JPH02229984A - Embedding method for city water pipe - Google Patents
Embedding method for city water pipeInfo
- Publication number
- JPH02229984A JPH02229984A JP1048991A JP4899189A JPH02229984A JP H02229984 A JPH02229984 A JP H02229984A JP 1048991 A JP1048991 A JP 1048991A JP 4899189 A JP4899189 A JP 4899189A JP H02229984 A JPH02229984 A JP H02229984A
- Authority
- JP
- Japan
- Prior art keywords
- water pipe
- main
- excavated
- city water
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 76
- 238000000034 method Methods 0.000 title claims abstract description 6
- 238000009412 basement excavation Methods 0.000 abstract description 17
- 238000010276 construction Methods 0.000 abstract description 2
- 238000002347 injection Methods 0.000 abstract 1
- 239000007924 injection Substances 0.000 abstract 1
- 239000004576 sand Substances 0.000 description 5
- 239000002689 soil Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000009933 burial Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 239000008399 tap water Substances 0.000 description 1
- 235000020679 tap water Nutrition 0.000 description 1
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
【発明の詳細な説明】
〔産業上の利用分野〕
本発明は道路等の既舗装を破壊することなく、また掘削
土砂の移動を行うことなく、幹線水道管より住戸への分
岐水道管を簡易に埋設する工法に関するものである。[Detailed Description of the Invention] [Field of Industrial Application] The present invention can easily connect branch water pipes from main water pipes to residential units without destroying existing paved roads or moving excavated soil. This is related to the method of burying the underground.
一般に道路下に埋設し・た幹線水道管より各戸に給水す
る場合、この幹線水道管よりほぼ直角方向にある住戸に
向かって分岐水道管を分岐埋設している。この分岐水道
管を住宅の新築等にともない埋設する場合、舖装された
道路を地表面より幹線水道管深度まで作業ピットと共に
掘削している。Generally, when water is supplied to each house from a main water pipe buried under the road, a branch water pipe is buried toward the residential unit almost perpendicular to the main water pipe. When this branch water pipe is to be buried when a new house is being built, a covered road is excavated from the ground surface to the depth of the main water pipe along with a work pit.
このため分岐水道管を後から埋設するためには、その都
度pA装道路を破壊し、所定深度まで掘削している。し
かも埋設される分岐水道管は25關径前後の細いもので
あっても、この分岐水道管埋設作業に要する幅を掘削す
る必要があり、この掘削量は多くなると共に、この溝埋
戻しは掘削土砂は法的に使用できないので、この掘削土
砂は投棄する必要がある。さらに埋戻後道路表面は再舗
装することが必要であり、このため細径の分岐水道管を
埋設するには高価なものとなっている。Therefore, in order to bury a branch water pipe later, the pA road is destroyed and excavated to a predetermined depth each time. Moreover, even if the branch water pipe to be buried is thin, with a diameter of around 25 mm, it is necessary to excavate the width required for burying the branch water pipe, and the amount of excavation increases, and the backfilling of this trench requires excavation. Since the earth and sand cannot be legally used, this excavated earth and sand must be dumped. Furthermore, it is necessary to resurface the road surface after backfilling, making it expensive to bury small-diameter branch water pipes.
本発明では必要以外に11ii装道路を破損することな
く、しかも安価に分岐水道管を埋設することを目的とす
る。The object of the present invention is to bury branch water pipes at low cost without damaging the 11II road beyond necessity.
〔73題を解決するための手段〕
分岐水道管を幹線水道管に連結する位置において主作業
ピットを、またこの幹線水道管に直角線上にある住戸敷
池もしくはその近傍位置に副作業ピットを夫々所要深度
と大きさに掘削すると共に、この主作業ピットから副作
業ピットに向かつ゛C分岐水道管を埋設するための横孔
を先端に高圧ジェットノズルを備えた掘削機を高圧水を
噴04 Lつつ掘削前進させて案内埋設管を順次継ぎ足
して埋設して形成し、両ピット間をIt!I表より所定
深度位置にて貫通せしめ、この案内埋設管内に所要の分
岐水道管を挿通し、その基端を幹線水道管に、他端を屋
内埋設管側に夫々継合する。[Means for solving problem 73] A main work pit is established at the location where the branch water pipe is connected to the main water pipe, and a sub-work pit is located at or near the residence pond located perpendicular to the main water pipe. While excavating to the required depth and size, an excavator equipped with a high-pressure jet nozzle at the tip was used to spray high-pressure water from the main work pit to the sub-work pit through a horizontal hole for burying the C branch water pipe. While excavating, move forward, guide buried pipes are successively added and buried, and it is done between both pits! Penetrate it at a predetermined depth according to Table I, insert the required branch water pipe into this guide buried pipe, and connect its base end to the main water pipe and the other end to the indoor buried pipe side, respectively.
以下本発明を図示の実施例にもとづいて説明する。 The present invention will be explained below based on the illustrated embodiments.
道路下所要深度に埋設されている幹線水道管1より道路
2に面した、もしくは少し離れた土地3の住戸に水道管
を敷設する場合、まずこの幹線水道管1の上方位置で、
かつ分岐水道管を敷設する位置に主作業ピット4を掘削
する。この主作業ピット4は舖装された道路表面よりP
作業あるいはユンボ等の使用による機械掘りにて幹線水
道管を損傷さないようにしてこの水道管埋設位置より少
し深い位置まで、 しかもビッ!・内にて作業が行える
大きさに掘削する。When laying a water pipe to a residential unit on land 3 facing the road 2 or a little away from the main water pipe 1 buried at the required depth under the road, first install it at a position above the main water pipe 1,
A main work pit 4 is also excavated at the location where the branch water pipe will be laid. This main work pit 4 is located at P from the covered road surface.
The main water pipes were excavated a little deeper than the water pipe burial position, without damaging the main water pipes during work or mechanical excavation using tools such as excavators. - Excavate to a size that allows work to be done inside.
またこの主作業ピット4と対向して分岐水道管を敷設す
る敷地、あるいはその近傍の道路等に副作業ピット5を
主作業ピットと同様にして掘削する。この主副両作業ピ
ット4.5を結ぶ直線は幹線水道管に対しほぼ直角とな
るようにして定められる。Further, a sub-work pit 5 is excavated in the same manner as the main work pit, at a site where a branch water pipe is to be laid, or on a road in the vicinity thereof, facing the main work pit 4. A straight line connecting the main and sub-work pits 4.5 is determined to be approximately perpendicular to the main water pipe.
次に幹線水道管位置より少し上方位置で、かつ主作業ピ
ット内壁の一部に向かって掘削機6を配設する。この掘
削機6により掘削孔の掘削方向は主作業ピット4と副作
業ピット5を結ぶ直線に一致するようになす。この分岐
水道管7を埋設する掘削孔lOはこの水道管7よりも少
し大径となるように掘削される。掘削機6は水道水もし
くは高圧ポンプ(図示せず)に高圧ホース61にて接続
された高圧ジェットノズル62を筒状の本体60に設け
、この本体60は外筒63に対し摺動可能に支持される
と共に、外筒63には固定装′I164に支持されてい
る。従ってこのように構成される掘削機6は固定装置6
4にて分岐水道管を埋設する位置の幹線水道管1に固定
する。このとき高圧ジェットノズル62はほぼ水平にし
て副作業ピット5に向かうようにする。次にこのジエヅ
トノズル62に接続された高圧ホース6 1 1:高圧
水を供給すると、ノズル62より高圧ジェット水が噴射
され、これにより掘削が行なわれる。高圧ジェットにて
掘削された土砂は高圧水と共に汚水となり主作業ピット
内に貯る。これをボンブ9にて排水する。Next, the excavator 6 is installed at a position slightly above the main water pipe position and toward a part of the inner wall of the main work pit. The excavation direction of the excavation hole by this excavator 6 is made to coincide with the straight line connecting the main work pit 4 and the sub-work pit 5. An excavated hole IO in which this branch water pipe 7 is buried is excavated so as to have a slightly larger diameter than this water pipe 7. The excavator 6 is provided with a high-pressure jet nozzle 62 connected to tap water or a high-pressure pump (not shown) through a high-pressure hose 61 in a cylindrical main body 60, and this main body 60 is slidably supported on an outer cylinder 63. At the same time, the outer cylinder 63 is supported by a fixing device 'I164. Therefore, the excavator 6 configured in this way has a fixing device 6
At step 4, fix the branch water pipe to the main water pipe 1 at the location where it will be buried. At this time, the high-pressure jet nozzle 62 is made substantially horizontal and directed toward the sub-work pit 5. Next, when high pressure water is supplied to the high pressure hose 6 1 1 connected to this jet nozzle 62, the high pressure jet water is injected from the nozzle 62, thereby performing excavation. The earth and sand excavated by the high-pressure jet becomes sewage together with high-pressure water and accumulates in the main work pit. This is drained using a bomb 9.
このようにして高圧水をジェットノズル62より噴射す
ると、このノズルと対向する土砂は掘削される。所定長
さのみ掘削され・ると次に本体60の後端にこの本体6
0と同径の案内筒65を継ぎ足す。このジェットノズル
の前進による掘削を順次案内筒65の継合にてより行な
い、この掘削孔を副作業ピットまで貫通せしめる。When high-pressure water is injected from the jet nozzle 62 in this manner, the earth and sand facing this nozzle is excavated. Once only a predetermined length has been excavated, the rear end of the main body 60 is
A guide cylinder 65 with the same diameter as 0 is added. Excavation by the forward movement of the jet nozzle is sequentially performed by connecting the guide cylinder 65, and this excavation hole is made to penetrate to the sub-work pit.
掘削孔が主副両作業ピット間に貫通されると高圧ジェッ
トノズルを備えた本体60及び固定装置64を取り外す
が、案内@65は土中に埋設された状態とする。この案
内筒65の内径は11ノ述したように分岐水道管径より
も少し大径となっているので、この案内簡65内に所要
径の分岐水道管を挿通し、その基端側を従来の工法によ
り幹線水道管に接続し、副作業ピット内にある先端を水
道メータ8側に接続する。When the excavation hole is penetrated between the main and sub-work pits, the main body 60 equipped with the high-pressure jet nozzle and the fixing device 64 are removed, but the guide @ 65 remains buried in the soil. As mentioned in Section 11, the inner diameter of this guide tube 65 is slightly larger than the diameter of the branch water pipe, so a branch water pipe of the required diameter is inserted into this guide tube 65, and its proximal end is It is connected to the main water pipe using the construction method, and the tip inside the sub-work pit is connected to the water meter 8 side.
こようにして分岐水道管を上中に予め埋設された案内筒
内に貫通して敷設した後、主作業ピット4内を法律に適
合した土砂にて埋め戻して分岐水道管の埋設工事は完了
するものである。After the branch water pipe is thus laid through the guide tube previously buried in the upper part, the main work pit 4 is backfilled with earth and sand that complies with the law, and the branch water pipe burying work is completed. It is something to do.
なお上記実施例においては分岐水道管の埋設について説
明したが、この管はガス管、その他の管体の埋設にも適
用される。Although the above embodiments have been described with respect to burying branch water pipes, this pipe can also be applied to burying gas pipes and other pipe bodies.
また高圧ジェットノズル62の前進にて土中に岩石やガ
ス管等他の埋設物に衝突した場合、高圧ジェットノズル
による掘削は停止する。このような場合は、その位置か
ら副作業ピット間を地表面より掘削するものとし、この
ような時でも道′IP1表面からの掘削長を可及的に短
くするものである。Further, if the high-pressure jet nozzle 62 collides with other buried objects such as rocks or gas pipes in the soil as it moves forward, excavation by the high-pressure jet nozzle will stop. In such a case, excavation shall be carried out from the ground surface between the sub-work pits from that position, and even in such a case, the excavation length from the road IP1 surface should be made as short as possible.
本発明は分岐水道管を幹線水道管に連結する位置におい
て主作業ピットを、またこの幹線水道管に直角線上にあ
る住戸敷地もしくはその近傍位置に副作業ピットを夫々
所要深度と大きさに掘削すると共に、この主作業ピット
から副作業ピットに向かって分岐水道管を埋設するため
の横孔を先端に高圧ジェットノズルを備えた掘削機を高
圧水を噴射しつつ掘削前進させて案内埋設管を順次継ぎ
足して埋設して形成し、両ピット間を地表より所定深度
位置にて貫通せしめ、この案内埋設管内に所要の分岐水
道管を挿通し、その基端を幹線水道管に、他端を屋内埋
設管側に夫々継合するようになしているため、舗装され
た道路から必要住戸等に分岐水道管を埋設する場合でも
、地a面からの掘削は作業ピット分のみでよいため、必
要以上の舗装を破損せず、かつ分岐水道管埋設位置の地
表からの掘削をも必要としないので埋設工事が簡易に迅
速に行なえると共に、安価に行なえ、更に既設の近隣埋
設管を損傷することなく行える利点がある。The present invention excavates a main work pit at the location where the branch water pipe is connected to the main water pipe, and a sub-work pit to the required depth and size at the residential unit site or in the vicinity thereof, which is perpendicular to the main water pipe. At the same time, an excavator equipped with a high-pressure jet nozzle at the tip of the horizontal hole for burying the branch water pipes from the main work pit to the sub-work pit is moved forward while injecting high-pressure water to excavate and guide the buried pipes one by one. It is formed by connecting and burying it, and it is penetrated between both pits at a predetermined depth from the ground surface, and the required branch water pipe is inserted into this guide buried pipe, its base end is connected to the main water pipe, and the other end is buried indoors. Since the pipes are connected to each other on the pipe side, even if branch water pipes are buried from a paved road to a necessary residence, etc., only the work pit needs to be excavated from the ground level, so there is no need to excavate more than necessary. Since it does not damage the pavement and does not require excavation from the ground surface at the location where the branch water pipe is buried, the burying work can be done easily, quickly, and inexpensively, and it can also be done without damaging existing nearby buried pipes. There are advantages.
第1図は本発明による水道管の埋設工法を示す実施例図
、第2図は掘削機の説明図である。
1は幹線水道管、2は道路、3は土地、 4は主作業ビ
ッ1・、5は副作業ピット、6は掘削機、62は高圧ジ
ェットノズル、 65は案内筒、7は分岐水道管、8は
水道メータ、9はポンプ、10は掘削孔.
?−1
ほか1名FIG. 1 is an embodiment diagram showing a water pipe burying method according to the present invention, and FIG. 2 is an explanatory diagram of an excavator. 1 is the main water pipe, 2 is the road, 3 is the land, 4 is the main work bit 1, 5 is the sub-work pit, 6 is the excavator, 62 is the high pressure jet nozzle, 65 is the guide tube, 7 is the branch water pipe, 8 is a water meter, 9 is a pump, and 10 is a borehole. ? -1 and 1 other person
Claims (1)
主作業ピットを、またこの幹線水道管に直角線上にある
住戸敷地もしくはその近傍位置に副作業ピットを夫々所
要深度と大きさに掘削すると共に、この主作業ピットか
ら副作業ピットに向かって分岐水道管を埋設するための
横孔を先端に高圧ジェットノズルを備えた掘削機を高圧
水を噴射しつつ掘削前進させて案内埋設管を順次継ぎ足
して埋設して形成し、両ピット間を地表より所定深度位
置にて貫通せしめ、この案内埋設管内に所要の分岐水道
管を挿通し、その基端を幹線水道管に、他端を屋内埋設
管側に夫々継合するようになしたことを特徴とする水道
管の埋設工法。(1) Excavate a main work pit at the location where the branch water pipe is connected to the main water pipe, and a sub-work pit to the required depth and size at a location on or near the residential unit site perpendicular to the main water pipe. At the same time, an excavator equipped with a high-pressure jet nozzle at the tip of the horizontal hole for burying the branch water pipes from the main work pit to the sub-work pit is moved forward while injecting high-pressure water to excavate and guide the buried pipes one by one. It is formed by connecting and burying it, and it is penetrated between both pits at a predetermined depth from the ground surface, and the required branch water pipe is inserted into this guide buried pipe, its base end is connected to the main water pipe, and the other end is buried indoors. A method for burying water pipes, characterized by the fact that they are joined to each other on the pipe side.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1048991A JPH02229984A (en) | 1989-03-01 | 1989-03-01 | Embedding method for city water pipe |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1048991A JPH02229984A (en) | 1989-03-01 | 1989-03-01 | Embedding method for city water pipe |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH02229984A true JPH02229984A (en) | 1990-09-12 |
Family
ID=12818691
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1048991A Pending JPH02229984A (en) | 1989-03-01 | 1989-03-01 | Embedding method for city water pipe |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH02229984A (en) |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5826192A (en) * | 1981-08-08 | 1983-02-16 | 日本基礎技術株式会社 | Pipe propelling apparatus |
| JPS621074A (en) * | 1985-02-01 | 1987-01-07 | Hitachi Ltd | parallel image processing processor |
| JPS6278398A (en) * | 1985-09-30 | 1987-04-10 | 住友金属鉱山株式会社 | Attachment pipe construction method |
-
1989
- 1989-03-01 JP JP1048991A patent/JPH02229984A/en active Pending
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5826192A (en) * | 1981-08-08 | 1983-02-16 | 日本基礎技術株式会社 | Pipe propelling apparatus |
| JPS621074A (en) * | 1985-02-01 | 1987-01-07 | Hitachi Ltd | parallel image processing processor |
| JPS6278398A (en) * | 1985-09-30 | 1987-04-10 | 住友金属鉱山株式会社 | Attachment pipe construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108678130A (en) | A kind of non-digging drag pipe construction method | |
| JPH11152986A (en) | Shield excavation protection method for low soil cover | |
| KR100333024B1 (en) | Grouting Horizontal directional drilling method | |
| KR20230047673A (en) | the improvement structure and this formation method of the oscillation work outlet facilitating the input of the propulsion pipe | |
| JP2507827B2 (en) | Underground method of pipe | |
| JP3753647B2 (en) | Open-cut construction method for buried works such as pipes and markers for existing buried objects | |
| JPH10317883A (en) | Ultra-small bore drilling method | |
| JP2773000B2 (en) | Leakage prevention method for unused supply pipes | |
| KR100632971B1 (en) | Self-propelled tip propelled long-distance fume pipe propulsion method and device | |
| CN215491265U (en) | Underground pipe heat exchanger protection structure in foundation pit | |
| JP3110927B2 (en) | Backfill injection method in propulsion method | |
| JPH0426680B2 (en) | ||
| JP2953843B2 (en) | Pipe line laying method by non-cutting propulsion method | |
| JPH11241593A (en) | Prevention method of ground collapse in shield method | |
| KR20060101734A (en) | Non-Standing Directional Pipe Construction Method | |
| JPS603394A (en) | Construction of underground connecting measure | |
| CN107012888B (en) | A kind of tunneling device | |
| JPS6314138B2 (en) | ||
| Mercer | Guided microtunnelling equipment for small-diameter utility installation | |
| JPS61252988A (en) | Method of propulsion construction of small-diameter pipe | |
| KR20240135925A (en) | the connecting apparatus for pipe and the connecting structure for pipe | |
| JP3511429B2 (en) | Replacement of existing buried pipes | |
| JP3464114B2 (en) | Installation method of impermeable wall of gutter pipe | |
| JPS6213480B2 (en) | ||
| JP2900212B2 (en) | Repair method for inner lining of existing piping |