JPH0247588A - Pedestal made of steel - Google Patents

Pedestal made of steel

Info

Publication number
JPH0247588A
JPH0247588A JP63198001A JP19800188A JPH0247588A JP H0247588 A JPH0247588 A JP H0247588A JP 63198001 A JP63198001 A JP 63198001A JP 19800188 A JP19800188 A JP 19800188A JP H0247588 A JPH0247588 A JP H0247588A
Authority
JP
Japan
Prior art keywords
steel
concrete
pressure vessel
pedestal
reactor pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP63198001A
Other languages
Japanese (ja)
Inventor
Tsuneo Hirokane
広兼 常男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP63198001A priority Critical patent/JPH0247588A/en
Publication of JPH0247588A publication Critical patent/JPH0247588A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

PURPOSE:To easily install a pedestal made of steel by providing concrete filling tubing in the inside of a cylinder in the long size pedestal made of steel in which a plurality of short size cylinders are stacked. CONSTITUTION:A cylindrical structure 2 made of steel consists of an inner cylinder 3 which constitutes the inside of a reactor pressure vessel pedestal 1 made of steel and an outer cylinder 4 surrounding the inner cylinder at regular intervals. Reinforcing materials 5 for reinforcing the cylinders 2a-2f made of steel are mounted between the outer cylinder 4 and the inner cylinder 3. Further, after the cylinders 2a-2f are installed, concrete filling tubing 6 for filling the inside thereof with concrete is formed by utilizing a part of the reinforcing materials 5. The reactor pressure vessel pedestal 1 made of steel is installed so that short size cylinders 2a-2f of the cylindrical structure 2 are divided to produce at a factory and they are assembled by welding and the like at a site to fill the inside of the cylinders 2a-2f with concrete from the concrete filling tubing 6.

Description

【発明の詳細な説明】 [発明の目的] (産業上の利用分野) 本発明は鋼製ペデスタルに係り、特に据付工程の短縮お
よび工業上の安全性の向上を図った原子炉圧力容器鋼製
ペデスタルに関する。
[Detailed Description of the Invention] [Object of the Invention] (Industrial Application Field) The present invention relates to a steel pedestal, and in particular to a steel pedestal for a nuclear reactor pressure vessel that shortens the installation process and improves industrial safety. Regarding the pedestal.

(従来の技術) 第3図は沸騰水型原子炉を示すもので、図において符号
21は原子炉建屋22内に収容されている原子炉格納容
器を示している。この原子炉格納容器21内はダイヤフ
ラムフロア8によってドライウェル23とウェットウェ
ル24に2分割されている。ウェットウェル24の底面
を構成する基礎コンクリートマット25にはドライウェ
ル23内に上部が配設される原子炉圧力容器ペデスタル
26が立設されている。ドライウェル23内にはこの原
子炉圧力容器ペデスタル26上に載置支持される原子炉
圧力容器27が収容され、この原子炉圧力容器27は原
子炉遮蔽壁28に囲まれている。またダイヤフラムフロ
ア8にはウェットウェル24に向けて多数のベント管1
0が植設されている。
(Prior Art) FIG. 3 shows a boiling water nuclear reactor, and in the figure, reference numeral 21 indicates a reactor containment vessel housed in a reactor building 22. The inside of this reactor containment vessel 21 is divided into two by a diaphragm floor 8 into a dry well 23 and a wet well 24. A reactor pressure vessel pedestal 26 whose upper portion is disposed within the dry well 23 is erected on a basic concrete mat 25 constituting the bottom surface of the wet well 24 . A reactor pressure vessel 27 mounted and supported on the reactor pressure vessel pedestal 26 is housed in the dry well 23, and the reactor pressure vessel 27 is surrounded by a reactor shielding wall 28. In addition, the diaphragm floor 8 has a large number of vent pipes 1 toward the wet well 24.
0 is planted.

このように構成された沸騰水形原子炉において原子炉圧
力容器ペデスタル26は、原子炉圧力容器27等の重量
物を支えているため鉄筋量の非常に多い鉄筋コンクリー
ト製とされ、すべて現地作業により据付けられていた。
In a boiling water reactor configured in this way, the reactor pressure vessel pedestal 26 supports heavy objects such as the reactor pressure vessel 27, so it is made of reinforced concrete with a very large amount of reinforcing steel, and all installation is done on-site. It was getting worse.

しかしながら、この原子炉圧力容器ペデスタル26の完
成はダイヤフラムフロア8を搭載するための必要条件で
あり、またダイヤフラムフロア8の搭載は原子炉格納容
器21の上部の現地据付けの・必要条件となっている。
However, the completion of this reactor pressure vessel pedestal 26 is a necessary condition for installing the diaphragm floor 8, and the installation of the diaphragm floor 8 is also a necessary condition for the on-site installation of the upper part of the reactor containment vessel 21. .

また、原子炉圧力容器ペデスタル26の完成後、原子炉
遮蔽壁28の据付け、原子炉圧力容器27の据付け、原
子炉格納容器21内の構造物、配管等の据付けが行われ
る。そのため、この原子炉圧力容器ペデスタル26の据
付は工程の短縮は、原子力発電所建設工程を短縮する重
要な要素となっている。そこで、この原子炉圧力容器ペ
デスタル26の据付は工程を短縮化するため、原子炉圧
力容器ペデスタル26の主体構造を鋼製とコンクリート
とし、従来現地において行われていた鉄筋組立作業をな
くし、かつ鋼製部を工場で分割製作して、現地において
これを溶接あるいはボルト接合により組立てられ、鋼製
部内部にコンクリートを充填し、原子炉圧力容器ペデス
タル26が据付けられる。
Further, after the reactor pressure vessel pedestal 26 is completed, the reactor shielding wall 28 is installed, the reactor pressure vessel 27 is installed, and structures inside the reactor containment vessel 21, piping, etc. are installed. Therefore, shortening the installation process of the reactor pressure vessel pedestal 26 is an important factor in shortening the nuclear power plant construction process. Therefore, in order to shorten the installation process of the reactor pressure vessel pedestal 26, the main structure of the reactor pressure vessel pedestal 26 is made of steel and concrete, eliminating the reinforcing steel assembly work that was conventionally done on site, and The fabricated part is manufactured in parts at a factory, assembled on site by welding or bolting, the inside of the steel part is filled with concrete, and the reactor pressure vessel pedestal 26 is installed.

次に従来の原子炉圧力容器鋼製ペデスタルのコンクリー
ト充填作業について、第4図を参照して説明する。第4
図は原子炉圧力容器鋼製ペデスタルを示す半断面図であ
る。まず、原子炉圧力容器鋼製ペデスタル基礎7の据付
けが完了したならば、工場で分割製作された鋼製短尺円
筒体2a〜2dをダイヤフラムフロア8が据付けられる
段数まで搭載し、溶接あるいはボルト接合で組立てられ
一体化される。次にダイヤフラムフロア8を下から支え
るコラムサポート9を据付け、ダイヤフラムフロア8を
円筒体2dとコラムサポート9上に搭載する。次に原子
炉圧力容器鋼製ペデスタル1上部の短尺円筒体2e、2
fを搭載し、溶接あるいはボルト接合で組立てる。一方
、ダイヤフラムフロア8上においては、ベント管10の
挿入、植設工事およびベント管挿入後、パイブホイッブ
ストラクチャ−11の搭載工事が平行して実施される。
Next, a conventional concrete filling operation for a steel pedestal of a nuclear reactor pressure vessel will be explained with reference to FIG. Fourth
The figure is a half-sectional view showing a steel pedestal of a nuclear reactor pressure vessel. First, once the installation of the reactor pressure vessel steel pedestal foundation 7 is completed, the short steel cylindrical bodies 2a to 2d, which are manufactured in parts at the factory, are mounted up to the number of stages on which the diaphragm floor 8 is installed, and then welded or bolted together. assembled and integrated. Next, a column support 9 that supports the diaphragm floor 8 from below is installed, and the diaphragm floor 8 is mounted on the cylindrical body 2d and the column support 9. Next, the short cylindrical bodies 2e, 2 on the top of the reactor pressure vessel steel pedestal 1
f and is assembled by welding or bolting. On the other hand, on the diaphragm floor 8, the insertion and planting work of the vent pipe 10 and the installation work of the pipe whip structure 11 are carried out in parallel after the vent pipe is inserted.

ここまでの原子炉圧力容器鋼製ペデスタル1の鋼製円筒
構造物2の組立てが完了したならば、鋼製円筒構造物2
内にコンクリートを充填するために、仮設のコンクリー
ト充填用配管12が、原子炉圧力容器鋼製ペデスタル1
の鋼製円筒構造物2の内側および外側に布設される。次
にコンクリートを鋼製円筒体2aの下段から充填し、予
め決められた充填段数毎に仮設コンクリート充填用配管
12を盛替えて充填作業を行う。この充填作業が完了し
たならば、仮設コンクリート充填用配管12を一時撤去
する。この仮設コンクリート充填用配管12の撤去が完
了したならば、次に原子炉圧力容器鋼製ペデスタル1の
更に上部の鋼製円筒構造物(図示せず)を搭載し、溶接
あるいはボルト接合で原子炉圧力容器鋼製ペデスタル1
を組立てる。
Once the assembly of the steel cylindrical structure 2 of the reactor pressure vessel steel pedestal 1 has been completed, the steel cylindrical structure 2
In order to fill the reactor pressure vessel with concrete, a temporary concrete filling pipe 12 is connected to the reactor pressure vessel steel pedestal 1.
It is laid inside and outside of the steel cylindrical structure 2. Next, concrete is filled from the lower stage of the steel cylindrical body 2a, and filling work is performed by replacing the temporary concrete filling pipe 12 every predetermined number of filling stages. When this filling work is completed, the temporary concrete filling pipe 12 is temporarily removed. Once the removal of this temporary concrete filling pipe 12 is completed, the steel cylindrical structure (not shown) on the upper part of the reactor pressure vessel steel pedestal 1 is then mounted and welded or bolted to the reactor reactor. Pressure vessel steel pedestal 1
Assemble.

引続き、原子炉圧力容器鋼製ペデスタル1の上部にコン
クリートを充填するために、仮設コンクリート配管12
を再び前記鋼製円筒構造物の上部に吊設し、原子炉圧力
容器鋼製ペデスタル1上部のコンクリート充填作業を実
施する。コンクリート充填作業が完了したならば、仮設
コンクリート充填用配管12を撤去し、原子炉圧力容器
鋼製ペデスタル1の充填作業は完了し、原子炉圧力容器
鋼製ペデスタル1の据付けも完了する。
Subsequently, temporary concrete piping 12 was installed to fill the upper part of the reactor pressure vessel steel pedestal 1 with concrete.
is again suspended from the top of the steel cylindrical structure, and concrete filling work is carried out on the top of the steel pedestal 1 of the reactor pressure vessel. When the concrete filling work is completed, the temporary concrete filling pipe 12 is removed, the filling work of the reactor pressure vessel steel pedestal 1 is completed, and the installation of the reactor pressure vessel steel pedestal 1 is also completed.

(発明が解決しようとする課題) 上記のようなコンクリート充填作業は、主に原子炉圧力
容器鋼製ペデスタル1の構成する閉空間での作業となる
。すなわち、仮設コンクリート充填用配管12の布設作
業およびコンクリート充填時には、鋼板で仕切られた各
空間へコンクリート充填するための仮設フレキシブル配
管の移動作業等、鋼製円筒構造物2内側での作業となり
、この充填作業にかなりの時間が費やされ、また作業員
の安全管理上も望ましくなかった。
(Problems to be Solved by the Invention) The concrete filling work as described above is mainly performed in the closed space constituted by the reactor pressure vessel steel pedestal 1. In other words, during the work of laying the temporary concrete filling piping 12 and filling with concrete, the work must be done inside the steel cylindrical structure 2, such as moving the temporary flexible piping for filling concrete into each space partitioned by steel plates. The filling operation took a considerable amount of time and was also undesirable from the standpoint of worker safety.

本発明は上記課題を解決するためになされたものであり
、工期の短縮化を計ることができるとともに、作業員の
安全性を高めることのできる鋼製ペデスタルを提供しよ
うとするものである。
The present invention has been made to solve the above-mentioned problems, and aims to provide a steel pedestal that can shorten the construction period and improve the safety of workers.

[発明の構成] (課題を解決するための手段) 本発明は、同心円状の複数の短尺円筒体を積重ねて長尺
化した鋼製円筒構造物と、この円筒構造物内に設けられ
た補強材と、この補強材または前記円筒構造物の内面に
取着されたコンクリート充填用配管とを具備したことを
特徴とする。
[Structure of the Invention] (Means for Solving the Problems) The present invention provides a steel cylindrical structure made of a plurality of concentric short cylindrical bodies stacked together to make it elongated, and a reinforcement provided in the cylindrical structure. The present invention is characterized by comprising a reinforcing material and a concrete filling pipe attached to the reinforcing material or the inner surface of the cylindrical structure.

(作用) 鋼製円筒構造物内部へのコンクリート充填作業は、調装
置n構造物内部に予め取着したコンクリート充填用配管
によって行われる。そのため従来例のように仮設コンク
リート充填用配管の布設作業がなく、また補強部材とし
て使用でき、その配管の撤去作業も必要がない。しかも
、コンクリート充填用配管路を各短尺円筒体ごとに設け
ることにより、仮設フレキシブル配管も必要なく、鋼製
円筒構造物内部の仮設フレキシブル配管の移動作業もな
い。
(Operation) Concrete filling inside the steel cylindrical structure is carried out using concrete filling piping that is previously attached to the inside of the structure. Therefore, unlike the conventional example, there is no need to install temporary concrete filling piping, and it can be used as a reinforcing member, and there is no need to remove the piping. Furthermore, by providing a concrete filling piping path for each short cylindrical body, there is no need for temporary flexible piping, and there is no need to move the temporary flexible piping inside the steel cylindrical structure.

したがって、仮設コンクリート充填用配管の布設作業お
よび撤去作業がなく、また、盛替え作業も必要ないこと
により、工期が大幅に短縮される。
Therefore, there is no need to install or remove temporary concrete filling piping, and there is no need for replacement work, so the construction period can be significantly shortened.

さらに鋼製円筒構造物内部における仮設コンクリート充
填用配管の布設および仮設フレキシブル配管の移動作業
もないことにより、作業員の安全性の向上も計ることが
できる。
Furthermore, since there is no need to install temporary concrete filling pipes or move temporary flexible pipes inside the steel cylindrical structure, it is possible to improve the safety of workers.

(実施例) 本発明の一実施例について、第1図および第2図を参照
しながら説明する。
(Example) An example of the present invention will be described with reference to FIGS. 1 and 2.

第1図は本発明に係る原子炉圧力容器鋼製ペデスタルの
一実施例を示す半断面図である。第2図は第1図におけ
る鋼製円筒構造物の鳥紋図である。
FIG. 1 is a half-sectional view showing an embodiment of a nuclear reactor pressure vessel steel pedestal according to the present invention. FIG. 2 is a bird's-eye view of the steel cylindrical structure in FIG. 1.

第4図に示す従来例と同一要素には、同一符号を付して
いる。
The same elements as those in the conventional example shown in FIG. 4 are given the same reference numerals.

本発明に係わるこの原子炉圧力容器鋼製ペデスタル1は
、鋼製短尺円筒体2a〜2fを積重ねて長尺化した鋼製
円筒構造物2から構成されている。
This nuclear reactor pressure vessel steel pedestal 1 according to the present invention is composed of a steel cylindrical structure 2 made of elongated steel short cylindrical bodies 2a to 2f stacked together.

鋼製円筒構造物2は、第2図に示す如く原子炉圧力容器
鋼製ペデスタル1の内側を構成する内筒3と、この内筒
3を一定間隔で囲む外筒4とから構成されている。外筒
4と内筒3との間には、この鋼製円筒体2a〜2fを補
強するための鋼板からなる補強材5が取着されている。
As shown in FIG. 2, the steel cylindrical structure 2 is composed of an inner cylinder 3 that forms the inside of the reactor pressure vessel steel pedestal 1, and an outer cylinder 4 that surrounds the inner cylinder 3 at regular intervals. . A reinforcing member 5 made of a steel plate is attached between the outer cylinder 4 and the inner cylinder 3 to reinforce the steel cylindrical bodies 2a to 2f.

また円筒体2a〜2fの据付は後に、コンクリートをそ
の内部に充填するためのコンクリート充填用配管6が、
鋼板で、第2図に示す如く補強材5の一部を利用して構
成されている。原子炉圧力容器鋼製ペデスタル1の据付
けは、前記鋼製円筒構造物2の短尺円筒体2a〜2fを
工場で分割製作し、現地でこれを溶接あるいはボルト接
合により組立てられ、円筒体2a〜2f内部にコンクリ
ートを充填し、原子炉圧力容器鋼製ペデスタル1が据付
けられる。
Further, after the installation of the cylindrical bodies 2a to 2f, a concrete filling pipe 6 for filling the inside with concrete is installed.
It is made of a steel plate and is constructed using a part of the reinforcing material 5 as shown in FIG. To install the reactor pressure vessel steel pedestal 1, the short cylindrical bodies 2a to 2f of the steel cylindrical structure 2 are manufactured separately at a factory, and then assembled on site by welding or bolting. The inside is filled with concrete and the reactor pressure vessel steel pedestal 1 is installed.

次に原子炉圧力容器鋼製ペデスタル1のコンクリート充
填作業について、第1図を参照して説明する。まず、原
子炉圧力容器鋼製ペデスタル基礎7の据付けが完了した
ならば、工場で分割製作された円筒体2a〜2dをダイ
ヤフラムフロア8が据付けられる段数まで搭載し、溶接
あるいはボルト接合で組立てられる。この時、コンクリ
ート充填用配管6部は、溶接やボルト接合する必要はな
い。但し、数ミリメートルの隙間があってもよいが、上
と下とのコンクリート充填用配管6は嵌合するように設
計、製作しておく。次にダイヤフラムフロア8を下から
支えるコラムサポート9を据付け、ダイヤフラムフロア
8を原子炉圧力容器鋼製ペデスタル1とコラムサポート
9上に搭載する。
Next, concrete filling work for the reactor pressure vessel steel pedestal 1 will be explained with reference to FIG. First, when the installation of the reactor pressure vessel steel pedestal foundation 7 is completed, the cylindrical bodies 2a to 2d, which are manufactured in parts at the factory, are mounted up to the number of stages on which the diaphragm floor 8 is installed, and assembled by welding or bolting. At this time, there is no need to weld or bolt the 6 parts of the concrete filling pipe. However, although there may be a gap of several millimeters, the upper and lower concrete filling pipes 6 are designed and manufactured so that they fit together. Next, a column support 9 that supports the diaphragm floor 8 from below is installed, and the diaphragm floor 8 is mounted on the reactor pressure vessel steel pedestal 1 and the column support 9.

次に原子炉圧力容器鋼製ペデスタル1上部の鋼製円筒体
2e〜2fを搭載し、前記同様に溶接あるいはボルト接
合で組立てる。一方、ダイヤフラムフロア8上において
は、ベント管10の挿入、植設工事およびベント管挿入
後、パイブホイッブストラクチャ−11の搭載工事が平
行して実施される。ここまでの原子炉圧力容器鋼製ペデ
スタル1の鋼製円筒構造物2の組立てが完了したならば
、鋼製円筒構造物2内にコンクリートを充填するために
、仮設コンクリート充填用配管12を鋼製円筒構造物2
内に補強材5の一部を利用して構成されたコンクリート
充填用配管6に接続する。次にコンクリートを鋼製円筒
構造物2の下段よりこのコンクリート充填用配管6を通
じて充填する。鋼製円筒構造物2内にコンクリートの充
填が完了したならば、コンクリート充填用配管6もコン
クリートに充填する。鋼製円筒構造物2の内筒3、外筒
4および補強材5で囲まれた各空間をコンクリートで充
填するため、数個のコンクリート充填用配管6を鋼製円
筒構造物2は、内部に有しており、予め決められた順に
仮設コンクリート配管12をコンクリート充填用配管6
に接続し、鋼製円筒構造物2内にコンクリートを充填す
る。この充填作業が完了したならば、仮設コンクリート
充填用配管12は、コンクリート充填用配管6までの部
分を一時撤去する。この仮設コンクリート充填用配管1
2の撤去が完了したならば、次に原子炉圧力容器鋼製ペ
デスタル1の更に上部の鋼製円筒構造物2を搭載し、溶
接あるいはボルト接合で原子炉鋼製ペデスタル1を組立
てる。この時、下部の鋼製円筒構造物2と前記同様に、
互いのコンクリート充填用配管6部は、溶接やボルト接
合する必要はない。但し、数ミリメートルの隙間があっ
てもよいが、上部と下部とのコンクリート充填用配管6
は合うように設計・製作しておく。引続き、原子炉圧力
容器鋼製ペデスタル1上部にコンクリートを充填するた
めに、仮設コンクリート配管12をコンクリート充填用
配管6に接続し、原子炉圧力容器鋼製ペデスタル1上部
のコンクリート充填作業を実施する。空間のコンクリー
ト充填作業が完了したならば、コンクリート充填用配管
6もコンクリートを充填しておく。各空間にコンクリー
トを充填するために、数個のコンクリート充填用配管6
を鋼製円筒構造物1内に有する。各空間のコンクリート
充填作業もコンクリート充填用配管6のコンクリート充
填も完了したならば、仮設コンクリート充填用配管12
を撤去し、原子炉圧力容器鋼製ペデスタル1の充填作業
は全完し、原子炉圧力容器鋼製ペデスタル1の据付けも
完了する。
Next, the steel cylindrical bodies 2e to 2f on the upper part of the reactor pressure vessel steel pedestal 1 are mounted and assembled by welding or bolting in the same manner as described above. On the other hand, on the diaphragm floor 8, the insertion and planting work of the vent pipe 10 and the installation work of the pipe whip structure 11 are carried out in parallel after the vent pipe is inserted. Once the assembly of the steel cylindrical structure 2 of the reactor pressure vessel steel pedestal 1 has been completed, in order to fill the steel cylindrical structure 2 with concrete, the temporary concrete filling piping 12 is made of steel. Cylindrical structure 2
It is connected to a concrete filling pipe 6 constructed using a part of the reinforcing material 5 inside. Next, concrete is filled from the lower part of the steel cylindrical structure 2 through this concrete filling pipe 6. When the steel cylindrical structure 2 is filled with concrete, the concrete filling pipe 6 is also filled with concrete. In order to fill each space surrounded by the inner cylinder 3, outer cylinder 4 and reinforcing material 5 of the steel cylindrical structure 2 with concrete, several concrete filling pipes 6 are installed inside the steel cylindrical structure 2. The temporary concrete piping 12 is connected to the concrete filling piping 6 in a predetermined order.
and fill the steel cylindrical structure 2 with concrete. When this filling work is completed, the portion of the temporary concrete filling pipe 12 up to the concrete filling pipe 6 is temporarily removed. This temporary concrete filling pipe 1
2 is completed, next the steel cylindrical structure 2 on the upper part of the reactor pressure vessel steel pedestal 1 is mounted, and the reactor steel pedestal 1 is assembled by welding or bolting. At this time, as in the case of the lower steel cylindrical structure 2,
There is no need to weld or bolt the six sections of concrete filling pipes to each other. However, although there may be a gap of several millimeters, there may be gaps between the upper and lower parts of the concrete filling pipe 6.
Design and manufacture to fit. Subsequently, in order to fill the upper part of the reactor pressure vessel steel pedestal 1 with concrete, the temporary concrete pipe 12 is connected to the concrete filling pipe 6, and the work of filling the upper part of the reactor pressure vessel steel pedestal 1 with concrete is carried out. When the concrete filling work of the space is completed, the concrete filling pipe 6 is also filled with concrete. Several concrete filling pipes 6 to fill each space with concrete.
is included in the steel cylindrical structure 1. Once the concrete filling work in each space and the concrete filling in the concrete filling pipe 6 are completed, the temporary concrete filling pipe 12
has been removed, the filling work for the reactor pressure vessel steel pedestal 1 has been completed, and the installation of the reactor pressure vessel steel pedestal 1 has also been completed.

本実施例の原子炉圧力容器鋼製ペデスタル1によれば、
コンクリート充填用配管6が、予め工場で鋼製円筒構造
物2に内蔵されており、現地における鋼製円筒構造物2
内に仮設コンクリート充填用配管12を布設する作業が
なくなる。また、コンクリート充填用配管6は、鋼製円
筒構造物2の補強材5を利用して構成されており、しか
もコンクリート充填用配管6もコンクリートで充填され
るため、従来実施していたようなコンクリート充填用配
管の撤去作業も必要ない。すなわち、鋼製円筒構造物2
内のコンクリート充填用配管12の布設作業および撤去
作業がなく、鋼製円筒構造物2内のコンクリート充填作
業ができるため、原子炉圧力容器鋼製ペデスタル1の据
付は工事を大幅に短縮することができる。
According to the reactor pressure vessel steel pedestal 1 of this embodiment,
The concrete filling pipe 6 is built into the steel cylindrical structure 2 in advance at the factory, and the steel cylindrical structure 2 is installed at the site.
There is no need to install the temporary concrete filling pipe 12 inside. In addition, the concrete filling pipe 6 is constructed using the reinforcing material 5 of the steel cylindrical structure 2, and since the concrete filling pipe 6 is also filled with concrete, it is not necessary to use the conventional concrete filling pipe 6. There is no need to remove the filling piping. That is, the steel cylindrical structure 2
Since there is no need to install or remove the concrete filling pipe 12 inside the reactor pressure vessel, and the concrete filling work can be done inside the steel cylindrical structure 2, the installation work of the reactor pressure vessel steel pedestal 1 can be significantly shortened. can.

また、原子炉圧力容器鋼製ペデスタル1を構成する閉空
間、すなわち鋼製円筒構造物2内側でのコンクリート充
填用配管布設作業および撤去作業が必要ないことにより
、作業員の安全性の向上が計られる。また、鋼製円筒構
造物2は鋼板で仕切られた各空間にコンクリートが充填
できるよう、複数個のコンクリート充填用配管6を有す
るため、従来実施していた鋼製円筒構造物2内側におけ
るコンクリート充填用の仮設フレキシブル配管の移動作
業もなくなることにより、作業員の安全性の向上が計ら
れるとともに、現地における工数低減も計られる。
In addition, worker safety is expected to be improved by eliminating the need for concrete filling piping installation and removal work in the closed space that constitutes the reactor pressure vessel steel pedestal 1, that is, inside the steel cylindrical structure 2. It will be done. In addition, since the steel cylindrical structure 2 has a plurality of concrete filling pipes 6 so that each space partitioned by steel plates can be filled with concrete, concrete filling inside the steel cylindrical structure 2, which was conventionally carried out, is By eliminating the need to move temporary flexible piping, worker safety will be improved and man-hours on site will also be reduced.

なお、上記実施例では原子炉圧力容器用鋼製ペデスタル
について説明したが、これに限ることなく、他の構築物
、橋梁の土台等の建設にも適用できる。
In the above embodiment, the steel pedestal for a nuclear reactor pressure vessel has been described, but the present invention is not limited to this, and can be applied to the construction of other structures, bridge foundations, etc.

[発明の効果] 本発明によれば、予めコンクリート充填用配管を取着し
ているため、従来例のように鋼製ペデスタルを構成する
閉空間での、コンクリート充填用配管の布設作業および
撤去作業が不要となり、鋼製ペデスタルの据付は工程を
大幅に短縮することができる。また、鋼製ペデスタルを
構成する閉空間における作業が低減されることにより、
作業員の安全性の向上および工数低減など多くの効果を
発揮する。
[Effects of the Invention] According to the present invention, since the concrete filling piping is installed in advance, the work of laying and removing the concrete filling piping in a closed space constituting a steel pedestal as in the conventional example is eliminated. This eliminates the need for steel pedestals, and the process for installing steel pedestals can be significantly shortened. In addition, by reducing the work required in the closed space that makes up the steel pedestal,
It has many effects such as improving worker safety and reducing man-hours.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は、本発明に係る原子炉圧力容器鋼製ペデスタル
の一実施例を示す断面図、第2図は、第1図における鋼
製円筒構造物の鳥ホ図、第3図は、沸騰水形原子炉を示
す断面図、第4図は、従来の原子炉圧力容器鋼製ペデス
タルを示す断面図である。 1・・・・・・・・・原子炉圧力容器鋼製ペデスタル2
・・・・・・・・・鋼製円筒構造物 6・・・・・・・・・コンクリート充填用配管12・・
・・・・・・・仮設コンクリート充填用配管代理人 弁
理士 則 近 憲 佑 同   第子丸  健 邑 「0 J D 寸 へ1
FIG. 1 is a sectional view showing an embodiment of a steel pedestal for a nuclear reactor pressure vessel according to the present invention, FIG. 2 is a bird's-eye view of the steel cylindrical structure in FIG. 1, and FIG. FIG. 4 is a sectional view showing a water reactor, and FIG. 4 is a sectional view showing a conventional nuclear reactor pressure vessel steel pedestal. 1...Reactor pressure vessel steel pedestal 2
......Steel cylindrical structure 6...Pipe for concrete filling 12...
......Temporary concrete filling piping agent Patent attorney Nori Chika Ken Yudo Daishimaru Kenmura ``0 J D size 1

Claims (1)

【特許請求の範囲】[Claims] 同心円状の複数の短尺円筒体を積重ねて長尺化した鋼製
円筒構造物と、この円筒構造物内に設けられた補強材と
、この補強材または前記円筒構造物の内面に取着された
コンクリート充填用配管とを具備したことを特徴とする
鋼製ペデスタル。
A steel cylindrical structure made of a plurality of concentric short cylindrical bodies stacked one on top of the other, a reinforcing material provided within the cylindrical structure, and a reinforcing material attached to the reinforcing material or the inner surface of the cylindrical structure. A steel pedestal characterized by being equipped with concrete filling piping.
JP63198001A 1988-08-10 1988-08-10 Pedestal made of steel Pending JPH0247588A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63198001A JPH0247588A (en) 1988-08-10 1988-08-10 Pedestal made of steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63198001A JPH0247588A (en) 1988-08-10 1988-08-10 Pedestal made of steel

Publications (1)

Publication Number Publication Date
JPH0247588A true JPH0247588A (en) 1990-02-16

Family

ID=16383863

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63198001A Pending JPH0247588A (en) 1988-08-10 1988-08-10 Pedestal made of steel

Country Status (1)

Country Link
JP (1) JPH0247588A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9081085B2 (en) 2011-11-09 2015-07-14 Panasonic Intellectual Property Management Co., Ltd. Spread spectrum radar apparatus and method of controlling the same
US10600519B2 (en) 2011-03-18 2020-03-24 Rolls-Royce Plc Nuclear reactor module

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10600519B2 (en) 2011-03-18 2020-03-24 Rolls-Royce Plc Nuclear reactor module
US9081085B2 (en) 2011-11-09 2015-07-14 Panasonic Intellectual Property Management Co., Ltd. Spread spectrum radar apparatus and method of controlling the same

Similar Documents

Publication Publication Date Title
US6536181B1 (en) Composite retaining wall and construction method for underground structure
CN212716623U (en) Corrugated plate well cementation foundation structure and subway vertical shaft
US5119598A (en) Method of construction of top slab for a nuclear containment building
JPH11337675A (en) Reactor containment vessel and its construction method
JPH0247588A (en) Pedestal made of steel
JP3283735B2 (en) Method for constructing upper dry well of reactor containment vessel and module used for the method
US5748690A (en) Construction method of nuclear reactor reinforced concrete containment vessel and diaphragm floor structure of nuclear reactor reinforced concrete containment vessel
JP4352071B2 (en) Construction method of reactor containment vessel
JP3340871B2 (en) Reactor containment vessel
SU977176A1 (en) Apparatus for installing underground reinforced concrete vessels
KR100517121B1 (en) Reactor structure inner type refueling water storage tank for nuclear fuel of nuclear power plant
JPS6331075B2 (en)
JPH03501280A (en) Method of constructing concrete columns for platforms or similar structures and column parts for similar uses
JPS63308B2 (en)
JPS581037B2 (en) Construction method of lining tank
JPH04285893A (en) Construction method of cylindrical reinforced concrete containment vessel
JPH08166485A (en) Containment vessel
JPS6145745B2 (en)
JP3309538B2 (en) Construction method of reactor containment diaphragm floor
JPH0672095U (en) Top slab structure of containment vessel
JPS6145746B2 (en)
JP3308761B2 (en) Reactor containment vessel construction method
JPS6270792A (en) Method of constructing ceiling section of container for nuclear reactor and turus support used for said constriction
JPH09310442A (en) Roof structure
JPH064696U (en) Concrete containment diaphragm floor structure