JPH024390U - - Google Patents
Info
- Publication number
- JPH024390U JPH024390U JP1988080594U JP8059488U JPH024390U JP H024390 U JPH024390 U JP H024390U JP 1988080594 U JP1988080594 U JP 1988080594U JP 8059488 U JP8059488 U JP 8059488U JP H024390 U JPH024390 U JP H024390U
- Authority
- JP
- Japan
- Prior art keywords
- work
- line
- control panel
- displays
- centralized
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009825 accumulation Methods 0.000 claims description 2
- 238000012806 monitoring device Methods 0.000 claims description 2
- 230000002159 abnormal effect Effects 0.000 claims 1
- 238000012544 monitoring process Methods 0.000 claims 1
- 238000010586 diagram Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Multi-Process Working Machines And Systems (AREA)
- General Factory Administration (AREA)
- Alarm Systems (AREA)
- Selective Calling Equipment (AREA)
Description
第1図はこの考案の一実施例のシステム構成図
である。
1……集中制御盤、2……子局、3……モニタ
リング装置、4……集中ラインモニタ、5……デ
ータ入力キースイツチ、6……スタートスイツチ
、7……停止スイツチ、8……ヘルプスイツチ、
9……データ表示器、10……子局取付器具、1
1……子局番号設定スイツチ、12……ヘルプス
イツチ、13……データ表示器、15……動作状
態表示器、16……データ表示器、18……ライ
ン名称表示器、19……動作状態表示器、20…
…ロス時間積算表示器。
FIG. 1 is a system configuration diagram of an embodiment of this invention. 1... Central control panel, 2... Slave station, 3... Monitoring device, 4... Central line monitor, 5... Data input key switch, 6... Start switch, 7... Stop switch, 8... Help switch ,
9...Data display, 10...Slave station mounting equipment, 1
1...Slave station number setting switch, 12...Help switch, 13...Data display, 15...Operating status display, 16...Data display, 18...Line name display, 19...Operating status Display, 20...
...Loss time accumulation display.
Claims (1)
間入力に基き作業残り時間を演算して出力すると
共に、システム全体の動作制御を司る集中制御盤
と、この集中制御盤からの作業残り時間を表示す
るために作業ライン上に設置された子局と、作業
ラインの稼動中、停止中、又は異常中の動作状態
表示及び生産個数表示を行なうモニタリング装置
と、複数の作業ラインについて作業ライン毎の動
作状態表示及びロス時間積算表示を行なう集中ラ
インモニタであつて、遠隔の集中監視室に設置さ
れ、各作業ライン上の集中制御盤と遠隔データ通
信手段により結ばれている集中ラインモニタとを
備えて成る作業ペースコントロール装置。 A central control panel is installed corresponding to each work line, which calculates and outputs the remaining work time based on the specified work time input, and also displays the remaining work time from this central control panel, which controls the operation of the entire system. A slave station installed on the work line for the purpose of operation, a monitoring device that displays the operating status and production quantity when the work line is in operation, stopped, or abnormal, and the operation of each work line for multiple work lines. This is a centralized line monitor that displays status and loss time accumulation, and is installed in a remote centralized monitoring room and is connected to the centralized control panel on each work line by remote data communication means. Work pace control device consisting of.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1988080594U JPH024390U (en) | 1988-06-20 | 1988-06-20 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1988080594U JPH024390U (en) | 1988-06-20 | 1988-06-20 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JPH024390U true JPH024390U (en) | 1990-01-11 |
Family
ID=31305416
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1988080594U Pending JPH024390U (en) | 1988-06-20 | 1988-06-20 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH024390U (en) |
-
1988
- 1988-06-20 JP JP1988080594U patent/JPH024390U/ja active Pending
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0196003U (en) | ||
| JPS62119901U (en) | ||
| JP3211465B2 (en) | Remote control device | |
| JPH057791Y2 (en) | ||
| JPH0724304Y2 (en) | Switching device for CTC device | |
| JPS63155926A (en) | Home controller | |
| JPS62146298U (en) | ||
| JPH0420465A (en) | Remote maintenance device for elevator | |
| JPS6454181U (en) | ||
| JPS627746U (en) | ||
| JPS63107060U (en) | ||
| JPH0619355U (en) | Supervisory control device | |
| JPH0386488U (en) | ||
| JPS6217259U (en) | ||
| JPS61284000A (en) | Wireless type manual control operator for signal control machine | |
| JPH01135254A (en) | Building management system | |
| JPS63266995A (en) | Home control device | |
| JPH0398800U (en) | ||
| JPS61152195U (en) | ||
| JPH0238037U (en) | ||
| JPS6381487U (en) | ||
| JPH0390582U (en) | ||
| JPH0425299A (en) | Backup system for centralized monitor system | |
| JPH0235560U (en) | ||
| JP3695904B2 (en) | Supervisory control device |