow bottom expansion cast-in-place ready-made concrete pile |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH02225714A true JPH02225714A (en) | 1990-09-07 |
Family
ID=12692760
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP4448289A Pending JPH02225714A (en) | 1989-02-23 | 1989-02-23 | Construction method of hollow bottom expansion cast-in-place ready-made concrete pile |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH02225714A (en) |
-
1989
- 1989-02-23 JP JP4448289A patent/JPH02225714A/en active Pending
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH06136745A (en) | Construction method for hollow widened bottom cast-in-place concrete pile | |
| US3499293A (en) | Method and apparatus for forming underground construction in situ | |
| US1993291A (en) | Retaining wall | |
| BR112013005081A2 (en) | SYSTEM TO BUILD A SUPPORT COLUMN AND METHOD OF BUILDING A SUPPORT COLUMN | |
| JP2002061178A (en) | Method of burying existing pile with protrusion in pile installation by inner excavation and foundation pile structure | |
| JPH02225714A (en) | Construction method of hollow bottom expansion cast-in-place ready-made concrete pile | |
| JPS5847823A (en) | Construction of in-place concrete pile | |
| JP2002317594A (en) | Pile hole excavating method, construction method for foundation pile, and soil adhering device to pile hole wall | |
| US5100262A (en) | Expanding base deep foundation system | |
| JPS583091B2 (en) | Construction method for underground column walls | |
| JP7049976B2 (en) | Construction method of Shinbashira | |
| JPH09125389A (en) | Pile construction method | |
| JP2004308411A (en) | Existing concrete pile foundation having large diameter and method for burying existing pile | |
| JPH0776845A (en) | How to lay open caisson | |
| JPH02200913A (en) | Operation method for cast in place ready made concrete pile with expanded bottom | |
| JPS59195925A (en) | Construction of on-site concrete pile | |
| CN108005079B (en) | Implanted precast pile grouting device and implanted grouting process | |
| JPH0230807A (en) | Execution of cast-in-place concrete piling work | |
| KR20210072944A (en) | Slurry wall and construction method for the same | |
| JP2941235B2 (en) | Drilling rig | |
| CN224079102U (en) | Operating system for constructing pre-bored stiffening core composite pile | |
| JPH03233018A (en) | Steel tubular concrete pile | |
| JP7424085B2 (en) | Drainage device and liquid discharge method | |
| JPH0931954A (en) | Corrugated pipe for shaft | |
| JPH02171416A (en) | Construction of steel pipe concrete pile with widened bottom |