JPH0249973U - - Google Patents

Info

Publication number
JPH0249973U
JPH0249973U JP12817888U JP12817888U JPH0249973U JP H0249973 U JPH0249973 U JP H0249973U JP 12817888 U JP12817888 U JP 12817888U JP 12817888 U JP12817888 U JP 12817888U JP H0249973 U JPH0249973 U JP H0249973U
Authority
JP
Japan
Prior art keywords
frames
insertion portions
bottom framework
support frames
members
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP12817888U
Other languages
Japanese (ja)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to JP12817888U priority Critical patent/JPH0249973U/ja
Publication of JPH0249973U publication Critical patent/JPH0249973U/ja
Pending legal-status Critical Current

Links

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Types And Forms Of Lifts (AREA)

Description

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本考案による住宅用エレベータの概略
構成を示す左側面図、第2図はその正面図、第3
図は第2図の―断面図、第4図は本考案によ
る昇降路の構成を示す分解斜視図、第5図はラツ
クポールの固定部を示す斜視図、第6図はラツク
ポール固定部の他の実施例を示す斜視図、第7図
はケージの上面および下面に軸支されるピニオン
、アイドラプーリの軸支状態を示す斜視図である
。 1……昇降路、2……ゲージ、3……ラツクポ
ール、4,5……滑車、6……ワイヤロープ、1
1……底部枠組、11a……支柱挿入部、12…
…側部支柱枠組、12a……前部支柱、12b…
…後部支柱、12c……横桁、13……横桁枠組
、14……頂部枠組、15……横桁部材、16…
…接続管、17……筋かい部材、18……係止具
、21……開閉扉、22……天板上面、23……
底板下面、31……ラツク歯、33……固定金具
、34……固定ボルト、35……取付けブラケツ
ト、41……ピニオン、42……アイドラプーリ
、46……駆動モータ、48……緊急ブレーキ装
置。
Fig. 1 is a left side view showing the schematic configuration of a residential elevator according to the present invention, Fig. 2 is a front view thereof, and Fig. 3
The figure is a sectional view of FIG. 2, FIG. 4 is an exploded perspective view showing the configuration of the hoistway according to the present invention, FIG. 5 is a perspective view showing the rack pole fixing part, and FIG. FIG. 7 is a perspective view showing the embodiment, and FIG. 7 is a perspective view showing the pinion and idler pulley supported on the upper and lower surfaces of the cage. 1... Hoistway, 2... Gauge, 3... Rack pole, 4, 5... Pulley, 6... Wire rope, 1
1... Bottom framework, 11a... Pillar insertion part, 12...
...Side support frame, 12a...Front support, 12b...
... Rear strut, 12c... Cross beam, 13... Cross beam framework, 14... Top framework, 15... Cross beam member, 16...
... Connection pipe, 17 ... Bracing member, 18 ... Locking tool, 21 ... Opening/closing door, 22 ... Top plate top surface, 23 ...
Lower surface of bottom plate, 31...Rack tooth, 33...Fixing metal fittings, 34...Fixing bolt, 35...Mounting bracket, 41...Pinion, 42...Idler pulley, 46...Drive motor, 48...Emergency brake device .

Claims (1)

【実用新案登録請求の範囲】 4隅に角パイプ製の支柱を立設し、各支柱間に
横桁と筋かい部材を所要段数架設して個人住宅用
エレベータの昇降路を構成するものにおいて、 4隅に角パイプを切断して形成した支柱挿入部
を配置し、この支柱挿入部に連結部材を溶着して
なる底部枠組と、 上記底部枠組の支柱挿入部に嵌着される接続管
を下端部に固着してなる前部および後部支柱の上
部を横桁により連結してなる左右一対の側部支柱
枠組と、 上記側部支柱枠組の後部を連結する支柱および
横桁からなる横桁枠組と、 4隅の各支柱枠組上端部に嵌着される前部支柱
および後部支柱を連結部材により溶着してなる頂
部枠組と、 上記各支柱枠組の周囲で、正面側出入口部を除
いた適正位置に組付けられるフツク状締付金具を
有する横桁部材と、 上記各支柱枠組の対角線上に張設される筋かい
部材とを備え、 上記底部枠組の上方に側部支柱枠組と横桁枠組
を複数段連接した後、上記各支柱枠組の支柱間、
および底部枠組、頂部枠組と各支柱枠組の対角線
上に筋かい部材を張設してなることを特徴とする
住宅用エレベータの昇降路。
[Scope of Claim for Utility Model Registration] A hoistway for an elevator for a private residence is constructed by erecting pillars made of square pipes at the four corners and installing the required number of crossbeams and bracing members between each pillar, A bottom framework is formed by arranging strut insertion portions formed by cutting square pipes at the four corners and welding connecting members to the strut insertion portions, and connecting pipes fitted into the strut insertion portions of the bottom framework are attached to the lower end. a pair of left and right side support frames, which are formed by connecting the upper parts of the front and rear supports that are fixed to each other by a crossbeam; , a top frame formed by welding the front and rear columns fitted to the upper ends of each of the four corner column frames with connecting members; A cross beam member having a hook-like fastening fitting to be assembled, and a bracing member stretched diagonally to each of the above-mentioned support frames, and a plurality of side support frames and cross-beam frames are arranged above the bottom framework. After connecting the stages, between the pillars of each of the above pillar frameworks,
and a hoistway for a residential elevator, characterized in that bracing members are stretched diagonally across the bottom frame, the top frame, and each support frame.
JP12817888U 1988-09-29 1988-09-29 Pending JPH0249973U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP12817888U JPH0249973U (en) 1988-09-29 1988-09-29

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP12817888U JPH0249973U (en) 1988-09-29 1988-09-29

Publications (1)

Publication Number Publication Date
JPH0249973U true JPH0249973U (en) 1990-04-06

Family

ID=31381269

Family Applications (1)

Application Number Title Priority Date Filing Date
JP12817888U Pending JPH0249973U (en) 1988-09-29 1988-09-29

Country Status (1)

Country Link
JP (1) JPH0249973U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03243586A (en) * 1990-02-20 1991-10-30 Nissei Build Kogyo Co Ltd Tower unit for home elevator
JP2019527781A (en) * 2016-07-20 2019-10-03 ヴォッベン プロパティーズ ゲーエムベーハーWobben Properties Gmbh Supply scaffold, scaffold module, tower, wind turbine, and method of building and / or operating a supply scaffold to be placed inside a tower and method of building a tower

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4942134A (en) * 1972-08-22 1974-04-20

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4942134A (en) * 1972-08-22 1974-04-20

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03243586A (en) * 1990-02-20 1991-10-30 Nissei Build Kogyo Co Ltd Tower unit for home elevator
JP2019527781A (en) * 2016-07-20 2019-10-03 ヴォッベン プロパティーズ ゲーエムベーハーWobben Properties Gmbh Supply scaffold, scaffold module, tower, wind turbine, and method of building and / or operating a supply scaffold to be placed inside a tower and method of building a tower

Similar Documents

Publication Publication Date Title
JPH0249973U (en)
JP3199870B2 (en) Composite panel loading rack
JPH08284291A (en) Partition wall
JPH08324918A (en) Structure of elevator
JP2528505Y2 (en) Unit bus opening reinforcement structure
JPS5851285Y2 (en) bay window device
CN221703006U (en) An elevator steel structure shaft preventing tilting and sinking
JPH0510089Y2 (en)
JP3349262B2 (en) handrail
JP2532912Y2 (en) Staircase equipment
JPH0247125Y2 (en)
JPH0732679Y2 (en) External wall panel mounting structure
JPH078718Y2 (en) Top handrail device for suspended scaffolding
JPH0765355B2 (en) Exterior wall panel
JPH08324919A (en) Structure of elevator
JPH0352893Y2 (en)
JP2892197B2 (en) House closet structure and construction method
JPH0354242Y2 (en)
JPS6217526Y2 (en)
JPH0416838Y2 (en)
JP2895138B2 (en) Method of forming load-bearing panel for building
JPH0640721Y2 (en) Prefabricated small building
JPH076226B2 (en) How to assemble the balcony
JPH02167941A (en) Connecting structure of building unit
JPS63200574U (en)