JPH0230809A - Pile press-in apparatus - Google Patents

Pile press-in apparatus

Info

Publication number
JPH0230809A
JPH0230809A JP23528587A JP23528587A JPH0230809A JP H0230809 A JPH0230809 A JP H0230809A JP 23528587 A JP23528587 A JP 23528587A JP 23528587 A JP23528587 A JP 23528587A JP H0230809 A JPH0230809 A JP H0230809A
Authority
JP
Japan
Prior art keywords
piles
press
pile
pile press
moved
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP23528587A
Other languages
Japanese (ja)
Inventor
Akira Oshima
章 大島
Ikuo Yanajima
梁島 郁夫
Osamu Watanabe
修 渡辺
Toru Uchino
徹 内野
Muneo Yoshida
宗生 吉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Nippon Concrete Industries Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Nippon Concrete Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd, Nippon Concrete Industries Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP23528587A priority Critical patent/JPH0230809A/en
Publication of JPH0230809A publication Critical patent/JPH0230809A/en
Pending legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PURPOSE:To secure the press-in force of piles and manage the execution of work ad facilitate the press-in of a plurality of the piles by arranging screw anchors on the periphery of a trestle, and by arranging a plurality of pile press-in oil-pressure jacks on the center movably in the mutually orthogonal direction within a horizontal surface. CONSTITUTION:In the front and rear and to the left and right of a trestle 5, screw anchors 7 are fitted, and on the center, on moving bases 13 which can be horizontally moved in the one direction, in the direction orthogonal to the moving direction of the moving bases 13, pile press-in oil-pressure cylinders 14 are movably set. Then, to the head sections of piles 3 driven previously near a bearing layer, the tresle 5 is moved by a crawler 4, and is fixed with the screw anchors 7 and after that, by the cylinders 14, the piles 3 are pressed-in. When there are a plurality of the piles 3, then the crawler 4 is moved to a proper position, and the movement of the respective cylinders 14 is regulated, and the cylinders 14 are exactly accommodated to the head sections of the respective piles 3 and they are pressed-in at the same time.

Description

【発明の詳細な説明】 「産業上の利用分野」 この発明は、既II基礎杭の圧入装置に関するものであ
る。
DETAILED DESCRIPTION OF THE INVENTION "Field of Industrial Application" The present invention relates to a press-fitting device for existing II foundation piles.

「従来の技術1発明が解決せんとする問題点」一般に、
基礎杭の役割は構造物重重を軟弱な地盤を貫いて良質な
地盤に支持させることにあり、そのため施工時に地盤中
に設置された杭1木毎に支持力を確認し、抗体の健全性
や打ち止め深さを的確に判断することが施工管理上望ま
しい。
"Prior art 1. Problems to be solved by the invention" Generally,
The role of foundation piles is to penetrate the soft ground and support the weight of the structure on good quality ground. Therefore, during construction, the supporting capacity of each pile installed in the ground is checked, and the soundness of the antibodies and It is desirable for construction management to accurately judge the stopping depth.

ところで、従来の杭の支持力確認管理の方法としては、
現場造成杭や先端根囲め処理による埋込み杭では施工後
に躯体コンクリートか或いは根固め注入液が硬化した後
に、その内の一部の代表杭について鉛直載荷試験を行う
方法を採っているため、その試験に費用と時間を要し、
しかも代表杭以外の杭については実際の支持力を確認し
ていないので、全杭についての支持力の適正を必ずしも
確保し得ない欠点がある。
By the way, the conventional method of confirming and managing the bearing capacity of piles is as follows:
For piles prepared on-site and piles embedded by enclosing the tip, after construction, after the concrete structure or the cementing liquid has hardened, a vertical loading test is performed on some representative piles, so the test It takes time and money to
Moreover, since the actual bearing capacity of piles other than the representative piles has not been confirmed, there is a drawback that it is not always possible to ensure the appropriate bearing capacity of all piles.

また、打ち込み杭では、杭1本毎に貫入量を測定し、動
的支持力算定式(杭打ち込み公式)により計算上におい
て支持力の確認を行っているが、算定式の実際上の適合
性(動的から静的に変換する故)や、騒音・振動などの
建設公害などの問題がある。
In addition, for driven piles, the amount of penetration is measured for each pile and the bearing capacity is checked using the dynamic bearing capacity calculation formula (pile driving formula), but the actual suitability of the calculation formula is (due to the conversion from dynamic to static) and construction pollution such as noise and vibration.

一方、杭圧入ジヤツキを装備した固定式又は自走式圧入
躯体をスクリューアンカーで支持し躯体重量とアンカー
に反力をとって杭を静的荷重により圧入する方法も知ら
れているか、部反力を負担する躯体重量に限界かあり、
充分な支持反力を期待できないと共に、ジヤツキが一体
に固定されているため、その位置決め移動が容易でない
等の問題があった。
On the other hand, there is also a known method in which a fixed or self-propelled press-in structure equipped with a pile press-in jack is supported by screw anchors, and the piles are press-fitted by a static load by taking the weight of the structure and the reaction force on the anchor. Is there a limit to the weight of the body that can bear the burden?
There were problems such as not being able to expect a sufficient supporting reaction force, and also not being able to easily position and move the jack because it is fixed integrally.

「問題点を解決するための手段」 この発明は前記従来の課題を解決するために架台中央部
に複数台の杭圧入用油圧ジヤツキをそれぞれ水平面内に
おいて互いに直交する方向に独立して移動自在に設置す
、ることにより、予め前工程として支持層付近まで貫入
した杭の頭部上のおおよその位置にクローラ−を移動し
た上で、杭圧入用油圧ジヤツキを移動FA整して正確に
杭頭部上に装着して圧入することを可使とすると共に、
複数台の油圧シャツ・キの移動範囲において近接して貫
入された複数本の杭をクローラ−を移動することなく同
時に圧入することを可能とし、また高止まり杭をも圧入
可能とした杭の圧入装置を提案するものである。
"Means for Solving the Problems" In order to solve the above-mentioned conventional problems, the present invention has a plurality of hydraulic jacks for press-fitting piles in the center of the frame, each of which is movable independently in directions orthogonal to each other in a horizontal plane. As a pre-process, the crawler is moved to the approximate position above the head of the pile that has penetrated to the vicinity of the support layer, and then the hydraulic jack for pile press-in is moved to adjust the FA to accurately position the pile head. It can be attached and press-fitted on the part, and
A pile press-in system that makes it possible to press-in multiple piles that have been penetrated close together within the movement range of multiple hydraulic shirts at the same time without moving the crawler, and also makes it possible to press-in high-stop piles. This paper proposes a device.

また、油圧ジヤツキの加圧反力をその加圧力に応じて地
盤に貫入した複数のスクリューアンカーにとることかで
き、これによって充分な杭の圧入力を確保することを可
能とすると共に、各杭の正大施工と同時にその都度ジヤ
ツキによる加圧荷重を検出し、杭の支持力を容易に確認
することを可能とした杭の圧入装置を提案するものであ
る。
In addition, the pressurizing reaction force of the hydraulic jack can be applied to multiple screw anchors that penetrate the ground according to the pressurizing force, which makes it possible to secure sufficient pile pressing force and to This paper proposes a pile press-fitting device that detects the pressurized load due to jacking at the same time as the full-scale construction of piles, making it possible to easily check the bearing capacity of the pile.

「実施例」 以下この発明を図面に示す実施例について説明すると、
先ず第1図(a)、(b)に示すように、前工程として
施工地盤をオーガースクリューロットなとの削孔機lを
用いて削孔し、支持層付近まで掘削孔2を所要数設け、
これに既製杭3を順次建込み、杭打ち機により支持層付
近まで貫入する。
"Embodiments" Below, embodiments of the present invention shown in the drawings will be described.
First, as shown in Fig. 1 (a) and (b), as a pre-process, holes are drilled in the construction ground using a hole drilling machine such as an auger screw rod, and the required number of excavated holes 2 are made up to the vicinity of the support layer. ,
Ready-made piles 3 are erected one after another on this, and penetrated to the vicinity of the supporting layer using a pile driver.

次いで第1図(C)、(d)に示すように、眞入された
既製杭3を第2〜5図に示す杭圧入装置により圧入する
。
Next, as shown in FIGS. 1(C) and 1(d), the inserted ready-made pile 3 is press-fitted by a pile press-fitting device shown in FIGS. 2-5.

この杭圧入装置は、クローラ−4によって走行移動可歳
な架台5を備え、この架台5は上下に伸縮する高さ調節
シリンダー6により高低調節自在に架設されている。
This pile press-in device is equipped with a pedestal 5 that can be moved and moved by crawlers 4, and this pedestal 5 is installed so that its height can be adjusted freely by a height adjusting cylinder 6 that extends and contracts up and down.

架台5は矩形枠状に形成され、その周囲の前後左右にス
クリューアンカー7が取付けられている。スクリューア
ンカー7は、架台5に設けたブラケット8にボルト9に
より取付けたガイドホルダー10とその上部に設置した
門型のフレーム11に支持され、回転スライド機構12
によって回転しながら上下に進退するように構成されて
いる。
The frame 5 is formed into a rectangular frame shape, and screw anchors 7 are attached to the front, rear, left and right sides of the periphery thereof. The screw anchor 7 is supported by a guide holder 10 attached to a bracket 8 provided on the frame 5 with bolts 9 and a gate-shaped frame 11 installed above the guide holder 10, and a rotating slide mechanism 12.
It is configured to move up and down while rotating.

架台5の中央の空間部には、それぞれ独立して一方向に
水平に移動するように両側を支持された少な、くとも二
台の移動台13が設けられ、各移動台13にはその移動
方向と直交する方向に移動する杭圧入用油圧シリンダ−
14が設置され、そのピストンロッドの先端には、既製
杭3の頭部に嵌合可能な加圧キャップ15が取付けられ
ている。
At least two movable platforms 13 are provided in the central space of the pedestal 5, and each movable platform 13 is supported on both sides so as to move horizontally in one direction independently. Hydraulic cylinder for pile press-fitting that moves in the direction perpendicular to the direction
14 is installed, and a pressure cap 15 that can be fitted onto the head of the ready-made pile 3 is attached to the tip of the piston rod.

各移動台13は、それぞれ例えば第5.6図に示すよう
にその両端に設けたナツト16を架台5に回転自在に支
承した一対の平行な送りネジ軸17に嵌着し、この送り
ネジ軸17をスプロケット・チェーン18を介してモー
ター19により回転することによって進退移動するよう
に構成されている。
Each moving table 13 has nuts 16 provided at both ends thereof, as shown in FIG. 17 is rotated by a motor 19 via a sprocket chain 18 to move it forward and backward.

また、各杭圧入用油圧シリンダ−14は、その側面に設
けたナツト20を移動台13にその移動方向と直交状に
回転自在に支承した一対の平行な送りネジ軸21C嵌着
し、この送りネジ軸21をスプロケット・チェーン22
を介してモーター23により回転することによって進退
移動するように構成されている。
Each pile press-fitting hydraulic cylinder 14 is fitted with a pair of parallel feed screw shafts 21C which are rotatably supported on the movable base 13 by a nut 20 provided on its side surface, and this feed Connect the screw shaft 21 to the sprocket chain 22
It is configured to move forward and backward by being rotated by a motor 23 via.

また、ブラケット8は架台5のコーナ一部等の他の個所
にも設けられ、例えば杭圧入用油圧シリンダ−14の移
動位置に応じて支持反力のバランスを保つため、或いは
載荷荷重の増大に応じて適宜スクリューアンカー7のガ
イドホルダーlOを取付は得るようになっている。
Brackets 8 are also provided at other locations such as a part of the corner of the pedestal 5, for example, in order to maintain the balance of support reaction force according to the movement position of the hydraulic cylinder 14 for pile press-in, or to cope with an increase in applied load. Accordingly, the guide holder IO of the screw anchor 7 can be installed as appropriate.

なお、!!台5は杭3の頭部の高さに応じて高さ調節シ
リンダー6により高低調部することができるか、第7図
に示すように高止まり・杭3゜に対しては、別途作成し
た加圧台24を架台5の外周の適宜位置に取付け、これ
に取付けた杭圧入用油圧シリンダ−14’により、架台
5の底面下を通過可能に正常に貫入された他の既製杭3
と同一高さまで圧入し、その後に架台5をその頭部上に
移動して架台5の中央部の杭圧入用油圧シリンダ−14
により圧入する。
In addition,! ! The height of the stand 5 can be adjusted using the height adjustment cylinder 6 according to the height of the head of the pile 3.As shown in Fig. 7, it is possible to adjust the height of the stand 5 depending on the height of the head of the pile 3. A pressurizing stand 24 is attached to an appropriate position on the outer periphery of the pedestal 5, and by means of a pile press-fitting hydraulic cylinder 14' attached to this, other ready-made piles 3 are normally penetrated so as to be able to pass under the bottom surface of the pedestal 5.
After that, the pedestal 5 is moved to the top of the pile to the same height as the pile press-fitting hydraulic cylinder 14 in the center of the pedestal 5.
Press fit.

以上のように構成されたクローラ−架台5を上記予め互
いに近接して貫入設置した既製杭3の頭部上に走行移動
し、ここで各スクリューアンカー7を作動して所要の引
抜き反力が得られる深度(10m程度)まで地盤中に貫
入する。
The crawler frame 5 constructed as described above is moved over the heads of the ready-made piles 3 which have been penetrated and installed close to each other in advance, and each screw anchor 7 is actuated here to obtain the required pulling reaction force. Penetrates into the ground to a depth (approximately 10m).

この状態で、各移動台13と油圧シリンダー14の相互
の移動範囲にある近接した2木の既製杭3の位置に応じ
て、各移動台13とそれぞれの杭圧入用油圧シリンダ−
14を適宜スライド調整して加圧キャップ16を杭頭に
合せて嵌合した後、油圧シリンダー14を作動して静的
圧入荷重(最大200L程度)により2本則時に圧入す
る。
In this state, each movable base 13 and each hydraulic cylinder for pile press-in are moved according to the positions of two adjacent ready-made piles 3 within the mutual movement range of each movable base 13 and each hydraulic cylinder 14.
14 is slide adjusted as appropriate to fit the pressurizing cap 16 to the pile cap, and then the hydraulic cylinder 14 is operated to press-fit the pile with a static press-fitting load (maximum of about 200 L) at the time of two screws.

このときの圧入荷重は順次検出して施工デー久−として
記録する。
The press-fitting loads at this time are sequentially detected and recorded as the construction date.

なお 既製杭3が各移動台13と油圧シリンダー14の
相互の移動範囲に2本以上ある場合には同位置において
順次同様に圧入工程を連続することができ、またその範
囲に圧入すべき既製杭3が1木である場合にも、いずれ
か一方の移動台13の油圧シリンダー14により杭位置
に応じて同様の圧入を行うことができる。
In addition, if there are two or more ready-made piles 3 within the mutual movement range of each moving table 13 and hydraulic cylinder 14, the press-fitting process can be continued in the same manner one after another at the same position, and the ready-made piles to be press-fitted in that range can be Even when the number of piles 3 is one piece, similar press-fitting can be performed using the hydraulic cylinder 14 of one of the movable platforms 13 depending on the position of the pile.

また、移動台13及び杭圧入用油圧シリンダ−14を二
台以上設置して二本以上の既製杭3を同時に圧入するこ
とも可能である。
It is also possible to install two or more movable tables 13 and pile press-fitting hydraulic cylinders 14 to press-fit two or more ready-made piles 3 at the same time.

このようにして既製杭3を設置した後、各油圧シリンダ
ー14により杭1本毎にその頭部に設計支持力の1〜3
倍の荷重を保持時間5分程度載荷し、それぞれの杭につ
いて支持力を確認する。
After installing the ready-made piles 3 in this way, each hydraulic cylinder 14 is used to apply 1 to 3 of the design bearing capacity to the head of each pile.
Load twice as much load for about 5 minutes and check the bearing capacity of each pile.

その後は、スクリューアンカー7を引抜いた上でクロー
ラ−4を走行して架台5を別の既製杭3上に移動し、順
次同様の工程を行う。
Thereafter, after pulling out the screw anchor 7, the crawler 4 is run to move the pedestal 5 onto another ready-made pile 3, and the same steps are sequentially performed.

「発明の効果」 以上の通りこの発明によれば、予め前工程で支持層付近
まで貫入した杭の頭部上にクローラ−を移動し、クロー
ラ−架台の周囲に装備した複数のスクリューアンカーを
周辺地盤に貫入して架台を支持した後、架台中央部に設
置した杭圧入用油圧ジヤツキに杭を圧入するので、油圧
ジヤツキの加圧反力をその加圧力に応じて地盤に貫入し
た複数のスクリューアンカーにとることかでき、これに
よって充分な杭の圧入力を確保することが可能となると
共に、各杭の圧入施工と同時にその都度ジヤツキによる
加圧荷重な検出し、杭の実際の支持力を確実かつ容易に
確認することができ、杭1木毎に完璧な施工管理を行う
ことができる。
"Effects of the Invention" As described above, according to the present invention, a crawler is moved over the head of the pile that has penetrated to the vicinity of the support layer in advance in the previous process, and a plurality of screw anchors installed around the crawler frame are moved around the pile. After penetrating the ground and supporting the pedestal, the pile is press-fitted into a hydraulic jack installed in the center of the pedestal, so the pressure reaction force of the hydraulic jack is applied to the multiple screws that penetrated into the ground. This makes it possible to secure sufficient pile pressing force, and at the same time as each pile is press-fitted, it is possible to detect the pressurized load due to jacking and check the actual bearing capacity of the pile. It can be confirmed reliably and easily, and perfect construction management can be performed for each pile.

さらに、架台中央部に複数台の杭圧入用油圧ジヤツキを
水平面内において互いに直交する方向に移動自在に設置
することにより、クローラ−を杭の頭部上のおおよその
位置に移動した上で、複数台の杭圧入用油圧ジヤツキを
移動調整して正確に複数本の杭頭部上に装着して同時に
圧入することができると共に、油圧ジヤツキの移動範囲
において近接して貫入された2本以上の杭をクローラ−
を移動することなく連続して圧入し、かつそれぞれの支
持力を確認することができる。
Furthermore, by installing a plurality of hydraulic jacks for pile press-fitting in the center of the mount so that they can move freely in directions perpendicular to each other in a horizontal plane, the crawler can be moved to the approximate position above the head of the pile, and then multiple By adjusting the movement of the hydraulic jack for pile press-fitting on the stand, it is possible to accurately attach it to the heads of multiple piles and press-fit them at the same time. crawler
can be press-fitted continuously without moving, and the supporting force of each can be confirmed.

架台の周囲の所定個所に高止まり杭用加圧台を取付け、
これに杭圧入用油圧シリンダーを設置してなるので、高
止まり杭な架台の底面下を通過可能に正常に貫入された
他の既製杭と同一高さまて予め圧入した上で、架台をそ
の頭部上に移動して架台の中央部の杭圧入用油圧シリン
ターにより圧入することがてきる。
Attach pressure bases for high perch piles at designated locations around the pedestal,
A hydraulic cylinder for pile press-fitting is installed in this, so the pile is press-fitted in advance to the same height as other ready-made piles that have been successfully penetrated so that it can pass under the bottom of the pedestal, and then the pedestal is attached to the top of the pedestal. The pile can be moved to the top of the frame and press-fitted using the hydraulic cylinder for pile press-fitting in the center of the pedestal.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図(a)、(b)、(C)、(d)はこの発明の施
工工程を示す縦断側面図、第2図はこの発明に係る杭圧
入装置の側面図、第3図は同正面図、第4図は同平面図
、第5図はこの発明に係る杭圧入装置における杭圧入用
シリンダーの移動機構を示す平面図、第6図は同縦断側
面図、第7図は高止り杭の圧入態様を示す部分側面図で
ある。 ■・・削孔機、2・・掘削孔、3・・既製杭3′  ・
高止まり杭、4・・クローラ−5・・架台、6・・高さ
調節シリンダー7・・スクリューアンカー、8・・ブラ
ケット9・・ボルト、10・・ガイドホルダーit・・
フレーム、12・・回転スライド機構13・・移動台、 14.14°  ・杭圧入用油圧シリンダ−15・・加
圧キャップ、16・・ナツト。 17・・送りネジ軸、18・・スプロケット・チェーン
、19・・モーター、20・・ナツト21・・送りネジ
軸、22・・スプロケット・チェーン、23・・モータ
ー、24・・加圧台。 特許出願人 日本コンクリート工業株式会社第6図 第5図 手続補正書(方式)  ジ 平成 1年9月11日 特許庁長官 吉 1)文 毅 殿 事件の表示 昭和62年特許願第235285号 発明の名称 杭圧入装置 補正をする者 事件との関係 特許出願人 日本コンクリート工業株式会社
Figures 1 (a), (b), (C), and (d) are vertical sectional side views showing the construction process of the present invention, Figure 2 is a side view of the pile press-in device according to the present invention, and Figure 3 is the same. A front view, FIG. 4 is a plan view of the same, FIG. 5 is a plan view showing a moving mechanism of a pile press-in cylinder in a pile press-in device according to the present invention, FIG. 6 is a vertical side view of the same, and FIG. 7 is a high stop. It is a partial side view which shows the press-fitting aspect of a pile. ■...Drilling machine, 2...Drilling hole, 3...Ready-made pile 3' ・
High perch pile, 4... Crawler 5... Frame, 6... Height adjustment cylinder 7... Screw anchor, 8... Bracket 9... Bolt, 10... Guide holder it...
Frame, 12...Rotation slide mechanism 13...Moving table, 14.14° - Hydraulic cylinder for pile press-in 15...Pressure cap, 16...Nut. 17...Feed screw shaft, 18...Sprocket chain, 19...Motor, 20...Nut 21...Feed screw shaft, 22...Sprocket chain, 23...Motor, 24...Pressure table. Patent Applicant Nippon Concrete Industries Co., Ltd. Figure 6 Figure 5 Procedural Amendment (Method) September 11, 1999 Commissioner of the Japan Patent Office Yoshi 1) Indication of Moon Takeshi Case 1985 Patent Application No. 235285 Invention Relationship with the case of the person amending the name of the pile press-in device Patent applicant Nippon Concrete Industry Co., Ltd.

Claims (1)

【特許請求の範囲】 1)クローラーにより走行移動自在な架台の周囲に複数
のスクリューアンカーを装備し、前記架台中央部に複数
台の杭圧入用油圧ジャッキをそれぞれ水平面内において
前後左右に独立して移動自在に設置してなることを特徴
とする杭圧入装置。 2)クローラーにより走行移動自在な架台の周囲に複数
のスクリューアンカーを装備し、前記架台中央部に複数
台の杭圧入用油圧ジャッキをそれぞれ水平面内において
前後左右に独立して移動自在に設置し、前記架台の周囲
の所定個所に高止まり杭用加圧台を取付け、これに杭圧
入用油圧シリンダーを設置してなることを特徴とする杭
圧入装置。
[Scope of Claims] 1) A plurality of screw anchors are equipped around a frame that can be freely moved by crawlers, and a plurality of hydraulic jacks for press-fitting piles are installed in the center of the frame independently in the front, rear, left, and right directions in a horizontal plane. A pile press-in device characterized by being installed in a movable manner. 2) A plurality of screw anchors are installed around a pedestal that can be moved freely by crawlers, and a plurality of hydraulic jacks for pile press-in are installed in the center of the pedestal, each movable independently in the front, rear, left, and right directions in a horizontal plane; A pile press-fitting device, characterized in that a pressurizing stand for high-end piles is attached to a predetermined location around the pedestal, and a hydraulic cylinder for pile press-fitting is installed thereon.
JP23528587A 1987-09-19 1987-09-19 Pile press-in apparatus Pending JPH0230809A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23528587A JPH0230809A (en) 1987-09-19 1987-09-19 Pile press-in apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23528587A JPH0230809A (en) 1987-09-19 1987-09-19 Pile press-in apparatus

Publications (1)

Publication Number Publication Date
JPH0230809A true JPH0230809A (en) 1990-02-01

Family

ID=16983841

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23528587A Pending JPH0230809A (en) 1987-09-19 1987-09-19 Pile press-in apparatus

Country Status (1)

Country Link
JP (1) JPH0230809A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9157208B2 (en) 2011-08-22 2015-10-13 Chin Chai Ong Adjustable raked pile driver using the push pull method
CN107489152A (en) * 2017-09-07 2017-12-19 淮海工学院 A kind of screw anchor encircles static press piling constructing device and its construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52149515A (en) * 1976-06-04 1977-12-12 Sulzer Ag Marine diesel engine installation
JPS5532922U (en) * 1978-08-24 1980-03-03
JPS6187019A (en) * 1984-10-03 1986-05-02 Asia Kogyo Kk Pile driver

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52149515A (en) * 1976-06-04 1977-12-12 Sulzer Ag Marine diesel engine installation
JPS5532922U (en) * 1978-08-24 1980-03-03
JPS6187019A (en) * 1984-10-03 1986-05-02 Asia Kogyo Kk Pile driver

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9157208B2 (en) 2011-08-22 2015-10-13 Chin Chai Ong Adjustable raked pile driver using the push pull method
CN107489152A (en) * 2017-09-07 2017-12-19 淮海工学院 A kind of screw anchor encircles static press piling constructing device and its construction method

Similar Documents

Publication Publication Date Title
CN112324160B (en) Temporary support frame for installing assembled lattice steel structure and use method thereof
CN105178968A (en) Pushing and supporting device of tunneling machine and construction method
US5161625A (en) Pile driving apparatus
CA1336545C (en) Pile driving apparatus
CN111829804B (en) Shield propulsion simulation test platform
JPS63300113A (en) Method and apparatus for penetrating pile
JPH01146015A (en) Method and apparatus for pile penetration
CN111926813B (en) Static pile machine with column pile positioning system and column pile construction method
CN113788383B (en) Jacking process and jacking mechanism for existing house with additionally-installed elevator
GB2071740A (en) Method of assembling and testing a vertically movable marine working platform having groundable support frames
JP3297212B2 (en) Construction method of tower-like structure and supporting structure used for it
USRE35165E (en) Pile driving apparatus
CN220908399U (en) Pile erecting device for spinning head-expanded steel pipe pile
CN119686567B (en) A cantilever floor support frame for building construction and its construction method
JP4896549B2 (en) Structure setting method
CN117026926B (en) Continuous Penetration Static Cone Testing Method
JP2584609Y2 (en) Guide frame structure in pipe burying equipment
CN223880393U (en) A static load compressive strength test device for pile foundations
CN112814401A (en) Liftable support for construction engineering construction
CN219430033U (en) Converter dust removal heavy load main drive speed reducer
JP7566384B1 (en) Pile driving device and pile driving method
CN222512546U (en) A diesel engine test vehicle upper and lower test bench device
CN223458820U (en) Prestressed loading system for retaining wall in foundation pit
CN119102235B (en) Prestressing system and prestressing method for the retaining wall within the excavation pit
CN116477496B (en) An integrated installation process for the electrical room of a pile-spinning crane